1. Menggali 1 M3 tanah biasa sedalam 1 m
0.750 Oh Pekerja Rp. 85,000.00 Rp.
0.025 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

2. Mengurug 1 M3 pasir urug


1.200 M3 Pasir urug Rp. 140,000.00 Rp.
0.300 Oh Pekerja Rp. 85,000.00 Rp.
0.010 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

PEKERJAAN PASANGAN DINDING


1. Memasang1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 4PP
70.000 Bh Batu merah Rp. 825.00 Rp.
11.500 Kg Semen Portland Rp. 1,200.00 Rp.
0.043 M3 Pasir pasang Rp. 165,000.00 Rp.
0.300 Oh Pekerja Rp. 85,000.00 Rp.
0.100 Oh Tukang batu Rp. 110,000.00 Rp.
0.010 Oh Kepala Tukang Batu Rp. 120,000.00 Rp.
0.015 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

PEKERJAAN PLESTERAN
1. Memasang 1 M2 plesteran 1PC : 4PP, tebal 15 mm
6.240 Kg Semen Portland Rp. 1,200.00 Rp.
0.024 M3 Pasir pasang Rp. 165,000.00 Rp.
0.300 Oh Pekerja Rp. 85,000.00 Rp.
0.150 Oh Tukang batu Rp. 110,000.00 Rp.
0.015 Oh Kepala Tukang Batu Rp. 120,000.00 Rp.
0.015 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

2. Memasang 1 M2 acian
3.250 Kg Semen Portland Rp. 1,200.00 Rp.
0.150 Oh Pekerja Rp. 85,000.00 Rp.
0.100 Oh Tukang batu Rp. 110,000.00 Rp.
0.010 Oh Kepala Tukang Batu Rp. 120,000.00 Rp.
0.008 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.
PEKERJAAN BETON
3. Membuat 1 M3 lantai kerja beton mutu f'c=7,4 Mpa (K 100), slump (3-6) cm, w/c=0,87
230.000 Kg Semen Portland Rp. 1,200.00 Rp.
893.000 Kg Pasir beton (Kg) Rp. 132.14 Rp.
1,027.000 Kg split/chipping 2-3 cm(Kg) Rp. 211.11 Rp.
200.000 Ltr Air Rp. 100.00 Rp.
1.200 Oh Pekerja Rp. 85,000.00 Rp.
0.200 Oh Tukang batu Rp. 110,000.00 Rp.
0.020 Oh Kepala Tukang Batu Rp. 120,000.00 Rp.
0.060 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

4. Membuat 1 M3 beton mutu f'c=14,5 Mpa (K 175), slump (12 ± 2) cm, w/c=0,66
326.000 Kg Semen Portland Rp. 1,200.00 Rp.
760.000 Kg Pasir beton (Kg) Rp. 132.14 Rp.
1,029.000 Kg split/chipping 2-3 cm(Kg) Rp. 211.11 Rp.
215.000 Ltr Air Rp. 100.00 Rp.
1.650 Oh Pekerja Rp. 85,000.00 Rp.
0.275 Oh Tukang batu Rp. 110,000.00 Rp.
0.028 Oh Kepala Tukang Batu Rp. 120,000.00 Rp.
0.083 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

5. Membuat 1 M3 beton mutu f'c=19,3 Mpa (K 225), slump (12 ± 2) cm, w/c=0,58
371.000 Kg Semen Portland Rp. 1,200.00 Rp.
698.000 Kg Pasir beton (Kg) Rp. 132.14 Rp.
1,047.000 Kg split/chipping 2-3 cm(Kg) Rp. 211.11 Rp.
215.000 Ltr Air Rp. 100.00 Rp.
1.650 Oh Pekerja Rp. 85,000.00 Rp.
0.275 Oh Tukang batu Rp. 110,000.00 Rp.
0.028 Oh Kepala Tukang Batu Rp. 120,000.00 Rp.
0.083 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

6. Pembesian 1 Kg dengan besi polos atau besi ulir


10.500 Kg Besi beton ulir Rp. 13,000.00 Rp.
0.150 Kg Kawat beton Rp. 15,000.00 Rp.
0.070 Oh Pekerja Rp. 85,000.00 Rp.
0.070 Oh Tukang besi Rp. 110,000.00 Rp.
0.007 Oh Kepala Tukang Besi Rp. 120,000.00 Rp.
0.004 Oh Mandor Rp. 125,000.00 Rp.
Untuk Pembesian 10 Kg Rp.
Untuk Pembesian 1 Kg Rp.
Profit Dan Overhead (10%) Rp.
Jumlah Rp.
7. Pemasangan 1 Kg Jaring Kawat Baja (Wiremesh) M.10
10.200 Kg Wiremesh M.10 Rp. 14,000.00 Rp.
0.050 Kg Kawat beton Rp. 15,000.00 Rp.
0.025 Oh Pekerja Rp. 85,000.00 Rp.
0.025 Oh Tukang besi Rp. 110,000.00 Rp.
0.025 Oh Kepala Tukang Besi Rp. 120,000.00 Rp.
0.001 Oh Mandor Rp. 125,000.00 Rp.
Untuk Pembesian 10 Kg Rp.
Untuk Pembesian 1 Kg Rp.
Profit Dan Overhead (10%) Rp.
Jumlah Rp.

8. Memasang 1 M2 bekisting untuk kolom Untuk 2x Pemakaian


0.028 M3 Kayu klas III (papan) Rp. 2,000,000.00 Rp.
(papan 2 x pakai)
0.400 Kg Paku 5 cm dan 7 cm Rp. 17,500.00 Rp.
0.200 Ltr Minyak bekisting Rp. 15,000.00 Rp.
0.009 M3 Kayu klas II (balok) Rp. 3,000,000.00 Rp.
(Balok 2x pakai)
0.245 Lbr Multipleks 1.22 x 2.44 x 9 mm Rp. 120,000.00 Rp.
(Multipleks 2x pakai)
1.000 Btg Dolken kayu Ø8-10/400 cm Rp. 25,000.00 Rp.
(dolken 2x pakai)
0.660 Oh Pekerja Rp. 85,000.00 Rp.
0.330 Oh Tukang kayu Rp. 110,000.00 Rp.
0.033 Oh Kepala Tukang Kayu Rp. 120,000.00 Rp.
0.033 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

9. Memasang 1 M2 bekisting untuk balok Untuk 2x pemakaian


0.028 M3 Kayu klas III (papan) Rp. 2,000,000.00 Rp.
(papan 2 x pakai)
0.400 Kg Paku 5 cm dan 7 cm Rp. 17,500.00 Rp.
0.200 Ltr Minyak bekisting Rp. 15,000.00 Rp.
0.009 M3 Kayu klas II (balok) Rp. 3,000,000.00 Rp.
(Balok 2x pakai)
0.245 Lbr Multipleks 1.22 x 2.44 x 9 mm Rp. 120,000.00 Rp.
(Multipleks 2x pakai)
1.000 Btg Dolken kayu Ø8-10/400 cm Rp. 25,000.00 Rp.
(dolken 2x pakai)
0.660 Oh Pekerja Rp. 85,000.00 Rp.
0.330 Oh Tukang kayu Rp. 110,000.00 Rp.
0.033 Oh Kepala Tukang Kayu Rp. 120,000.00 Rp.
0.033 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.
10. Memasang 1 M2 Bondek untuk lantai
1.030 m2 Bondek Superdyma G550 K18, Tbl 0.75 Tct Rp. 110,000.00 Rp.
0.040 M3 Kayu klas III (Balok) Rp. 2,000,000.00 Rp.
0.100 Kg Paku 5 cm dan 7 cm Rp. 17,500.00 Rp.
1.500 Btg Dolken kayu Ø8-10/400 cm Rp. 25,000.00 Rp.
0.170 Oh Pekerja Rp. 85,000.00 Rp.
0.080 Oh Tukang kayu Rp. 110,000.00 Rp.
0.010 Oh Kepala Tukang Kayu Rp. 120,000.00 Rp.
0.010 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

PEKERJAAN LANGIT-LANGIT (PLAFOND)


1. Memasang 1 M2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm + rangka Hollow
4.400 M Besi Hollow Galvanis 2 x 4 MB, Tbl 0.7 mm Rp. 11,000.00 Rp.
1.500 Bh Ramsel nails Rp. 5,000.00 Rp.
0.364 Lbr Gypsumboard 9 mm Rp. 62,000.00 Rp.
0.600 Kg UB 888/400 Compoud Rp. 8,000.00 Rp.
0.016 Roll Isolasi Gypsun Rp. 15,000.00 Rp.
11.500 Bh Srews/sekrup Rp. 750.00 Rp.
1.000 Lbr Kertas Amplas Rp. 4,000.00 Rp.
0.070 Oh Pekerja Rp. 85,000.00 Rp.
0.700 Oh Tukang besi Rp. 110,000.00 Rp.
0.007 Oh Kepala Tukang Besi Rp. 120,000.00 Rp.
0.012 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

2. Memasang 1 M2 langit-langit Kalsiboard board ukuran (120x240) mm, tebal 4 mm + rangka Hollow
4.400 M Besi Hollow Galvanis 2 x 4 MB, Tbl 0.7 mm Rp. 11,000.00 Rp.
1.500 Bh Ramsel nails Rp. 5,000.00 Rp.
0.364 Lbr Kalsiboard 4 mm Rp. 62,500.00 Rp.
0.600 Kg UB 888/400 Compoud Rp. 8,000.00 Rp.
0.016 Roll Isolasi Gypsun Rp. 15,000.00 Rp.
11.500 Bh Srews/sekrup Rp. 750.00 Rp.
1.000 Lbr Kertas Amplas Rp. 4,000.00 Rp.
0.070 Oh Pekerja Rp. 85,000.00 Rp.
0.700 Oh Tukang besi Rp. 110,000.00 Rp.
0.007 Oh Kepala Tukang Besi Rp. 120,000.00 Rp.
0.012 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.
3. Memasang 1 M' List Profil Gypsump
1.050 M' List gypsum profil Rp. 30,000.00 Rp.
0.150 Kg Lem profil gypsum Rp. 10,000.00 Rp.
0.060 Oh Pekerja Rp. 85,000.00 Rp.
0.060 Oh Tukang kayu Rp. 110,000.00 Rp.
0.006 Oh Kepala Tukang Kayu Rp. 120,000.00 Rp.
0.003 Oh Mandor Rp. 125,000.00 Rp.
Rp.
Profit Dan Overhead (10%) Rp.
Jumlah Rp.
PEKERJAAN BESI DAN ALUMINIUM
1. Mengerjakan 1 M' Kusen Aluminium
1.100 M' Kusen Aluminium Warna 4" x 1 3/4" Rp. 80,000.00 Rp.
2.000 Bh Sektrup Fixer Rp. 1,500.00 Rp.
0.060 Tube Sealent Rp. 35,000.00 Rp.
0.043 Oh Pekerja Rp. 85,000.00 Rp.
0.043 Oh Tukang besi Rp. 110,000.00 Rp.
0.0043 Oh Kepala Tukang Besi Rp. 120,000.00 Rp.
0.0021 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

2. Mengerjakan 1 M' Bingkai Jendela Aluminium


A 1.100 M' Bingkai Pintu Aluminium Warna 4" x 1 1/2" Rp. 70,000.00 Rp.
B 1.100 M' Bingkai Pintu / Rangka Partisi Aluminium Wa Rp. 60,000.00 Rp.
C 1.100 M1 Bingkai Jendela Aluminium Warna (2"x1") Rp. 50,000.00 Rp.
0.060 Tube Sealent Rp. 35,000.00 Rp.
0.043 Oh Pekerja Rp. 85,000.00 Rp.
0.043 Oh Tukang besi Rp. 110,000.00 Rp.
0.0043 Oh Kepala Tukang Besi Rp. 120,000.00 Rp.
0.0021 Oh Mandor Rp. 125,000.00 Rp.
1.000 Ls Alat Bantu + Accessories dll Rp.
Rp.
Profit Dan Overhead (10%) Rp.
Jumlah A Rp.
B Rp.
Profit Dan Overhead (10%) Rp.
Jumlah B Rp.
C Rp.
Profit Dan Overhead (10%) Rp.
Jumlah C Rp.

3. 1 Unit Pasang Pintu Kaca Tempered, Tebal 12 Mm, Uk. 1.01 x 239 cm
2.535 M2 Pintu Kaca Tempered 12 mm Rp. 1,200,000.00 Rp.
1.000 Oh Pekerja Rp. 85,000.00 Rp.
2.500 Oh Tukang Besi Rp. 110,000.00 Rp.
0.250 Oh Kepala Tukang Besi Rp. 120,000.00 Rp.
0.050 Oh Mandor Rp. 125,000.00 Rp.
1.000 Set Frame List, Baut / Sekrup DLL Rp.
1.000 Ls Alat bantu + Fabrikasi dll Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

4. Memasang 1 M2 Pintu Aluminium


1.000 m2 Pintu Aluminium Rp. 1,000,000.00 Rp.
1.050 Oh Pekerja Rp. 85,000.00 Rp.
1.050 Oh Tukang besi Rp. 110,000.00 Rp.
0.105 Oh Kepala Tukang Besi Rp. 120,000.00 Rp.
0.0052 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.
5. Pemasangan 1 m2 Cladding Aluminium Composite Panel (Pasang Biasa) + Rangka
1.0000 m2 Aluminium Composite Panel Rp. 250,000.00 Rp.
4.000 m' Besi Hollow 40 x 40 Rp. 20,000.00 Rp.
20.000 Bh Srews/sekrup Rp. 750.00 Rp.
0.080 Tube Sealent Rp. 35,000.00 Rp.
1.000 Bh Stiffener Rp. 30,000.00 Rp.
1.000 Bh Bracket steel Galfanized Rp. 25,000.00 Rp.
1.0000 Ls Alat Bantu Rp. 20,000.00 Rp.
1.5000 oh Pekerja Rp. 85,000.00 Rp.
1.5000 oh Tukang Besi Rp. 110,000.00 Rp.
0.1500 oh Kepala Tukang Besi Rp. 120,000.00 Rp.
0.6000 oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

PEKERJAAN KUNCI DAN KACA


1. Memasang 1 Bh kunci tanam biasa
1.000 Bh Kunci tanam biasa (2 x Slag) Rp. 250,000.00 Rp.
0.010 Oh Pekerja Rp. 85,000.00 Rp.
0.500 Oh Tukang kayu Rp. 110,000.00 Rp.
0.010 Oh Kepala Tukang Kayu Rp. 120,000.00 Rp.
0.005 Oh Mandor Rp. 125,000.00 Rp.
Rp.
Profit Dan Overhead (10%) Rp.
Jumlah Rp.
2. Memasang 1 Psg Flooring Engsel pintu
1.000 Psg Flooring engsel Rp. 900,000.00 Rp.
0.015 Oh Pekerja Rp. 85,000.00 Rp.
0.300 Oh Tukang kayu Rp. 110,000.00 Rp.
0.030 Oh Kepala Tukang Kayu Rp. 120,000.00 Rp.
0.0008 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

3. Memasang 1 Bh door closer


1.000 Bh Door closer/espanyolet Rp. 200,000.00 Rp.
0.050 Oh Pekerja Rp. 85,000.00 Rp.
0.500 Oh Tukang kayu Rp. 110,000.00 Rp.
0.050 Oh Kepala Tukang Kayu Rp. 120,000.00 Rp.
0.0025 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.
4. Memasang 1 Bh pegangan pintu/door holder
1.000 Bh Door Holder Rp. 150,000.00 Rp.
0.050 Oh Pekerja Rp. 85,000.00 Rp.
0.500 Oh Tukang kayu Rp. 110,000.00 Rp.
0.050 Oh Kepala Tukang Kayu Rp. 120,000.00 Rp.
0.0025 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.
5. Memasang 1 M2 kaca, tebal 5 mm
1.100 M2 Kaca Ryben 5mm Rp. 175,000.00 Rp.
0.050 Kg Sealant Rp. 35,000.00 Rp.
0.015 Oh Pekerja Rp. 85,000.00 Rp.
0.150 Oh Tukang kayu Rp. 110,000.00 Rp.
0.015 Oh Kepala Tukang Kayu Rp. 120,000.00 Rp.
0.0008 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

PEKERJAAN PENUTUP LANTAI DAN DINDING


1. Memasang 1 M2 lantai Keramik uk. (60x60) cm
3.100 Bh Tegel 60 x 60 Cm, Homogenous Tile Rp. 60,000.00 Rp.
9.600 Kg Semen Portland Rp. 1,200.00 Rp.
0.045 M3 Pasir pasang Rp. 165,000.00 Rp.
0.150 Kg Semen warna Rp. 15,000.00 Rp.
0.700 Oh Pekerja Rp. 85,000.00 Rp.
0.350 Oh Tukang batu Rp. 110,000.00 Rp.
0.035 Oh Kepala Tukang Batu Rp. 120,000.00 Rp.
0.035 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

2. Memasang 1 M2 lantai Keramik Anti Noda T = 1 cm, ukuran (20x60) cm


9.160 Bh Keramik Anti noda,T=1Cm,20x60Cm Rp. 25,000.00 Rp.
9.800 Kg Semen Portland Rp. 1,200.00 Rp.
0.045 M3 Pasir pasang Rp. 165,000.00 Rp.
0.150 Kg Semen warna Rp. 15,000.00 Rp.
0.700 Oh Pekerja Rp. 85,000.00 Rp.
0.350 Oh Tukang batu Rp. 110,000.00 Rp.
0.035 Oh Kepala Tukang Batu Rp. 120,000.00 Rp.
0.035 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

3. Memasang 1 M2 lantai keramik ukuran (30x30) cm


11.870 Bh Tegel keramik 30 x 30 cm (Putih) Rp. 8,000.00 Rp.
10.000 Kg Semen Portland Rp. 1,200.00 Rp.
0.045 M3 Pasir pasang Rp. 165,000.00 Rp.
0.150 Kg Semen warna Rp. 15,000.00 Rp.
0.700 Oh Pekerja Rp. 85,000.00 Rp.
0.350 Oh Tukang batu Rp. 110,000.00 Rp.
0.035 Oh Kepala Tukang Batu Rp. 120,000.00 Rp.
0.035 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.
4. Memasang 1 M2 dinding keramik ukuran (20x25) cm
21.000 Bh Tegel keramik 20 x 25 cm ( warna ) Rp. 5,000.00 Rp.
9.300 Kg Semen Portland Rp. 1,200.00 Rp.
0.018 M3 Pasir pasang Rp. 165,000.00 Rp.
1.940 Kg Semen warna Rp. 15,000.00 Rp.
0.900 Oh Pekerja Rp. 85,000.00 Rp.
0.450 Oh Tukang batu Rp. 110,000.00 Rp.
0.045 Oh Kepala Tukang Batu Rp. 120,000.00 Rp.
0.045 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

PEKERJAAN PENGECATAN
1. Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat penutup)
0.100 Kg Plamur tembok Rp. 15,000.00 Rp.
0.100 Kg Cat dasar Rp. 25,000.00 Rp.
0.260 Kg Cat tembok Kw. 1 Rp. 60,000.00 Rp.
0.020 Oh Pekerja Rp. 85,000.00 Rp.
0.063 Oh Tukang cat Rp. 110,000.00 Rp.
0.0063 Oh Kepala Tukang Cat Rp. 120,000.00 Rp.
0.0025 Oh Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

PEKERJAAN SANITASI
1. Memasang 1 buah Kloset Duduk
1.000 bh Kloset duduk Rp. 1,750,000.00 Rp.
6.00% hrg Perlengkapan Rp. 1,750,000.00 Rp.
1.100 org/hr Tukang batu Rp. 110,000.00 Rp.
0.010 org/hr Kepala tukang Rp. 120,000.00 Rp.
3.300 org/hr Pekerja Rp. 85,000.00 Rp.
0.160 org/hr Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

2. Memasang 1 buah Urinoir


1.000 bh Urinoir Rp. 2,000,000.00 Rp.
30.00% hrg Perlengkapan Rp. 2,000,000.00 Rp.
1.000 org/hr Tukang batu Rp. 110,000.00 Rp.
0.100 org/hr Kepala tukang Rp. 120,000.00 Rp.
1.000 org/hr Pekerja Rp. 85,000.00 Rp.
0.100 org/hr Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.
3. Memasang 1 buah Washtafel
1.000 bh Washtafel Rp. 1,200,000.00 Rp.
12.00% hrg Perlengkapan Rp. 1,200,000.00 Rp.
6.000 Kg Semen Portland Rp. 1,200.00 Rp.
0.010 M3 Pasir pasang Rp. 165,000.00 Rp.
1.450 org/hr Tukang batu Rp. 110,000.00 Rp.
0.145 org/hr Kepala tukang Rp. 120,000.00 Rp.
1.200 org/hr Pekerja Rp. 85,000.00 Rp.
0.060 org/hr Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

4. Memasang 1 buah Kran Air


1.000 bh Kran air Rp. 50,000.00 Rp.
0.025 Bh Seal tape Rp. 12,500.00 Rp.
0.400 org/hr Tukang batu Rp. 110,000.00 Rp.
0.040 org/hr Kepala tukang Rp. 120,000.00 Rp.
0.010 org/hr Pekerja Rp. 85,000.00 Rp.
0.005 org/hr Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

5. Memasang 1 buah Floor Drain


1.000 bh Floor Drain Rp. 75,000.00 Rp.
0.100 org/hr Tukang batu Rp. 110,000.00 Rp.
0.010 org/hr Kepala tukang Rp. 120,000.00 Rp.
0.010 org/hr Pekerja Rp. 85,000.00 Rp.
0.005 org/hr Mandor Rp. 125,000.00 Rp.
Jumlah Rp.
Profit & Overhead (10%) Rp.
Total Rp.

Makassar, 17 April 2018

PT. CIPTA AGORA LESTARI

Ir. Sony Matulatan


Direktur Utama
AN

63,750.00
3,125.00
66,875.00
6,687.50
73,562.50

168,000.00
25,500.00
1,250.00
194,750.00
19,475.00
214,225.00

57,750.00
13,800.00
7,095.00
25,500.00
11,000.00
1,200.00
1,875.00
118,220.00
11,822.00
130,042.00

7,488.00
3,960.00
25,500.00
16,500.00
1,800.00
1,875.00
57,123.00
5,712.30
62,835.30

3,900.00
12,750.00
11,000.00
1,200.00
1,000.00
29,850.00
2,985.00
32,835.00
276,000.00
118,003.57
216,811.11
20,000.00
102,000.00
22,000.00
2,400.00
7,500.00
764,714.68
76,471.47
841,186.15

391,200.00
100,428.57
217,233.33
21,500.00
140,250.00
30,250.00
3,360.00
10,375.00
914,596.90
91,459.69
1,006,056.60

445,200.00
92,235.71
221,033.33
21,500.00
140,250.00
30,250.00
3,360.00
10,375.00
964,204.05
96,420.40
1,060,624.45

136,500.00
2,250.00
5,950.00
7,700.00
840.00
500.00
153,740.00
15,374.00
1,537.40
16,911.40
142,800.00
750.00
2,125.00
2,750.00
3,000.00
125.00
151,550.00
15,155.00
1,515.50
16,670.50

56,000.00

7,000.00
3,000.00
28,350.00

29,400.00

25,000.00

56,100.00
36,300.00
3,960.00
4,125.00
249,235.00
24,923.50
274,158.50

56,000.00

7,000.00
3,000.00
28,350.00

29,400.00

25,000.00

56,100.00
36,300.00
3,960.00
4,125.00
249,235.00
24,923.50
274,158.50
113,300.00
80,000.00
1,750.00
37,500.00
14,450.00
8,800.00
1,200.00
1,250.00
258,250.00
25,825.00
284,075.00

+ rangka Hollow
48,400.00
7,500.00
22,568.00
4,800.00
240.00
8,625.00
4,000.00
5,950.00
77,000.00
840.00
1,500.00
181,423.00
18,142.30
199,565.30

+ rangka Hollow
48,400.00
7,500.00
22,750.00
4,800.00
240.00
8,625.00
4,000.00
5,950.00
77,000.00
840.00
1,500.00
181,605.00
18,160.50
199,765.50

31,500.00
1,500.00
5,100.00
6,600.00
720.00
375.00
45,795.00
4,579.50
50,374.50
88,000.00
3,000.00
2,100.00
3,655.00
4,730.00
516.00
262.50
102,263.50
10,226.35
112,489.85

77,000.00
66,000.00
55,000.00
2,100.00
3,655.00
4,730.00
516.00
262.50
6,600.00
94,863.50
9,486.35
104,349.85
83,863.50
8,386.35
92,249.85
72,863.50
7,286.35
80,149.85

3,041,514.00
85,000.00
275,000.00
30,000.00
6,250.00
1,520,757.00
152,075.70
5,110,596.70
511,059.67
5,621,656.37

1,000,000.00
89,250.00
115,500.00
12,600.00
650.00
1,218,000.00
121,800.00
1,339,800.00
250,000.00
80,000.00
15,000.00
2,800.00
30,000.00
25,000.00
20,000.00
127,500.00
165,000.00
18,000.00
75,000.00
808,300.00
80,830.00
889,130.00

250,000.00
850.00
55,000.00
1,200.00
625.00
307,675.00
30,767.50
338,442.50

900,000.00
1,275.00
33,000.00
3,600.00
93.75
937,968.75
93,796.88
1,031,765.63

200,000.00
4,250.00
55,000.00
6,000.00
312.50
265,562.50
26,556.25
292,118.75

150,000.00
4,250.00
55,000.00
6,000.00
312.50
215,562.50
21,556.25
237,118.75
192,500.00
1,750.00
1,275.00
16,500.00
1,800.00
100.00
213,925.00
21,392.50
235,317.50

186,000.00
11,520.00
7,425.00
2,250.00
59,500.00
38,500.00
4,200.00
4,375.00
313,770.00
31,377.00
345,147.00

229,000.00
11,760.00
7,425.00
2,250.00
59,500.00
38,500.00
4,200.00
4,375.00
357,010.00
35,701.00
392,711.00

94,960.00
12,000.00
7,425.00
2,250.00
59,500.00
38,500.00
4,200.00
4,375.00
223,210.00
22,321.00
245,531.00
105,000.00
11,160.00
2,970.00
29,100.00
76,500.00
49,500.00
5,400.00
5,625.00
285,255.00
28,525.50
313,780.50

1,500.00
2,500.00
15,600.00
1,700.00
6,930.00
756.00
312.50
29,298.50
2,929.85
32,228.35

1,750,000.00
105,000.00
121,000.00
1,200.00
280,500.00
20,000.00
2,277,700.00
227,770.00
2,505,470.00

2,000,000.00
600,000.00
110,000.00
12,000.00
85,000.00
12,500.00
2,819,500.00
281,950.00
3,101,450.00
1,200,000.00
144,000.00
7,200.00
1,650.00
159,500.00
17,400.00
102,000.00
7,500.00
1,639,250.00
163,925.00
1,803,175.00

50,000.00
312.50
44,000.00
4,800.00
850.00
625.00
100,587.50
10,058.75
110,646.25

75,000.00
11,000.00
1,200.00
850.00
625.00
88,675.00
8,867.50
97,542.50
DAFTAR HARGA BAHAN DAN UPAH

NO. URAIAN SATUAN


I. HARGA BAHAN
BAHAN BATU, PASIR, CHIPPING DAN BATU MERAH
1 Pasir pasang M3 Rp.
2 Pasir beton M3 Rp.
3 Pasir beton = 1400 Kg/m3 M3 Rp.
4 Pasir urug M3 Rp.
5 Split/chipping 2-3 cm M3 Rp.
6 Split/chipping 2-3 cm = 1350 Kg/m3 Kg Rp.
7 Batu merah Bh Rp.
8 Air Ltr Rp.
BAHAN SEMEN
1 Semen PC Kg Rp.
2 Semen warna Kg Rp.
BAHAN BESI
1 Besi beton ulir Kg Rp.
2 Wiremesh M.10 Kg Rp.
3 Kawat beton Kg Rp.
4 Paku 5 cm dan 7 cm Kg Rp.
5 Besi Hollow 40 x 40 M' Rp.
6 Besi Hollow Galvanis 2 x 4 M' Rp.
7 Pintu Aluminium M2 Rp.
8 Aluminium Composite Panel PVDF M2 Rp.
9 Screw / sekrup Bh Rp.
10 Sekrup Fixer Bh Rp.
11 Stiffener Bh Rp.
12 Bracket steel Galfanized Bh Rp.
BAHAN PLAPON DAN PARTISI
1 Multipleks 1.22 x 2.44 x 9 mm Lbr Rp.
2 Gypsumboard 9 mm Lbr Rp.
3 Kalsiboard 4 mm Lbr Rp.
NO. URAIAN SATUAN
4 Ramsel nails Bh Rp.
5 UB 888/400 Compoud Kg Rp.
6 Isolasi Gypsum Roll Rp.
7 List gypsum profil M' Rp.
8 Lem profil gypsum Kg Rp.
NO. URAIAN SATUAN
BAHAN KERAMIK
1 Tegel keramik 30 x 30 cm (putih) Bh Rp.
2 Tegel keramik 20 x 25 cm ( warna ) BH Rp.
3 Tegel keramik Uk, 60 x 60 cm, Homogenous Tile Bh Rp.
4 Tegel keramik Anti noda, T = 1 Cm, 20 x 60 Cm Bh Rp.
BAHAN ALUMINIUM
1 Kusen Aluminium Warna 4" x 1 3/4" M' Rp.
2 Bingkai Pintu Aluminium Warna 4" x 1 1/2" M' Rp.
3 Bingkai Pintu / Rangka Partisi Aluminium Warna 3" x 1 1/2" M' Rp.
4 Bingkai Jendela Aluminium Warna (2"x1") M' Rp.
BAHAN KAYU
1 Kayu klas II (balok) M3 Rp.
2 Kayu klas III (balok) M3 Rp.
3 Kayu klas III (papan) M3 Rp.
4 Dolken kayu Ø8-10/400 cm Btg Rp.
BAHAN KUNCI, ENGSEL, GRENDEL DAN HAK ANGIN
1 Kunci tanam biasa (2 x Slag) Bh Rp.
2 Flooring engsel Psg Rp.
3 Door closser/espanyolet Bh Rp.
4 Door Holder Bh Rp.
BAHAN KACA
1 Kaca Ryben 5mm M2 Rp.
2 Pintu Kaca Tempered 12 mm M2 Rp.
BAHAN CAT
1 Cat tembok Mowilex Ltr Rp.
2 Minyak bekisting Ltr Rp.
3 Plamur tembok Kg Rp.
4 Kertas amplas Lbr Rp.
5 Dempul Kg Rp.
6 Minyak cat Kg Rp.
7 Cat dasar tembok Ltr Rp.
8 Sealant Tube Rp.
9 Spacer / formite / penjaga jarak bekisting Bh Rp.
10 Bondek Superdyma G550 K18, Tbl 0.75 Tct M2 Rp.
11 Tali Ijuk Kg Rp.
BAHAN SANITASI
1 Kloset duduk KIA Bh Rp.
2 Urinoir KIA Mini Washbrook Bh Rp.
NO. URAIAN SATUAN
3 Washtafel KIA Bh Rp.
4 Kran air Bh Rp.
5 Floor Drain stainless steel Bh Rp.
6 Seal tape Bh Rp.
NO. URAIAN SATUAN
II. HARGA UPAH KERJA
TUKANG
1 Tukang kayu Oh Rp.
2 Tukang las Oh Rp.
3 Tukang Pipa Oh Rp.
4 Tukang batu Oh Rp.
5 Tukang besi Oh Rp.
6 Tukang cat Oh Rp.
7 Tukang listrik Oh Rp.
KEPALA TUKANG
8 Kepala Tukang Kayu Oh Rp.
9 Kepala Tukang Batu Oh Rp.
10 Kepala Tukang Cat Oh Rp.
11 Kepala Tukang Listrik Oh Rp.
12 Kepala Tukang Pipa Oh Rp.
13 Kepala Tukang Besi Oh Rp.
14 MANDOR Oh Rp.
15 PEKERJA Oh Rp.

Makassar, 17 April 2018


PT. CIPTA AGORA LESTARI

Ir. Sony Matulatan


Direktur Utama
HARGA

165,000.00
185,000.00
132.14
140,000.00
285,000.00
211.11
825.00
100.00

1,200.00
15,000.00

13,000.00
14,000.00
15,000.00
17,500.00
20,000.00
11,000.00
1,000,000.00
250,000.00
750.00
1,500.00
30,000.00
25,000.00

120,000.00
62,000.00
62,500.00
HARGA
5,000.00
8,000.00
15,000.00
30,000.00
10,000.00
HARGA

8,000.00
5,000.00
60,000.00
25,000.00

80,000.00
70,000.00
60,000.00
50,000.00

3,000,000.00
2,000,000.00
2,000,000.00
25,000.00

250,000.00
900,000.00
200,000.00
150,000.00

175,000.00
1,200,000.00

60,000.00
15,000.00
15,000.00
4,000.00
15,000.00
6,000.00
25,000.00
35,000.00
7,500.00
110,000.00
60,000.00

1,750,000.00
2,000,000.00
HARGA
1,200,000.00
50,000.00
75,000.00
12,500.00
HARGA

110,000.00
110,000.00
110,000.00
110,000.00
110,000.00
110,000.00
110,000.00

120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
125,000.00
85,000.00

sar, 17 April 2018


PTA AGORA LESTARI

ny Matulatan
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GEDUNG STUDENT CENTER FAKULTAS KEDOKTERAN UNHA

UNIT PEKERJAAN : PEMB. GEDUNG STUDENT CENTER FAKULTAS KEDOKTERAN UNHAS (THP. III)
T. ANGGARAN : 2018

NO URAIAN PEKERJAAN VOL. SAT.

I. PEKERJAAN PERSIAPAN
1. Pembersihan Lokasi 1.00 Ls
2. Keamanan dan keselamatan kerja (K3) 1.00 Ls
3. Biaya Papan Nama Proyek 1.00 Ls
4. Biaya Mobilisasi dan Demobilisasi 1.00 Ls
Jumlah I
II. PEKERJAAN STRUKTUR
1. Pek. Plat Lantai II (Atas Drop Off)
- Structural Floor Decking 71.68 m2
- Wiremesh M10 610.00 kg
- Beton K225 (f'c=19.3 Mpa (K225), Slump (12±2) cm, w/c=0.58) 8.60 m3

2. Pek. Balok B4, Uk. 25 x 50 Cm


- Bekisting 2x Pakai 3.45 m2
- Besi Beton 59.08 kg
- Beton K225 (f'c=19.3 Mpa (K225), Slump (12±2) cm, w/c=0.58) 0.35 m3

3. Pekerjaan Kolom dan Ringbalk Aristektur LT.III


Pek. Kolom Kp, Uk. 15 x 15 cm ( Dinding Bagian Dalam)
- Bekisting 2x Pakai 47.42 m2
- Besi Beton 767.95 kg
- Beton K175 ( f'c=14.5 Mpa (K175), Slump (12±2) cm, w/c=0.66) 3.56 m3
Pek. Rringbalk Rb, Uk. 15 x 15 cm
- Bekisting 2x Pakai 21.00 m2
- Besi Beton 340.06 kg
- Beton K175 ( f'c=14.5 Mpa (K175), Slump (12±2) cm, w/c=0.66) 1.58 m3
Jumlah II
NO URAIAN PEKERJAAN VOL. SAT.

III. PEKERJAAN ARSITEKTUR


A. Pek. Pasangan Dan Plesteran
a. Pek. Pasangan Dan Plesteran Lantai II (Area Drop off)
1. Dinding Tembok Tebal 1/2 Bata (1pc : 4ps) 160.75 m2
2. Plesteran Tembok (1pc : 4ps) 321.50 m2
3. Acian Semen 321.50 m2
b Pek. Pasangan Dan Plesteran Lantai III
1. Dinding Tembok Tebal 1/2 Bata (1pc : 4ps) 45.50 m2
2. Plesteran Tembok (1pc : 4ps) 112.00 m2
3. Acian Semen 112.00 m2
NO URAIAN PEKERJAAN VOL. SAT.

B. Pek. Kosen Pintu Dan Jendela


a. Pek. Kosen Pintu Dan Jendela Lantai I
1. Pintu Type PJ1 2.00 Bh
- Kusen Aluminium, Uk. 4 x 1 3/4" 156.24 m'
- Pintu Kaca Tempered, Tbl = 18 mm (Frameless), Uk. 101 x 239 Cm 8.00 Bh
- Pas. Kaca Tebal 5mm (Kaca Mati) 36.52 m2
- Flooring Engsel 8.00 Set
- Kunci Pintu 4.00 buah
- Handel Pintu 8.00 Set
- Door Closer / Expanyolet 8.00 buah
- Gawangan Pintu Utama, Uk. 20 x 25 21.46 m2
(Aluminium Composite Panel Type PVDF, Rangka Hollow BS 40 x 40)
2. Pintu Type P1 9.00 Bh
- Kusen Aluminium, Uk. 4 x 1 3/4" 54.72 m'
- Bingkai Aluminium Rangka Pintu Kaca 106.56 m'
- Pas. Kaca Tebal 5mm (Pintu Kaca) 9.68 m2
- Flooring Engsel 18.00 buah
- Kunci Pintu 9.00 buah
- Handel Pintu 18.00 Set
- Door Closer/Expanyolet 18.00 buah
3. Pintu Type P2 4.00 Bh
- Kusen Aluminium, Uk. 4 x 1 3/4" 20.72 m'
- Bingkai Aluminium Rangka Pintu Kaca 22.88 m'
- Pas. Kaca Tebal 5mm (Pintu Kaca) 3.53 m2
- Engsel Pintu 12.00 buah
- Kunci Pintu 4.00 buah
- Handel Pintu 4.00 Set
- Door Closer/Expanyolet 4.00 buah
4. Pintu Type P3 2.00 Bh
- Kusen Aluminium, Uk. 4 x 1 3/4" 14.08 m'
- Pek. Pintu Aluminium 2.00 buah
- Pas. Kaca Tebal 5mm (Kaca Mati) 0.70 m2
5. Pek. Cubical Km/Wc
- Pek. Dinding Cubical PVC 7.90 m'
6. Pek. Ornamen Aluminium Composite Panel, Uk. 15 x 30 49.50 m2
(Antara Kolom Dinding Luar Dan Kolom Entrance Sisi dalam)
(Aluminium Composite Panel Type PVDF, Rangka Hollow BS 40 x 40)

b. Pek. Kosen Pintu Dan Jendela Lantai II


1. Pintu Type P1 1.00 Bh
NO URAIAN PEKERJAAN VOL. SAT.

- Kusen Aluminium, Uk. 4 x 1 3/4" 6.08 m'


- Bingkai Aluminium Rangka Pintu Kaca 11.84 m'
- Pas. Kaca Tebal 5mm (Pintu Kaca) 1.08 m2
- Flooring Engsel 2.00 buah
- Kunci Pintu 1.00 buah
- Handel Pintu 2.00 Set
- Door Closer/Expanyolet 2.00 buah
2. Jendela Type J1 3.00 Bh
- Kusen Aluminium, Uk. 4 x 1 3/4" 13.20 m'
- Bingkai Jendela Kaca Rangka Aluminium 5.85 m2
- Pas. Kaca Tebal 5mm 2.64 m2
NO URAIAN PEKERJAAN VOL. SAT.

C. Pek. Plafond
a. Pek. Plafond Lantai I
1. Plafond Gypsum Board Tebal 9mm 914.92 m2
2. Plafond GRC Tebal 4mm 26.00 m2
3. List Plafond Gypsum 569.47 m'
b. Pek. Plafond Lantai II
1. Plafond Gypsum Board Tebal 9mm 55.45 m2
2. List Plafond Gypsum 32.15 m'

D. Pek. Pengecatan
a. Pek. Pengecatan Lantai I
1. Pengecatan Tembok Mowilex 1,147.62 m2
2. Pengecatan Plafond cat Kimex Nippon Paint 940.92 m2
b Pek. Pengecatan Lantai II
1. Pengecatan Tembok Mowilex 112.00 m2
2. Pengecatan Plafond cat Kimex Nippon Paint 55.45 m2

E. Penutup Lantai dan Dinding Keramik


a. Pek. Keramik Lantai I
1. Pek. Pasir Urug Alas Lantai 205.57 m3
2. Pek. Beton Lantai Kerja Alas Keramik, Tbl = 8 cm 109.64 m3
3. Pek. Lantai Keramik Utama, Teras Dan Stage (60cm x 60cm) 1,249.28 m2
4. Pek. Keramik 20x60 Variasi Border 95.16 m2
5. Pek. Keramik 30x30 Lantai KM/WC 26.00 m2
6. Dinding Keramik 20x25 (KM/WC) 71.04 m2
b. Pek. Keramik Lantai II
1. Pek. Lantai Keramik Lantai II (60cm x 60cm) 55.45 m2

F. Pekerjaan Lain - Lain


1. Pek. Dinding Fasad Aluminium Composite Panel 948.32 m2
(Aluminium Composite Panel Type PVDF, Rangka Hollow BS 40 x 40)
2. Pek. Lisplank Aluminium Composite Panel 396.50 m2
(Aluminium Composite Panel Type PVDF, Rangka Hollow BS 40 x 40)
3. Pembersihan Terakhir 1.00 ls

Jumlah III
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
I. PEKERJAAN MEKANIKAL
SANITASI
1. LANTAI I
NO URAIAN PEKERJAAN VOL. SAT.

- Kloset Duduk KIA 4.00 buah


- Washtafel KIA lengkap 3.00 buah
- Urinoir KIA lengkap 2.00 buah
- Kran Air 4.00 buah
- Floor drain 5.00 buah
Jumlah I
NO URAIAN PEKERJAAN VOL. SAT.

II. PEKERJAAN ELEKTRIKAL


1. Instalasi
LANTAI I
Penerangan
- Lampu RM 2 x 36 W 63.00 titik
- Lampu DL 7 W 65.00 titik
- Lampu DL 7 W, Outbow / Ess. 7 W 5.00 titik
- Stop kontak biasa 17.00 titik
- Stop kontak AC 15.00 titik
- Saklar tunggal 8.00 titik
- Saklar ganda 19.00 titik
Instalasi
- Instalasi Penerangan (NYM 2x2,5mm2 in Conduit) 133.00 titik
- Instalasi Stop Kontak Biasa (NYM 3x2,5mm2 in Conduit) 17.00 titik
- Instalasi Stop Kontak AC (NYM 3x2,5mm2 in Conduit ) 15.00 titik
Jumlah II
III. PEKERJAAN PEMASANGAN AIR CONDITIONING (AC) LT. 1 & 2
Pengadaan Dan Pemas. AC Sentral System VRV Lengkap assesoris
Peralatan Utama :
- AC Split Daikin Kap. 18.000 BTU/h c/w braket dan assesoris 8.00 set
- AC Split Daikin Kap. 9.000 BTU/h c/w braket dan assesoris 8.00 buah
- AC Split Daikin Kap. 6.750 BTU/h c/w braket dan assesoris 7.00 buah
- Instalasi Pipa Refrigerand s/r 23.00 ttk
- Instalasi Pipa Drain 23.00 ttk
- Instalasi Listrik Out Door Uniit 23.00 ttk
Jumlah III
IV. GENSET
1. Genset HARTECH 100KVA 220/380 V; 50Hz, Diesel Cumming, 1.00 set
Type Silent , lengkap assesoris
2. Panel Control Genset cw. Change Over switch (COS) 1.00 set
3. Kabel Power 4x35 mm2 12.00 m
4. Tangki Bahan Bakar 1 m3 cw. Dudukan 1.00 set
5. Pompa Bahan Bakar 1 m3 cw. Pengabelan 1.00 set
6. Grounding System 1.00 ls
7. Testing & Commistion, c/w Sertifikasi DEPNAKER 1.00 lot
Jumlah IV

Makassar, 17 April 2018

PT. CIPTA AGORA LES


NO URAIAN PEKERJAAN VOL. SAT.

Ir. Sony Matulatan


Direktur Utama
3.4

B)
S KEDOKTERAN UNHAS

S (THP. III)

HRG. SAT. (Rp.) JML. HARGA

3,000,000.00 3,000,000.00
5,000,000.00 5,000,000.00
500,000.00 500,000.00
5,000,000.00 5,000,000.00
Jumlah I 28,500,000.00

284,075.00 20,362,496.00
16,670.50 10,169,005.00
1,060,624.45 9,121,370.29

274,158.50 945,846.83
16,911.40 999,125.51
1,060,624.45 371,218.56

274,158.50 13,000,596.07
16,911.40 12,987,109.63
1,006,056.60 3,581,561.48

274,158.50 5,757,328.50
16,911.40 5,750,890.68
1,006,056.60 1,589,569.42
Jumlah II 84,636,117.97
HRG. SAT. (Rp.) JML. HARGA

130,042.00 20,904,251.50
62,835.30 20,201,548.95
32,835.00 10,556,452.50

130,042.00 5,916,911.00
62,835.30 7,037,553.60
32,835.00 3,677,520.00
68,294,237.55
HRG. SAT. (Rp.) JML. HARGA

112,489.85 17,575,414.16
5,621,656.37 44,973,250.96
235,317.50 8,593,795.10
1,031,765.63 8,254,125.00
338,442.50 1,353,770.00
237,118.75 1,896,950.00
292,118.75 2,336,950.00
889,130.00 19,080,729.80

112,489.85 6,155,444.59
104,349.85 11,119,520.02
235,317.50 2,277,873.40
1,031,765.63 18,571,781.25
338,442.50 3,045,982.50
237,118.75 4,268,137.50
292,118.75 5,258,137.50

112,489.85 2,330,789.69
104,349.85 2,387,524.57
235,317.50 830,670.78
1,031,765.63 12,381,187.50
338,442.50 1,353,770.00
237,118.75 948,475.00
292,118.75 1,168,475.00

112,489.85 1,583,857.09
1,339,800.00 2,679,600.00
235,317.50 164,722.25

4,000,000.00 31,600,000.00
889,130.00 44,011,935.00
HRG. SAT. (Rp.) JML. HARGA

112,489.85 683,938.29
104,349.85 1,235,502.22
235,317.50 254,142.90
1,031,765.63 2,063,531.25
338,442.50 338,442.50
237,118.75 474,237.50
292,118.75 584,237.50

112,489.85 1,484,866.02
92,249.85 539,661.62
235,317.50 621,238.20
264,482,666.66
HRG. SAT. (Rp.) JML. HARGA

199,565.30 182,586,284.28
199,765.50 5,193,903.00
50,374.50 28,686,766.52

199,565.30 11,065,895.89
50,374.50 1,619,540.18
229,152,389.85

32,228.35 36,985,899.03
25,000.00 23,523,000.00

32,228.35 3,609,575.20
25,000.00 1,386,250.00
65,504,724.23

214,225.00 44,038,233.25
841,186.15 92,227,649.57
345,147.00 431,185,244.16
392,711.00 37,370,378.76
245,531.00 6,383,806.00
313,780.50 22,290,966.72

345,147.00 19,138,401.15
652,634,679.61

889,130.00 843,179,761.60

889,130.00 352,540,045.00

3,500,000.00 3,500,000.00
1,199,219,806.60
Jumlah III 2,479,288,504.50
RIKAL
HRG. SAT. (Rp.) JML. HARGA

2,505,470.00 10,021,880.00
1,803,175.00 5,409,525.00
3,101,450.00 6,202,900.00
110,646.25 442,585.00
97,542.50 487,712.50
Jumlah I 22,564,602.50
HRG. SAT. (Rp.) JML. HARGA

375,000.00 23,625,000.00
150,000.00 9,750,000.00
150,000.00 750,000.00
30,000.00 510,000.00
40,000.00 600,000.00
30,000.00 240,000.00
40,000.00 760,000.00

250,000.00 33,250,000.00
250,000.00 4,250,000.00
250,000.00 3,750,000.00
Jumlah II 77,485,000.00

7,500,000.00 60,000,000.00
5,500,000.00 44,000,000.00
5,300,000.00 37,100,000.00
750,000.00 17,250,000.00
100,000.00 2,300,000.00
250,000.00 5,750,000.00
Jumlah III 166,400,000.00

225,000,000.00 225,000,000.00

65,000,000.00 65,000,000.00
275,000.00 3,300,000.00
10,000,000.00 10,000,000.00
3,000,000.00 3,000,000.00
2,500,000.00 2,500,000.00
4,000,000.00 4,000,000.00
Jumlah IV 312,800,000.00

Makassar, 17 April 2018

PT. CIPTA AGORA LESTARI


HRG. SAT. (Rp.) JML. HARGA

Ir. Sony Matulatan


Direktur Utama
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN GEDUNG STUDENT CENTER FAKULTAS KEDOKTERAN UNHA

UNIT PEKERJAAN : PEMB. GEDUNG STUDENT CENTER FAKULTAS KEDOKTERAN UNHAS (THP. III)
T. ANGGARAN : 2018

NO JENIS P E K E R JAAN TOTAL HA


I. PEKERJAAN PERSIAPAN Rp.
II. PEKERJAAN STRUKTUR Rp.
III. PEKERJAAN ARSITEKTUR Rp.
JUMLAH A Rp.
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
I. PEKERJAAN MEKANIKAL Rp.
II. PEKERJAAN ELEKTRIKAL Rp.
III. PEKERJAAN PEMASANGAN AIR CONDITIONING (AC) LT. 1 & 2 Rp.
IV. GENSET Rp.
JUMLAH B Rp.
REAL COST ( A + B ) Rp.
PPN 10% Rp.
TOTAL BIAYA Rp.
DIBULATKAN Rp.

TERBILANG : Tiga Milyar Empat Ratus Delapan Puluh Delapan Juta Delapan Ratus Ribu Rupiah

Makassar, 17 A
PT. CIPTA AGO

Ir. Sony Matula


Direktur Utama
KTERAN UNHAS

UNHAS (THP. III)

TOTAL HARGA (Rp.)


28,500,000.00
84,636,117.97
2,479,288,504.50
2,592,424,622.47

22,564,602.50
77,485,000.00
166,400,000.00
312,800,000.00
579,249,602.50
3,171,674,224.97
317,167,422.50
3,488,841,647.47
3,488,800,000.00

Ribu Rupiah

Makassar, 17 April 2018


PT. CIPTA AGORA LESTARI

Ir. Sony Matulatan


Direktur Utama
T I M E S C H E D U L L E
UNIT PEKERJAAN : PEMB. GEDUNG STUDENT CENTER FAKULTAS KEDOKTERAN UNHAS (THP. III)
T. ANGGARAN : 2018

WAKTU PELAKSANAAN PEKERJA


BOBOT
NO. URAIAN PEKERJAAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9
(%) BULAN KE : I BULAN KE : II BULAN

I PEKERJAAN PERSIAPAN 0.90 0.30 0.30 0.30


II PEKERJAAN STRUKTUR 2.67 0.33 0.33 0.33 0.33 0.33 0.33 0.33
III. PEKERJAAN ARSITEKTUR
A. Pek. Pasangan Dan Plesteran 2.15 0.72 0.72 0.72
B. Pek. Kosen Pintu Dan Jendela 8.34 1.39 1.39 1.39
C. Pek. Plafond 7.22
D. Pek. Pengecatan 2.07
E. Penutup Lantai dan Dinding Keramik 20.58
F. Pekerjaan Lain - Lain 37.81 2.36
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL
I. PEKERJAAN MEKANIKAL 0.71
II. PEKERJAAN ELEKTRIKAL 2.44 0.31

PEKERJAAN PEMASANGAN AIR


III. 5.25
CONDITIONING (AC) LT. 1 & 2
IV. GENSET 9.86
100.00
Bobot Mingguan 0.30 0.30 0.63 1.05 1.05 1.05 1.72 1.72 4.39
RENCANA KEMAJUAN PEK.
Bobot Komulatif 0.30 0.60 1.23 2.28 3.33 4.39 6.11 7.83 12.22
N PEKERJAAN 180 (SERATUS DELAPAN PULUH ) HARI KALENDER
PROGRES
M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 S (%)
BULAN KE : III BULAN KE : IV BULAN KE : V BULAN KE : VI
100

0.33

1.39 1.39 1.39


1.20 1.20 1.20 1.20 1.20 1.20
0.52 0.52 0.52 0.52
3.43 3.43 3.43 3.43 3.43 3.43
2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36 2.36

0.09 0.09 0.09 0.09 0.09 0.09 0.09 0.09


0.31 0.31 0.31 0.31 0.31 0.31 0.31

0.66 0.66 0.66 0.66 0.66 0.66 0.66 0.66

1.23 1.23 1.23 1.23 1.23 1.23 1.23 1.23


0

4.39 5.26 5.26 3.96 3.96 7.39 7.39 8.29 8.29 8.29 8.29 4.25 4.25 4.25 4.25

16.62 21.88 27.14 31.10 35.06 42.46 49.85 58.13 66.42 74.71 82.99 87.24 91.50 95.75 100.00

Makassar, 17 April 2018


PT. CIPTA AGORA LESTARI

Ir. Sony Matulatan


Direktur Utama
SPESIFIKASI TEKNIS
UNIT PEKERJAAN : PEMB. GEDUNG STUDENT CENTER FAKULTAS KEDOKTERAN UNHAS (THP
T. ANGGARAN : 2018

No. Uraian Pekerjaan

1 KOLOM, BALOK & PLAT LANTAI BETON -

2 DINDING -

3 PINTU & JENDELA -

4 LANTAI -

5 PLAFOND + RANGKA -

6 CAT TEMBOK -

7 GENSET -

8 AIR CONDITIONING (AC) LT. 1 & 2 -


NG STUDENT CENTER FAKULTAS KEDOKTERAN UNHAS (THP. III)

Spesifikasi Teknis Keterangan

BETON K-175 & BETON K-225

PASANGAN BATU BATA + PLESTER + ACIAN

KUSEN ALUMUNIUM
DAUN PINTU KACA TEMPERED & DAUN PINTU
KACA RANGKA ALUMUNIUM
DAUN JENDELA KACA RANGKA ALUMUNIUM

LANTAI I :
KERAMIK 20X60 BORDER
KERAMIK 30X30 LANTAI KM/WC
KERAMIK 20X25 DINDING KM/WC
LANTAI I :
KERAMIK 60X60

GYPSUMP T. 9MM & GRC T. 4MM + RANGKA BESI


HOLLOW

MOWILEX & KIMEX NIPPONT PAINT

HARTECH 100KVA 220/380 V; 50Hz


Diesel Cumming, Type Silent

AC SPLIT, DAIKIN
Makassar, 17 April 2018
PT. CIPTA AGORA LESTARI

Ir. Sony Matulatan


Direktur Utama
STRUKTUR ORGANIS

UNIT PEKERJAAN : PEMB. GEDUNG STUDENT CENTER FAKU


T. ANGGARAN : 2018

MANAGER PRO
Reynold Anthonius L
MANAGER PRO
Reynold Anthonius L

PELAKSANA ARSITEKTUR PELAKSANA STRUKTUR


Nisba Ridwan, ST Ir. Imelda Phie
PELAKSANA LAPA
Bakri

MANDOR

KEPALA TUKAN

TUKANG

PEKERJA
GANISASI INTI PROYEK

ER FAKULTAS KEDOKTERAN UNHAS (THP. III)

AGER PROYEK
honius Ligianto, ST
AGER PROYEK
honius Ligianto, ST

PETUGAS K3 ADM & LOGISTIK


Ronny Irwan Tanzil Muh. As'ad Dg Serang
ANA LAPANGAN
Bakri

MANDOR

ALA TUKANG

TUKANG

PEKERJA

Makassar, 17 April 2018


PT. CIPTA AGORA LESTARI

Ir. Sony Matulatan


Direktur Utama
REKAPITULASI PERHITUNGAN TINGKAT

UNIT PEKERJAAN : PEMB. GEDUNG STUDENT CENTER FAKULTAS


T. ANGGARAN : 2018

NILAI GABUNGAN BARANG DAN


Uraian Pekerjaan
LN DN

1 2 3
Barang
I. Material Langsung (Bahan Baku) - 18,226,728.00
II. Peralatan (Barang Jadi) - 225,000,000.00
A. Sub Total Barang Jasa - 243,226,728.00

Jasa
III. Manajemen Proyek Dan Perekayasaan - 426,000,000.00
IV. Alat Kerja / Fasilitas Kerja - -
V. Konstruksi dan Fabrikasi
VI. Jasa Umum
B. Sub Total Jasa - 426,000,000.00
C. TOTAL Biaya (A+B) - 669,226,728.00
TINGKAT KOMPONEN DALAM NEGERI (TKDN)

ER FAKULTAS KEDOKTERAN UNHAS (THP. III)

BARANG DAN JASA*) (US$) % TKDN GABUNGAN


TOTAL
TKDN US$
(US$) % KDN
4 5 6 7
Barang
18,226,728.00 100.00 7.4937191936 18,226,728.00
225,000,000.00 100.00 92.5062808064 225,000,000.00
243,226,728.00 100.00 100 243,226,728.00

Jasa
426,000,000.00 100.00 100 426,000,000.00
- - 0 -

426,000,000.00 100.00 100 426,000,000.00


669,226,728.00 100.00 100 669,226,728.00
Formulasi Perhitungan :

243,226,728.00 - - +
669,226,728.00

426,000,000.00 - -
669,226,728.00

= 1,00 % TKDN Gabungan barang dan Jasa

Makassar, 17 April 2018


PT. CIPTA AGORA LESTARI

Ir. Sony Matulatan


Direktur Utama
N GABUNGAN

2.72
33.62
36.34

63.66
0.00

63.66
100.00
CAPAIAN TINGKAT KOMPONEN DALAM NEGERI UNTUK MATERIAL LANGSUNG (BAHAN BAKU)

Nama Peyedia Barang Jasa : PT. CIPTA AGORA LESTARI


Alamat : Jl. Bulukunyi No. 22
Nama Gabungan Barang dan Jasa

HARGA SATUAN (US$) NILAI (US$) %


No. Uraian Pekerjaan Spesifikasi Pemasok/ Jumlah Satuan/ Material Upah Alat Kerja/Non Upah Total LN DN TOTAL TKDN
Negara Asal Durasi LN DN LN DN LN DN LN DN (US$) % KDN
0 1 2 3 4 5 6 7 8 9 10 11 12 13

1 Pasir Campuran Pasir Lokal 12.60 m3 Rp. 165,000.00 - Rp. 165,000.00 - 2,079,000.00 2,079,000.00 100.00 0.8547580347
1 Pasir Beton Pasir Lokal 24.00 m3 Rp. 185,000.00 - Rp. 185,000.00 - 4,440,000.00 4,440,000.00 100.00 #DIV/0!
2 Semen PC Semen Bosowa Lokal 2,881.44 kg Rp. 1,200.00 - Rp. 1,200.00 - 3,457,728.00 3,457,728.00 100.00 1.4216069214
3 Batu bata batu bata Lokal 10000.00 bh Rp. 825.00 - Rp. 825.00 - 8,250,000.00 8,250,000.00 100.00 3.3918969629

SUB TOTAL - 18,226,728.00 18,226,728.00 100.00 7.4937191936


CAPAIAN TINGKAT KOMPONEN DALAM NEGERI UNTUK PERALATAN (BARANG JADI)

Nama Peyedia Barang Jasa : PT. CIPTA AGORA LESTARI


Alamat : Jl. Bulukunyi No. 22
Nama Gabungan Barang dan Jasa

HARGA SATUAN (US$) NILAI (US$) %


No. Uraian Pekerjaan Spesifikasi Pemasok/ Jumlah Satuan/ Material Upah Alat Kerja/Non Upah Total LN DN TOTAL TKDN
Negara Asal Durasi LN DN LN DN LN DN LN DN (US$) % KDN
0 1 2 3 4 5 6 7 8 9 10 11 12 13

1 acp Lokal 1,344.82 M2 Rp. 250,000.00 - Rp. 250,000.00 - 336,205,000.00 336,205,000.00 100.00 138.22699617
2 Pek. Generator Set 200 kva Lengkap Accessories Lokal 1.00 bh Rp. 225,000,000.00 - Rp. 225,000,000.00 - 225,000,000.00 225,000,000.00 100.00 92.506280806

SUB TOTAL - 225,000,000.00 225,000,000.00 100.00 92.506280806

Makassar, 15 Juni 2007


CV. PUJIATI BARU

Ir. Sony Matulatan


Direktur
CAPAIAN TINGKAT KOMPONEN DALAM NEGERI UNTUK MANAJEMEN PROYEK DAN PEREKAYASAAN

Nama Peyedia Barang Jasa : PT. CIPTA AGORA LESTARI


Alamat : Jl. Bulukunyi No. 22
Nama Gabungan Barang dan Jasa

HARGA SATUAN (US$) NILAI (US$) %


No. Uraian Pekerjaan Kualifikasi Warga Jumlah Satuan/ Material Upah Alat Kerja/Non Upah Total LN DN TOTAL TKDN
Negara Durasi LN DN LN DN LN DN LN DN RP % KDN
0 1 2 3 4 5 6 7 8 9 10 11 12 13

1 Manager Proyek S1 Teknik Sipil Indonesia 1.00 6.00 Bln Rp. 8,000,000.00 - Rp. 8,000,000.00 - 48,000,000.00 48,000,000.00 100.00 11.267605634
2 Pelaksana Struktur Indonesia 1.00 6.00 Bln Rp. 7,000,000.00 - Rp. 7,000,000.00 - 42,000,000.00 42,000,000.00 100.00 9.8591549296
3 Pelaksana Arsitektur Indonesia 1.00 6.00 Bln Rp. 7,000,000.00 - Rp. 7,000,000.00 - 42,000,000.00 42,000,000.00 100.00 9.8591549296
4 Pelaksana lapangan Indonesia 1.00 6.00 Bln Rp. 6,000,000.00 - Rp. 6,000,000.00 - 36,000,000.00 36,000,000.00 100.00 8.4507042254
5 Petugas K3 Indonesia 1.00 6.00 Bln Rp. 6,000,000.00 - Rp. 6,000,000.00 - 36,000,000.00 36,000,000.00 100.00 8.4507042254
6 Juru gambar Indonesia 1.00 6.00 Bln Rp. 5,000,000.00 - Rp. 5,000,000.00 - 30,000,000.00 30,000,000.00 100.00 7.0422535211
7 Tenaga Elektro Indonesia 1.00 6.00 Bln Rp. 4,000,000.00 - Rp. 4,000,000.00 - 24,000,000.00 24,000,000.00 100.00 5.6338028169
8 Tenaga Batu bata Beton Indonesia 1.00 6.00 Bln Rp. 4,000,000.00 - Rp. 4,000,000.00 - 24,000,000.00 24,000,000.00 100.00 5.6338028169
9 Tenaga Pipa Indonesia 1.00 6.00 Bln Rp. 4,000,000.00 - Rp. 4,000,000.00 - 24,000,000.00 24,000,000.00 100.00 5.6338028169
10 Tengaga Keramik Indonesia 1.00 6.00 Bln Rp. 4,000,000.00 - Rp. 4,000,000.00 - 24,000,000.00 24,000,000.00 100.00 5.6338028169
11 Tenaga Pas. Plafond Indonesia 1.00 6.00 Bln Rp. 4,000,000.00 - Rp. 4,000,000.00 - 24,000,000.00 24,000,000.00 100.00 5.6338028169
12 Tenaga Cor Indonesia 1.00 6.00 Bln Rp. 4,000,000.00 - Rp. 4,000,000.00 - 24,000,000.00 24,000,000.00 100.00 5.6338028169
9 Tengaga Instalasi Indonesia 1.00 6.00 Bln Rp. 4,000,000.00 - Rp. 4,000,000.00 - 24,000,000.00 24,000,000.00 100.00 5.6338028169
6 Logistik Indonesia 1.00 6.00 Bln Rp. 4,000,000.00 - Rp. 4,000,000.00 - 24,000,000.00 24,000,000.00 100.00 5.6338028169

SUB TOTAL - 426,000,000.00 426,000,000.00 100.00 100


CAPAIAN TINGKAT KOMPONEN DALAM NEGERI UNTUK ALAT KERJA / FASILITAS KERJA

Nama Peyedia Barang Jasa : PT. CIPTA AGORA LESTARI


Alamat : Jl. Bulukunyi No. 22
Nama Gabungan Barang dan Jasa

Pemasok / HARGA SATUAN (US$) NILAI (US$) %


No. Uraian Pekerjaan Spesifikasi Kepemilikan Jumlah Satuan/ Material Upah Alat Kerja/Non Upah Total LN DN TOTAL TKDN
Durasi LN DN LN DN LN DN LN DN (US$) % KDN
0 1 2 3 4 5 6 7 8 9 10 11 12 13

1 Genset 3 KVA Milik 1.00 6.00 bln 0 - Rp. - - 0 - 0.00 0


2 Molen Beton 350 Ltr Milik 2.00 6.00 bln 0 - Rp. - - 0 - 0.00 0
3 Alat Pertukangan Listri 0 Milik 2.00 6.00 bln 0 - Rp. - - 0 - 0.00 0
4 Alat Pertukangan Meka 0 Milik 2.00 6.00 bln 0 - Rp. - - 0 - 0.00 0
5 Alat Pertukangan Elektr 0 Milik 2.00 6.00 bln 0 - Rp. - - 0 - 0.00 0
6 Alat Pertukangan Batu 0

SUB TOTAL - - - 0.00 100.00


3,488,800,000 Tiga Milyar Empat Ratus Delapan Puluh Delapan Juta Delapan
Ratus Ribu Rupiah

Sesuaikan sel yang berwarna merah dengan Sel yang akan ditulis terbilang pada Sheet anda

0
1
2
3
4
5
6
7
8
9
3488800000 3488800000
Satu
Dua 3 Milyaran
Tiga Ribu 488 Jutaan
Empat 800 Ribuan
Lima Delapan Ratus 000 Ratusan
Enam Delapan Juta
Tujuh Delapan Puluh
Delapan Empat Ratus
Sembilan Tiga Milyar

Anda mungkin juga menyukai