Anda di halaman 1dari 19

PROYEK : SDA BALITBANG KEMEN PU-PERA TAHUN ANGGARAN 2018

No. PAKET KONTRAK : ………………………………………………


NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : LUBUK LINGGAU
ITEM PEMBAYARAN NO. 5.2 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN Pekerjaan Pembersihan TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0450 4,657.31 209.58


3. Mandor (L03) jam 0.8130 7,281.29 5,919.69

JUMLAH HARGA TENAGA 6,129.26

B. BAHAN

1. - - - - -
2. - - - - -
3. - - - - -

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E43) jam 0.0043 7,887.17 33.91


2. Dump truck (E49) jam 0.1290 57,319.25 7,394.18
3. Bulldozer (E23) jam 0.0067 131,467.37 880.83

JUMLAH HARGA PERALATAN 8,308.93

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 14,438.19


E. OVERHEAD & PROFIT 15.0 % x D 2,165.73
F. HARGA SATUAN PEKERJAAN ( D + E ) 16,603.92
PROYEK : SDA BALITBANG KEMEN PU-PERA TAHUN ANGGARAN 2018
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : LUBUK LINGGAU
ITEM PEMBAYARAN NO. 5.2 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN Galian Tanah TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0370 4,657.31 172.32


3. Mandor (L03) jam 0.0076 7,281.29 55.34

JUMLAH HARGA TENAGA 227.66

B. BAHAN

1. - - - - -
2. - - - - -
3. - - - - -

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E43) jam 0.0023 268,882.94 618.43


2. Dump truck (E49) jam 0.1290 255,047.57 32,901.14
3. Bulldozer (E23) jam 0.0036 131,467.37 473.28

JUMLAH HARGA PERALATAN 33,992.85

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 34,220.51


E. OVERHEAD & PROFIT 15.0 % x D 5,133.08
F. HARGA SATUAN PEKERJAAN ( D + E ) 39,353.58
PROYEK : SDA BALITBANG KEMEN PU-PERA TAHUN ANGGARAN 2018
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : LUBUK LINGGAU
ITEM PEMBAYARAN NO. 5.2 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN Lapis Pondasi Bawah TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0570 4,657.31 265.47


3. Mandor (L03) jam 0.0055 7,281.29 40.05

JUMLAH HARGA TENAGA 305.51

B. BAHAN

1. Sirtu (M28) m3 1.2800 156,537.66 200,368.20


2. - - - - -
3. - - - - -

JUMLAH HARGA BAHAN 200,368.20

C. PERALATAN

1. Wheel Loader (E40) jam 0.0064 329,870.66 2,111.17


2. Dump truck (E49) jam 0.1480 255,047.57 37,747.04
3. Motor Grader (E13) jam 0.0024 131,467.37 315.52
4 Tandem Roller (E17) jam 0.0343 189,356.76 6,494.94
5 Water Tank (E55) jam 0.0015 197,056.43 285.73

JUMLAH HARGA PERALATAN 46,954.40

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 247,628.12


E. OVERHEAD & PROFIT 15.0 % x D 37,144.22
F. HARGA SATUAN PEKERJAAN ( D + E ) 284,772.34
PROYEK : SDA BALITBANG KEMEN PU-PERA TAHUN ANGGARAN 2018
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : LUBUK LINGGAU
ITEM PEMBAYARAN NO. 5.2 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN Timbunan Tanah TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0570 4,657.31 265.47


3. Mandor (L03) jam 0.0055 7,281.29 40.05

JUMLAH HARGA TENAGA 305.51

B. BAHAN

1. Tanah Timbunan (M08) m3 1.1100 90,000.00 99,900.00


2. - - - - -
3. - - - - -

JUMLAH HARGA BAHAN 99,900.00

C. PERALATAN

1. Wheel Loader (E40) jam 0.0064 329,870.66 2,111.17


2. Dump truck (E49) jam 0.1570 255,047.57 40,042.47
3. Bulldozer (E23) jam 0.0064 131,467.37 841.39
4 Vibrator Roller (E31) jam 0.0043 189,356.76 814.23
5 Water Tank (E55) jam 0.0095 197,056.43 1,872.04

JUMLAH HARGA PERALATAN 45,681.30

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 145,886.82


E. OVERHEAD & PROFIT 15.0 % x D 21,883.02
F. HARGA SATUAN PEKERJAAN ( D + E ) 167,769.84

PROYEK : SDA BALITBANG KEMEN PU-PERA TAHUN ANGGARAN 2018


No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : LUBUK LINGGAU
ITEM PEMBAYARAN NO. 5.2 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN Lapis Pondasi Atas TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0570 4,657.31 265.47


3. Mandor (L03) jam 0.0055 7,281.29 40.05

JUMLAH HARGA TENAGA 305.51

B. BAHAN

1. Agregat Kasar (M26) m3 0.6200 162,098.99 100,501.37


2. Agregat Halus (M27) m3 0.3600 175,987.03 63,355.33

JUMLAH HARGA BAHAN 163,856.70

C. PERALATAN

1. Wheel Loader (E40) jam 0.0064 329,870.66 2,111.17


2. Dump truck (E49) jam 0.1570 255,047.57 40,042.47
3. Bulldozer (E23) jam 0.0064 131,467.37 841.39
4 Vibrator Roller (E31) jam 0.0043 189,356.76 814.23
5 Water Tank (E55) jam 0.0095 197,056.43 1,872.04

JUMLAH HARGA PERALATAN 45,681.30


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 209,843.52
E. OVERHEAD & PROFIT 15.0 % x D 31,476.53
F. HARGA SATUAN PEKERJAAN ( D + E ) 241,320.05
PROYEK : SDA BALITBANG KEMEN PU-PERA TAHUN ANGGARAN 2018
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : LUBUK LINGGAU
ITEM PEMBAYARAN NO. 5.2 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN Lapis AC-WC TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0198 4,657.31 92.21


3. Mandor (L03) jam 0.0065 7,281.29 47.33

JUMLAH HARGA TENAGA 139.54

B. BAHAN

1. Agregat Kasar (M26) m3 0.6200 162,098.99 100,501.37


2. Agregat Halus (M27) m3 0.3600 175,987.03 63,355.33
3 Aspal (M10) kg 72.8000 15,500.00 1,128,400.00
4 Semen (M05) kg 9.8700 6,400.00 63,168.00

JUMLAH HARGA BAHAN 1,355,424.70

C. PERALATAN

1. Wheel Loader (E40) jam 0.0064 329,870.66 2,111.17


2. Dump truck (E49) jam 0.1480 0.00 0.00
3. AMP (E01) jam 0.0064 3,959,876.99 25,343.21
4 Tandem Roller (E17) jam 0.0243 189,356.76 4,601.37
5 Water Tank (E55) jam 0.0075 197,056.43 1,477.92
6 P. Tyre Roller (E18) jam 0.0456 133,566.70 6,090.64
7 Asphalt Finisher (E02) jam 0.0032 575,675.08 1,819.13

JUMLAH HARGA PERALATAN 41,443.45

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,397,007.70


E. OVERHEAD & PROFIT 15.0 % x D 209,551.16
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,606,558.86

PROYEK : SDA BALITBANG KEMEN PU-PERA TAHUN ANGGARAN 2018


No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : LUBUK LINGGAU
ITEM PEMBAYARAN NO. 5.2 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN Prime Coat TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0198 4,657.31 92.21


3. Mandor (L03) jam 0.0065 7,281.29 47.33

JUMLAH HARGA TENAGA 139.54

B. BAHAN

1. Aspal (M10) kg 897.0000 15,500.00 13,903,500.00


2. Minyak Tanah (M11) liter 0.3100 175,987.03 54,555.98

JUMLAH HARGA BAHAN 13,958,055.98

C. PERALATAN

1. Asphalt Sprayer (E03) jam 0.7670 143,750.00 110,256.25


JUMLAH HARGA PERALATAN 110,256.25

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 14,068,451.77


E. OVERHEAD & PROFIT 15.0 % x D 2,110,267.77
F. HARGA SATUAN PEKERJAAN ( D + E ) 16,178,719.54

PROYEK : SDA BALITBANG KEMEN PU-PERA TAHUN ANGGARAN 2018


No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : LUBUK LINGGAU
ITEM PEMBAYARAN NO. 5.2 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN Timbunan Gorong-Gorong TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0053 4,657.31 24.68


3. Mandor (L03) jam 0.0165 7,281.29 120.14

JUMLAH HARGA TENAGA 144.82

B. BAHAN

1. Tanah Timbunan (M08) m3 1.2000 90,000.00 108,000.00

JUMLAH HARGA BAHAN 108,000.00

C. PERALATAN
1. Excavator (E43) jam 0.0073 268,882.94 1,973.60
2. Dump truck (E49) jam 0.1470 0.00 0.00
3. Motor Grader (E13) jam 0.0046 131,467.37 604.75
4 Vibrator Roller (E31) jam 0.0067 189,356.76 1,274.37
5 Water Tank (E55) jam 0.0037 197,056.43 729.11

JUMLAH HARGA PERALATAN 1,973.60

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 110,118.43


E. OVERHEAD & PROFIT 15.0 % x D 16,517.76
F. HARGA SATUAN PEKERJAAN ( D + E ) 126,636.19

PROYEK : SDA BALITBANG KEMEN PU-PERA TAHUN ANGGARAN 2018


No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : LUBUK LINGGAU
ITEM PEMBAYARAN NO. 5.2 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN Pekerjaan Pengukuran TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN M2 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.3300 4,657.31 6,194.23


2 Mandor (L03) jam 0.1000 7,281.29 728.13
3 Juru Ukur (L05) jam 0.6700 9,641.42 6,459.75

JUMLAH HARGA TENAGA 13,382.11

B. BAHAN

1. -
2. -
JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Waterpass/Theodolite buah 0.6700 62,900,000.00 42,143,000.00


2 Kendaraan buah 0.6700 350,000.00 234,500.00
3 Rambu ukur buah 1.3300 450,000.00 598,500.00

JUMLAH HARGA PERALATAN 42,976,000.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 42,989,382.11


E. OVERHEAD & PROFIT 15.0 % x D 6,448,407.32
F. HARGA SATUAN PEKERJAAN ( D + E ) 49,437,789.42

PROYEK : SDA BALITBANG KEMEN PU-PERA TAHUN ANGGARAN 2018


No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : LUBUK LINGGAU
ITEM PEMBAYARAN NO. 5.2 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN Pekerjaan Pasir Urug Gorong-Gorong TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0056 4,657.31 26.08


3. Mandor (L03) jam 0.0312 7,281.29 227.18

JUMLAH HARGA TENAGA 253.26

B. BAHAN

1. Pasir Urug (M12) m3 1.1800 90,000.00 106,200.00


JUMLAH HARGA BAHAN 106,200.00

C. PERALATAN

1. Excavator (E43) jam 0.0063 329,870.66 2,081.48


2. Dump truck (E49) jam 0.1460 189,356.76 27,646.09

JUMLAH HARGA PERALATAN 2,081.48

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 108,534.74


E. OVERHEAD & PROFIT 15.0 % x D 16,280.21
F. HARGA SATUAN PEKERJAAN ( D + E ) 124,814.95

PROYEK : SDA BALITBANG KEMEN PU-PERA TAHUN ANGGARAN 2018


No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : LUBUK LINGGAU
ITEM PEMBAYARAN NO. 5.2 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN Galian Gorong-Gorong TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0056 4,657.31 26.08


3. Mandor (L03) jam 0.0312 7,281.29 227.18

JUMLAH HARGA TENAGA 253.26

B. BAHAN
1. -

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E43) jam 0.0063 255,047.57 1,609.35


2. Dump truck (E49) jam 0.1460 189,356.76 27,646.09

JUMLAH HARGA PERALATAN 1,609.35

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,862.61


E. OVERHEAD & PROFIT 15.0 % x D 279.39
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,142.00

PROYEK : SDA BALITBANG KEMEN PU-PERA TAHUN ANGGARAN 2018


No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : LUBUK LINGGAU
ITEM PEMBAYARAN NO. 5.2 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN Pekerjaan Gorong-Gorong TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0057 4,657.31 26.41


3. Mandor (L03) jam 0.0312 7,281.29 227.18

JUMLAH HARGA TENAGA 253.58


B. BAHAN

1. Beton K-300 (M59) M3 0.1450 873,690.35 126,685.10


2. Baja Tulangan (M39) Kg 16.7800 8,500.00 142,630.00
3. Timbunan Porus (EI-241) M3 0.1449 89,688.73 12,995.90
4. Mat. Pilihan (M09) M3 1.0630 25,000.00 26,575.00

JUMLAH HARGA BAHAN 308,886.00

C. PERALATAN

1. Tamper (E25) Jam 1.3280 15,041.78 19,975.49


2. Flat Bed Truck (E11) Jam 0.1250 242,689.55 30,336.19

JUMLAH HARGA PERALATAN 19,975.49

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 329,115.07


E. OVERHEAD & PROFIT 15.0 % x D 49,367.26
F. HARGA SATUAN PEKERJAAN ( D + E ) 378,482.33

PROYEK : SDA BALITBANG KEMEN PU-PERA TAHUN ANGGARAN 2018


No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : LUBUK LINGGAU
ITEM PEMBAYARAN NO. 5.2 (7) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN Pekerjaan direksi Keet TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0057 4,657.31 26.41


2 Mandor (L03) jam 0.0031 7,281.29 22.57
3 Tukang kayu (L04) jam 0.0057 6,088.57 34.70
4 Kepala Tukang (L06) jam 0.0031 5,125.00 15.89
5 Tukang Batu (L07) jam 0.0057 6,088.57 34.70

JUMLAH HARGA TENAGA 134.28

B. BAHAN

1. kayu dolken M3 0.1450 29,200.00 4,234.00


2. kayu papan albasiah Kg 0.1800 880,000.00 158,400.00
3. paku biasa M3 0.8500 23,400.00 19,890.00
4. semen portland M3 0.3500 61,800.00 21,630.00
5 pasir pasang m3 0.1500 165,800.00 24,870.00
6 pasir beton m3 0.1000 320,500.00 32,050.00
koral beton m3 0.1500 281,500.00 42,225.00
batu bata buah 0.3000 885.00 265.50
besi strip kg 0.1100 12,500.00 1,375.00
jendela nako buah 0.6000 265,800.00 159,480.00
kaca polos m2 0.8000 96,700.00 77,360.00
kunci tanam buah 0.1500 51,500.00 7,725.00
plywood 4mm lbr 0.0600 165,000.00 9,900.00
seng plat lbr 0.2500 36,800.00 9,200.00

JUMLAH HARGA BAHAN 568,604.50

C. PERALATAN

1. -
2. -

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 568,738.78


E. OVERHEAD & PROFIT 15.0 % x D 85,310.82
F. HARGA SATUAN PEKERJAAN ( D + E ) 654,049.59
###
ITEM PEMBAYARAN : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

B. PERALATAN

1 ASPHALT MIXING PLANT E01 Unit 1 200,000,000 200,000,000


2 ASPHALT FINISHER E02 Unit 1 500,000 500,000
3 ASPHALT SPRAYER E03 Unit 1 100,000 100,000
4 BULLDOZER 100-150 HP E04 Unit 1 500,000 500,000
5 COMPRESSOR 4000-6500 L\M E05 Unit 1 150,000 150,000
6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit 1 100,000 100,000
7 CRANE 10-15 TON E07 Unit 1 150,000 150,000
8 DUMP TRUCK 3.5 TON E08 Unit 18 150,000 2,700,000
9 DUMP TRUCK 10 TON E09 Unit 1 121,345 121,345
10 EXCAVATOR 80-140 HP E10 Unit 1 1,405,260 1,405,260
11 FLAT BED TRUCK 3-4 M3 E11 Unit 1 150,000 150,000
12 GENERATOR SET E12 Unit 1 300,000 300,000
13 MOTOR GRADER >100 HP E13 Unit 1 500,000 500,000
14 TRACK LOADER 75-100 HP E14 Unit 1 500,000 500,000
15 WHEEL LOADER 1.0-1.6 M3 E15 Unit 1 500,000 500,000
16 THREE WHEEL ROLLER 6-8 T E16 Unit 2 500,000 1,000,000
17 TANDEM ROLLER 6-8 T. E17 Unit 1 500,000 500,000
18 TIRE ROLLER 8-10 T. E18 Unit 1 500,000 500,000
19 VIBRATORY ROLLER 5-8 T. E19 Unit 1 500,000 500,000
23 WATER TANKER 3000-4500 L. E23 Unit 1 150,000 150,000

Total untuk Item B pada Lembar 1 259,376,605