Anda di halaman 1dari 1

PT TELKOMSEL

FORMULIR RELOKASI ASET

Relokasi Dari Departemen/Cost Center/Lokasi : NS Manado


Ke Departemen/Cost Center/Lokasi : NS Manado
Tanggal Relokasi : November 2019

ALASAN UNTUK RELOKASI:


Improvement Availability

DETAIL MODUL/NODE:
S/N Deskripsi Modul/Node Jumlah % from total (Partial)* Site ID Donor Regional Donor Site ID Acceptor Regional Acceptor
Battery <=130 Ah 8 100% KTG120 Sulawesi Gudang Telkomsel Sulawesi
Battery <= 90 Ah 15 100% KTG006 Sulawesi Gudang Telkomsel Sulawesi
Battery <=12-100 AH 31 100% KTG131 Sulawesi Gudang Telkomsel Sulawesi
Battery <=2-800 AH 13 100% KTG014 Sulawesi Gudang Telkomsel Sulawesi
Battery <=100 AH 18 100% KTG003 Sulawesi Gudang Telkomsel Sulawesi
Battery <=800 AH 6 100% AMR006 Sulawesi Gudang Telkomsel Sulawesi

PERSETUJUAN ***
Diusulkan oleh ( Asset Donor/Owner) Diterima oleh (Asset Acceptor) Verifikasi dg Data Network (NOS/PSC)**
Nama : Ari Abdi Pribadi Nama : Ari Abdi Priadi Nama :
Jabatan : Supervisor RTPO Kotamobagu Jabatan : Supervisor RTPO Kotamobagu Jabatan :
Tanggal : November 2019 Tanggal : November 2019 Tanggal :

Tanda Tangan : Tanda Tangan : Tanda Tangan :

*Untuk relokasi partial (% diambil dari total unit/module yang dipindahkan dibandingkan dengan total modul yang ada)
**Untuk perangkat Network Only (Capex -> PSC, OPEX/Swadaya --> NOS)
***Persetujuan ditandatangani minimun oleh Manager

Anda mungkin juga menyukai