Anda di halaman 1dari 1

LS_PINANG SOUTH

PATTERN = 8 X 8.5 M
PPV Target : 2.90
LOKASI ALL LOCATION Jarak ke Station (m): 10000
Num of holes blast at same time : 0m
DECKING NON - DECKING Maximum Exp Charge tiap Lubang (Kgs) : 21878
Dalam Isian Bawah Control
Isian Atas Control Stemming Isian PF Decking PF Non-Deck
Kuzram Analysis (%
Lubang Isian Stemming Isian Control Stemming
Deck Stemming Stemming Akhir Non-Decking
(m) meter kg Akhir meter kg meter kg Kg/m3 Kg/m3

3 0.3 2.1 0.9 33 2.2 0.163 50.7%


3.5 2.4 1.1 41 2.5 0.171 51.5%
4 2.7 1.3 48 2.8 0.176 51.9%
4.5 2.9 1.6 59 3.1 0.193 54.5%
5 3.2 1.8 66 3.4 0.196 54.3%
5.5 3.5 2.0 74 3.7 0.197 54.1%
6 3.6 2.4 89 3.8 0.217 57.2%
6.5 3.8 2.7 100 4.1 0.000
0.226 58.1%
7 4.1 3.0 109 4.3 0.229 58.2%
7.5 4.3 3.3 120 4.6 0.235 58.8%
8 4.4 3.6 133 4.8 0.244 59.8%
8.5 4.6 3.9 144 5.0 0.249 60.2%
9 4.8 4.3 157 5.2 0.256 60.9%
9.5 5.0 4.5 166 5.5 0.257 60.7%
10 5.0 5.0 185 5.5 0.272 62.4%
10.5 3.0 2.6 94 8.2 3.0 2.0 74 3.2 5.0 5.5 203 5.6 0.284 63.9%
Note
LUBANG PRODUKSI
1. Loading disesuaikan dengan angka actual pita drill, angka di belakang koma semuanya dibulatkan ke LS 0.5 meter ( Contoh: 10.1 m s/d 10.9 m menggunakan isian LS: 10.5m)
2. Minimum waktu gassing adalah 35 menit sebelum di stemming, minimal adalah 20 menit dan harus approval T5
3. Stemming lubang basah 2 meter sisanya drill cutting, kering full drill cutting
LUBANG TRIM

ISIAN TRIM 1/2 KOLOM CHARGE PRODUKSI


MOHON PERTAHANKAN GASSING MINIMAL 20 MENIT !!!!!!!
AWASI ANGGOTA YANG STEMMING CANGKUL SEBELUM GASSING OPTIMAL !!!

Anda mungkin juga menyukai