CP Lee
Vice President of Human Resources
Asia Pacific region
Motorola Inc.
100,000
66,810
10,000
6,210
1,000
DPMO
233
100
10
3.4
1
31 42 35 6
4
Sigma
Quality Goal Setting
100,000
66,810 or 3.00 sigma
10,000
6,810 or 3.97 sigma
1,000
681 or 4.70 sigma
DPMO
100
68 or 5.34 sigma
10
7 or 5.85 sigma
1
1988
1 1990
2 1992
3 1994
4 1996
5
Time (Years)
Motorola’s Quality Roadmap
+
Establish A Culture Where Quality is Priority #1
How Do The Pieces Fit Together?
Execute The Apply The
Focus on The Deploy The
Right Right Quality
Right Quality Right Quality
Improvement Methods &
Targets Team
Projects Systems
3. Ensure there is a plan to convert 50% of top talent interns to FT at each strategic site. Roshny
3. Standardize intern management process
regionally to insure better conversion to FT.
4. a) 20 BLDP/ SCLP rotational opportunities, at least one in each strategic site. b) Final
Aggressively develop, deploy and
How we talk
Dassatti, C. Director Development Contingent
placement offers to at least 4 graduating BLDPs Q2. c) Attract at least 5 BLDPs to rotate
connect critical talent pools to drive workforce
in SC each period (ongoing). d) Achieve 50% diversity goal in new BLDP selection (Q2)- Roshny
Ross, N. University Relations management 4. BLDP sponsorship & rotation/final placement
growth (Manpower, Inside the supply chain and launch SCLP
5. a) Agreed-upon supplier scorecard with Manpower Q1 b) Each site must
third party
have common agreed-upon service-level agreement and KPIs with their respective
vendors) 5. Apply supplier performance management
contract providers by Q2. Marty/Michael
to our relationships w/Manpower. Site specific
Improve the organizational health of service level agreement, ID secondary source
6. a) Will identify/evaluate the use of a second-source cost-competitive at 4 major site locations by end of
HR, enhancing its ability to function Theros, C. HR Development for all key locations, ensure commonality of Q4 and take action. b) Reduction in overall cost and to Motorola for DL in all strategic sites $ 3M by year end
vendor util. across SC . Marty/Michael/Esther/Patty/Hanjoerg/Corvini
effectively, grow and develop
7.Improved service delivery by the ARMS provider as determined by all measures green by year end on
supplier scorecard and KPI’s. Marty/Michael
Data Privacy Mfg & Service Supply Chain 1. Complete the execution of phase one 2. Design new organization, align HC and ensure seamless operations (org design
Optimization Transformation Transformation. Initiate Phase two projects in Q1 to be implemented and staffing of jobs by customer required due dates) transition talent. Drive
next level completed by Dec 2006. Change as per plan. Marty/Michael/Patty/Marti/Hanjoerg/Corvini
2. Implement Triathlon - Rationalization of locations
& IDL usage across the SC. 3.Staff the jobs by customer required due date with appropriate local talent
Marty/Michael/Patty/Marti/Hanjoerg/Corvini/Jim
High-Performance Organization 3. Successfully manage ISC acquisitions, alliances, and/or
OD Skill Infusion divestititure initiatives
Drive high performance framework Pearson, F. PM Process Improvement 4. Europe: align GL&F SC organization and processes to
network structure (work on this)
for Motorola Regional
Engagement Dimensions Alignment:
5. Successfully identify talent to support SC initiatives (Q2)
Global Sales & Service India & Europe (India strategy/Regional alignment /Asia/Regional Control
Towers)
Bus/Reg Dashboard
Theros, C. Leadership Academy
development System View
MOTOROL A CONFIDE NT IAL PROPRIET ARY HR Qu arte rly Sco ring Inde x 2 006
Quality Plan
into the newly formed Networks & Enterprise business. IMO, functional & business integration teams, etc.), help drive the business goal to “plan &
execute full integration of these two businesses swiftly, thoughtfully, and effectively with minimal
disruption to our businesses and customer commitments”.
2. Efficiently and effectively transition the Automotive Partnering with the Continental AG human resources & business teams, plan & execute a
business to Continental AG prior to the end of Q2. smooth transition of the Motorola Automotive business, with minimal disruption to businesses
operations, customer commitments, and our employees’ lives.
3. Profitable growth of the Networks & Enterprise business. Provide leadership & the tools to drive a 10% reduction in the cost of management (1/06 vs.
Compulsory
bottom 2 Box score 16% >15% 11%-15% <11%
Open Door 85
ER Sat
Survey started 12/05 Project plans & timelines established 70%
bottom 2 Box score Rebase in May 06 >7.5% 7.5%-2.5% <2.5%
charts
External Charges 3
OPERATIONAL QUALITY DRIVERS
2006 Targets
Signing & announcement 100%
2005
Measure Description
Baseline MISS ACHIEVE EXCEED Weights Global rollout of communications
100%
Goal updates
12/30 VP Successors ‘
Recruiting and Onboarding
Process Maturity
obtain maturity level of 3.0 by None Level 2 Level 3 Level 4
Staffing 12/30
Cost of Management Actual Cost of Mgmt ‘
Initial target population (E13 – E15)
COST /PRODUCTIVITY 100% New Manager Training ‘
identified (GEMS only)
2005 2006 Targets
Measure Description Assessment methodology & training tools Cost of Labor ‘
Baseline MISS ACHIEVE EXCEED Weights 70%
Project work
Hacket Study
HR Costs HR Costs as a % of Sales Benchmark - .50 .37% .35% .33% Project plans & timelines established 70% ‘ ‘
2005 - .35%
Platform Roadmaps
March 6th, 2006
System View
• Review and coach vital few HR projects in A/P 2006 HR : Big Y’s Sponsor: Chris Theros Lead: David Rider Quality Y’s:
How we know
1. Provide relevant, consistent, timely information that Strategic Intent: 1. Deploy HR quality strategy (4,2)
facilitates senior level business decisions. Design and deploy a system of basic operational disciplines that
allows HR to collectively navigate strategy to detailed execution. 2. Deploy and Confirm a sound systematic
2. Meet HR's fiduciary responsibilities.
A system that establishes measurement system (4)
3. Improve the organizational health of HR, enhancing it's
ability to function effectively, grow and develop. • Proper ownership and accountabilities for Quality execution 3. Design and Deploy proper, review
4. Drive the quality of staffing solutions to result in significant • Management of regular work, project work and defects forums(4,2)
improvement in the user experience of candidates and • Role clarity within the HR org design 4. Institutionalize DSS approach in HR (4)
• Robust Measurement
Systems - Rider
Baseline VOC
ID Change Team
Internal
HR Audit
External DSS
Audit
Measure Gaps
ID Controls
Status Perf
External
HR DSS
Audit
Process
Maturity
Status Perf
• Improve data quality by 15%.
• Achieve level 2 maturity
Ops Reviews
• HR Quality Plan – Focused • Quantifiable Measures
on Staffing Gaps
Measure Wins Analyze Improve/Control Solutions
Implemented Implemented
(DMAIC Analysis) - Jackson
•Issues Resolution
System View
•Decision Making
•Commitment Status Project Updates Execute Well
•Business Impact HR Quality- Quality Vital Signs
Objective: Drive HR quality competency development and
understanding of Motorola’s total approach to quality
Milestones:
White Belt PHASE 1: Sponsorship
31 Mar - Rey More SHRLT Meeting
February 7, 2006
Quantifiable
•Global Deployment
Goals: 30 April - SHRLT member belt plan
•Provide proper sponsorship, training, mentoring, and support 15 May - Initiate CIC2006 Training
Results
for W hite Belt and professional Belt growth within HR
White Belt PHASE 2: Deployment
Results & Targeted performance levels April – Nov Monthly monitor to plan
• 80% of HR population attain White Belt by 12/31/06
• 50% increase in GB/BB population within HR by 12/31/06 GB / BB
28 Feb – Set up proper HR MBB role in DSS.mot.com
HR GB / BB Plans HR White Belt Plans 30 mar – All official GB / BB candidates registered in
•Cost
80% of HR population
50% increase system
April – Nov Monthly monitor to plan
800
30 30 Mar - Protocol for HR approval documented at
# of Belts
# of Belts
600 communicated
20
400 30 Nov – Grandfather GB comes to close
10
200
•Quality
0 0
Jan
Jun
July
Mar
Feb
Q3
Q4
Apri
May
Nov
Jan
June
July
Mar
Feb
Aug
April
Sept
Oct
May
Dec
% of HR completed
Committed Resources:
Sponsor: Owner:
• CIC 2004 – 78%
• CIC 2006 – 0%
BB:
Changes: Problem / Opportunities
• CIC2006 is to be taught by HR VP’s, we need a way to get them
prepared.
Decisions/Actions required:
•Cycle Time
• Each SHRLT personalize plan for their organizations belt development
•Say / Do
Chris Theros Susan Waldman Dave Rider
System View
Examples of DSS Projects
• Optimization of Work Shift Patterns
• Electronics Relocation Activation
Process
• Hiring Cycle Time Reduction
• Operation Efficiency of Motorola
University
D M A I C
Voice of Customer
D M A I C
Make our
Business Case Customer Happy!
(On Time Assignment)
• Motorola’s Expatriate program potentially affects all Motorolans.
ACS’ Global Assignment Center – “the GAC”
GAC – plays a critical role in assisting Motorola
in its end-to-end relocation efforts.
• eRAP
Unfortunately, the entire Expatriate process has proven at times to be both lengthy and
cumbersome. Specifically, a lot of dissatisfaction and inefficiencies have centered
Project
around the time involved in initiating an International Relocation assignment.
3 3 6
1 ATL 4 1,003,475
2 YICT Class I 13 607,476
5 Supplier GB 9 1,605,451
6 Supplier BB 8 3,120,878
7 China Mobile Kaifong Branch 1 716,588
Total 37 9 7,913,961
On Going Projects:
1 BYD 13
2 YICT 10
3 CAOE 18 4
4 Haier 10
5 Nidec 3
6 Flextronics 3