Prepared by:
M Ridwan, Dr, ST, M.Eng
mridwan2000@yahoo.com
http://www.geosindoutama.co.id
Outline
1. Pendahuluan
2. Spesifikasi Tiang Pancang
3. Daya Dukung Tiang Tunggal
Berdasarkan Data CPT
4. Daya Dukung Tiang Tunggal
Berdasarkan Data SPT
5. Studi Kasus
1
10/7/2019
PENDAHULUAN
Daya Dukung Tiang Tunggal
Qu = Qp + Qs – Wp
Qall = Qu SF
Qu = daya dukung tiang ultimit (batas)
L Qs
Qp = daya dukung ujung tiang
2
10/7/2019
3
10/7/2019
4
10/7/2019
L Qs
Qp
D
P =(qc*Ap)/3 + (JHL*L)/5
P = Daya dukung tiang pancang ijin (kg)
qc = Nilai konus (kg/cm2)
Ap = Luas penampang tiang pancang (cm2)
L = Keliling penampang tiang (cm1)
JHL = Jumlah hambatan lekat
SF = Safety factor ; 3 dan 5
5
10/7/2019
6
10/7/2019
7
10/7/2019
8
10/7/2019
-0.00
N1 = 22
-3.00
N2 = 35
-6.00
N3 = 48
-9.00
N4 = 49
-12.00
N5 = 50
-15.00
N6 = 55
9
10/7/2019
N = 49
8D
N = 50
3D
N = 55
Np = (N4 + N5 + N6)/3
Np = (49 + 50 + 55)/3 = 51,33 ~ 52
Ns = (N1+N2+N3+N4 + N5)/5
Ns = (22+35+48+49 + 50)/5 = 40,8 ~ 41
10/7/2019 DR M RIDWAN, ST, M.ENG 20
10
10/7/2019
Studi Kasus:
Pembangunan Warehouse Penajam PPU
11
10/7/2019
Studi Kasus:
Pembangunan Warehouse Penajam PPU
SPT Blow Count, N (blows/ft) 0
10
15
20
25
30
35
40
45
50
55
60
65
70
0
5
0 -2
-2
-4 -4
-6
-8 -6
-10 S.01 S.02
-12 -8
-14
-16 -10
-18 S.03 S.04
-20 -12
-22
Ground Elevation, (m)
20
40
60
80
100
120
140
160
180
200
220
240
260
280
10/7/2019 DR M RIDWAN, ST, M.ENG 23
Studi Kasus:
Pembangunan Warehouse
Penajam PPU
Pile Allowable Compression & Tension Capacity
Effective Pile
Pile Size
Length Ultimite Allowable
Ultimite Friction Ultimite Base Ultimite Friction Pile Eff. Weight AllowableTension
Compression Compression
Resistence Resistence Resistence (Wp) Bearing Capacity
Bearing Capacity Bearing Capacity
12
10/7/2019
Studi Kasus:
Pembangunan Warehouse
Penajam PPU
Pile Allowable Compression Capacity (kN)
Pile Allowable Tension Capacity (kN)
1000
1100
1200
1300
1400
100
150
200
250
300
350
400
450
500
100
200
300
400
500
600
700
800
900
50
0
0
0 0
-2 Pile dia.30 -2 Pile dia.30
-4 -4
Pile dia.40 Pile dia.40
-6 -6
Pile dia.50 Pile dia.50
-8 -8
-10 -10
-12 -12
-14 -14
-16 -16
-18 -18
-20 -20
-22 -22
-24 -24
-26 -26
-28 -28
-30 -30
Pembangunan Warehouse
Penajam PPU
PILE ALLOWABLE COMPRESSION & TENSION CAPACITY (kN)
Project : Pembangunan Warehouse
Lokasi : Gudang 3 (ASTRA INFRA PORT) Penajam,PPU - Kal-Tim
Data : BH.01
Struktur : Gudang
(cm) (m) Qs (kN) Qb (kN) (kN) (kN) Qs (kN) (kN) (kN) (mm)
13
10/7/2019
Pembangunan Warehouse
Penajam PPU
Pile Allowable Compression Capacity (kN) Pile Allowable Tension Capacity (kN)
1000
1200
1400
1600
1800
2000
2200
2400
2600
2800
3000
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2400
2600
2800
3000
3200
3400
3600
3800
4000
200
400
600
800
0
0
0 0
-2 Pile dia.30 -2 Pile dia.30
-4 -4
-6 -6
-8 Pile dia 40 -8 Pile dia.40
-10 -10
-12 -12
-14 Pile dia 50 -14 Pile dia.50
-16 -16
-18 Pile dia.60 -18
-20 -20 Pile dia.60
Ground Level ( meter)
-22 -22
14