REALISASI PEMBAYARAN NILAI PEKERJAAN

Bulan : I (Pertama)
PEMERINTAH DAERAN KABUPATEN KOLAKA
Periode : 26 April 2019 s/d 30 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consul
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019

Pengawasan Pembangunan Talud


Jumlah Bobot Realisasi s/d Bulan Ini
Tertimbang
NO. URAIAN PEKERJAAN Nilai Pekerjaan Kontrak Nilai Tercapai
(%)
( Rp ) (%) Brutto (Rp) (%)
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN 3,752,273.50 #NAME? 3,752,273.50 100.00 2.79

II PEKERJAAN TANAH DAN PASIR 6,445,020.16 #NAME? 6,445,020.16 100.00 4.79

III PEKERJAAN PONDASI 119,506,682.98 #NAME? 119,506,682.98 100.00 88.74

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

IV PEKERJAAN PIPA PERESAPAN 4,967,419.11 #NAME? 4,967,419.11 100.00 3.69

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?


Real Cost / Total Bobot #NAME? #NAME? #NAME? #NAME?
Ppn 10% #NAME? #NAME?
Total Cost #NAME? #NAME?
Dibulatkan #NAME? #NAME?
Pengambilan Uang Muka #NAME? 30.00
s/d Bulan Lalu - -
Bulan Saat Ini #NAME? #NAME?
Potongan Nilai Fisik s/d Bulan Ini #NAME? #NAME?
Pengembalian Uang Muka #NAME? -
Retensi Pemeliharaan 5 % - -
Jumlah Yang Dibayarkan (Termasuk PPn 10 %) #NAME?
Nilai Yang Dibayarkan #NAME?
Dibulatkan #NAME?
Delapan Puluh Dua Juta Lima Ratus Enam Puluh Delapan Ribu Rupiah

Kolaka, 30 Mei 2019

Dibuat Oleh :
### #NAME?
### #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN KOLAKA

### #NAME?
### #NAME?

#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
REALISASI PEMBAYARAN NILAI PEKERJAAN
Bulan #NAME?
PEMERINTAH DAERAN KABUPATEN KOLAKA
Periode #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas #NAME?
TAHUN ANGGARAN 2019 No/Tgl Kontrak #NAME?
Nilai Kontrak #NAME?

Pengawasan Pembangunan Talud


Jumlah Bobot Realisasi s/d Bulan Ini
Tertimbang
NO. URAIAN PEKERJAAN Nilai Pekerjaan Kontrak Nilai Tercapai
(%)
( Rp ) (%) Brutto (Rp) (%)
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN 3,752,273.50 #NAME? #NAME? #NAME? #NAME?

II PEKERJAAN TANAH DAN PASIR 6,445,020.16 #NAME? #NAME? #NAME? #NAME?

III PEKERJAAN PONDASI 119,506,682.98 #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

IV PEKERJAAN PIPA PERESAPAN 4,967,419.11 #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?


Real Cost / Total Bobot #NAME? #NAME? #NAME? #NAME?
Ppn 10% #NAME? #NAME?
Total Cost #NAME? #NAME?
Dibulatkan #NAME? #NAME?
Pengambilan Uang Muka #NAME? 30.00
s/d Bulan Lalu #NAME? #NAME?
Bulan Saat Ini #NAME? #NAME?
Potongan Nilai Fisik s/d Bulan Ini #NAME? -
Pengembalian Uang Muka #NAME? -
Retensi Pemeliharaan 5 % - -
Jumlah Yang Dibayarkan (Termasuk PPn 10 %) #NAME?
Nilai Yang Dibayarkan #NAME?
Dibulatkan #NAME?
Tiga Ratus Delapan Puluh Empat Juta Enam Ratus Enam Puluh Sembilan Ribu Rupiah

#NAME?

Dibuat Oleh :
### #NAME?
### #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN KOLAKA

#NAME?
### #NAME?
###
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
REALISASI PEMBAYARAN NILAI PEKERJAAN
Bulan #NAME?
PEMERINTAH DAERAN KABUPATEN KOLAKA
Periode #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas #NAME?
TAHUN ANGGARAN 2019 No/Tgl Kontrak #NAME?
Nilai Kontrak #NAME?

Pengawasan Pembangunan Talud


Jumlah Bobot Realisasi s/d Bulan Ini
Tertimbang
NO. URAIAN PEKERJAAN Nilai Pekerjaan Kontrak Nilai Tercapai
(%)
( Rp ) (%) Brutto (Rp) (%)
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN 3,752,273.50 #NAME? #NAME? #NAME? #NAME?

II PEKERJAAN TANAH DAN PASIR 6,445,020.16 #NAME? #NAME? #NAME? #NAME?

III PEKERJAAN PONDASI 119,506,682.98 #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

IV PEKERJAAN PIPA PERESAPAN 4,967,419.11 #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?


Real Cost / Total Bobot #NAME? #NAME? #NAME? #NAME?
Ppn 10% #NAME? #NAME?
Total Cost #NAME? #NAME?
Dibulatkan #NAME? #NAME?
Pengambilan Uang Muka #NAME? 30.00
s/d Bulan Lalu #NAME? #NAME?
Bulan Saat Ini #NAME? #NAME?
Potongan Nilai Fisik s/d Bulan Ini #NAME? #NAME?
Pengembalian Uang Muka #NAME? -
Retensi Pemeliharaan 5 % - -
Jumlah Yang Dibayarkan (Termasuk PPn 10 %) #NAME?
Nilai Yang Dibayarkan #NAME?
Dibulatkan #NAME?
Enam Ratus Dua Juta Delapan Ratus Sembilan Puluh Lima Ribu Rupiah

#NAME?

Dibuat Oleh :
### #NAME?
### #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN KOLAKA

#NAME?
### #NAME?
###
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
REALISASI PEMBAYARAN NILAI PEKERJAAN
Bulan #NAME?
PEMERINTAH DAERAN KABUPATEN KOLAKA
Periode #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas #NAME?
TAHUN ANGGARAN 2019 No/Tgl Kontrak #NAME?
Nilai Kontrak #NAME?

Pengawasan Pembangunan Talud


Jumlah Bobot Realisasi s/d Bulan Ini
Tertimbang
NO. URAIAN PEKERJAAN Nilai Pekerjaan Kontrak Nilai Tercapai
(%)
( Rp ) (%) Brutto (Rp) (%)
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN 3,752,273.50 #NAME? #NAME? #NAME? #NAME?

II PEKERJAAN TANAH DAN PASIR 6,445,020.16 #NAME? #NAME? #NAME? #NAME?

III PEKERJAAN PONDASI 119,506,682.98 #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

IV PEKERJAAN PIPA PERESAPAN 4,967,419.11 #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?

### ### #NAME? #NAME? #NAME? #NAME? #NAME?


Real Cost / Total Bobot #NAME? #NAME? #NAME? #NAME?
Ppn 10% #NAME? #NAME?
Total Cost #NAME? #NAME?
Dibulatkan #NAME? #NAME?
Pengambilan Uang Muka #NAME? 30.00
s/d Bulan Lalu #NAME? #NAME?
Bulan Saat Ini #NAME? #NAME?
Potongan Nilai Fisik s/d Bulan Ini #NAME? #NAME?
Pengembalian Uang Muka #NAME? #NAME?
Retensi Pemeliharaan 5 % - -
Jumlah Yang Dibayarkan (Termasuk PPn 10 %) #NAME?
Nilai Yang Dibayarkan #NAME?
Dibulatkan #NAME?
Lima Ratus Sembilan Puluh Dua Juta Tujuh Ratus Enam Puluh Ribu Rupiah

#NAME?

Dibuat Oleh :
### #NAME?
### #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN KOLAKA

### #NAME?
### #NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
Kolaka, 30 Mei 2019

Nomor : 22 /LAP.01/CV.GEOLAND/PGWSN/DIKMUDORA/VII/2016
Lampiran : 1 Berkas
Perihal : Laporan Kemajuan Pekerjaan

Kepada Yth,
Pejabat Pembuat Komitmen (PPK)
DINAS PENDIDIKAN DAN OLAHRAGA
KABUPATEN KOLAKA
Tahun Anggaran 2016
Di -
Kolaka

Dengan Hormat,

Pengembangan Jaringan Perpipaan SPAM Ranosangia Untuk Desa Ranosangia Kec. Toari Kab. Kolaka
(DAK Penugasan) 14 Juli 2016 s/d 13 Agustus 2016.

Realisasi kemajuan fisik pekerjaan sampai dengan saat laporan ini dibuat secara umum dapat digambarkan
sebagai berikut :

Ω Realisasi pelaksanaan s/d bulan ini = 100.00 %


Ω Jadwal rencana pelaksanaan = 0.00 %
Ω Deviasi Pelaksanaan Pekerjaan = 0.00 %

Demikian Laporan Kemajuan Pekerjaan Bulanan ini disampaikan untuk menjadi bahan evaluasi dan atas
perhatiannya diucapkan terima kasih.

Konsultan Supervisi,
###
###

###
###

Tembusan disampaikan kepada Yth,


1. Kepala Dinas Pendidikan dan Olahraga Kabupaten Kolaka
2. Arsip,-
#NAME?

Nomor : 22 /LAP.02/CV.GEOLAND/PGWSN/DIKMUDORA/VII/2016
Lampiran : 1 Berkas
Perihal : Laporan Kemajuan Pekerjaan

Kepada Yth,
Pejabat Pembuat Komitmen (PPK)
DINAS PENDIDIKAN DAN OLAHRAGA
KABUPATEN KOLAKA
Tahun Anggaran 2016
Di -
Kolaka

Dengan Hormat,

Sehubungan dengan pelaksanaan Pengembangan Jaringan Perpipaan SPAM Ranosangia Untuk Desa
Ranosangia Kec. Toari Kab. Kolaka (DAK Penugasan) 14 Agustus 2016 s/d 13 September 2016.

Realisasi kemajuan fisik pekerjaan sampai dengan saat laporan ini dibuat secara umum dapat digambarkan
sebagai berikut :

Ω Realisasi pelaksanaan s/d bulan ini = #NAME? %


Ω Jadwal rencana pelaksanaan = 0.00 %
Ω Deviasi Pelaksanaan Pekerjaan = #NAME? %

Demikian Laporan Kemajuan Pekerjaan Bulanan ini disampaikan untuk menjadi bahan evaluasi dan atas
perhatiannya diucapkan terima kasih.

Konsultan Supervisi,
###
###

###
###

Tembusan disampaikan kepada Yth,


1. Kepala Dinas Pendidikan dan Olahraga Kabupaten Kolaka
2. Arsip,-
#NAME?

Nomor : 22 /LAP.03/CV.GEOLAND/PGWSN/DIKMUDORA/VII/2016
Lampiran : 1 Berkas
Perihal : Laporan Kemajuan Pekerjaan

Kepada Yth,
Pejabat Pembuat Komitmen (PPK)
DINAS PENDIDIKAN DAN OLAHRAGA
KABUPATEN KOLAKA
Tahun Anggaran 2016
Di -
Kolaka

Dengan Hormat,

Sehubungan dengan pelaksanaan PEMBANGUNAN 2 RKB PAUD PELANGI pada Satker Dinas
Pendidikan dan Olahraga Kabupaten Kolaka, yang berlokasi di Kecamatan Kolaka dan dilaksanakan oleh
CV.TANETA, dengan ini kami sampaikan Laporan Kemajuan Fisik Pekerjaan Bulanan untuk periode
14 September 2016 s/d 13 Oktober 2016.

Realisasi kemajuan fisik pekerjaan sampai dengan saat laporan ini dibuat secara umum dapat digambarkan
sebagai berikut :

Ω Realisasi pelaksanaan s/d bulan ini = #NAME? %


Ω Jadwal rencana pelaksanaan = 0.00 %
Ω Deviasi Pelaksanaan Pekerjaan = 0.00 %

Demikian Laporan Kemajuan Pekerjaan Bulanan ini disampaikan untuk menjadi bahan evaluasi dan atas
perhatiannya diucapkan terima kasih.

Konsultan Supervisi,
###
###

###
###

Tembusan disampaikan kepada Yth,


1. Kepala Dinas Pendidikan dan Olahraga Kabupaten Kolaka
2. Arsip,-
#NAME?

Nomor : 22 /LAP.04/CV.GEOLAND/PGWSN/DIKMUDORA/VII/2016
Lampiran : 1 Berkas
Perihal : Laporan Kemajuan Pekerjaan

Kepada Yth,
Pejabat Pembuat Komitmen (PPK)
DINAS PENDIDIKAN DAN OLAHRAGA
KABUPATEN KOLAKA
Tahun Anggaran 2016
Di -
Kolaka

Dengan Hormat,

Sehubungan dengan pelaksanaan PEMBANGUNAN 2 RKB PAUD PELANGI pada Satker Dinas
Pendidikan dan Olahraga Kabupaten Kolaka, yang berlokasi di Kecamatan Kolaka dan dilaksanakan oleh
CV.TANETA, dengan ini kami sampaikan Laporan Kemajuan Fisik Pekerjaan Bulanan untuk periode
14 Oktober 2016 s/d 13 November 2016.

Realisasi kemajuan fisik pekerjaan sampai dengan saat laporan ini dibuat secara umum dapat digambarkan
sebagai berikut :

Ω Realisasi pelaksanaan s/d bulan ini = #NAME? %


Ω Jadwal rencana pelaksanaan = 0.00 %
Ω Deviasi Pelaksanaan Pekerjaan = 0.00 %

Demikian Laporan Kemajuan Pekerjaan Bulanan ini disampaikan untuk menjadi bahan evaluasi dan atas
perhatiannya diucapkan terima kasih.

Konsultan Supervisi,
###
###

###
###

Tembusan disampaikan kepada Yth,


1. Kepala Dinas Pendidikan dan Olahraga Kabupaten Kolaka
2. Arsip,-
#NAME?

Nomor : 22 /LAP.05/CV.GEOLAND/PGWSN/DIKMUDORA/VII/2016
Lampiran : 1 Berkas
Perihal : Laporan Kemajuan Pekerjaan

Kepada Yth,
Pejabat Pembuat Komitmen (PPK)
DINAS PENDIDIKAN DAN OLAHRAGA
KABUPATEN KOLAKA
Tahun Anggaran 2016
Di -
Kolaka

Dengan Hormat,

Sehubungan dengan pelaksanaan PEMBANGUNAN 2 RKB PAUD PELANGI pada Satker Dinas
Pendidikan dan Olahraga Kabupaten Kolaka, yang berlokasi di Kecamatan Kolaka dan dilaksanakan oleh
CV.TANETA, dengan ini kami sampaikan Laporan Kemajuan Fisik Pekerjaan Bulanan untuk periode
14 November 2016 s/d 10 Desember 2016.

Realisasi kemajuan fisik pekerjaan sampai dengan saat laporan ini dibuat secara umum dapat digambarkan
sebagai berikut :

Ω Realisasi pelaksanaan s/d bulan ini = #NAME? %


Ω Jadwal rencana pelaksanaan = 0.00 %
Ω Deviasi Pelaksanaan Pekerjaan = 0.00 %

Demikian Laporan Kemajuan Pekerjaan Bulanan ini disampaikan untuk menjadi bahan evaluasi dan atas
perhatiannya diucapkan terima kasih.

Konsultan Supervisi,
###
###

###
###

Tembusan disampaikan kepada Yth,


1. Kepala Dinas Pendidikan dan Olahraga Kabupaten Kolaka
2. Arsip,-
RINGKASAN KEMAJUAN PEKERJAAN

PEMERINTAH KABUPATEN KOLAKA


DINAS PERINDUSTRIAN DAN PERDAGANGAN
TAHUN ANGGARAN 2019

Periode : 26 April 2019 s/d 30 Mei 2019

DATA UMUM PROYEK

Pekerjaan : Fisik Rehabilitasi Pasar


Lokasi : Kabupaten Kolaka
Waktu Pelaksanaan : 120 (Seratus Lima Puluh ) Hari Kalender
Masa Pemeliharaan : 180 (Seratus Delapan Puluh) Hari Kalender

DATA UMUM KONSULTAN

Pekerjaan : Pengawasan Pembangunan Talud

Badan Usaha : ###


No. Kontrak : Rp. 4.004.000
Tanggal : 26 April 2019

DATA UMUM PELAKSANA

Badan Usaha : CV. TANETA


No. Kontrak : 11/KONTRAK/DIKMUDORA/VII/2016
Tanggal Kontrak : 26 April 2019

RINGKASAN KEMAJUAN PEKERJAAN


Periode Pelaksanaan Pekerjaan
% Progres Komulatif
NILAI KONTRAK a. Masa Konst. Fisik b. Masa Pemeliharaan
a. Fisik
120 (Seratus Lima Puluh ) 180 (Seratus Delapan Puluh) 1. Rencana : %
a. Real Cost Rp. 233,444,739.00 Hari Kalender Hari Kalender 2. Realisasi : 100.00 %
b. Ppn 10% Rp. 23,344,473.90 3. Deviasi : %
c. Total Cost Rp. 256,789,000.00 b. Waktu Yang Terpakai s/d saat ini b. Keuangan ( Rp.)
Ω Jumlah Hari Total = 120 Hari 1. Uang Muka : %
Ω Jumlah Hari Terpakai = 30 Hari 2. Termin : %
Ω Persentase = 25.00 %
Permasalahan

Penanganan Permasalahan
RINGKASAN KEMAJUAN PEKERJAAN

PEMERINTAH KABUPATEN KOLAKA


DINAS PERINDUSTRIAN DAN PERDAGANGAN
TAHUN ANGGARAN 2019

Periode ###

DATA UMUM PROYEK

Pekerjaan : Fisik Rehabilitasi Pasar


Lokasi : Kabupaten Kolaka
Waktu Pelaksanaan : 120 (Seratus Lima Puluh ) Hari Kalender
Masa Pemeliharaan : 180 (Seratus Delapan Puluh) Hari Kalender

DATA UMUM KONSULTAN

Pekerjaan : Pengawasan Pembangunan Talud


Badan Usaha : ###
No. Kontrak : Rp. 4.004.000
Tanggal : 26 April 2019

DATA UMUM PELAKSANA

Badan Usaha : CV. TANETA


No. Kontrak : 11/KONTRAK/DIKMUDORA/VII/2016
Tanggal Kontrak : 26 April 2019

RINGKASAN KEMAJUAN PEKERJAAN


Periode Pelaksanaan Pekerjaan
% Progres Komulatif
NILAI KONTRAK a. Masa Konst. Fisik b. Masa Pemeliharaan
a. Fisik
120 (Seratus Lima Puluh ) 180 (Seratus Delapan Puluh) 1. Rencana : %
a. Real Cost Rp. 233,444,739.00 Hari Kalender Hari Kalender 2. Realisasi : #NAME? %
b. Ppn 10% Rp. 23,344,473.90 3. Deviasi : %
c. Total Cost Rp. 256,789,000.00 b. Waktu Yang Terpakai s/d saat ini b. Keuangan ( Rp.)
Ω Jumlah Hari Total = 120 Hari 1. Uang Muka : %
Ω Jumlah Hari Terpakai = 60 Hari 2. Termin : %
Ω Persentase = 50.00 %
Permasalahan

Penanganan Permasalahan
RINGKASAN KEMAJUAN PEKERJAAN

PEMERINTAH KABUPATEN KOLAKA


DINAS PERINDUSTRIAN DAN PERDAGANGAN
TAHUN ANGGARAN 2019

Periode ###

DATA UMUM PROYEK

Pekerjaan : Fisik Rehabilitasi Pasar


Lokasi : Kabupaten Kolaka
Waktu Pelaksanaan : 120 (Seratus Lima Puluh ) Hari Kalender
Masa Pemeliharaan : 180 (Seratus Delapan Puluh) Hari Kalender

DATA UMUM KONSULTAN

Pekerjaan : Pengawasan Pembangunan Talud


Badan Usaha : ###
No. Kontrak : Rp. 4.004.000
Tanggal : 26 April 2019

DATA UMUM PELAKSANA

Badan Usaha : CV. TANETA


No. Kontrak : 11/KONTRAK/DIKMUDORA/VII/2016
Tanggal Kontrak : 26 April 2019

RINGKASAN KEMAJUAN PEKERJAAN


Periode Pelaksanaan Pekerjaan
% Progres Komulatif
NILAI KONTRAK a. Masa Konst. Fisik b. Masa Pemeliharaan
a. Fisik
120 (Seratus Lima Puluh ) 180 (Seratus Delapan Puluh) 1. Rencana : %
a. Real Cost Rp. 233,444,739.00 Hari Kalender Hari Kalender 2. Realisasi : #NAME? %
b. Ppn 10% Rp. 23,344,473.90 3. Deviasi : %
c. Total Cost Rp. 256,789,000.00 b. Waktu Yang Terpakai s/d saat ini b. Keuangan ( Rp.)
Ω Jumlah Hari Total = 120 Hari 1. Uang Muka : %
Ω Jumlah Hari Terpakai = 90 Hari 2. Termin : %
Ω Persentase = 75.00 %
Permasalahan

Penanganan Permasalahan
RINGKASAN KEMAJUAN PEKERJAAN

PEMERINTAH KABUPATEN KOLAKA


DINAS PERINDUSTRIAN DAN PERDAGANGAN
TAHUN ANGGARAN 2019

Periode ###

DATA UMUM PROYEK

Pekerjaan : Fisik Rehabilitasi Pasar


Lokasi : Kabupaten Kolaka
Waktu Pelaksanaan : 120 (Seratus Lima Puluh ) Hari Kalender
Masa Pemeliharaan : 180 (Seratus Delapan Puluh) Hari Kalender

DATA UMUM KONSULTAN

Pekerjaan : Pengawasan Pembangunan Talud


Badan Usaha : ###
No. Kontrak : Rp. 4.004.000
Tanggal : 26 April 2019

DATA UMUM PELAKSANA

Badan Usaha : CV. TANETA


No. Kontrak : 11/KONTRAK/DIKMUDORA/VII/2016
Tanggal Kontrak : 26 April 2019

RINGKASAN KEMAJUAN PEKERJAAN


Periode Pelaksanaan Pekerjaan
% Progres Komulatif
NILAI KONTRAK a. Masa Konst. Fisik b. Masa Pemeliharaan
a. Fisik
120 (Seratus Lima Puluh ) 180 (Seratus Delapan Puluh) 1. Rencana : %
a. Real Cost Rp. 233,444,739.00 Hari Kalender Hari Kalender 2. Realisasi : #NAME? %
b. Ppn 10% Rp. 23,344,473.90 3. Deviasi : %
c. Total Cost Rp. 256,789,000.00 b. Waktu Yang Terpakai s/d saat ini b. Keuangan ( Rp.)
Ω Jumlah Hari Total = 120 Hari 1. Uang Muka : %
Ω Jumlah Hari Terpakai = 120 Hari 2. Termin : %
Ω Persentase = 100.00 %
Permasalahan

Penanganan Permasalahan
RINGKASAN KEMAJUAN PEKERJAAN

PEMERINTAH KABUPATEN KOLAKA


DINAS PERINDUSTRIAN DAN PERDAGANGAN
TAHUN ANGGARAN 2019

Periode ###

DATA UMUM PROYEK

Pekerjaan : Fisik Rehabilitasi Pasar


Lokasi : Kabupaten Kolaka
Waktu Pelaksanaan : 120 (Seratus Lima Puluh ) Hari Kalender
Masa Pemeliharaan : 180 (Seratus Delapan Puluh) Hari Kalender

DATA UMUM KONSULTAN

Pekerjaan : Pengawasan Pembangunan Talud


Badan Usaha : ###
No. Kontrak : Rp. 4.004.000
Tanggal : 26 April 2019

DATA UMUM PELAKSANA

Badan Usaha : CV. TANETA


No. Kontrak : 11/KONTRAK/DIKMUDORA/VII/2016
Tanggal Kontrak : 26 April 2019

RINGKASAN KEMAJUAN PEKERJAAN


Periode Pelaksanaan Pekerjaan
% Progres Komulatif
NILAI KONTRAK a. Masa Konst. Fisik b. Masa Pemeliharaan
a. Fisik
120 (Seratus Lima Puluh ) 180 (Seratus Delapan Puluh) 1. Rencana : %
a. Real Cost Rp. 233,444,739.00 Hari Kalender Hari Kalender 2. Realisasi : #NAME? %
b. Ppn 10% Rp. 23,344,473.90 3. Deviasi : %
c. Total Cost Rp. 256,789,000.00 b. Waktu Yang Terpakai s/d saat ini b. Keuangan ( Rp.)
Ω Jumlah Hari Total = 120 Hari 1. Uang Muka : %
Ω Jumlah Hari Terpakai = 150 Hari 2. Termin : %
Ω Persentase = 125.00 %
Permasalahan

Penanganan Permasalahan
REALISASI WAKTU PELAKSANAAN PEKERJAAN / TIME SCHEDULE (CURVE "

#NAME? Pengawas : CV. Zenith Engineering consultant


DINAS PERINDUSTRIAN DAN PERDAGANGAN No/Tgl Kontrak : Rp. 4.004.000
#NAME? Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019
TAHUN ANGGARAN 2019

Pengawasan Pembangunan Talud


PERIODE PELAKSANAAN
NO. URAIAN PEKERJAAN Bobot BULAN I BULAN II BULAN III
% I II III IV V VI VII VIII IX X XI XI
1 2 3 4 5 6 7 8 9 10 11

I###
PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH DAN PASIR 4.79 1.44 ### ### ###
### #NAME? ### 4.42 ### ### ###
### #NAME? ### ### ### ### ###
### #NAME? ### ### ### ### ###
### #NAME? ### 0.00 ### ### ###
### #NAME? ### ### ### ### ###
### #NAME? ### ### ### ### ###
### #NAME? ### ### ### ### ###
### #NAME? ### ### ### ### ###
### #NAME? ### ### ### ### ###
### #NAME?
### #NAME? ### ### ### ### ###

JUMLAH TOTAL ###

Rencana Pelaksanaan Minggu Ini ### ### ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Kumulatif Rencana s/d Minggu Ini ### ### ### ### ### ### ### ### ### ### ### ###

Realisasi Pelaksanaan Minggu Ini 5.86 ### ### ###

Kumulatif Realisasi s/d Minggu Ini 5.86 ### ### ###

Deviasi ( + ) , ( - ) ### ### ### ###

#REF
#REF! Dibuat O
#REF! #REF
#REF! #REF
#REF! #REF

#REF! #REF
#REF! #REF

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
NAAN PEKERJAAN / TIME SCHEDULE (CURVE "S")

awasan Pembangunan Talud


PERIODE PELAKSANAAN
BULAN IV BULAN V KET.
XII XIII XIV XV XVI XVII XVIII XIX
12 13 14 15 16
100%

90%

80%

70%

60%

50%

40%

30%

20%

10%

0%

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


### ### ### ### ### ### ### ###

#REF!
Dibuat Oleh :
#REF!
#REF!
#REF!

#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
REALISASI KEMAJUAN PEKERJAAN

Bulan : I (Pertama)
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 26 April 2019 s/d 30 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consultant
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019

Pengawasan Pembangunan Talud


Target Kontrak Realisasi Bulan Ini
NO. URAIAN PEKERJAAN Harga Sat. Nilai Pekerjaan Bobot Tercapai Tertimb
Volume Sat. Volume Nilai Pekerjaan
(Rp) ( Rp ) % (%) (%)
1 2 3 4 5 6 7 8 9 10 11
I PEKERJAAN PERSIAPAN
1 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? 1.00 #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? 45.00 #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? 21.00 #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? 1.00 #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
II PEKERJAAN TANAH DAN PASIR
1 #NAME? #NAME? ### #NAME? #NAME? #NAME? 55.81 #NAME? #NAME? #NAME?
2 #NAME? #NAME? ### #NAME? #NAME? #NAME? 11.16 #NAME? #NAME? #NAME?
3 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
4 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
III PEKERJAAN PONDASI
1 #NAME? #NAME? ### #NAME? #NAME? #NAME? 120.00 #NAME? #NAME? #NAME?
2 #NAME? #NAME? ### #NAME? #NAME? #NAME? 126.21 #NAME? #NAME? #NAME?
3 #NAME? #NAME? ### #NAME? #NAME? #NAME? 117.39 #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
1 #NAME?
- -
### #NAME?
1 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
IV PEKERJAAN PIPA PERESAPAN
1 #NAME? #NAME? ### #NAME? #NAME? #NAME? 28.00 #NAME? #NAME? #NAME?
2 #NAME? #NAME? ### #NAME? #NAME? #NAME? 44.00 #NAME? #NAME? #NAME?
3 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
4 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
1 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
3 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
4 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
5 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
1 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
3 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
4 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
5 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
6 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
7 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
1 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
3 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
4 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
Real Cost / Total Bobot #NAME? #NAME? #NAME? #NAME?
PPN 10% #NAME? #NAME?
Jumlah/ Total #NAME? #NAME?
Dibulatkan #NAME? #NAME?

Kolaka, 30 Mei 2019

Mengetahui Oleh : Diperiksa / Disetujui Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK) #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN DINAS PERINDUSTRIAN DAN PERDAGANGAN #NAME?
KABUPATEN KOLAKA KABUPATEN KOLAKA

Dr. H. MUH AZIKIN, STP, MS Drs. KAMAL ARIF #NAME?


NIP. 19680912 1997703 1 011 NIP. 19660501 200112 1 004 #NAME?
REALISASI KEMAJUAN PEKERJAAN

Bulan #NAME?
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas #NAME?
TAHUN ANGGARAN 2019 No/Tgl Kontrak #NAME?
Nilai Kontrak #NAME?
###

Pengawasan Pembangunan Talud


Target Kontrak Realisasi Bulan Ini
NO. URAIAN PEKERJAAN Harga Sat. Nilai Pekerjaan Bobot Tercapai Tertimb
Volume Sat. Volume Nilai Pekerjaan
(Rp) ( Rp ) % (%) (%)
1 2 3.00 4 5.00 6 7 8 9 10 11
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?

### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

#NAME?

Mengetahui Oleh : Diperiksa / Disetujui Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK) #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN DINAS PERINDUSTRIAN DAN PERDAGANGAN #NAME?
KABUPATEN KOLAKA KABUPATEN KOLAKA

Dr. H. MUH AZIKIN, STP, MS Drs. KAMAL ARIF #NAME?


NIP. 19680912 1997703 1 011 NIP. 19660501 200112 1 004 #NAME?
REALISASI KEMAJUAN PEKERJAAN

Bulan #NAME?
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas #NAME?
TAHUN ANGGARAN 2019 No/Tgl Kontrak #NAME?
Nilai Kontrak #NAME?

Pengawasan Pembangunan Talud


Target Kontrak Realisasi Bulan Ini
NO. URAIAN PEKERJAAN Harga Sat. Nilai Pekerjaan Bobot Tercapai Tertimb
Volume Sat. Volume Nilai Pekerjaan
(Rp) ( Rp ) % (%) (%)
1 2 3 4 5 6 7 8 9 10 11
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME?

### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
1 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
3 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
4 #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

#NAME?

Mengetahui Oleh : Diperiksa / Disetujui Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK) #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN DINAS PERINDUSTRIAN DAN PERDAGANGAN #NAME?
KABUPATEN KOLAKA KABUPATEN KOLAKA

### Drs. KAMAL ARIF #NAME?


### NIP. 19660501 200112 1 004 #NAME?
REALISASI KEMAJUAN PEKERJAAN

Bulan #NAME?
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas #NAME?
TAHUN ANGGARAN 2019 No/Tgl Kontrak #NAME?
Nilai Kontrak #NAME?

Pengawasan Pembangunan Talud


Target Kontrak Realisasi Bulan Ini
NO. URAIAN PEKERJAAN Harga Sat. Nilai Pekerjaan Bobot Tercapai Tertimb
Volume Sat. Volume Nilai Pekerjaan
(Rp) ( Rp ) % (%) (%)
1 2 3.00 4 5.00 6 7 8 9 10 11
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME?

### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
### #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
### #NAME? #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Jumlah #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?
#NAME? #NAME? #NAME?

#NAME?

Mengetahui Oleh : Diperiksa / Disetujui Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK) #NAME?
DINAS PERINDUSTRIAN DAN PERDAGANGAN DINAS PERINDUSTRIAN DAN PERDAGANGAN #NAME?
KABUPATEN KOLAKA KABUPATEN KOLAKA

#NAME? Drs. KAMAL ARIF #NAME?


#NAME? NIP. 19660501 200112 1 004 #NAME?
LAPORAN KEMAJUAN BOBOT PEKERJAAN

Bulan : I (Pertama)
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 26 April 2019 s/d 30 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consultant
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019

Pengawasan Pembangunan Talud


Target Kontrak
NO. URAIAN PEKERJAAN Nilai Pekerjaan Bobot Nilai Pekerjaan Tercapai Tertimb.
( Rp ) % ( Rp ) (%) (%)
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN 3,752,273.50 2.79 3,752,273.50 100.00 2.79

II PEKERJAAN TANAH DAN PASIR 6,445,020.16 4.79 6,445,020.16 100.00 4.79

III PEKERJAAN PONDASI 119,506,682.98 88.74 119,506,682.98 100.00 88.74

IV PEKERJAAN PIPA PERESAPAN 4,967,419.11 3.69 4,967,419.11 100.00 3.69


Real Cost / Total Bobot 134,671,395.75 100.00 134,671,395.75 100.00
PPN 10% 13,467,139.58 13,467,139.58
Jumlah/ Total 148,138,535.33 148,138,535.33
Dibulatkan 148,130,000.00 148,130,000.00

Kolaka, 30 Mei 2019

Diperiksa / Disetujui Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Supervisi
DINAS PERINDUSTRIAN DAN PERDAGANGAN CV. ZENITH ENGINEERING CONSULTANT
KABUPATEN KOLAKA

Drs. KAMAL ARIF JABIRUDDIN, ST


NIP. 19660501 200112 1 004 Direktur

Mengetahui Oleh :
Pejabat Pembuat Komitmen (PPK)
DINAS PERINDUSTRIAN DAN PERDAGANGAN
KABUPATEN KOLAKA

Dr. H. MUH AZIKIN, STP, MS


NIP. 19680912 1997703 1 011
LAPORAN KEMAJUAN PEKERJAAN BULANAN

Bulan : I (Pertama)
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 26 April 2019 s/d 30 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consultant
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019

Pengawasan Pembangunan Talud


Target Kontrak Realisasi s/d Bulan Lalu Realisasi Bulan Ini Realisasi s/d Bulan Ini
NO. URAIAN PEKERJAAN Harga Sat. Nilai Pekerjaan Bobot Tercapai Tertimb Tercapai Tertimb Tercapai Tertimb
Volume Sat. Volume Volume Volume
(Rp) ( Rp ) % (%) (%) (%) (%) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
I PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 Ls 150,000.00 150,000.00 0.111 - - - 1.00 100.00 0.11 1.00 100.00 0.11
2 Pek. Pembuatan Karung Kisdam Uk. 43 Cm X 65 Cm 45.00 Bh 20,680.00 930,600.00 0.691 - - - 45.00 100.00 0.69 45.00 100.00 0.69
3 Pek. Pengukuran Dan Pasang Bouwplank 21.00 M2 59,603.50 1,251,673.50 0.929 - - - 21.00 100.00 0.93 21.00 100.00 0.93
4 Pek. Air Kerja, P3K, dan Administrasi 1.00 Ls 1,420,000.00 1,420,000.00 1.054 - - - 1.00 100.00 1.05 1.00 100.00 1.05
Sub Jumlah 3,752,273.50 2.79 - 2.79 2.79
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Lumpur Sedalam 1 m 55.81 m3 97,948.40 5,466,500.20 4.059 - - - 55.81 100.00 4.06 55.81 100.00 4.06
2 Pek. Urugan Pasir 11.16 M3 87,681.00 978,519.96 0.727 - - - 11.16 100.00 0.73 11.16 100.00 0.73
Sub Jumlah 6,445,020.16 4.79 - 4.79 4.79
III PEKERJAAN PONDASI
1 Pek. Memancang Tiang Pancang Kayu gelondong Ø 20 cm (2, 120.00 m3 85,074.00 10,208,880.00 7.581 - - - 120.00 100.00 7.58 120.00 100.00 7.58
2 Pek. Pasang Pondasi batu belah Camp 1 pc : 3 ps 126.21 m3 805,844.47 101,705,630.56 75.521 - - - 126.21 100.00 75.52 126.21 100.00 75.52
3 Pek. Plesteran Skoning adk. 1pc : 2ps, tebal 10mm (Mata Sap 117.39 m3 64,674.78 7,592,172.42 5.638 - - - 117.39 100.00 5.64 117.39 100.00 5.64
Sub Jumlah 119,506,682.98 88.74 - 88.74 88.74
IV PEKERJAAN PIPA PERESAPAN
1 Pek. Pipa Resapan (PVC 1") 28.00 m3 54,097.59 1,514,732.51 1.125 - - - 28.00 100.00 1.12 28.00 100.00 1.12
2 Pek. Pipa Resapan (PVC 2,5") 44.00 m3 78,470.15 3,452,686.60 2.564 - - - 44.00 100.00 2.56 44.00 100.00 2.56
Sub Jumlah 4,967,419.11 3.69 - 3.69 3.69

Real Cost / Total Bobot 134,671,395.75


PPN 10% 13,467,139.58
100.00 0.00 100.00 100.00
Jumlah/ Total 148,138,535.33
Dibulatkan 148,130,000.00

Kolaka, 30 Mei 2019

Mengetahui Oleh : Diperiksa / Disetujui Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Supervisi
DINAS PERINDUSTRIAN DAN PERDAGANGAN DINAS PERINDUSTRIAN DAN PERDAGANGAN CV. ZENITH ENGINEERING CONSULTANT
KABUPATEN KOLAKA KABUPATEN KOLAKA Pusat Konawe

Dr. H. MUH AZIKIN, STP, MS Drs. KAMAL ARIF JABIRUDDIN, ST


NIP. 19680912 1997703 1 011 NIP. 19660501 200112 1 004 Direktur
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN

Minggu : I (Pertama)
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 26 April 2019 s/d 02 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consultant
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019

Pengawasan Pembangunan Talud


Target Kontrak Realisasi s/d Minggu Lalu Realisasi Minggu Ini Realisasi s/d Minggu Ini
NO. URAIAN PEKERJAAN Harga Sat. Nilai Pekerjaan Bobot Tercapai Tertimb Tercapai Tertimb Tercapai Tertimb
Volume Sat. Volume Volume Volume
(Rp) ( Rp ) % (%) (%) (%) (%) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
I PEKERJAAN PENDAHULUAN
1 Pembuatan Papan Nama Proyek 1.00 Ls 150,000.00 150,000.00 0.111 - - - 1.00 100.00 0.11 1.00 100.00 0.11
2 Pek. Pembuatan Karung Kisdam Uk. 43 Cm X 65 Cm 45.00 Bh 20,680.00 930,600.00 0.691 - - - 12.00 26.67 0.18 12.00 26.67 0.18
3 Pek. Pengukuran Dan Pasang Bouwplank 21.00 M2 59,603.50 1,251,673.50 0.929 - - - 21.00 100.00 0.93 21.00 100.00 0.93
4 Pek. Air Kerja, P3K, dan Administrasi 1.00 Ls 1,420,000.00 1,420,000.00 1.054 - - - 0.20 20.00 0.21 0.20 20.00 0.21
Sub Jumlah 3,752,273.50 2.79 - 1.44 1.44
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Lumpur Sedalam 1 m 55.81 M3 97,948.40 5,466,500.20 4.059 - - - 55.81 100.00 4.06 55.81 100.00 4.06
2 Pek. Urugan Pasir 11.16 M3 87,681.00 978,519.96 0.727 - - - 5.58 50.00 0.36 5.58 50.00 0.36
Sub Jumlah 6,445,020.16 4.79 0.00 4.42 4.42
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Memancang Tiang Pancang Kayu gelondong Ø 20 cm (2,5 120.00 M' 85,074.00 10,208,880.00 7.581 - - - - - - - - -
2 Pek. Pasang Pondasi batu belah Camp 1 pc : 3 ps 126.21 M3 805,844.47 101,705,630.56 75.521 - - - - - - - - -
3 Pek. Plesteran Skoning adk. 1pc : 2ps, tebal 10mm (Mat 117.39 M2 64,674.78 7,592,172.42 5.638 - - - - - - - - -
Sub Jumlah 119,506,682.98 88.74 0.00 0.00 0.00
IV PEKERJAAN PIPA PERESAPAN
1 Pek. Pipa Resapan (PVC 1") 28.00 M' 54,097.59 1,514,732.51 1.125 - - - - - - - - -
2 Pek. Pipa Resapan (PVC 2,5") 44.00 M' 78,470.15 3,452,686.60 2.564 - - - - - - - - -
Sub Jumlah 4,967,419.11 3.69 0.00 0.00 0.00

Real Cost / Total Bobot 134,671,395.75


PPN 10% 13,467,139.58
100 0 5.86 5.86
Jumlah/ Total 148,138,535.33
Dibulatkan 148,130,000.00

Kolaka, 02 Mei 2019

Mengetahui Oleh : Diperiksa / Disetujui Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Supervisi
DINAS PERINDUSTRIAN DAN PERDAGANGAN DINAS PERINDUSTRIAN DAN PERDAGANGAN CV. ZENITH ENGINEERING CONSULTANT
KABUPATEN KOLAKA KABUPATEN KOLAKA Pusat Konawe

Dr. H. MUH AZIKIN, STP, MS Drs. KAMAL ARIF JABIRUDDIN, ST


NIP. 19680912 1997703 1 011 NIP. 19660501 200112 1 004 Direktur
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN

Minggu : II (Kedua)
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 03 Mei 2019 s/d 09 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consultant
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019

Pengawasan Pembangunan Talud


Target Kontrak Realisasi s/d Minggu Lalu Realisasi Minggu Ini Realisasi s/d Minggu Ini
NO. URAIAN PEKERJAAN Harga Sat. Nilai Pekerjaan Bobot Tercapai Tertimb Tercapai Tertimb Tercapai Tertimb
Volume Sat. Volume Volume Volume
(Rp) ( Rp ) % (%) (%) (%) (%) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
I PEKERJAAN PENDAHULUAN
1 Pembuatan Papan Nama Proyek 1.00 Ls 150,000.00 150,000.00 0.111 1.00 100.00 0.11 - - - 1.00 100.00 0.11
2 Pek. Pembuatan Karung Kisdam Uk. 43 Cm X 65 Cm 45.00 Bh 20,680.00 930,600.00 0.691 12.00 26.67 0.18 12.00 26.67 0.18 24.00 53.33 0.37
3 Pek. Pengukuran Dan Pasang Bouwplank 21.00 Ls 59,603.50 1,251,673.50 0.929 21.00 100.00 0.93 - - - 21.00 100.00 0.93
4 Pek. Air Kerja, P3K, dan Administrasi 1.00 Ls 1,420,000.00 1,420,000.00 1.054 0.20 20.00 0.21 0.20 20.00 0.21 0.40 40.00 0.42
Sub Jumlah 3,752,273.50 2.79 1.44 0.40 1.83
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Lumpur Sedalam 1 m 55.81 M3 97,948.40 5,466,500.20 4.059 55.81 100.00 4.06 - - - 55.81 100.00 4.06
2 Pek. Urugan Pasir 11.16 M3 87,681.00 978,519.96 0.727 5.58 50.00 0.36 5.58 50.00 0.36 11.16 100.00 0.73
Sub Jumlah 6,445,020.16 4.79 4.42 0.36 4.79
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Memancang Tiang Pancang Kayu gelondong Ø 20 cm120.00 M' 85,074.00 10,208,880.00 7.581 - - - 60.00 50.00 3.79 60.00 50.00 3.79
2 Pek. Pasang Pondasi batu belah Camp 1 pc : 3 ps 126.21 M3 805,844.47 101,705,630.56 75.521 - - - 31.55 25.00 18.88 31.55 25.00 18.88
3 Pek. Plesteran Skoning adk. 1pc : 2ps, tebal 10mm (Mat 117.39 M2 64,674.78 7,592,172.42 5.638 - - - - - - - - -
Sub Jumlah 119,506,682.98 88.74 - 22.67 22.67
IV PEKERJAAN PIPA PERESAPAN
###
1 Pek. Pipa Resapan (PVC 1") 28.00 M' 54,097.59 1,514,732.51 1.125 - - - 7.00 25.00 0.28 7.00 25.00 0.28
###
2 Pek. Pipa Resapan (PVC 2,5") 44.00 M' 78,470.15 3,452,686.60 2.564 - - - 11.00 25.00 0.64 11.00 25.00 0.64
Sub Jumlah 4,967,419.11 3.69 - 0.92 0.92

Real Cost / Total Bobot 134,671,395.75


PPN 10% 13,467,139.58
100 5.86 24.35 30.21
Jumlah/ Total 148,138,535.33
Dibulatkan 148,130,000.00

Kolaka, 09 Mei 2019

Mengetahui Oleh : Diperiksa / Disetujui Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Supervisi
DINAS PERINDUSTRIAN DAN PERDAGANGAN DINAS PERINDUSTRIAN DAN PERDAGANGAN CV. ZENITH ENGINEERING CONSULTANT
KABUPATEN KOLAKA KABUPATEN KOLAKA Pusat Konawe

Dr. H. MUH AZIKIN, STP, MS Drs. KAMAL ARIF JABIRUDDIN, ST


NIP. 19680912 1997703 1 011 NIP. 19660501 200112 1 004 Direktur
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN

Minggu : III (Ketiga)


PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 10 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : 16 Mei 2019
TAHUN ANGGARAN 2019 No/Tgl Kontrak : CV. Zenith Engineering consultant
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019

Pengawasan Pembangunan Talud


Target Kontrak Realisasi s/d Minggu Lalu Realisasi Minggu Ini Realisasi s/d Minggu Ini
NO. URAIAN PEKERJAAN Harga Sat. Nilai Pekerjaan Bobot Tercapai Tertimb Tercapai Tertimb Tercapai Tertimb
Volume Sat. Volume Volume Volume
(Rp) ( Rp ) % (%) (%) (%) (%) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
I PEKERJAAN PENDAHULUAN
1 Pembuatan Papan Nama Proyek 1.00 Ls 150,000.00 150,000.00 0.111 1.00 100.00 0.11 - - - 1.00 100.00 0.11
2 Pek. Pembuatan Karung Kisdam Uk. 43 Cm X 65 Cm 45.00 Bh 20,680.00 930,600.00 0.691 24.00 53.33 0.37 21.00 46.67 0.32 45.00 100.00 0.69
3 Pek. Pengukuran Dan Pasang Bouwplank 21.00 Ls 59,603.50 1,251,673.50 0.929 21.00 100.00 0.93 - - - 21.00 100.00 0.93
4 Pek. Air Kerja, P3K, dan Administrasi 1.00 Ls 1,420,000.00 1,420,000.00 1.054 0.40 40.00 0.42 0.20 20.00 0.21 0.60 60.00 0.63
Sub Jumlah 3,752,273.50 2.79 1.83 0.53 2.36
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Lumpur Sedalam 1 m 55.81 M3 97,948.40 5,466,500.20 4.059 55.81 100.00 4.06 - - - 55.81 100.00 4.06
2 Pek. Urugan Pasir 11.16 M3 87,681.00 978,519.96 0.727 11.16 100.00 0.73 - - - 11.16 100.00 0.73
Sub Jumlah 6,445,020.16 4.79 4.79 - 4.79
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Memancang Tiang Pancang Kayu gelondong Ø 20 cm120.00 M' 85,074.00 10,208,880.00 7.581 60.00 50.00 3.79 60.00 50.00 3.79 120.00 100.00 7.58
2 Pek. Pasang Pondasi batu belah Camp 1 pc : 3 ps 126.21 M3 805,844.47 101,705,630.56 75.521 31.55 25.00 18.88 31.55 25.00 18.88 63.11 50.00 37.76
3 Pek. Plesteran Skoning adk. 1pc : 2ps, tebal 10mm (Mat 117.39 M2 64,674.78 7,592,172.42 5.638 - - - 39.13 33.33 1.88 39.13 33.33 1.88
Sub Jumlah 119,506,682.98 88.74 22.67 24.55 47.22
IV PEKERJAAN PIPA PERESAPAN
1 Pek. Pipa Resapan (PVC 1") 28.00 M' 54,097.59 1,514,732.51 1.125 7.00 25.00 0.28 7.00 25.00 0.28 14.00 50.00 0.56
2 Pek. Pipa Resapan (PVC 2,5") 44.00 M' 78,470.15 3,452,686.60 2.564 11.00 25.00 0.64 11.00 25.00 0.64 22.00 50.00 1.28
Sub Jumlah 4,967,419.11 3.69 0.92 0.92 1.84

Real Cost / Total Bobot 134,671,395.75


PPN 10% 13,467,139.58
100 30.21 26.01 56.21
Jumlah/ Total 148,138,535.33
Dibulatkan 148,130,000.00

Kolaka, 16 Mei 2019

Mengetahui Oleh : Diperiksa / Disetujui Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Supervisi
DINAS PERINDUSTRIAN DAN PERDAGANGAN DINAS PERINDUSTRIAN DAN PERDAGANGAN CV. ZENITH ENGINEERING CONSULTANT
KABUPATEN KOLAKA KABUPATEN KOLAKA Pusat Konawe

Dr. H. MUH AZIKIN, STP, MS Drs. KAMAL ARIF JABIRUDDIN, ST


NIP. 19680912 1997703 1 011 NIP. 19660501 200112 1 004 Direktur
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN

Minggu : IV (Keempat)
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 17 Mei 2019 s/d 23 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consultant
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019

Pengawasan Pembangunan Talud


Target Kontrak Realisasi s/d Minggu Lalu Realisasi Minggu Ini Realisasi s/d Minggu Ini
NO. URAIAN PEKERJAAN Harga Sat. Nilai Pekerjaan Bobot Tercapai Tertimb Tercapai Tertimb Tercapai Tertimb
Volume Sat. Volume Volume Volume
(Rp) ( Rp ) % (%) (%) (%) (%) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
I PEKERJAAN PENDAHULUAN
1 Pembuatan Papan Nama Proyek 1.00 Ls 150,000.00 150,000.00 0.111 1.00 100.00 0.11 - - 1.00 100.00 0.11
2 Pek. Pembuatan Karung Kisdam Uk. 43 Cm X 65 Cm 45.00 Bh 20,680.00 930,600.00 0.691 45.00 100.00 0.69 - - - 45.00 100.00 0.69
3 Pek. Pengukuran Dan Pasang Bouwplank 21.00 Ls 59,603.50 1,251,673.50 0.929 21.00 100.00 0.93 - - 21.00 100.00 0.93
4 Pek. Air Kerja, P3K, dan Administrasi 1.00 Ls 1,420,000.00 1,420,000.00 1.054 0.60 60.00 0.63 0.20 20.00 0.21 0.80 80.00 0.84
Sub Jumlah 3,752,273.50 2.79 2.36 0.21 2.58
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Lumpur Sedalam 1 m 55.81 M3 97,948.40 5,466,500.20 4.059 55.81 100.00 4.06 - - - 55.81 100.00 4.06
2 Pek. Urugan Pasir 11.16 M3 87,681.00 978,519.96 0.727 11.16 100.00 0.73 - - - 11.16 100.00 0.73
Sub Jumlah 6,445,020.16 4.79 4.79 - 4.79
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Memancang Tiang Pancang Kayu gelondong Ø 20 cm120.00 M' 85,074.00 10,208,880.00 7.581 120.00 100.00 7.58 - - - 120.00 100.00 7.58
2 Pek. Pasang Pondasi batu belah Camp 1 pc : 3 ps 126.21 M3 805,844.47 101,705,630.56 75.521 63.11 50.00 37.76 31.55 25.00 18.88 94.66 75.00 56.64
3 Pek. Plesteran Skoning adk. 1pc : 2ps, tebal 10mm (Mat 117.39 M2 64,674.78 7,592,172.42 5.638 39.13 33.33 1.88 39.13 33.33 1.88 78.26 66.67 3.76
Sub Jumlah 119,506,682.98 88.74 47.22 20.76 67.98
IV PEKERJAAN PIPA PERESAPAN
1 Pek. Pipa Resapan (PVC 1") 28.00 M' 54,097.59 1,514,732.51 1.125 14.00 50.00 0.56 7.00 25.00 0.28 21.00 75.00 0.84
2 Pek. Pipa Resapan (PVC 2,5") 44.00 M' 78,470.15 3,452,686.60 2.564 22.00 50.00 1.28 11.00 25.00 0.64 33.00 75.00 1.92
Sub Jumlah 4,967,419.11 3.69 1.84 0.92 2.77

Real Cost / Total Bobot 134,671,395.75


PPN 10% 13,467,139.58
100 56.21 21.89 78.11
Jumlah/ Total 148,138,535.33
Dibulatkan 148,130,000.00

Kolaka, 23 Mei 2019

Mengetahui Oleh : Diperiksa / Disetujui Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Supervisi
DINAS PERINDUSTRIAN DAN PERDAGANGAN DINAS PERINDUSTRIAN DAN PERDAGANGAN CV. ZENITH ENGINEERING CONSULTANT
KABUPATEN KOLAKA KABUPATEN KOLAKA Pusat Konawe

Dr. H. MUH AZIKIN, STP, MS Drs. KAMAL ARIF JABIRUDDIN, ST


NIP. 19680912 1997703 1 011 NIP. 19660501 200112 1 004 Direktur
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN

Minggu : V (Kelima)
PEMERINTAH DAERAN KABUPATEN KOLAKA Periode : 24 Mei 2019 s/d 30 Mei 2019
DINAS PERINDUSTRIAN DAN PERDAGANGAN Pengawas : CV. Zenith Engineering consultant
TAHUN ANGGARAN 2019 No/Tgl Kontrak : Rp. 4.004.000
Nilai Kontrak : 05/SPK-PT/PL-DPP/IV/2019

Pengawasan Pembangunan Talud


Target Kontrak Realisasi s/d Minggu Lalu Realisasi Minggu Ini Realisasi s/d Minggu Ini
NO. URAIAN PEKERJAAN Harga Sat. Nilai Pekerjaan Bobot Tercapai Tertimb Tercapai Tertimb Tercapai Tertimb
Volume Sat. Volume Volume Volume
(Rp) ( Rp ) % (%) (%) (%) (%) (%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
I PEKERJAAN PENDAHULUAN
1 Pembuatan Papan Nama Proyek 1.00 Ls 150,000.00 150,000.00 0.111 1.00 100.00 0.11 - - - 1.00 100.00 0.11
2 Pek. Pembuatan Karung Kisdam Uk. 43 Cm X 65 Cm 45.00 Bh 20,680.00 930,600.00 0.691 45.00 100.00 0.69 - - - 45.00 100.00 0.69
3 Pek. Pengukuran Dan Pasang Bouwplank 21.00 Ls 59,603.50 1,251,673.50 0.929 21.00 100.00 0.93 - - - 21.00 100.00 0.93
4 Pek. Air Kerja, P3K, dan Administrasi 1.00 Ls 1,420,000.00 1,420,000.00 1.054 0.80 80.00 0.84 0.20 20.00 0.21 1.00 100.00 1.05
Sub Jumlah 3,752,273.50 2.79 2.58 0.21 2.79
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Lumpur Sedalam 1 m 55.81 M3 97,948.40 5,466,500.20 4.059 55.81 100.00 4.06 - - - 55.81 100.00 4.06
2 Pek. Urugan Pasir 11.16 M3 87,681.00 978,519.96 0.727 11.16 100.00 0.73 - - - 11.16 100.00 0.73
Sub Jumlah 6,445,020.16 4.79 4.79 - 4.79
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pek. Memancang Tiang Pancang Kayu gelondong Ø 20 cm120.00 M' 85,074.00 10,208,880.00 7.581 120.00 100.00 7.58 - - - 120.00 100.00 7.58
2 Pek. Pasang Pondasi batu belah Camp 1 pc : 3 ps 126.21 M3 805,844.47 101,705,630.56 75.521 94.66 75.00 56.64 31.55 25.00 18.88 126.21 100.00 75.52
3 Pek. Plesteran Skoning adk. 1pc : 2ps, tebal 10mm (Mat 117.39 M2 64,674.78 7,592,172.42 5.638 78.26 66.67 3.76 39.13 33.33 1.88 117.39 100.00 5.64
Sub Jumlah 119,506,682.98 88.74 67.98 20.76 88.74
IV PEKERJAAN PIPA PERESAPAN
1 Pek. Pipa Resapan (PVC 1") 28.00 M' 54,097.59 1,514,732.51 1.125 21.00 75.00 0.84 7.00 25.00 0.28 28.00 100.00 1.12
2 Pek. Pipa Resapan (PVC 2,5") 44.00 M' 78,470.15 3,452,686.60 2.564 33.00 75.00 1.92 11.00 25.00 0.64 44.00 100.00 2.56
Sub Jumlah 4,967,419.11 3.69 2.77 0.92 3.69

Real Cost / Total Bobot 134,671,395.75


PPN 10% 13,467,139.58
100 78.11 21.89 100.00
Jumlah/ Total 148,138,535.33
Dibulatkan 148,130,000.00

Kolaka, 30 Mei 2019

Mengetahui Oleh : Diperiksa / Disetujui Oleh : Dibuat Oleh :


Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Supervisi
DINAS PERINDUSTRIAN DAN PERDAGANGAN DINAS PERINDUSTRIAN DAN PERDAGANGAN CV. ZENITH ENGINEERING CONSULTANT
KABUPATEN KOLAKA KABUPATEN KOLAKA Pusat Konawe

Dr. H. MUH AZIKIN, STP, MS Drs. KAMAL ARIF JABIRUDDIN, ST


NIP. 19680912 1997703 1 011 NIP. 19660501 200112 1 004 Direktur
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN

Minggu
PEMERINTAH KABUPATEN KOLAKA Periode
DINAS PENDIDIKAN PEMUDA DAN OLAHRAGA Pelaksana
KABUPATEN KOLAKA No/Tgl Kontrak
TAHUN ANGGARAN 2015 Nilai Kontrak

PEMBANGUNAN RKB TK MEKONGGA INDAH (2 RKB)


Target Kontrak
NO. URAIAN PEKERJAAN Harga Sat. Nilai Pekerjaan Bobot
Volume Sat.
(Rp) ( Rp ) %
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Pembuatan Papan Nama Proyek 1.00 Ls 250,000.00 250,000.00 0.15
2 Pek. Administrasi, Penyediaan Air Kerja dan Pembersihan Lokasi 1.00 Ls 800,000.00 800,000.00 0.49
3 Administrasi, air kerja, dokumentasi, P3K dll. 1.00 Ls 1,300,000.00 1,300,000.00 0.79
4 Pek. Pemasangan Bowplank 10.00 M1 73,617.25 736,172.50 0.45
Sub Jumlah 3,086,172.50 1.89
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi 15.59 M3 53,906.25 840,533.20 0.51
2 Pek. Urugan Tanah Kembali 4.25 M3 38,812.50 165,050.16 0.10
3 Pek. Timbunan Tanah 11.90 M3 95,306.25 1,134,461.27 0.69
4 Pek. Urugan pasir bawah lantai 3.40 M3 366,562.50 1,246,660.73 0.76
5 Pek. Urugan pasir bawah Pondasi 1.22 M3 366,562.50 445,373.44 0.27
Sub Jumlah 3,832,078.80 2.34
III PEKERJAAN BETON DAN PONDASI
1 Pek. Sloof Beton 13 x 15 cm 0.79 M3 6,431,484.25 5,079,264.69 3.10
2 Pek. Kolom Praktis 58.94 M' 107,973.50 6,363,958.09 3.89
3 Pek. Ring Balk Beton 63.74 M' 143,767.25 9,163,724.52 5.60
4 Pek. Plat Beton 0.50 M3 7,327,196.25 3,692,027.65 2.26
5 Pek. Rabat Lantai 2.38 M3 1,391,339.67 3,312,313.65 2.02
6 Pek. Acian Pondasi 12.15 M2 34,097.50 414,284.63 0.25
7 Pek. Pas. Batu Kosong 3.65 M3 768,366.75 2,800,696.80 1.71
8 Pek. Pondasi Batu Belah Campuran 1 PC : 4 PP 8.51 M3 1,323,563.75 11,256,909.69 6.88
Sub Jumlah 42,083,179.71 25.72
IV PEKERJAAN DINDING
1 Pek. Pas. Dinding Tembok 1/2 Bata Campuran 1 Pc : 5 PP 113.27 M2 236,070.85 26,738,800.90 16.34
Sub Jumlah 26,738,800.90 16.34
V PEKERJAAN PLESTERAN
1 Pek. Plesteran Dinding Tembok 1 : 4 tebal 15 mm 226.53 M2 62,441.55 14,145,009.20 8.65
2 Pek. Plesteran Permukaan Pondasi 1 : 4 tebal 15 mm 52.67 M2 67,099.97 3,534,249.36 2.16
Sub Jumlah 17,679,258.56 10.81

1 2 3 4 5 6 7
VI PLESTERAN ATAP
1 Pek. Kuda-kuda kayu Pondoh/Meranti 0.75 M3 5,332,578.75 3,978,061.09 2.43
2 Pek. Gording, Balok Nok dan Balok Angin Kayu Pondoh/Meranti 0.67 M3 5,604,438.75 3,772,101.13 2.31
3 Pek. Listplank Double 2x2/20 Kayu Pondoh/Meranti 17.22 M1 73,456.25 1,264,916.63 0.77
4 Pek. Atap Soka 67.07 M2 97,957.00 6,570,162.11 4.02
5 Pek. Nok Seng 7.79 M1 53,831.50 419,347.39 0.26
Sub Jumlah 16,004,588.33 9.78
VII PEKERJAAN KAYU DAN KACA (PINTU DAN JENDELA)
1 Pek. Kusen Kayu Kalapi/Bitti 0.40 M3 6,663,675.00 2,694,123.80 1.65
2 Pek. Pemas. Pintu Kamar Mandi 1.00 Set 520,000.00 520,000.00 0.32
3 Pek. Pintu Panil Kayu Kalapi/Bitti 6.72 M2 506,000.00 3,400,320.00 2.08
4 Pek. Bingkai Jendela Kaca Kayu 0.09 M2 352,762.50 30,422.24 0.02
5 Pemas. Kaca Bening T= 5 mm 3.20 M2 203,291.25 649,881.47 0.40
Sub Jumlah 7,294,747.51 4.46
VIII PEKERJAAN LANTAI KERAMIK
1 Pek. Pas. Tegel Keramik 40 x 40 cm 32.48 M2 249,423.50 8,100,053.10 4.95
2 Pek. Pas. Tegel Keramik 20 x 20 cm 1.53 M2 233,926.85 358,937.35 0.22
3 Pek. Pas. Plint Keramik 10 x 40 cm 36.16 M1 30,612.43 1,106,945.29 0.68
Sub Jumlah 9,565,935.75 5.85
IX PEKERJAAN LANGIT-LANGIT
1 Pek. Rangka Plafond Kayu Podoh/Meranti Uk. 5/7 cm 47.16 M2 96,634.50 4,557,582.59 2.79
2 Pek. Pas. Plafond Tripleks Uk 120 x 240 tebal 3 mm 47.16 M2 48,848.03 2,303,824.64 1.41
3 Pek. List Plafond Kayu 69.01 M1 25,351.75 1,749,473.56 1.07
Sub Jumlah 8,610,880.79 5.26
X PEKERJAAN INSTALASI LISTRIK
1 Titik Instalasi Penerangan Dengan Kabel NYM Conduit She Ega 3 x 6.00 Ttk 165,000.00 990,000.00 0.61
2 Titik Instalasi Stop Kontak Dengan Kabel NYM Conduit She Ega 3 x 4.00 Ttk 165,000.00 660,000.00 0.40
3 Pemas. Lampu TL 40 watt 5.00 Bh 189,703.00 948,515.00 0.58
4 Pemas. Lampu Tl 10 watt 1.00 Bh 105,000.00 105,000.00 0.06
5 Saklar Ganda 1.00 Bh 22,216.00 22,216.00 0.01
6 Saklar Tunggal 4.00 Bh 19,747.00 78,988.00 0.05
7 Stop Kontak 4.00 Bh 17,896.00 71,584.00 0.04
8 Sekring Box ( MCB ) 1.00 Bh 183,560.00 183,560.00 0.11
Sub Jumlah 3,059,863.00 1.87
XI PEKERJAAN LANTAI OVERSTEK DAN SANITASI
1 Pek. Urugan Pasir Bawah Lantai Overstek 1.84 Ttk 366,562.50 675,739.64 0.41
2 Pek. Lantai Overstek Rabat Beton Mutu K. 100 1.84 Ttk 1,391,339.67 2,564,865.11 1.57
3 Pek. Pemas. Ornamen Batu Alam 9.97 Bh 539,946.02 5,385,583.61 3.29
Sub Jumlah 8,626,188.36 5.27
XII PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pemas. Kunci Tanam 2 Slag 4.00 Bh 203,291.25 813,165.00 0.50
2 Pemas. Engsel Pintu 12.00 Bh 66,304.69 795,656.25 0.49
3 Pemas. Engsel Jendela 16.00 Bh 20,035.37 320,565.90 0.20
4 Pemas. Kait Angin Jendela 16.00 Bh 39,647.96 634,367.42 0.39
5 Pemas. Grendel Jendela 8.00 Bh 12,300.00 98,400.00 0.06
6 Pemas. Grendel Pintu 8.00 Bh 32,000.00 256,000.00 0.16
Sub Jumlah 2,918,154.57 1.78

1 2 3 4 5 6 7
XIII PEKERJAAN FINISHING
1 Pek. Cat Dinding Tembok 226.53 M2 17,884.23 4,051,349.26 2.48
2 Pek. Cat Kusen 14.31 M2 37,136.38 531,272.98 0.32
3 Pek. Cat Lisplank 5.17 M2 37,136.38 191,846.51 0.12
4 Pek. Cat Daun Pintu Panil 13.44 M2 37,136.38 499,112.88 0.31
5 Pek. Cat Bingkai Jendela 0.17 M2 37,136.38 6,405.28 0.00
Sub Jumlah 5,279,986.91 3.23
XIV PEKERJAAN PLUMBING
a. Pek. Perpipaan Air Bersih
1 Pemas. Bak Air 1.00 Bh 375,000.00 375,000.00 0.23
2 Pemas. Closed Jongkok Toto 1.00 Bh 766,245.00 766,245.00 0.47
3 Pemas. Instalasi Pipa PVC 1/2 " 16.00 M' 57,730.00 923,680.00 0.56
4 Pemas. Stop Kran 1/2 " 1.00 Bh 19,521.25 19,521.25 0.01
5 Pemas. Fighting-fighting Pipa 1.00 Ls 200,000.00 200,000.00 0.12
Sub Jumlah 2,284,446.25 1.40
b. Pek. Pipa Air Kotor, Buangan Vent
1 Pek. Septik Tank + Resapan 1.00 Bh 4,000,000.00 4,000,000.00 2.45
2 Pemas. Pipa PVC Dia 3 " (Wavin) 12.00 M' 86,877.44 1,042,529.28 0.64
3 Pemas. Pipa PVC Dia 2 " (Wavin) 12.00 M' 48,901.57 586,818.78 0.36
4 Pemas. Fighting-fighting pipa PVC 1.00 Ls 200,000.00 200,000.00 0.12
Sub Jumlah 5,829,348.06 3.56
XV PEKERJAAN LAIN-LAIN
1 Pek. Pembersihan Akhir 1.00 Ls 700,000.00 700,000.00 0.43
Sub Jumlah 700,000.00 0.43
Real Cost / Total Bobot 163,593,630.01
Ppn 10% 16,359,363.00
100.00
Total 179,952,993.01
Dibulatkan 179,950,000.00

Diperiksa / Disetujui Oleh, Diperiksa Oleh,


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Supervisi
DINAS PENDIDIKAN PEMUDA DAN OLAHRAGA CV. NIKKOU ENGINEERING DESIGN CONSULTANT
KABUPATEN KOLAKA Pusat Kendari

H. A. PANGORISENG, S.Pd., M.Pd MUH. SAID WARISTO, ST


NIP. 19671231 198812 1 012 Inspector

LAPORAN KEMAJUAN PEKERJAAN MINGGUAN

Minggu
PEMERINTAH KABUPATEN KOLAKA Periode
DINAS PENDIDIKAN PEMUDA DAN OLAHRAGA Pelaksana
KABUPATEN KOLAKA No/Tgl Kontrak
TAHUN ANGGARAN 2015 Nilai Kontrak

PEMBANGUNAN RKB TK MEKONGGA INDAH (2 RKB)


Target Kontrak
NO. URAIAN PEKERJAAN Harga Sat. Nilai Pekerjaan Bobot
Volume Sat.
(Rp) ( Rp ) %
1 2 3 4 5 6 7
I PEKERJAAN PENDAHULUAN
1 Pembuatan Papan Nama Proyek 1.00 Ls 250,000.00 250,000.00 0.15
2 Pek. Administrasi, Penyediaan Air Kerja dan Pembersihan Lokasi 1.00 Ls 800,000.00 800,000.00 0.49
3 Administrasi, air kerja, dokumentasi, P3K dll. 1.00 Ls 1,300,000.00 1,300,000.00 0.79
4 Pek. Pemasangan Bowplank 10.00 M1 73,617.25 736,172.50 0.45
Sub Jumlah 3,086,172.50 1.89
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi 15.59 M3 53,906.25 840,533.20 0.51
2 Pek. Urugan Tanah Kembali 4.25 M3 38,812.50 165,050.16 0.10
3 Pek. Timbunan Tanah 11.90 M3 95,306.25 1,134,461.27 0.69
4 Pek. Urugan pasir bawah lantai 3.40 M3 366,562.50 1,246,660.73 0.76
5 Pek. Urugan pasir bawah Pondasi 1.22 M3 366,562.50 445,373.44 0.27
Sub Jumlah 3,832,078.80 2.34
III PEKERJAAN BETON DAN PONDASI
1 Pek. Sloof Beton 13 x 15 cm 0.79 M3 6,431,484.25 5,079,264.69 3.10
2 Pek. Kolom Praktis 58.94 M' 107,973.50 6,363,958.09 3.89
3 Pek. Ring Balk Beton 63.74 M' 143,767.25 9,163,724.52 5.60
4 Pek. Plat Beton 0.50 M3 7,327,196.25 3,692,027.65 2.26
5 Pek. Rabat Lantai 2.38 M3 1,391,339.67 3,312,313.65 2.02
6 Pek. Acian Pondasi 12.15 M2 34,097.50 414,284.63 0.25
7 Pek. Pas. Batu Kosong 3.65 M3 768,366.75 2,800,696.80 1.71
8 Pek. Pondasi Batu Belah Campuran 1 PC : 4 PP 8.51 M3 1,323,563.75 11,256,909.69 6.88
Sub Jumlah 42,083,179.71 25.72
IV PEKERJAAN DINDING
1 Pek. Pas. Dinding Tembok 1/2 Bata Campuran 1 Pc : 5 PP 113.27 M2 236,070.85 26,738,800.90 16.34
Sub Jumlah 26,738,800.90 16.34
V PEKERJAAN PLESTERAN
1 Pek. Plesteran Dinding Tembok 1 : 4 tebal 15 mm 226.53 M2 62,441.55 14,145,009.20 8.65
2 Pek. Plesteran Permukaan Pondasi 1 : 4 tebal 15 mm 52.67 M2 67,099.97 3,534,249.36 2.16
Sub Jumlah 17,679,258.56 10.81
1 2 3 4 5 6 7
VI PLESTERAN ATAP
1 Pek. Kuda-kuda kayu Pondoh/Meranti 0.75 M3 5,332,578.75 3,978,061.09 2.43
2 Pek. Gording, Balok Nok dan Balok Angin Kayu Pondoh/Meranti 0.67 M3 5,604,438.75 3,772,101.13 2.31
3 Pek. Listplank Double 2x2/20 Kayu Pondoh/Meranti 17.22 M1 73,456.25 1,264,916.63 0.77
4 Pek. Atap Soka 67.07 M2 97,957.00 6,570,162.11 4.02
5 Pek. Nok Seng 7.79 M1 53,831.50 419,347.39 0.26
Sub Jumlah 16,004,588.33 9.78
VII PEKERJAAN KAYU DAN KACA (PINTU DAN JENDELA)
1 Pek. Kusen Kayu Kalapi/Bitti 0.40 M3 6,663,675.00 2,694,123.80 1.65
2 Pek. Pemas. Pintu Kamar Mandi 1.00 Set 520,000.00 520,000.00 0.32
3 Pek. Pintu Panil Kayu Kalapi/Bitti 6.72 M2 506,000.00 3,400,320.00 2.08
4 Pek. Bingkai Jendela Kaca Kayu 0.09 M2 352,762.50 30,422.24 0.02
5 Pemas. Kaca Bening T= 5 mm 3.20 M2 203,291.25 649,881.47 0.40
Sub Jumlah 7,294,747.51 4.46
VIII PEKERJAAN LANTAI KERAMIK
1 Pek. Pas. Tegel Keramik 40 x 40 cm 32.48 M2 249,423.50 8,100,053.10 4.95
2 Pek. Pas. Tegel Keramik 20 x 20 cm 1.53 M2 233,926.85 358,937.35 0.22
3 Pek. Pas. Plint Keramik 10 x 40 cm 36.16 M1 30,612.43 1,106,945.29 0.68
Sub Jumlah 9,565,935.75 5.85
IX PEKERJAAN LANGIT-LANGIT
1 Pek. Rangka Plafond Kayu Podoh/Meranti Uk. 5/7 cm 47.16 M2 96,634.50 4,557,582.59 2.79
2 Pek. Pas. Plafond Tripleks Uk 120 x 240 tebal 3 mm 47.16 M2 48,848.03 2,303,824.64 1.41
3 Pek. List Plafond Kayu 69.01 M1 25,351.75 1,749,473.56 1.07
Sub Jumlah 8,610,880.79 5.26
X PEKERJAAN INSTALASI LISTRIK
1 Titik Instalasi Penerangan Dengan Kabel NYM Conduit She Ega 3 x 6.00 Ttk 165,000.00 990,000.00 0.61
2 Titik Instalasi Stop Kontak Dengan Kabel NYM Conduit She Ega 3 x 4.00 Ttk 165,000.00 660,000.00 0.40
3 Pemas. Lampu TL 40 watt 5.00 Bh 189,703.00 948,515.00 0.58
4 Pemas. Lampu Tl 10 watt 1.00 Bh 105,000.00 105,000.00 0.06
5 Saklar Ganda 1.00 Bh 22,216.00 22,216.00 0.01
6 Saklar Tunggal 4.00 Bh 19,747.00 78,988.00 0.05
7 Stop Kontak 4.00 Bh 17,896.00 71,584.00 0.04
8 Sekring Box ( MCB ) 1.00 Bh 183,560.00 183,560.00 0.11
Sub Jumlah 3,059,863.00 1.87
XI PEKERJAAN LANTAI OVERSTEK DAN SANITASI
1 Pek. Urugan Pasir Bawah Lantai Overstek 1.84 Ttk 366,562.50 675,739.64 0.41
2 Pek. Lantai Overstek Rabat Beton Mutu K. 100 1.84 Ttk 1,391,339.67 2,564,865.11 1.57
3 Pek. Pemas. Ornamen Batu Alam 9.97 Bh 539,946.02 5,385,583.61 3.29
Sub Jumlah 8,626,188.36 5.27
XII PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pemas. Kunci Tanam 2 Slag 4.00 Bh 203,291.25 813,165.00 0.50
2 Pemas. Engsel Pintu 12.00 Bh 66,304.69 795,656.25 0.49
3 Pemas. Engsel Jendela 16.00 Bh 20,035.37 320,565.90 0.20
4 Pemas. Kait Angin Jendela 16.00 Bh 39,647.96 634,367.42 0.39
5 Pemas. Grendel Jendela 8.00 Bh 12,300.00 98,400.00 0.06
6 Pemas. Grendel Pintu 8.00 Bh 32,000.00 256,000.00 0.16
Sub Jumlah 2,918,154.57 1.78

1 2 3 4 5 6 7
XIII PEKERJAAN FINISHING
1 Pek. Cat Dinding Tembok 226.53 M2 17,884.23 4,051,349.26 2.48
2 Pek. Cat Kusen 14.31 M2 37,136.38 531,272.98 0.32
3 Pek. Cat Lisplank 5.17 M2 37,136.38 191,846.51 0.12
4 Pek. Cat Daun Pintu Panil 13.44 M2 37,136.38 499,112.88 0.31
5 Pek. Cat Bingkai Jendela 0.17 M2 37,136.38 6,405.28 0.00
Sub Jumlah 5,279,986.91 3.23
XIV PEKERJAAN PLUMBING
a. Pek. Perpipaan Air Bersih
1 Pemas. Bak Air 1.00 Bh 375,000.00 375,000.00 0.23
2 Pemas. Closed Jongkok Toto 1.00 Bh 766,245.00 766,245.00 0.47
3 Pemas. Instalasi Pipa PVC 1/2 " 16.00 M' 57,730.00 923,680.00 0.56
4 Pemas. Stop Kran 1/2 " 1.00 Bh 19,521.25 19,521.25 0.01
5 Pemas. Fighting-fighting Pipa 1.00 Ls 200,000.00 200,000.00 0.12
Sub Jumlah 2,284,446.25 1.40
b. Pek. Pipa Air Kotor, Buangan Vent
1 Pek. Septik Tank + Resapan 1.00 Bh 4,000,000.00 4,000,000.00 2.45
2 Pemas. Pipa PVC Dia 3 " (Wavin) 12.00 M' 86,877.44 1,042,529.28 0.64
3 Pemas. Pipa PVC Dia 2 " (Wavin) 12.00 M' 48,901.57 586,818.78 0.36
4 Pemas. Fighting-fighting pipa PVC 1.00 Ls 200,000.00 200,000.00 0.12
Sub Jumlah 5,829,348.06 3.56
XV PEKERJAAN LAIN-LAIN
1 Pek. Pembersihan Akhir 1.00 Ls 700,000.00 700,000.00 0.43
Sub Jumlah 700,000.00 0.43
Real Cost / Total Bobot 163,593,630.01
Ppn 10% 16,359,363.00
100.00
Total 179,952,993.01
Dibulatkan 179,950,000.00

Diperiksa / Disetujui Oleh, Diperiksa Oleh,


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Supervisi
DINAS PENDIDIKAN PEMUDA DAN OLAHRAGA CV. NIKKOU ENGINEERING DESIGN CONSULTANT
KABUPATEN KOLAKA Pusat Kendari

H. A. PANGORISENG, S.Pd., M.Pd MUH. SAID WARISTO, ST


NIP. 19671231 198812 1 012 Inspector
NGGUAN

: I (Pertama)
: 27 Juni 2014 s/d 03 Juli 2014
aksana : CV. MANUNGGAL PERSADA
/Tgl Kontrak : 411.23/60/DID-DIKMUDORA/2014
ai Kontrak : Rp. 580,580,000

H (2 RKB)
Realisasi s/d Minggu Lalu Realisasi Minggu Ini Realisasi s/d Minggu Ini
Tercapai Tertimb Tercapai Tertimb Tercapai Tertimb
Volume Volume Volume
(%) (%) (%) (%) (%) (%)
8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - -

8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - -

0.00 0.00 0.00

Kolaka, 03 Juli 2014

Dilaporkan Oleh,
Kontraktor Pelaksana
CONSULTANT CV. MANUNGGAL PERSADA
Pusat Kolaka

ST Drs. ABUSTON MUHAMMADONG


Direktur

NGGUAN

: II (Kedua)
: 27 Juni 2014 s/d 03 Juli 2014
aksana : CV. MANUNGGAL PERSADA
/Tgl Kontrak : 411.23/60/DID-DIKMUDORA/2014
ai Kontrak : Rp. 580,580,000

H (2 RKB)
Realisasi s/d Minggu Lalu Realisasi Minggu Ini Realisasi s/d Minggu Ini
Tercapai Tertimb Tercapai Tertimb Tercapai Tertimb
Volume Volume Volume
(%) (%) (%) (%) (%) (%)
8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - -
8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

8 9 10 11 12 13 14 15 16

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - -

- - - - - - - - -
- - -

0.00 0.00 0.00

Kolaka, 03 Juli 2014

Dilaporkan Oleh,
Kontraktor Pelaksana
CONSULTANT CV. MANUNGGAL PERSADA
Pusat Kolaka

ST Drs. ABUSTON MUHAMMADONG


Direktur
RENCANA ANGGARAN BIAYA

Satuan Kerja : Kantor Dinas Perindustrian dan Perdagangan


Pekerjaan : Rehabilitasi Pasar
Lokasi : Pasar Dawi - Dawi Pomalaa
Tahun Anggaran : 2019

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Volume Satuan
( Rp ) ( Rp )
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 Pek. Pembongkaran Atap Sirap (jika bongkaran tidak dipakai) 656.67 M2 3,344.00 2,195,904.48
2 Pembuatan Papan Nama Proyek 1.00 Ls 150,000.00 150,000.00
3 Pek. Pembongkaran Plesteran Dinding 194.78 M2 8,360.00 1,628,360.80
4 Pek. Pengukuran Dan Pemasangan Bouwplank 44.00 M2 65,808.60 2,895,578.40
5 Pek. Pembuatan Gedung Semen dan Alat-Alat 10.00 M2 1,003,058.65 10,030,586.50
6 Pek. Air Kerja, P3K, dan Administrasi 1.00 Ls 1,500,000.00 1,500,000.00
Total Rp. 18,400,430.18

II PEKERJAAN TANAH DAN PASIR

1 Pek. Galian Tanah Biasa sedalam 1 m 44.71 M3 47,520.00 2,124,619.20


2 Pek. Urugan Pasir 47.29 M3 153,905.71 7,278,201.03
3 Pek. Urugan Tanah 249.92 M3 75,900.00 18,968,928.00
4 Pek. Pemadatan Tanah (Mekanis) CBR 4% Tebal 20 cm 124.30 M3 56,522.40 7,025,734.32
Total Rp. 35,397,482.55

III PEKERJAAN PONDASI

1 Pek. Pasang Pondasi Batu Gunung adk 1pc : 4ps 59.62 M3 854,293.00 50,932,948.66
2 Pek. Pasang Pondasi Batu Kosong (aastanping) 22.36 M3 434,454.43 9,714,401.05
3 Pek. Urugan Pasir Alas Pondasi 7.45 M3 153,905.71 1,146,597.54

Total Rp. 61,793,947.25

IV PEKERJAAN BETON

1 Pek. Sloof Beton Tulang (200 kg + bekisting) 3.58 M3 6,062,971.20 21,705,436.90

Total Rp. 21,705,436.90

V PEKERJAAN PASANGAN DAN PLESTERAN

1 Pek. Plesteran adk. 1pc :4ps Tebal 15 mm 327.89 M2 67,885.84 22,259,088.08

Total Rp. 22,259,088.08

VII PEKERJAAN KUDA-KUDA

1 Pek Pasang Rangka Baja Ringan 328.34 M2 223,153.70 73,270,285.86


2 Pek. Pasang Atap Spandek +C5 656.67 M2 117,730.80 77,310,284.44
3 Pek. Pasang Atap Kanopi 192.00 M2 349,245.34 67,055,105.28
4 Pek. Pasang PVC Class Pipa Air Ø 2 112.00 M1 65,465.06 7,332,086.72

Total Rp. 224,967,762.29

VII PEKERJAAN LANTAI DINDING DAN PLAFOND

1 Pek. Lantai Keramik Polos 40 x 40 cm Ex. Mulia 615.08 M2 142,497.67 87,647,466.86


2 Pek. Lantai Keramik dop 40 x 40 cm Ex Mulia 208.36 M2 172,392.00 35,919,597.12
3 Pek. Memasang Plint Keramik Ukuran (10 x 40) cm 503.52 M1 60,921.19 30,675,037.59
4 Pek. Plafond gypsum (60 x 120) cm, t = 4 mm + rangka kayu 651.76 M2 193,138.00 125,879,622.88
5 Pek. List Plafond Gypsum 655.46 M1 32,104.00 21,042,887.84
6
7 Total Rp. 301,164,612.29
8

VIII PEKERJAAN INSTALASI LISTRIK

1 Pek. Pasang MCB 6A/1200Volt 12.00 Bh 905,014.00 10,860,168.00


2 Pek. Memasang Penerangan dan Stop Kontak 120.00 Titik 298,819.74 35,858,368.80
3 Pek. Pasang Lampu Philips LED 8 Watt 42.00 Bh 158,268.17 6,647,263.14
4 Pek. Pasang Lampu Philips LED 5 Watt 42.00 Bh 114,268.17 4,799,263.14
5 Pek. Pasang Fitting Lampu Broco 84.00 Bh 42,053.00 3,532,452.00
6 Pek. Saklar Ganda Merk Broco 41.00 Bh 58,945.70 2,416,773.70
7 Pek. Pasang Stop kontak biasa 40.00 Bh 73,315.00 2,932,600.00

Total Rp. 67,046,888.78

IX PEKERJAAN PINISING DAN PINTU ROLING DOOR

1 Pek. Pemasangan Rolling Door 295.80 M2 659,450.00 195,065,310.00


2 Pek. Mengecet Tembok Lama (1xCat dasar, 2x Cat Penutup) 1685.60 M2 17,440.50 29,397,706.80
3 Pek. Mengecet Tembok Baru (1xCat Dasar, 2xCat Penutup) 1406.06 M2 20,960.50 29,471,720.63
4 Pek. Mengecet Plafond (1xCat Dasar, 2xCat Penutup) 651.76 M2 56,094.03 36,559,844.99

Total Rp. 290,494,582.42


Kolaka, 05 Juli 2019

Dibuat Oleh,
CV. MUKTI RAMA
Pusat Kolaka

Kebutuhan Satuan Indeks Harga Satuan


BahList Kayu Profil M1 1.050 15000
Paku Kg 0.010 25000
Pekerja OH 0.021 90000
Tukang Kayu OH 0.021 100000
Ten
Kepala Tukang OH 0.002 120000
Mandor OH 0.001 100000
Jumlah Harga per-Satuan Pekerjaan
Kolaka, 05 Juli 2019

Disetujui Oleh, Dibuat Oleh,


CV. MUKTI RAMA CV. MUKTI RAMA
Pusat Kolaka Pusat Kolaka

SURYAWAN FAHRUL NASRUN


Direktur Staff Teknik

18,400,430.18
20,240,473.20
BACE UP DATA RANOMENTAA
A PEKERJAAN PERSIAPAN
1 Pek. Pembongkaran Atap Sirap (jika bongkaran tidak dipakai)
2 Pembuatan Papan Nama Proyek
3 Pek. Pembuatan Gedung Semen dan Alat-Alat

B. PEKERJAAN TANAH DAN PASIR


1

Anda mungkin juga menyukai