Rab Baja Ringan Tahan Banting
Rab Baja Ringan Tahan Banting
TOTAL 881,104,035.08
Harga Satuan
Volume TOTAL
NO. URAIAN PEKERJAAN (Rp.)
Unit Qty. Material Upah Alat (Rp.)
A. Persiapan
1. Perapihan Lahan m2 332.00 - 8,070.30 - 2,679,339.60
2. Pembuatan Stake Out dan Bowplank m 98.00 - 31,984.75 - 3,134,505.50
2. Lantai / Slab
a Lantai Kerja t=5cm m3 11.92 808,019.28 212,525.78 101,250.00 13,371,797.06
b Pembesian Kg 9,593.16 12,737.25 2,222.64 - 143,512,666.94
c Cor Beton Readymix K225, t=25 cm m3 64.12 1,113,750.00 400,284.50 270,000.00 114,392,292.14
d Cor Beton Readymix K175, t=12 cm m3 8.78 1,101,680.73 207,056.12 101,250.00 12,385,324.45
e Pasang Bekisting m2 49.90 53,190.00 80,499.83 - 6,671,122.27
f Bongkar Bekisting m2 49.90 - 5,188.05 - 258,883.70
Subtotal 340,455,962.06
35%
Harga Satuan
Volume TOTAL
NO. URAIAN PEKERJAAN (Rp.)
Unit Qty. Material Upah Alat (Rp.)
C. Pekerjaan Struktur Baja
1. Struktur Utama
a Kolom / Column I WF 250.125.6.9 Kg 1716.80 21,655.23 19,190.85 - 70,124,541.95
b Balok / Beam I WF 250.125.6.9 Kg 2782.40 21,655.23 19,190.85 - 113,650,119.71
c Clading CNP 200.75.20.3,2 (Horisontal) Kg 424.10 21,655.23 19,190.85 - 17,322,820.50
d Clading CNP 150.65.20.3,2 (Vertikal) Kg 117.26 21,655.23 19,190.85 - 4,789,610.78
e Base Plat t=9mm Kg 50.86 21,655.23 19,190.85 - 2,077,431.39
f Plat t=9mm Kg 242.13 18,830.63 19,951.82 - 9,390,317.21
g Plat Stifner t=9mm Kg 224.96 18,830.63 19,951.82 - 8,724,500.09
h Baut M22 bh 32.00 91,000.00 500.00 - 2,928,000.00
2. Struktur Atap
a Kasau I WF 150.75.5,2 Kg 2016.00 21,655.23 19,190.85 - 82,345,687.65
b Reng CNP 150.65.20.3,2 Kg 1936.00 21,655.23 19,190.85 - 79,078,001.64
c Gording I WF 200.100.5.5,8 Kg 1365.12 21,655.23 19,190.85 - 55,759,794.21
d Kloss L.70.70.7 Kg 116.16 11,200.00 11,982.46 - 2,692,874.55
e Ikatan Angin Dia 16mm Kg 185.16 12,565.00 19,830.30 - 5,998,469.25
f Atap Spandek Galvalum t=0.5mm m2 289.80 126,042.00 42,794.15 - 48,928,716.27
g Pasang Baut bh 450.00 2,500.00 500.00 - 1,350,000.00
Subtotal 505,160,885.19
Harga Satuan
Volume TOTAL
NO. URAIAN PEKERJAAN (Rp.)
Unit Qty. Material Upah Alat (Rp.)
D. Pekerjaan Pengecatan
1. Cat Dasar PROPAN METALKOTE m2 428.00 16,800.00 10,586.10 - 11,721,250.80
Cat NIPPON PAINT BODELAC (Warna Disesuaikan) m2 428.00 27,300.00 14,644.14 - 17,952,091.92
Subtotal 29,673,342.72
DAFTAR HARGA UPAH DAN BAHAN
A UPAH
1 Pekerja OH 82,600.00 82,600.00
2 Tukang OH 125,650.00 125,650.00
3 Tukang Las Konstruksi OH 125,650.00 125,650.00
3 Kepala Tukang OH 134,750.00 134,750.00
4 Mandor OH 134,750.00 134,750.00
5 Juru Ukur OH 134,750.00 134,750.00
6 Pembantu Juru Ukur OH 125,650.00 125,650.00
7 Drafter CAD OH 134,750.00 134,750.00
8 Desain Enginer OH 400,000.00 400,000.00
9 Operator Printer OH 125,650.00 125,650.00
B BAHAN/MATERIAL
1 Air L 100.00 - 100.00
2 Batu Kali m3 217,000.00 - 217,000.00
Sirtu m3 186,200.00 - 186,200.00
3 Batu Koral/Kerikil m3 186,200.00 - 186,200.00
4 Besi Beton (polos/ulir) Kg 8,800.00 - 8,800.00
5 Copy CD (soft file) Bh 10,000.00 - 10,000.00
6 Foto Album Bh 25,000.00 - 25,000.00
7 Foto copy Kertas A4 Lbr 250.00 - 250.00
8 Foto Printing Lbr 5,000.00 - 5,000.00
9 Kaso 4/6 cm kelas III m3 1,800,000.00 - 1,800,000.00
10 Kaso 5/7 cm kelas III m3 1,800,000.00 - 1,800,000.00
11 Kawat Ikat Kg 13,000.00 - 13,000.00
12 Kayu 8/12 cm Kayu kelas III m 3
1,800,000.00 - 1,800,000.00
13 Kertas HVS 70 gr Rim 30,000.00 - 30,000.00
14 Menjilid A4 + Laminasi Bh 15,000.00 - 15,000.00
15 Minyak Bekisting L 5,000.00 - 5,000.00
16 Paku segala ukuran Kg 14,000.00 - 14,000.00
17 Papan 3/20 cm Kayu kelas II m3 1,800,000.00 - 1,800,000.00
18 Pasir Beton m3 210,000.00 - 210,000.00
19 Pasir Pasang m 3
210,000.00 - 210,000.00
20 Portland Cement ( PC ) Kg 1,360.00 - 1,360.00
21 Sewa Pasir m 3
210,000.00 - 210,000.00
22 Tali Rapia/Plastik m¹ 50.00 - 50.00
23 Baja profil IWF dan CNP Kg 12,950.45 500.00 13,450.45
24 Plate 9mm Kg 12,950.45 500.00 13,450.45
25 Besi siku L70.70.7 Kg 8,000.00 - 8,000.00
26 Spandek Galvalum 5mm m' 90,000.00 - 90,000.00
27 Baut HTB M16 bh 3,500.00 - 3,500.00
28 Baut HTB M12 2,300.00 - 2,300.00
29 Baut HTB M10 1,900.00 - 1,900.00
HARGA ONGKOS JUMLAH
NO URAIAN SATUAN SATUAN DASAR ANGKUT HARGA
(Rp) (Rp) (Rp)
30 Anchor Bolt M22 65,000.00 - 65,000.00
31 SikaGrout®-214-11 Kg 8,000.00 - 8,000.00
32 Dowel bar 16mm @500mm
33 Readymix K225 m3 825,000.00 - 825,000.00
34 Solar liter 9,500.00 - 9,500.00
35 Minyak pelumas liter 35,000.00 - 35,000.00
36 Kawat Las RB26 - E6013 Kg 34,000.00 - 34,000.00
37 Pipa PVC 2" m' 11,666.67 - 11,666.67
38 Cat propan Metalkote Kg 40,000.00 - 40,000.00
39 Cat Nippon paint Boddelac Kg 65,000.00 - 65,000.00
40 Paku Spandek bh 600.00 - 600.00
41 Tinta Printer Botol 75,000.00 - 75,000.00
HARGA ONGKOS JUMLAH
NO URAIAN SATUAN SATUAN DASAR ANGKUT HARGA
(Rp) (Rp) (Rp)
C PERALATAN
1 Kamera SLR Sewa-hari 50,000.00 - 50,000.00
2 Komputer Sewa-bulan 1,000,000.00 - 1,000,000.00
3 Scanner Uk. A4 Sewa-bulan 250,000.00 - 250,000.00
4 Waterpass Sewa-hari 100,000.00 - 100,000.00
5 Mesin Las Sewa-hari 500,000.00 - 500,000.00
6 Molen Sewa-hari 300,000.00 - 300,000.00
7 Truck Crane 3 ton Sewa-jam 3,000,000.00 - 3,000,000.00
8 Mixer semen Sewa-hari 150,000.00 - 150,000.00
9 Alat Bantu Konstruksi Baja Ls 5,000.00 - 5,000.00
HARGA ONGKOS JUMLAH
NO URAIAN SATUAN SATUAN DASAR ANGKUT HARGA
(Rp) (Rp) (Rp)
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
A. Tenaga Kerja
1 Pekerja L.01 OH 0.060 82,600.00 4,956.00
2 Mandor L.04 OH 0.006 134,750.00 808.50
Jumlah Harga Tenaga Kerja 5,764.50
B. Bahan
C. Peralatan
A. Tenaga Kerja
1 Pekerja L.01 OH 0.100 82,600.00 8,260.00
2 Tukang Kayu 0.100 125,650.00 12,565.00
3 Kepala Tukang 0.010 134,750.00 1,347.50
4 Mandor 0.005 134,750.00 673.75
Jumlah Harga Tenaga Kerja 22,846.25
B. Bahan
C. Peralatan
A. Tenaga Kerja
1 Pekerja L.01 OH 0.060 82,600.00 4,956.00
2 Tukang Kayu L.02 OH 0.020 125,650.00 2,513.00
3 Mandor L.04 OH 0.006 134,750.00 808.50
4 Juru Ukur L.05 OH 0.020 134,750.00 2,695.00
5 Pembantu Juru Ukur L.06 OH 0.020 82,600.00 1,652.00
Jumlah Harga Tenaga Kerja 12,624.50
B. Bahan
1 Kaso 4/6 cm M.33.d m3 0.0025 1,800,000.00 4,500.00
2 Papan 2/20 M.35.e m3 0.0042 1,800,000.00 7,560.00
3 Paku M.65.b Kg 0.200 14,000.00 2,800.00
Jumlah Harga Bahan 14,860.00
C. Peralatan
1 Waterpass E.50 Sewa-hari 0.004 100,000.00 400.00
Jumlah Harga Peralatan 400.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 27,884.50
E. Overhead + Profit 40% × D 11,153.80
F. Harga Satuan Pekerjaan per - m¹ (D+E) 39,038.30
A. Tenaga Kerja
1 Pekerja L.01 OH 0.300 82,600.00 24,780.00
2 Mandor L.04 OH 0.010 134,750.00 1,347.50
Jumlah Harga Tenaga Kerja 26,127.50
B. Bahan
1 Pasir m3 1.20 210,000.00 252,000.00
C. Peralatan
A. Tenaga Kerja
1 Pekerja L.01 OH 0.250 82,600.00 20,650.00
2 Mandor L.04 OH 0.025 134,750.00 3,368.75
Jumlah Harga Tenaga Kerja 24,018.75
B. Bahan
1 Sirtu m3 1.20 186,200.00 223,440.00
C. Peralatan
A. Tenaga Kerja
1 Pekerja L.01 OH 0.6750 82,600.00 55,755.00
2 Mandor L.04 OH 0.0675 134,750.00 9,095.63
Jumlah Harga Tenaga Kerja 64,850.63
B. Bahan
C. Peralatan
Pekerjaan : Pasang 1 m³ Beton mutu, fc=19,3 Mpa (K225), slum(12±2) cm, w/c = 0,58 ( Molen )
Kode Analisa : A.3.1.B.07.b
HARGA
NO URAIAN KODE SATUAN KOEFISIEN SATUAN JUMLAH
(Rp) (Rp)
1 2 3 4 5 6 8
A. Tenaga Kerja
1 Pekerja L.01 OH 1.323 82,600.00 109,279.80
2 Tukang Batu L.02 OH 0.189 125,650.00 23,747.85
3 Kepala Tukang L.03 OH 0.019 134,750.00 2,560.25
4 Mandor L.04 OH 0.132 134,750.00 17,787.00
Jumlah Harga Tenaga Kerja 153,374.90
B. Bahan
1 Pasir Pasang M.14.b m3 0.698 210,000.00 146,580.00
2 Batu Koral/Kerikil M.12 m3 1.047 186,200.00 194,951.40
3 Air M.02 L 215.000 100.00 21,500.00
4 Portland Cement M.15 Kg 371.000 1,360.00 504,560.00
Jumlah Harga Bahan 867,591.40
C. Peralatan
1 Molen E.29.b Sewa-hari 0.250 300,000.00 75,000.00
Pekerjaan : Pasang 1 m³ Beton mutu, fc=14,5 Mpa (K175), slum(12±2) cm, w/c = 0,66 ( Molen )
Kode Analisa : A.3.1.B.05.b
HARGA
NO URAIAN KODE SATUAN KOEFISIEN SATUAN JUMLAH
(Rp) (Rp)
1 2 3 4 5 6 8
A. Tenaga Kerja
1 Pekerja L.01 OH 1.323 82,600.00 109,279.80
2 Tukang Batu L.02 OH 0.189 125,650.00 23,747.85
3 Kepala Tukang L.03 OH 0.019 134,750.00 2,560.25
4 Mandor L.04 OH 0.132 134,750.00 17,787.00
Jumlah Harga Tenaga Kerja 153,374.90
B. Bahan
1 Pasir Pasang M.14.b m3 0.760 210,000.00 159,600.00
2 Batu Koral/Kerikil M.12 m3 1.029 186,200.00 191,599.80
3 Air M.02 L 215.000 100.00 21,500.00
4 Portland Cement M.15 Kg 326.000 1,360.00 443,360.00
Jumlah Harga Bahan 816,059.80
C. Peralatan
1 Molen E.29.b Sewa-hari 0.250 300,000.00 75,000.00
Pekerjaan : Pasang 1 m³ Beton untuk lantai kerja (bedding) mutu, fc=7,4 1PC:2PB:3KR
Kode Analisa : A.3.1.B.01.c
HARGA
NO URAIAN KODE SATUAN KOEFISIEN SATUAN JUMLAH
(Rp) (Rp)
1 2 3 4 5 6 8
A. Tenaga Kerja
1 Pekerja L.01 OH 1.320 82,600.00 109,032.00
2 Tukang Batu L.02 OH 0.220 125,650.00 27,643.00
3 Kepala Tukang L.03 OH 0.022 134,750.00 2,964.50
4 Mandor L.04 OH 0.132 134,750.00 17,787.00
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
B. Bahan
1 Pasir Pasang M.14.b m3 0.618 210,000.00 129,780.00
2 Batu Koral/Kerikil M.12 m3 0.744 186,200.00 138,532.80
3 Air M.02 L 215.000 100.00 21,500.00
4 Portland Cement M.15 Kg 227.000 1,360.00 308,720.00
Jumlah Harga Bahan 598,532.80
C. Peralatan
1 Molen E.29.b Sewa-hari 0.250 300,000.00 75,000.00
Pekerjaan : Pasang 1 m³ Beton ReadyMix mutu, fc=19,3 Mpa (K225), slum(12±2) cm, w/c = 0,66
Kode Analisa :
HARGA
NO URAIAN KODE SATUAN KOEFISIEN SATUAN JUMLAH
(Rp) (Rp)
1 2 3 4 5 6 8
A. Tenaga Kerja
1 Pekerja L.01 OH 0.990 82,600.00 81,774.00
2 Tukang Batu L.02 OH 0.165 125,650.00 20,732.25
3 Kepala Tukang L.03 OH 0.017 134,750.00 2,290.75
4 Mandor L.04 OH 0.050 134,750.00 6,737.50
Jumlah Harga Tenaga Kerja 111,534.50
B. Bahan
1 Beton Ready Mix K225 m3 1.000 825,000.00 825,000.00
Jumlah Harga Bahan 825,000.00
C. Peralatan
1 Alat bantu slang + test lab E.29.b sum 1.000 200,000.00 200,000.00
A. Tenaga Kerja
1 Pekerja L.01 OH 1.323 82,600.00 109,279.80
2 Tukang Batu L.02 OH 0.189 125,650.00 23,747.85
3 Kepala Tukang L.03 OH 0.019 134,750.00 2,560.25
4 Mandor L.04 OH 0.132 134,750.00 17,787.00
Jumlah Harga Tenaga Kerja 153,374.90
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
B. Bahan
1 Pasir Pasang M.14.b m3 0.618 210,000.00 129,780.00
2 Batu Koral/Kerikil M.12 m3 0.744 186,200.00 138,532.80
3 Air M.02 L 215.000 100.00 21,500.00
4 SikaGrout®-214-11 M.15 Kg 227.000 8,000.00 1,816,000.00
Jumlah Harga Bahan 2,105,812.80
C. Peralatan
1 Molen E.29.b Sewa-hari 0.250 150,000.00 37,500.00
A. Tenaga Kerja
1 Pekerja L.01 OH 0.700 82,600.00 57,820.00
2 Tukang Batu L.02 OH 0.700 125,650.00 87,955.00
3 Kepala Tukang L.03 OH 0.070 134,750.00 9,432.50
4 Mandor L.04 OH 0.070 134,750.00 9,432.50
Jumlah Harga Tenaga Kerja 164,640.00
B. Bahan
1 Besi Beton (polos/ulir) M.55.d Kg 105.000 8,800.00 924,000.00
2 Kawat Ikat M.60 Kg 1.500 13,000.00 19,500.00
Jumlah Harga Bahan 943,500.00
C. Peralatan
Pekerjaan : Pasang 1 m² Bekisting Plat Beton biasa menggunakan kayu papan 3/20 cm
Kode Analisa : A.3.4.B.25.c
HARGA
NO URAIAN KODE SATUAN KOEFISIEN SATUAN JUMLAH
(Rp) (Rp)
1 2 3 4 5 6 8
A. Tenaga Kerja
1 Pekerja L.01 OH 0.360 82,600.00 29,736.00
2 Tukang Kayu L.02 OH 0.180 125,650.00 22,617.00
3 Kepala Tukang L.03 OH 0.018 134,750.00 2,425.50
4 Mandor L.04 OH 0.036 134,750.00 4,851.00
Jumlah Harga Tenaga Kerja 59,629.50
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
B. Bahan
1 Papan 3/20 cm Kayu kelas II M.35.e m3 0.014 1,800,000.00 25,200.00
2 Kaso 5/7 cm kelas III M.37.a m3 0.005 1,800,000.00 9,000.00
3 Paku segala ukuran M.65.b Kg 0.300 14,000.00 4,200.00
4 Minyak Bekisting M.129 L 0.200 5,000.00 1,000.00
Jumlah Harga Bahan 39,400.00
C. Peralatan
A. Tenaga Kerja
1 Pekerja L.01 OH 0.040 82,600.00 3,304.00
2 Mandor L.04 OH 0.004 134,750.00 539.00
Jumlah Harga Tenaga Kerja 3,843.00
B. Bahan
C. Peralatan
Pekerjaan : Pasang 1 m² Bekisting Plat Beton biasa menggunakan kayu papan 3/20 cm
Kode Analisa : A.3.4.B.25.c
HARGA
NO URAIAN KODE SATUAN KOEFISIEN SATUAN JUMLAH
(Rp) (Rp)
1 2 3 4 5 6 8
A. Tenaga Kerja
1 Pekerja L.01 OH 0.360 - 0.00
2 Tukang Kayu L.02 OH 0.180 - 0.00
3 Kepala Tukang L.03 OH 0.018 250,000.00 4,500.00
4 Mandor L.04 OH 0.036 250,000.00 9,000.00
Jumlah Harga Tenaga Kerja 13,500.00
B. Bahan
1 - 0.00 0.00 0.014 0.00 0.00
2 - 0.00 0.00 0.005 0.00 0.00
3 - 0.00 0.00 0.300 0.00 0.00
4 - - - 0.200 0.00 0.00
Jumlah Harga Bahan 0.00
C. Peralatan
A. Tenaga Kerja
1 Tukang Foto L.02 OH 2.000 125,650.00 251,300.00
Jumlah Harga Tenaga Kerja 251,300.00
B. Bahan
1 CD Copy Soft File Foto Image M.117 Bh 1.000 10,000.00 10,000.00
2 Foto Printing M.119.d Lbr 20.000 5,000.00 100,000.00
4 Foto Album M.119.a Bh 3.000 25,000.00 75,000.00
Jumlah Harga Bahan 185,000.00
C. Peralatan
1 Kamera SLR E.16 Sewa-hari 2.000 50,000.00 100,000.00
Jumlah Harga Peralatan 100,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 536,300.00
E. Overhead + Profit 40% × D 214,520.00
F. Harga Satuan Pekerjaan (D+E) 750,820.00
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
A. Tenaga Kerja
1 Drafter CAD L.14 OH 1.00 134,750.00 134,750.00
2 Desain Engineer L.15 OH 0.5 400,000.00 200,000.00
Jumlah Harga Tenaga Kerja 334,750.00
B. Bahan
C. Peralatan
1 Sewa Komputer M.139.a Sewa-bulan 0.04 1,000,000.00 40,000.00
2 Sewa Scanner Ukuran A4 M.139.b Sewa-bulan 0.025 250,000.00 6,250.00
Jumlah Harga Peralatan 46,250.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 381,000.00
E. Overhead + Profit 40% × D 152,400.00
F. Harga Satuan Pekerjaan (D+E) 533,400.00
A. Tenaga Kerja
1 Operator Printer L.16 OH 0.0800 125,650.00 10,052.00
Jumlah Harga Tenaga Kerja 10,052.00
B. Bahan
1 Kertas HVS M.125.e Rim 0.300 30,000.00 9,000.00
2 Tinta Printer/Plotter M.143.a Botol 0.050 75,000.00 3,750.00
Jumlah Harga Bahan 12,750.00
C. Peralatan
1 Sewa Komputer M.139.a Sewa-bulan 0.001 1,000,000.00 1,000.00
2 Sewa Scanner Ukuran A4 M.139.b Sewa-bulan 0.010 250,000.00 2,500.00
Jumlah Harga Peralatan 3,500.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 26,302.00
E. Overhead + Profit 40% × D 10,520.80
F. Harga Satuan Pekerjaan (D+E) 36,822.80
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
Lain- Lain
1 Foto Copy Kertas A4 M.125.b Lbr 200.00 250.00 50,000.00
2 Menjilid M.127.c Bh 1.00 15,000.00 15,000.00
A. Jumlah 65,000.00
B. Overhead + Profit 40% × D 26,000.00
C. Harga Satuan Pekerjaan (D+E) 91,000.00
A. Tenaga Kerja
1 Pekerja L.01 OH 0.060 82,600.00 4,956.00
2 Tukang Las Konstruksi L.02 OH 0.060 125,650.00 7,539.00
3 Kepala Tukang L.03 OH 0.006 134,750.00 808.50
4 Mandor L.04 OH 0.003 134,750.00 404.25
Jumlah Harga Tenaga Kerja 13,707.75
B. Bahan
1 Besi Baja WF Kg 1.015 13,450.45 13,652.21
Jumlah Harga Bahan 13,652.21
C. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 27,359.96
D. Overhead + Profit 40% × D 10,943.98
E. Harga Satuan Pekerjaan (D+E) 38,303.94
A. Tenaga Kerja
1 Pekerja L.01 OH 0.060 82,600.00 4,956.00
2 Tukang Las Konstruksi L.02 OH 0.060 125,650.00 7,539.00
3 Kepala Tukang L.03 OH 0.006 134,750.00 808.50
4 Mandor L.04 OH 0.003 134,750.00 404.25
Jumlah Harga Tenaga Kerja 13,707.75
B. Bahan
1 Besi Profil Kg 1.150 13,450.45 15,468.02
Jumlah Harga Bahan 15,468.02
B. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B) 29,175.77
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
A. Tenaga Kerja
1 Pekerja L.01 OH 0.1000 82,600.00 8,260.00
2 Tukang Konstruksi L.02 OH 0.1000 125,650.00 12,565.00
3 Kepala Tukang L.03 OH 0.0100 134,750.00 1,347.50
4 Mandor L.04 OH 0.0500 134,750.00 6,737.50
Jumlah Harga Tenaga Kerja 28,910.00
B. Bahan
1 Solar Liter 1.000 9,500.00 9,500.00
2 Minyak pelumas Liter 0.100 35,000.00 3,500.00
Jumlah Harga Bahan 13,000.00
C. Peralatan
1 Truck Crane 3 ton Sewa-jam 0.800 3,000,000.00 2,400,000.00
Jumlah Harga Peralatan 2,400,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 2,441,910.00
E. Overhead + Profit 40% × D 976,764.00
F. Harga Satuan Pekerjaan (D+E) 3,418,674.00
A. Tenaga Kerja
1 Pekerja L.01 OH 0.0400 82,600.00 3,304.00
2 Tukang Konstruksi L.02 OH 0.0200 125,650.00 2,513.00
3 Kepala Tukang L.03 OH 0.0020 134,750.00 269.50
4 Mandor L.04 OH 0.0020 134,750.00 269.50
Jumlah Harga Tenaga Kerja 6,356.00
B. Bahan
1 Kawat listrik Kg 0.400 34,000.00 13,600.00
2 Solar Liter 0.300 9,500.00 2,850.00
3 Minyak pelumas Liter 0.040 35,000.00 1,400.00
Jumlah Harga Bahan 16,450.00
C. Peralatan
1 Sewa Alat Las Sewa-hari 0.170 500,000.00 85,000.00
Jumlah Harga Peralatan 85,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 107,806.00
E. Overhead + Profit 40% × D 43,122.40
F. Harga Satuan Pekerjaan (D+E) 150,928.40
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
A. Tenaga Kerja
1 Pekerja L.01 OH 0.0670 82,600.00 5,534.20
2 Tukang Konstruksi L.02 OH 0.0230 125,650.00 2,889.95
3 Mandor L.04 OH 0.0010 134,750.00 134.75
Jumlah Harga Tenaga Kerja 8,558.90
B. Bahan
1 Besi siku L70.70.7 Kg 1.000 8,000.00 8,000.00
Jumlah Harga Bahan 8,000.00
C. Peralatan
A. Tenaga Kerja
1 Pekerja L.01 OH 0.0280 82,600.00 2,312.80
2 Tukang Konstruksi L.02 OH 0.0800 125,650.00 10,052.00
3 Mandor L.04 OH 0.0140 134,750.00 1,886.50
Jumlah Harga Tenaga Kerja 14,251.30
B. Bahan
1 Plate 9mm Kg 1.000 13,450.45 13,450.45
Jumlah Harga Bahan 13,450.45
C. Peralatan
A. Tenaga Kerja
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
B. Bahan
1 Besi baja bulat Kg 1.000 8,800.00 8,800.00
2 Baut Kg 0.050 3,500.00 175.00
3 Aksesories bh 1.000
Jumlah Harga Bahan 8,975.00
C. Peralatan
A. Tenaga Kerja
1 Pekerja L.01 OH 0.2000 82,600.00 16,520.00
2 Tukang L.02 OH 0.1000 125,650.00 12,565.00
2 Kepala Tukang OH 0.0100 134,750.00 1,347.50
4 Mandor L.04 OH 0.0010 134,750.00 134.75
Jumlah Harga Tenaga Kerja 30,567.25
B. Bahan
1 Spandek Galvalum 5mm m 1.000 90,000.000 90,000.00
2 Baut Kg 0.050 600.000 30.00
Jumlah Harga Bahan 90,030.00
C. Peralatan
1
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 120,597.25
E. Overhead + Profit 40% × D 48,238.90
F. Harga Satuan Pekerjaan (D+E) 168,836.15
A. Tenaga Kerja
1 Pekerja L.01 OH 0.0060 82,600.00 495.60
2 Tukang L.02 OH 0.0600 0.00 0.00
2 Kepala Tukang OH 0.0060 0.00 0.00
4 Mandor L.04 OH 0.0030 0.00 0.00
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
B. Bahan
2 Baut bh 1.000 2,500.000 2,500.00
Jumlah Harga Bahan 2,500.00
C. Peralatan
1
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 2,995.60
E. Overhead + Profit 40% × D 1,198.24
F. Harga Satuan Pekerjaan (D+E) 4,193.84
A. Tenaga Kerja
1 Pekerja L.01 OH 0.0060 30,000.00 180.00
2 Tukang L.02 OH 0.0600 82,600.00 4,956.00
2 Kepala Tukang OH 0.0120 134,750.00 1,617.00
4 Mandor L.04 OH 0.0060 134,750.00 808.50
Jumlah Harga Tenaga Kerja 7,561.50
B. Bahan
1 Cat Popan Metalkote Kg 0.300 40,000.000 12,000.00
Jumlah Harga Bahan 12,000.00
C. Peralatan
A. Tenaga Kerja
1 Pekerja L.01 OH 0.0060 82,600.00 495.60
2 Tukang L.02 OH 0.0600 125,650.00 7,539.00
2 Kepala Tukang OH 0.0120 134,750.00 1,617.00
4 Mandor L.04 OH 0.0060 134,750.00 808.50
Jumlah Harga Tenaga Kerja 10,460.10
B. Bahan
1 Cat Popan Metalkote Kg 0.300 65,000.000 19,500.00
Jumlah Harga Bahan 19,500.00
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
C. Peralatan
Stifneer
T1 0.25 0.06 0.009 48 0.00648 7850
Sambungan
P1 0.34 0.2 0.009 8 0.004896 7850
P2 0.05
12 0.25 0.125
6 6
Ket.
kol
tapak
tapak
tapak
cincin
15.3 4
KakiPlat DT 0.15 0.15
KakiPlat Ty 102 27
Plat DT
Plattyre
Plattyre
Dowel
Tiebar
Ikatanangin
50.868
38.4336