DAYA DUKUNG AKSIAL


PONDASI DALAM
BERDASARKAN DATA
LAPANGAN

Prepared by:
M Ridwan, Dr, ST, M.Eng
mridwan2000@yahoo.com
http://www.geosindoutama.co.id

Outline
1. Pendahuluan
2. Spesifikasi Tiang Pancang
3. Daya Dukung Tiang Tunggal
Berdasarkan Data CPT
4. Daya Dukung Tiang Tunggal
Berdasarkan Data SPT
5. Studi Kasus

10/7/2019 DR M RIDWAN, ST, M.ENG 2

1
10/7/2019

PENDAHULUAN
Daya Dukung Tiang Tunggal
Qu = Qp + Qs – Wp
Qall = Qu  SF
Qu = daya dukung tiang ultimit (batas)
L Qs
Qp = daya dukung ujung tiang

Qall = daya dukung tiang ijin

Qs = daya dukung gesekan selimut tiang


Q
Wp = berat sendiri tiang p D

SF = faktor keamanan (safety factor)

10/7/2019 DR M RIDWAN, ST, M.ENG 3

Spesifikasi Tiang Pancang

10/7/2019 DR M RIDWAN, ST, M.ENG 4

2
10/7/2019

Spesifikasi Tiang Pancang

10/7/2019 DR M RIDWAN, ST, M.ENG 5

Spesifikasi Tiang Pancang

10/7/2019 DR M RIDWAN, ST, M.ENG 6

3
10/7/2019

Spesifikasi Tiang Pancang

10/7/2019 DR M RIDWAN, ST, M.ENG 7

Spesifikasi Tiang Pancang

10/7/2019 DR M RIDWAN, ST, M.ENG 8

4
10/7/2019

Daya Dukung Tiang Tunggal


Berdasarkan Data CPT (Sondir)

L Qs

Qp
D

10/7/2019 DR M RIDWAN, ST, M.ENG 9

Daya Dukung Tiang Tunggal


Berdasarkan Data CPT

P =(qc*Ap)/3 + (JHL*L)/5
P = Daya dukung tiang pancang ijin (kg)
qc = Nilai konus (kg/cm2)
Ap = Luas penampang tiang pancang (cm2)
L = Keliling penampang tiang (cm1)
JHL = Jumlah hambatan lekat
SF = Safety factor ; 3 dan 5

10/7/2019 DR M RIDWAN, ST, M.ENG 10

5
10/7/2019

Daya Dukung berdasarkan Data


CPT
Contoh Soal 1
Suatu tiang pancang, dari hasil pemeriksaan
sondir pada tanah pendukung menunjukkan
bahwa qc pada kedalaman 25 m adalah 250
kg/cm2 dan JHP adalah 1800 kg/cm2 .
Digunakan Tiang 400/400 mm
Hitung daya dukung tanah menurut
pemeriksaan sondir
P = (qc*Ap)/3 + (JHL*Ka)/5
= (250*40*40)/3 + (1800*40*4)/5
= 133,333+57,600
= 190933 kg
= 190.9 Ton
10/7/2019 DR M RIDWAN, ST, M.ENG 11

Daya Dukung berdasarkan Data


CPT
Contoh Soal 2
Suatu tiang pancang, dari hasil pemeriksaan sondir pada tanah
pendukung menunjukkan bahwa qc pada kedalaman 40 m adalah
40 kg/cm2 dan JHP adalah 2500 kg/cm2 . Digunakan tiang
diameter 450 mm.
Hitung daya dukung tanah menurut pemeriksaan sondir
Jawab :
Ap = 0.16 m2 = 1600 cm2
O = π . 0,45 = 1,413 m = 141,3 cm
Qall = qc Ap /3 + JHP.O/5
Qall = 40 .1600 / 3 + 2500 . 141,3 / 5
Qall = 21333.33 + 70650 kg
Qall = 91983.33 kg = 91.98 ton

10/7/2019 DR M RIDWAN, ST, M.ENG 12

6
10/7/2019

Daya Dukung Berdasarkan Data SPT


Standard Penetration Test (SPT)
Rumus:
Qult (kN)= m Na As + n Nb Ap
m = koefesien perlawanan gesek
n = Koefesien perlawanan Ujung
N = Nilai SPT

Faktor koreksi Nilai jumlah pukulan SPT, N


Koreksi Ujung (dasar) tiang; Nb = 0.5 (N1 + N2) ≤ 40
N1 = nilai N ujung pada tiang
N2 = nilai rata-rata ujung tiang 4B diatas ujung tiang
B = lebar tiang

10/7/2019 DR M RIDWAN, ST, M.ENG 13

Daya Dukung Berdasarkan Data


SPT
Untuk tanah pasir sangat halus (fine sand) atau tanah pasir kelanauan
(silty sand ) yang terletak dibawah muka air tanah, nilai N cenderung
lebih tinggi karena permeabilitas yang lebih rendah maka nilai N perlu
dikoreksi sbb:
N = 15 + 0.5 (Nlap – 15)…………untuk N > 15
Nlap = nilai SPT lapangan
Bila Nlap , 15, nilai N = Nlap

10/7/2019 DR M RIDWAN, ST, M.ENG 14

7
10/7/2019

Daya Dukung Berdasarkan Data


SPT
Nilai tipikal koefesien-koefesien m dan n
JENIS TANAH JENIS TIANG n (base) m (skin) BATASAN
1 Meyerhof (1976)
Pasiran Pondasi dalam 400 2
Lempungan 5
2. Okahara (1992)
Pasiran Tiang Pancang 400 2 ≤ 100 kN/m2
Cor ditempat 120 5 ≤ 200 kN/m2
Inner digging 1 ≤ 50 kN/m2
Kohesif Tiang Pancang 10 ≤ 150 kN/m2
Cor ditempat 10 ≤ 150 kN/m2
Inner digging 5 ≤ 100 kN/m2
3. Takahashi (1992)

Pasiran Tiang pancang 300 2

10/7/2019 DR M RIDWAN, ST, M.ENG 15

Daya Dukung Berdasarkan Data


SPT

10/7/2019 DR M RIDWAN, ST, M.ENG 16

8
10/7/2019

Daya Dukung Berdasarkan Data SPT

10/7/2019 DR M RIDWAN, ST, M.ENG 17

Daya Dukung Berdasarkan Data SPT


Contoh: Nilai Hasil SPT

-0.00
N1 = 22
-3.00
N2 = 35
-6.00

N3 = 48
-9.00
N4 = 49
-12.00

N5 = 50
-15.00
N6 = 55

10/7/2019 DR M RIDWAN, ST, M.ENG 18

9
10/7/2019

Daya Dukung Berdasarkan Data SPT

Penentuan Nilai SPT pd Ujung Tiang

N = 49

8D
N = 50

3D
N = 55

Np = (N4 + N5 + N6)/3
Np = (49 + 50 + 55)/3 = 51,33 ~ 52

10/7/2019 DR M RIDWAN, ST, M.ENG 19

Daya Dukung Berdasarkan Data SPT

Penentuan Nilai SPT pd Skin Tiang


-0.00
N1 = 22
-3.00
N2 = 35
-6.00
N3 = 48
-9.00
N4 = 49
-12.00
N5 = 50
-15.00

Ns = (N1+N2+N3+N4 + N5)/5
Ns = (22+35+48+49 + 50)/5 = 40,8 ~ 41
10/7/2019 DR M RIDWAN, ST, M.ENG 20

10
10/7/2019

Daya Dukung Berdasarkan Data


SPT
Qult = Qp + Qs
Teg. Ujung Qp yang terjadi:
Qp = Ap .40. N. L/D ≤ Ap. 400. N

Contoh digunakan D=0.4m ; L=15 m


Ap = ¼. Π. D2 = ¼.Π.0.42=0.126m2
Qp = 0.126 * 40* 52* (15/0.4) ≤ 0.126 * 400 * 52
= 9828 ≥ 2620.8 kN. Digunakan 2620.8 kN

Teg friksi (Qs):


Qs = (2N).As = (2*41)*0.4Π*15 = 1544.88 Kn
Qa = (Qp/SF) + (Qs/SF) = (2620,8/3) + (1544.88/1.5) = 1903,52 kN

10/7/2019 DR M RIDWAN, ST, M.ENG 21

Studi Kasus:
Pembangunan Warehouse Penajam PPU

10/7/2019 DR M RIDWAN, ST, M.ENG 22

11
10/7/2019

Studi Kasus:
Pembangunan Warehouse Penajam PPU
SPT Blow Count, N (blows/ft) 0
10
15
20
25
30
35
40
45
50
55
60
65
70
0
5

0 -2
-2
-4 -4
-6
-8 -6
-10 S.01 S.02
-12 -8
-14
-16 -10
-18 S.03 S.04
-20 -12
-22
Ground Elevation, (m)

Ground Elevation, (m)


-24
-26 -14
-28
-30 -16
-32
-34 -18
-36
-38 -20
-40
-42 -22
-44
-46 -24
-48
-50 BH-1
-52 -26
-54 BH-2
-56 -28
-58 qc (Kg/cm2)
-60 -30
0

20

40

60

80

100

120

140

160

180

200

220

240

260

280
10/7/2019 DR M RIDWAN, ST, M.ENG 23

Studi Kasus:
Pembangunan Warehouse
Penajam PPU
Pile Allowable Compression & Tension Capacity

Project : Pembangunan Warehouse


Lokasi : Gudang 3 (ASTRA INFRA PORT) Penajam, PPU - Kal-Tim
Data : CPT S.01

Pile Allowable Compression Capacity Pile Allowable Tension Capacity

Effective Pile
Pile Size
Length Ultimite Allowable
Ultimite Friction Ultimite Base Ultimite Friction Pile Eff. Weight AllowableTension
Compression Compression
Resistence Resistence Resistence (Wp) Bearing Capacity
Bearing Capacity Bearing Capacity

(cm) (m) Qs (kN) Qb (kN) (kN) (kN) Qs (kN) (Ton) (kN)

25.00 664.75 790.10 1454.86 396.32 531.80 21.88 128.24


□ 25x25
26.00 697.53 790.10 1487.64 402.87 558.03 22.75 134.36

25.00 797.71 1137.75 1935.45 538.79 638.16 31.50 159.13


□ 30x30
26.00 837.04 1137.75 1974.79 546.66 669.63 32.76 166.69

25.00 626.52 893.59 1520.10 423.16 501.21 24.74 167.94


ø 30
26.00 657.41 893.59 1550.99 429.34 525.93 25.73 175.99

25.00 835.35 1588.60 2423.95 696.60 668.28 43.98 234.92


ø 40
26.00 876.55 1588.60 2465.14 704.84 701.24 45.74 246.09

25.00 1044.19 2482.18 3526.37 1036.23 835.35 68.72 307.40


ø 50
26.00 1095.68 2482.18 3577.86 1046.53 876.55 71.47 321.91

10/7/2019 DR M RIDWAN, ST, M.ENG 24

12
10/7/2019

Studi Kasus:
Pembangunan Warehouse
Penajam PPU
Pile Allowable Compression Capacity (kN)
Pile Allowable Tension Capacity (kN)

1000
1100
1200
1300
1400

100
150
200
250
300
350
400
450
500
100
200
300
400
500
600
700
800
900

50
0
0

0 0
-2 Pile dia.30 -2 Pile dia.30
-4 -4
Pile dia.40 Pile dia.40
-6 -6
Pile dia.50 Pile dia.50
-8 -8

Ground Level (meter)


Ground Level ( meter)

-10 -10
-12 -12
-14 -14
-16 -16
-18 -18
-20 -20
-22 -22
-24 -24
-26 -26
-28 -28
-30 -30

10/7/2019 DR M RIDWAN, ST, M.ENG 25

Pembangunan Warehouse
Penajam PPU
PILE ALLOWABLE COMPRESSION & TENSION CAPACITY (kN)
Project : Pembangunan Warehouse
Lokasi : Gudang 3 (ASTRA INFRA PORT) Penajam,PPU - Kal-Tim
Data : BH.01

Struktur : Gudang

Pile Compression Capacity Pile Tension Capacity

Effective Ultimite Allowable Estimated


Pile Size Ultimite Ultimite AllowableTens
Pile Length Ultimite Base Compression Compression Pile Eff. Settlement
Friction Friction ion Bearing
Resistence Bearing Bearing Weight (Wp)
Resistence Resistence Capacity
Capacity Capacity

(cm) (m) Qs (kN) Qb (kN) (kN) (kN) Qs (kN) (kN) (kN) (mm)

36.00 2484.61 699.79 3184.40 865.90 1987.69 34.64 602.55 24.45

ø 30 38.00 2825.08 805.82 3630.90 865.90 2260.06 36.62 618.50 26.82

40.00 3189.11 827.02 4016.13 865.90 2551.29 38.59 618.50 28.05

36.00 3312.81 1244.07 4556.88 1539.38 2650.25 61.58 818.79 28.32

ø 40 38.00 3766.77 1432.57 5199.34 1539.38 3013.42 65.09 926.07 30.64

40.00 4252.15 1470.27 5722.41 1539.38 3401.72 68.61 1040.53 31.56

36.00 4141.01 1943.86 6084.87 2405.28 3312.81 96.21 1042.73 32.57

ø 50 38.00 4708.46 2238.38 6946.85 2405.28 3766.77 101.71 1177.93 34.91

40.00 5315.18 2297.29 7612.47 2405.28 4252.15 107.21 1322.11 35.62

36.00 4969.21 2799.16 7768.37 3107.35 3975.37 138.54 1274.36 37.00

ø 60 38.00 5650.15 3223.27 8873.43 3463.61 4520.12 146.46 1437.92 39.40

40.00 6378.22 3308.10 9686.32 3463.61 5102.57 154.38 1612.26 39.95

10/7/2019 DR M RIDWAN, ST, M.ENG 26

13
10/7/2019

Pembangunan Warehouse
Penajam PPU
Pile Allowable Compression Capacity (kN) Pile Allowable Tension Capacity (kN)

1000
1200
1400
1600
1800
2000
2200
2400
2600
2800
3000
200
400
600
800
1000
1200
1400
1600
1800
2000
2200
2400
2600
2800
3000
3200
3400
3600
3800
4000
200
400
600
800

0
0

0 0
-2 Pile dia.30 -2 Pile dia.30
-4 -4
-6 -6
-8 Pile dia 40 -8 Pile dia.40
-10 -10
-12 -12
-14 Pile dia 50 -14 Pile dia.50
-16 -16
-18 Pile dia.60 -18
-20 -20 Pile dia.60
Ground Level ( meter)

-22 -22

Ground Level (meter)


-24 -24
-26 -26
-28 -28
-30 -30
-32 -32
-34 -34
-36 -36
-38 -38
-40 -40
-42 -42
-44 -44
-46 -46
-48 -48
-50 -50
-52 -52
-54 -54
-56
-58 -56
-60 -58
-60

10/7/2019 DR M RIDWAN, ST, M.ENG 27

14

Anda mungkin juga menyukai