No. SNI KODE KOEF SAT. URAIAN PAKERJAAN H
Rp
A.4.7.1.1
1 1 m2 Pengecatan Tembok
0
A TENAGA
L.01 0.02 OH Pekerja 100,000.00
L.02 0.063 OH Tukang Cat 110,000.00
L.03 0.0063 OH Kepala Tukang 110,000.00
L.04 0.003 OH Mandor 120,000.00
B BAHAN
0.1 kg Plamir 23,000.00
0.1 kg Cat Dasar 26,976.19
0.05 kg Soda Api 20,000.00
0.26 kg Cat Penutup 2 Kali 42,236.00
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (10%) 10%
F Harga Satuan Pekerjaan (D+E)
JUMLAH

Rp

29,658.18
9,983.00
2,000.00
6,930.00
693.00
360.00
16,978.98
2,300.00
2,697.62
1,000.00
10,981.36

26,961.98
2,696.20
29,658.18
Plamir Tembok 5 64000 12800
Cat Dasar Catylac 21 566500 26976.19
cat EKSTERIOR WEATHERSHIELD PRIMASHIELD 2.5 LITER 3.5 319000 91142.86
Cat Jotaplass 25 1055900 42236
RENCANA ANGGARAN BIAYA
PROYEK : PEKERJAAN PONDASI DAN PAGAR BRC PARKIR MOBIL BELAKANG

1 PEKERJAAN SIPIL
NO JENIS PEKERJAAN SATUAN VOLUME HARGA SATUAN
I PEMBONGKARAN
1 Mob dan Demob Tenaga dan Bahan ls 1 Rp 735,000.00
2 Pengecatan cat Exterior m2 4123.46 Rp 29,658.18
3 Steger ls 1.00 Rp 2,000,000.00

TOTAL BIAYA SEBELUM PAJAK


PPN 10%
TOTAL BIAYA
BIL BELAKANG

HARGA

Rp 735,000.00
Rp 122,294,306.34
Rp 2,000,000.00

Rp 124,294,306.34
Rp 12,429,430.63
Rp 136,723,736.97