Anda di halaman 1dari 2

I.

DIRECT COST PERSONNEL

No DESCRIPTION TIME UNIT PRICE TOTAL PRICE


. (MONT ($) ($)
H)
1 Team Leader 3 2500 0
2 Civil Engineer 3 1786 0
3 Quality Control 3 1786 0
4 Surveyor 1 1071 0
5 Assistant Surveyor 1 357 0
6 Assistant Surveyor 1 357 0
7 Drafter 3 571 0
8 Administration 3 500 0
TOTAL 0

II. DIRECT COST NON-PERSONNEL

No TOTAL PRICE
DESCRIPTION
. ($)
A PRELIMINARY SURVEY
1. Transport from House - Airport Soeta 21
2. Round Trip Flight fare for 1 person 214
3. Rent a car in Palembang and IN location during 4 286
days
4. Transport from Airport Soeta - House 21
B ACCOMODATION 143
C REPORTS 0
1. Preliminary Report 71
2. Monthly Report 71
3. Final Report 71
D BIDDING 0
In Jakarta 71
In Location – Sumatera Selatan 0
Transport from House - Airport Soeta 21
Round Trip Flight fare for 1 person 214
Rent a car in Palembang and location during 143
2 days
Transport from Bandara Soeta - House 21
TOTAL 0

III. GRAND TOTAL I + II = $ 23,214 + $ 1,368 = $24,582


Say: (Twenty-four thousand five hundred and eighty-two
dollars)
Currency Convert 1 $ USD = IDR 14.000
TATA CARA PEMBAYARAN

1. Pembayaran Pertama sebesar 25 % , diberikan setelah Konsultan di


tetapkan sebagai Pemenang dalam Pekerjaan Perencanaan dan
Pengawasan Pembuatan Jalan di Pendopo, Sumatera Selatan
2. Pembayaran Kedua sebesar 50%, diberikan setelah ada ketetapan
Pemenang dari Kontraktor untuk melaksanakan Pekerjaan
Perencanaan dan Pengawasan Pembuatan Jalan di Pendopo,
Sumatera Selatan
3. Pembayaran Ketiga atau Terakhir sebesar 25 % , diberikan setelah
Pekerjaan Fisik di Lapangan selesai dikerjakan oleh Kontraktor.