Bulan : I (Pertama)
PEMERINTAH DAERAN KABUPATEN KOLAKA
Periode : 26 April 2019 s/d 30 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consul
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019
Dibuat Oleh :
### #NAME?
### #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN KOLAKA
### #NAME?
### #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
REALISASI PEMBAYARAN NILAI PEKERJAAN
Bulan #NAME?
PEMERINTAH DAERAN KABUPATEN KOLAKA
Periode #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas #NAME?
TAHUN ANGGARAN 2019 No/Tgl Kontrak #NAME?
Nilai Kontrak #NAME?
#NAME?
Dibuat Oleh :
### #NAME?
### #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN KOLAKA
#NAME?
### #NAME?
###
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
REALISASI PEMBAYARAN NILAI PEKERJAAN
Bulan #NAME?
PEMERINTAH DAERAN KABUPATEN KOLAKA
Periode #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas #NAME?
TAHUN ANGGARAN 2019 No/Tgl Kontrak #NAME?
Nilai Kontrak #NAME?
#NAME?
Dibuat Oleh :
### #NAME?
### #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN KOLAKA
#NAME?
### #NAME?
###
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
REALISASI PEMBAYARAN NILAI PEKERJAAN
Bulan #NAME?
PEMERINTAH DAERAN KABUPATEN KOLAKA
Periode #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas #NAME?
TAHUN ANGGARAN 2019 No/Tgl Kontrak #NAME?
Nilai Kontrak #NAME?
#NAME?
Dibuat Oleh :
### #NAME?
### #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN KOLAKA
### #NAME?
### #NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
Kolaka, 30 Mei 2019
Nomor : 22 /LAP.01/CV.GEOLAND/PGWSN/DIKMUDORA/VII/2016
Lampiran : 1 Berkas
Perihal : Laporan Kemajuan Pekerjaan
Kepada Yth,
Pejabat Pembuat Komitmen (PPK)
DINAS PENDIDIKAN DAN OLAHRAGA
KABUPATEN KOLAKA
Tahun Anggaran 2016
Di -
Kolaka
Dengan Hormat,
Pengembangan Jaringan Perpipaan SPAM Ranosangia Untuk Desa Ranosangia Kec. Toari Kab. Kolaka
(DAK Penugasan) 14 Juli 2016 s/d 13 Agustus 2016.
Realisasi kemajuan fisik pekerjaan sampai dengan saat laporan ini dibuat secara umum dapat digambarkan
sebagai berikut :
Demikian Laporan Kemajuan Pekerjaan Bulanan ini disampaikan untuk menjadi bahan evaluasi dan atas
perhatiannya diucapkan terima kasih.
Konsultan Supervisi,
###
###
###
###
Nomor : 22 /LAP.02/CV.GEOLAND/PGWSN/DIKMUDORA/VII/2016
Lampiran : 1 Berkas
Perihal : Laporan Kemajuan Pekerjaan
Kepada Yth,
Pejabat Pembuat Komitmen (PPK)
DINAS PENDIDIKAN DAN OLAHRAGA
KABUPATEN KOLAKA
Tahun Anggaran 2016
Di -
Kolaka
Dengan Hormat,
Sehubungan dengan pelaksanaan Pengembangan Jaringan Perpipaan SPAM Ranosangia Untuk Desa
Ranosangia Kec. Toari Kab. Kolaka (DAK Penugasan) 14 Agustus 2016 s/d 13 September 2016.
Realisasi kemajuan fisik pekerjaan sampai dengan saat laporan ini dibuat secara umum dapat digambarkan
sebagai berikut :
Demikian Laporan Kemajuan Pekerjaan Bulanan ini disampaikan untuk menjadi bahan evaluasi dan atas
perhatiannya diucapkan terima kasih.
Konsultan Supervisi,
###
###
###
###
Nomor : 22 /LAP.03/CV.GEOLAND/PGWSN/DIKMUDORA/VII/2016
Lampiran : 1 Berkas
Perihal : Laporan Kemajuan Pekerjaan
Kepada Yth,
Pejabat Pembuat Komitmen (PPK)
DINAS PENDIDIKAN DAN OLAHRAGA
KABUPATEN KOLAKA
Tahun Anggaran 2016
Di -
Kolaka
Dengan Hormat,
Sehubungan dengan pelaksanaan PEMBANGUNAN 2 RKB PAUD PELANGI pada Satker Dinas
Pendidikan dan Olahraga Kabupaten Kolaka, yang berlokasi di Kecamatan Kolaka dan dilaksanakan oleh
CV.TANETA, dengan ini kami sampaikan Laporan Kemajuan Fisik Pekerjaan Bulanan untuk periode
14 September 2016 s/d 13 Oktober 2016.
Realisasi kemajuan fisik pekerjaan sampai dengan saat laporan ini dibuat secara umum dapat digambarkan
sebagai berikut :
Demikian Laporan Kemajuan Pekerjaan Bulanan ini disampaikan untuk menjadi bahan evaluasi dan atas
perhatiannya diucapkan terima kasih.
Konsultan Supervisi,
###
###
###
###
Nomor : 22 /LAP.04/CV.GEOLAND/PGWSN/DIKMUDORA/VII/2016
Lampiran : 1 Berkas
Perihal : Laporan Kemajuan Pekerjaan
Kepada Yth,
Pejabat Pembuat Komitmen (PPK)
DINAS PENDIDIKAN DAN OLAHRAGA
KABUPATEN KOLAKA
Tahun Anggaran 2016
Di -
Kolaka
Dengan Hormat,
Sehubungan dengan pelaksanaan PEMBANGUNAN 2 RKB PAUD PELANGI pada Satker Dinas
Pendidikan dan Olahraga Kabupaten Kolaka, yang berlokasi di Kecamatan Kolaka dan dilaksanakan oleh
CV.TANETA, dengan ini kami sampaikan Laporan Kemajuan Fisik Pekerjaan Bulanan untuk periode
14 Oktober 2016 s/d 13 November 2016.
Realisasi kemajuan fisik pekerjaan sampai dengan saat laporan ini dibuat secara umum dapat digambarkan
sebagai berikut :
Demikian Laporan Kemajuan Pekerjaan Bulanan ini disampaikan untuk menjadi bahan evaluasi dan atas
perhatiannya diucapkan terima kasih.
Konsultan Supervisi,
###
###
###
###
Nomor : 22 /LAP.05/CV.GEOLAND/PGWSN/DIKMUDORA/VII/2016
Lampiran : 1 Berkas
Perihal : Laporan Kemajuan Pekerjaan
Kepada Yth,
Pejabat Pembuat Komitmen (PPK)
DINAS PENDIDIKAN DAN OLAHRAGA
KABUPATEN KOLAKA
Tahun Anggaran 2016
Di -
Kolaka
Dengan Hormat,
Sehubungan dengan pelaksanaan PEMBANGUNAN 2 RKB PAUD PELANGI pada Satker Dinas
Pendidikan dan Olahraga Kabupaten Kolaka, yang berlokasi di Kecamatan Kolaka dan dilaksanakan oleh
CV.TANETA, dengan ini kami sampaikan Laporan Kemajuan Fisik Pekerjaan Bulanan untuk periode
14 November 2016 s/d 10 Desember 2016.
Realisasi kemajuan fisik pekerjaan sampai dengan saat laporan ini dibuat secara umum dapat digambarkan
sebagai berikut :
Demikian Laporan Kemajuan Pekerjaan Bulanan ini disampaikan untuk menjadi bahan evaluasi dan atas
perhatiannya diucapkan terima kasih.
Konsultan Supervisi,
###
###
###
###
Penanganan Permasalahan
RINGKASAN KEMAJUAN PEKERJAAN
Periode ###
Penanganan Permasalahan
RINGKASAN KEMAJUAN PEKERJAAN
Periode ###
Penanganan Permasalahan
RINGKASAN KEMAJUAN PEKERJAAN
Periode ###
Penanganan Permasalahan
RINGKASAN KEMAJUAN PEKERJAAN
Periode ###
Penanganan Permasalahan
REALISASI WAKTU PELAKSANAAN PEKERJAAN / TIME SCHEDULE (CURVE "
I###
PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH DAN PASIR 4.79 1.44 ### ### ###
### #NAME? ### 4.42 ### ### ###
### #NAME? ### ### ### ### ###
### #NAME? ### ### ### ### ###
### #NAME? ### 0.00 ### ### ###
### #NAME? ### ### ### ### ###
### #NAME? ### ### ### ### ###
### #NAME? ### ### ### ### ###
### #NAME? ### ### ### ### ###
### #NAME? ### ### ### ### ###
### #NAME?
### #NAME? ### ### ### ### ###
Rencana Pelaksanaan Minggu Ini ### ### ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Kumulatif Rencana s/d Minggu Ini ### ### ### ### ### ### ### ### ### ### ### ###
#REF
#REF! Dibuat O
#REF! #REF
#REF! #REF
#REF! #REF
#REF! #REF
#REF! #REF
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
NAAN PEKERJAAN / TIME SCHEDULE (CURVE "S")
90%
80%
70%
60%
50%
40%
30%
20%
10%
0%
#REF!
Dibuat Oleh :
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
REALISASI KEMAJUAN PEKERJAAN
Bulan : I (Pertama)
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 26 April 2019 s/d 30 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consultant
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019
Bulan #NAME?
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas #NAME?
TAHUN ANGGARAN 2019 No/Tgl Kontrak #NAME?
Nilai Kontrak #NAME?
###
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME?
Bulan #NAME?
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas #NAME?
TAHUN ANGGARAN 2019 No/Tgl Kontrak #NAME?
Nilai Kontrak #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
1 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
3 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
4 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME?
Bulan #NAME?
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas #NAME?
TAHUN ANGGARAN 2019 No/Tgl Kontrak #NAME?
Nilai Kontrak #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME?
Bulan : I (Pertama)
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 26 April 2019 s/d 30 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consultant
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019
Mengetahui Oleh :
Pejabat Pembuat Komitmen (PPK)
DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN KOLAKA
Bulan : I (Pertama)
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 26 April 2019 s/d 30 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consultant
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019
Minggu : I (Pertama)
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 26 April 2019 s/d 02 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consultant
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019
Minggu : II (Kedua)
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 03 Mei 2019 s/d 09 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consultant
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019
Minggu : IV (Keempat)
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 17 Mei 2019 s/d 23 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consultant
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019
Minggu : V (Kelima)
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 24 Mei 2019 s/d 30 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consultant
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019
Minggu
PEMERINTAH KABUPATEN KOLAKA Periode
DINAS PENDIDIKAN PEMUDA DAN OLAHRAGA Pelaksana
KABUPATEN KOLAKA No/Tgl Kontrak
TAHUN ANGGARAN 2015 Nilai Kontrak
1 2 3 4 5 6 7
VI PLESTERAN ATAP
1 Pek. Kuda-kuda kayu Pondoh/Meranti 0.75 M3 5,332,578.75 3,978,061.09 2.43
2 Pek. Gording, Balok Nok dan Balok Angin Kayu Pondoh/Meranti 0.67 M3 5,604,438.75 3,772,101.13 2.31
3 Pek. Listplank Double 2x2/20 Kayu Pondoh/Meranti 17.22 M1 73,456.25 1,264,916.63 0.77
4 Pek. Atap Soka 67.07 M2 97,957.00 6,570,162.11 4.02
5 Pek. Nok Seng 7.79 M1 53,831.50 419,347.39 0.26
Sub Jumlah 16,004,588.33 9.78
VII PEKERJAAN KAYU DAN KACA (PINTU DAN JENDELA)
1 Pek. Kusen Kayu Kalapi/Bitti 0.40 M3 6,663,675.00 2,694,123.80 1.65
2 Pek. Pemas. Pintu Kamar Mandi 1.00 Set 520,000.00 520,000.00 0.32
3 Pek. Pintu Panil Kayu Kalapi/Bitti 6.72 M2 506,000.00 3,400,320.00 2.08
4 Pek. Bingkai Jendela Kaca Kayu 0.09 M2 352,762.50 30,422.24 0.02
5 Pemas. Kaca Bening T= 5 mm 3.20 M2 203,291.25 649,881.47 0.40
Sub Jumlah 7,294,747.51 4.46
VIII PEKERJAAN LANTAI KERAMIK
1 Pek. Pas. Tegel Keramik 40 x 40 cm 32.48 M2 249,423.50 8,100,053.10 4.95
2 Pek. Pas. Tegel Keramik 20 x 20 cm 1.53 M2 233,926.85 358,937.35 0.22
3 Pek. Pas. Plint Keramik 10 x 40 cm 36.16 M1 30,612.43 1,106,945.29 0.68
Sub Jumlah 9,565,935.75 5.85
IX PEKERJAAN LANGIT-LANGIT
1 Pek. Rangka Plafond Kayu Podoh/Meranti Uk. 5/7 cm 47.16 M2 96,634.50 4,557,582.59 2.79
2 Pek. Pas. Plafond Tripleks Uk 120 x 240 tebal 3 mm 47.16 M2 48,848.03 2,303,824.64 1.41
3 Pek. List Plafond Kayu 69.01 M1 25,351.75 1,749,473.56 1.07
Sub Jumlah 8,610,880.79 5.26
X PEKERJAAN INSTALASI LISTRIK
1 Titik Instalasi Penerangan Dengan Kabel NYM Conduit She Ega 3 x 6.00 Ttk 165,000.00 990,000.00 0.61
2 Titik Instalasi Stop Kontak Dengan Kabel NYM Conduit She Ega 3 x 4.00 Ttk 165,000.00 660,000.00 0.40
3 Pemas. Lampu TL 40 watt 5.00 Bh 189,703.00 948,515.00 0.58
4 Pemas. Lampu Tl 10 watt 1.00 Bh 105,000.00 105,000.00 0.06
5 Saklar Ganda 1.00 Bh 22,216.00 22,216.00 0.01
6 Saklar Tunggal 4.00 Bh 19,747.00 78,988.00 0.05
7 Stop Kontak 4.00 Bh 17,896.00 71,584.00 0.04
8 Sekring Box ( MCB ) 1.00 Bh 183,560.00 183,560.00 0.11
Sub Jumlah 3,059,863.00 1.87
XI PEKERJAAN LANTAI OVERSTEK DAN SANITASI
1 Pek. Urugan Pasir Bawah Lantai Overstek 1.84 Ttk 366,562.50 675,739.64 0.41
2 Pek. Lantai Overstek Rabat Beton Mutu K. 100 1.84 Ttk 1,391,339.67 2,564,865.11 1.57
3 Pek. Pemas. Ornamen Batu Alam 9.97 Bh 539,946.02 5,385,583.61 3.29
Sub Jumlah 8,626,188.36 5.27
XII PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pemas. Kunci Tanam 2 Slag 4.00 Bh 203,291.25 813,165.00 0.50
2 Pemas. Engsel Pintu 12.00 Bh 66,304.69 795,656.25 0.49
3 Pemas. Engsel Jendela 16.00 Bh 20,035.37 320,565.90 0.20
4 Pemas. Kait Angin Jendela 16.00 Bh 39,647.96 634,367.42 0.39
5 Pemas. Grendel Jendela 8.00 Bh 12,300.00 98,400.00 0.06
6 Pemas. Grendel Pintu 8.00 Bh 32,000.00 256,000.00 0.16
Sub Jumlah 2,918,154.57 1.78
1 2 3 4 5 6 7
XIII PEKERJAAN FINISHING
1 Pek. Cat Dinding Tembok 226.53 M2 17,884.23 4,051,349.26 2.48
2 Pek. Cat Kusen 14.31 M2 37,136.38 531,272.98 0.32
3 Pek. Cat Lisplank 5.17 M2 37,136.38 191,846.51 0.12
4 Pek. Cat Daun Pintu Panil 13.44 M2 37,136.38 499,112.88 0.31
5 Pek. Cat Bingkai Jendela 0.17 M2 37,136.38 6,405.28 0.00
Sub Jumlah 5,279,986.91 3.23
XIV PEKERJAAN PLUMBING
a. Pek. Perpipaan Air Bersih
1 Pemas. Bak Air 1.00 Bh 375,000.00 375,000.00 0.23
2 Pemas. Closed Jongkok Toto 1.00 Bh 766,245.00 766,245.00 0.47
3 Pemas. Instalasi Pipa PVC 1/2 " 16.00 M' 57,730.00 923,680.00 0.56
4 Pemas. Stop Kran 1/2 " 1.00 Bh 19,521.25 19,521.25 0.01
5 Pemas. Fighting-fighting Pipa 1.00 Ls 200,000.00 200,000.00 0.12
Sub Jumlah 2,284,446.25 1.40
b. Pek. Pipa Air Kotor, Buangan Vent
1 Pek. Septik Tank + Resapan 1.00 Bh 4,000,000.00 4,000,000.00 2.45
2 Pemas. Pipa PVC Dia 3 " (Wavin) 12.00 M' 86,877.44 1,042,529.28 0.64
3 Pemas. Pipa PVC Dia 2 " (Wavin) 12.00 M' 48,901.57 586,818.78 0.36
4 Pemas. Fighting-fighting pipa PVC 1.00 Ls 200,000.00 200,000.00 0.12
Sub Jumlah 5,829,348.06 3.56
XV PEKERJAAN LAIN-LAIN
1 Pek. Pembersihan Akhir 1.00 Ls 700,000.00 700,000.00 0.43
Sub Jumlah 700,000.00 0.43
Real Cost / Total Bobot 163,593,630.01
Ppn 10% 16,359,363.00
100.00
Total 179,952,993.01
Dibulatkan 179,950,000.00
Minggu
PEMERINTAH KABUPATEN KOLAKA Periode
DINAS PENDIDIKAN PEMUDA DAN OLAHRAGA Pelaksana
KABUPATEN KOLAKA No/Tgl Kontrak
TAHUN ANGGARAN 2015 Nilai Kontrak
1 2 3 4 5 6 7
XIII PEKERJAAN FINISHING
1 Pek. Cat Dinding Tembok 226.53 M2 17,884.23 4,051,349.26 2.48
2 Pek. Cat Kusen 14.31 M2 37,136.38 531,272.98 0.32
3 Pek. Cat Lisplank 5.17 M2 37,136.38 191,846.51 0.12
4 Pek. Cat Daun Pintu Panil 13.44 M2 37,136.38 499,112.88 0.31
5 Pek. Cat Bingkai Jendela 0.17 M2 37,136.38 6,405.28 0.00
Sub Jumlah 5,279,986.91 3.23
XIV PEKERJAAN PLUMBING
a. Pek. Perpipaan Air Bersih
1 Pemas. Bak Air 1.00 Bh 375,000.00 375,000.00 0.23
2 Pemas. Closed Jongkok Toto 1.00 Bh 766,245.00 766,245.00 0.47
3 Pemas. Instalasi Pipa PVC 1/2 " 16.00 M' 57,730.00 923,680.00 0.56
4 Pemas. Stop Kran 1/2 " 1.00 Bh 19,521.25 19,521.25 0.01
5 Pemas. Fighting-fighting Pipa 1.00 Ls 200,000.00 200,000.00 0.12
Sub Jumlah 2,284,446.25 1.40
b. Pek. Pipa Air Kotor, Buangan Vent
1 Pek. Septik Tank + Resapan 1.00 Bh 4,000,000.00 4,000,000.00 2.45
2 Pemas. Pipa PVC Dia 3 " (Wavin) 12.00 M' 86,877.44 1,042,529.28 0.64
3 Pemas. Pipa PVC Dia 2 " (Wavin) 12.00 M' 48,901.57 586,818.78 0.36
4 Pemas. Fighting-fighting pipa PVC 1.00 Ls 200,000.00 200,000.00 0.12
Sub Jumlah 5,829,348.06 3.56
XV PEKERJAAN LAIN-LAIN
1 Pek. Pembersihan Akhir 1.00 Ls 700,000.00 700,000.00 0.43
Sub Jumlah 700,000.00 0.43
Real Cost / Total Bobot 163,593,630.01
Ppn 10% 16,359,363.00
100.00
Total 179,952,993.01
Dibulatkan 179,950,000.00
: I (Pertama)
: 27 Juni 2014 s/d 03 Juli 2014
aksana : CV. MANUNGGAL PERSADA
/Tgl Kontrak : 411.23/60/DID-DIKMUDORA/2014
ai Kontrak : Rp. 580,580,000
H (2 RKB)
Realisasi s/d Minggu Lalu Realisasi Minggu Ini Realisasi s/d Minggu Ini
Tercapai Tertimb Tercapai Tertimb Tercapai Tertimb
Volume Volume Volume
(%) (%) (%) (%) (%) (%)
8 9 10 11 12 13 14 15 16
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - -
8 9 10 11 12 13 14 15 16
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
8 9 10 11 12 13 14 15 16
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - -
Dilaporkan Oleh,
Kontraktor Pelaksana
CONSULTANT CV. MANUNGGAL PERSADA
Pusat Kolaka
NGGUAN
: II (Kedua)
: 27 Juni 2014 s/d 03 Juli 2014
aksana : CV. MANUNGGAL PERSADA
/Tgl Kontrak : 411.23/60/DID-DIKMUDORA/2014
ai Kontrak : Rp. 580,580,000
H (2 RKB)
Realisasi s/d Minggu Lalu Realisasi Minggu Ini Realisasi s/d Minggu Ini
Tercapai Tertimb Tercapai Tertimb Tercapai Tertimb
Volume Volume Volume
(%) (%) (%) (%) (%) (%)
8 9 10 11 12 13 14 15 16
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - -
8 9 10 11 12 13 14 15 16
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
8 9 10 11 12 13 14 15 16
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -
- - - - - - - - -
- - -
Dilaporkan Oleh,
Kontraktor Pelaksana
CONSULTANT CV. MANUNGGAL PERSADA
Pusat Kolaka
I PEKERJAAN PERSIAPAN
1 Pek. Pembongkaran Atap Sirap (jika bongkaran tidak dipakai) 656.67 M2 3,344.00 2,195,904.48
2 Pembuatan Papan Nama Proyek 1.00 Ls 150,000.00 150,000.00
3 Pek. Pembongkaran Plesteran Dinding 194.78 M2 8,360.00 1,628,360.80
4 Pek. Pengukuran Dan Pemasangan Bouwplank 44.00 M2 65,808.60 2,895,578.40
5 Pek. Pembuatan Gedung Semen dan Alat-Alat 10.00 M2 1,003,058.65 10,030,586.50
6 Pek. Air Kerja, P3K, dan Administrasi 1.00 Ls 1,500,000.00 1,500,000.00
Total Rp. 18,400,430.18
1 Pek. Pasang Pondasi Batu Gunung adk 1pc : 4ps 59.62 M3 854,293.00 50,932,948.66
2 Pek. Pasang Pondasi Batu Kosong (aastanping) 22.36 M3 434,454.43 9,714,401.05
3 Pek. Urugan Pasir Alas Pondasi 7.45 M3 153,905.71 1,146,597.54
IV PEKERJAAN BETON
Dibuat Oleh,
CV. MUKTI RAMA
Pusat Kolaka
18,400,430.18
20,240,473.20
BACE UP DATA RANOMENTAA
A PEKERJAAN PERSIAPAN
1 Pek. Pembongkaran Atap Sirap (jika bongkaran tidak dipakai)
2 Pembuatan Papan Nama Proyek
3 Pek. Pembuatan Gedung Semen dan Alat-Alat