PEMERINTAH ACEH

DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH


Jalan Pemancar No. 5 Simpang Tiga
Telp. (0651) 42882 Fax. (0651) 41130, Banda Aceh
PROGRES REPORT
PEKERJAAN : PEMBANGUNAN KANTOR BADAN NARKOTIKA NASIONAL BANDA ACEH (LANJUTAN) (OA)
LOKASI : KOTA BANDA ACEH
TAHUN ANGGARAN : 2017
DEPARTEMEN/INSTANSI : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
NOMOR KONTRAK : 602.1/100/TB-PML.06/PERKIM/APBA-P/2017
TANGGAL KONTRAK : 06 November 2017
NILAI KONTRAK : Rp. 465.865.000,00 PROGRES : 01 (SATU)
NOMOR KONTRAK ADD : 602.1/100-ADD.1/TB-PML.06/PERKIM/APBA-P/2017 BULAN : NOVEMBER
TANGGAL KONTRAK ADD : 28 November 2017 TANGGAL : 25/11/2017
NILAI KONTRAK ADD : Rp. 465.865.000,00
KONTRAKTOR PELAKSANA : CV. SYAQILA JAYA
KONSULTAN : CV. KANA PRATAMA JAYA

NILAI KONTRAK
S/D BULAN LALU BULAN INI S/D BULAN INI
NO URAIAN PEKERJAAN KET.
ADD-1 BOBOT KEMAJUAN KEMAJUAN KEMAJUAN
BOBOT (%) BOBOT (%) BOBOT (%)
(%) (%) (%) (%)
1 2 3 4 7 8 9 10 11

I PEKERJAAN PERSIAPAN 5,400,000.00 1.28 - - 100.00 1.28 100.00 1.28


II PEKERJAAN LANTAI I -
A PEKERJAAN BETON BERTULANG 32,049,611.29 7.57 - - 100.00 7.57 100.00 7.57
B PEKERJAAN PASANGAN DAN PLESTERAN 108,456,096.92 25.61 - - 81.15 20.78 81.15 20.78
C PEKERJAAN LANTAI 112,400,132.71 26.54 - - 30.45 8.08 30.45 8.08
D PEKERJAAN PLAFOND 54,903,585.00 12.96 - - - - - -
E PEKERJAAN KOSEN, PINTU, JENDELA DAN VENTILASI 76,984,628.75 18.18 - - 13.36 2.43 13.36 2.43
F PEKERJAAN KUNCI DAN PENGGANTUNG 10,125,000.00 2.39 - - - - - -
G PEKERJAAN INSTALASI LISTRIK 11,955,000.00 2.82 - - - - - -
H PEKERJAAN SANITASI 8,490,000.00 2.00 - - - - - -
I PEKERJAAN LAIN - LAIN 2,750,000.00 0.65 - - 100.00 0.65 100.00 0.65
A JUMLAH 423,514,054.67 100.00 40.78 40.78
B PAJAK PERTAMBAHAN NILAI (PPn 10%) 42,351,405.47
C JUMLAH HARGA TERMASUK PPn 10% 465,865,460.13
D JUMLAH KOTOR SERTIFIKAT BULAN INI ( C ) 465,865,000.00

TERBILANG : #NAME?

MENYETUJUI OLEH : DIPERIKSA/DISETUJUI OLEH : DIBUAT OLEH :


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BANDA ACEH WILAYAH I CV. KANA PRATAMA JAYA CV. SYAQILA JAYA

Ir. JASWANDI AYA SOFIA, ST SUPRAHAWATI


Nip. 19600314 198301 1 001 Inspector Direktur

MENGETAHUI OLEH :
KUASA PENGGUNA ANGGARAN/KUASA PENGGUNA BARANG
BIDANG TATA BANGUNAN DAN KONSTRUKSI
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH

Ir. T. MIRZUAN, MT
Nip. 19650803 199502 1 001
PEMERINTAH ACEH
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
Jalan Pemancar No. 5 Simpang Tiga
Telp. (0651) 42882 Fax. (0651) 41130, Banda Aceh
SERTIFIKAT BULANAN
PEKERJAAN : PEMBANGUNAN KANTOR BADAN NARKOTIKA NASIONAL BANDA ACEH (LANJUTAN) (OA)
LOKASI : KOTA BANDA ACEH
TAHUN ANGGARAN : 2017
DEPARTEMEN/INSTANSI : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
NOMOR KONTRAK : 602.1/100/TB-PML.06/PERKIM/APBA-P/2017
TANGGAL KONTRAK : 06 November 2017 SERTIFIKAT : 01 (SATU)
NILAI KONTRAK : Rp. 465.865.000,00 BULAN : NOVEMBER
NOMOR KONTRAK ADD : 602.1/100-ADD.1/TB-PML.06/PERKIM/APBA-P/2017 TANGGAL : 25/11/2017
TANGGAL KONTRAK ADD : 28 November 2017
NILAI KONTRAK ADD : Rp. 465.865.000,00
KONTRAKTOR PELAKSANA : CV. SYAQILA JAYA
KONSULTAN : CV. KANA PRATAMA JAYA

NILAI KONTRAK JUMLAH PEMBAYARAN


S/D S/D BOBOT PEKERJAAN
NO URAIAN PEKERJAAN KET.
ADD-1 BOBOT BULAN BULAN BULAN (%)
(%) LALU INI INI
1 2 3 4 7 8 9 10 11

I PEKERJAAN PERSIAPAN 5,400,000.00 1.28 - 5,400,000.00 5,400,000.00 1.28%

II PEKERJAAN LANTAI I

A PEKERJAAN BETON BERTULANG 32,049,611.29 7.57 - 32,049,611.29 32,049,611.29 7.57%

B PEKERJAAN PASANGAN DAN PLESTERAN 108,456,096.92 25.61 - 88,014,162.77 88,014,162.77 20.78%

C PEKERJAAN LANTAI 112,400,132.71 26.54 - 34,229,965.99 34,229,965.99 8.08%

D PEKERJAAN PLAFOND 54,903,585.00 12.96 - - - 0.00%

E PEKERJAAN KOSEN, PINTU, JENDELA DAN VENTILASI 76,984,628.75 18.18 - 10,284,628.75 10,284,628.75 2.43%

F PEKERJAAN KUNCI DAN PENGGANTUNG 10,125,000.00 2.39 - - - 0.00%

G PEKERJAAN INSTALASI LISTRIK 11,955,000.00 2.82 - - - 0.00%

H PEKERJAAN SANITASI 8,490,000.00 2.00 - - - 0.00%

I PEKERJAAN LAIN - LAIN 2,750,000.00 0.65 - 2,750,000.00 2,750,000.00 0.65%

A JUMLAH 423,514,054.67 100.00 - 172,728,368.80 172,728,368.80 S/D BULAN INI


B PAJAK PERTAMBAHAN NILAI (PPn 10%) 42,351,405.47 17,272,836.88 17,272,836.88
40.78%
C JUMLAH HARGA TERMASUK PPn 10% 465,865,460.13 190,001,205.68 190,001,205.68
D JUMLAH KOTOR SERTIFIKAT BULAN INI ( C ) 465,865,000.00 190,001,000.00 190,001,000.00 S/D BULAN LALU

TERBILANG : DUA RATUS TIGA PULUH JUTA SEMBILAN RATUS SEBELAS RIBU RUPIAH

MENYETUJUI OLEH : DIPERIKSA/DISETUJUI OLEH : DIBUAT OLEH :


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BANDA ACEH WILAYAH I CV. KANA PRATAMA JAYA CV. SYAQILA JAYA

Ir. JASWANDI AYA SOFIA, ST SUPRAHAWATI


Nip. 19600314 198301 1 001 Inspector Direktur

MENGETAHUI OLEH :
KUASA PENGGUNA ANGGARAN/KUASA PENGGUNA BARANG
BIDANG TATA BANGUNAN DAN KONSTRUKSI
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH

Ir. T. MIRZUAN, MT
Nip. 19650803 199502 1 001
PEMERINTAH ACEH
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
Jalan Pemancar No. 5 Simpang Tiga
Telp. (0651) 42882 Fax. (0651) 41130, Banda Aceh

PEKERJAAN : PEMBANGUNAN KANTOR BADAN NARKOTIKA NASIONAL BANDA ACEH (LANJUTAN) (OA)
LOKASI : KOTA BANDA ACEH
TAHUN ANGGARAN : 2017
DEPARTEMEN/INSTANSI : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
NOMOR KONTRAK : 602.1/100/TB-PML.06/PERKIM/APBA-P/2017 SERTIFIKAT : 01 (SATU)
TANGGAL KONTRAK : 06 November 2017 BULAN : NOVEMBER
NILAI KONTRAK : Rp. 465.865.000,00 TANGGAL : 25/11/2017
NOMOR KONTRAK ADD : 602.1/100-ADD.1/TB-PML.06/PERKIM/APBA-P/2017
TANGGAL KONTRAK ADD : 28 November 2017
NILAI KONTRAK ADD : Rp. 465.865.000,00
KONTRAKTOR PELAKSANA : CV. SYAQILA JAYA
KONSULTAN : CV. KANA PRATAMA JAYA

MONITORING PROGRESS FISIK


KUANTITAS
KUANTITAS BOBOT (%) %
HARGA SATUAN JUMLAH HARGA KONTRAK S/D S/D S/D S/D PROGRESS /
NO URAIAN PEKERJAAN SAT. BOBOT (%) KET.
(Rp) (Rp) ITEM (MAX
ADD-1 BULAN BULAN BULAN BULAN BULAN BULAN 100%)
LALU INI INI LALU INI INI

I PEKERJAAN PERSIAPAN
1 Papan nama Proyek Ls 1.00 400,000.00 400,000.00 0.09 - 1.00 1.00 - 0.09 0.09 100.00
2 Direksi Keet / Gudang Material Ls 1.00 5,000,000.00 5,000,000.00 1.18 - 1.00 1.00 - 1.18 1.18 100.00
SUB TOTAL 5,400,000.00 1.28 - 1.28 1.28
II PEKERJAAN LANTAI I (SATU)
A PEKERJAAN BETON BERTULANG
1 Tangga
a. Beton K-250 m3 1.77 1,078,170.50 1,908,361.79 0.45 - 1.77 1.77 - 0.45 0.45 100.00
b. Bekisting m2 15.77 411,895.00 6,495,584.15 1.53 - 15.77 15.77 - 1.53 1.53 100.00
c. Besi Beton Polos Kg 374.51 14,428.70 5,403,692.44 1.28 - 374.51 374.51 - 1.28 1.28 100.00

2 Plat Bordes T = 12 cm
a. Beton K-250 m3 0.92 1,078,170.50 991,916.86 0.23 - 0.92 0.92 - 0.23 0.23 100.00
b. Bekisting m2 8.90 524,700.00 4,669,830.00 1.10 - 8.90 8.90 - 1.10 1.10 100.00
c. Besi Beton Polos Kg 155.44 14,428.70 2,242,797.13 0.53 - 155.44 155.44 - 0.53 0.53 100.00

3 Balok Latai 13/13


a. Beton K-250 m3 0.93 1,078,170.50 1,002,698.57 0.24 - 0.93 0.93 - 0.24 0.24 100.00
b. Bekisting m2 14.23 411,895.00 5,861,265.85 1.38 - 14.23 14.23 - 1.38 1.38 100.00
c. Besi Beton Polos Kg 193.05 14,428.70 2,785,460.54 0.66 - 193.05 193.05 - 0.66 0.66 100.00

4 Kolom Praktis 13/13


a. Beton K-250 m3 0.06 1,078,170.50 64,690.23 0.02 - 0.06 0.06 - 0.02 0.02 100.00
b. Bekisting m2 0.95 411,895.00 391,300.25 0.09 - 0.95 0.95 - 0.09 0.09 100.00
c. Besi Beton Polos Kg 16.08 14,428.70 232,013.50 0.05 - 16.08 16.08 - 0.05 0.05 100.00
SUB TOTAL 32,049,611.29 7.57 - 7.57 7.57
B PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan Bata 1 Pc : 2 Ps m2 109.79 125,791.88 13,810,690.51 3.26 - 109.79 109.79 - 3.26 3.26 100.00
2 Pasangan Bata 1 Pc : 4 Ps m2 341.68 115,348.75 39,412,360.90 9.31 - 341.68 341.68 - 9.31 9.31 100.00
3 Plesteran Bata 1 Pc : 2 Ps m2 220.32 65,128.80 14,349,177.22 3.39 - 220.32 220.32 - 3.39 3.39 100.00
4 Plesteran Bata 1 Pc : 4 Ps m2 684.10 59,763.00 40,883,868.30 9.65 - 342.05 342.05 - 4.83 4.83 50.00
SUB TOTAL 108,456,096.92 25.61 - 20.78 20.78
C PEKERJAAN LANTAI
1 Timbunan Tanah Bawah Lantai m3 145.08 105,578.00 15,317,256.24 3.62 - 145.08 145.08 - 3.62 3.62 100.00
2 Urugan Pasir Bawah Lantai m3 24.38 200,750.00 4,894,285.00 1.16 - 24.38 24.38 - 1.16 1.16 100.00
3 Beton Cor Lantai Kerja m3 17.05 822,195.00 14,018,424.75 3.31 - 17.05 17.05 - 3.31 3.31 100.00
4 Keramik Lantai Ruangan dan Teras 40 x 40 cm m2 267.98 208,945.00 55,993,498.86 13.22 - - - - - - -
5 Keramik 20 x 20 cm Lantai KM/WC m2 20.04 214,321.80 4,295,008.87 1.01 - - - - - - -
6 Keramik 20 x 25 cm Dinding KM/WC m2 74.52 239,957.85 17,881,658.98 4.22 - - - - - -
SUB TOTAL 112,400,132.71 26.54 - 8.08 8.08
D PEKERJAAN PLAFOND
1 Pemasangan Rangka Plafond m2 239.00 155,870.00 37,252,930.00 8.80 - - - - - - -
2 Plafond Triplek m2 239.00 53,350.00 12,750,650.00 3.01 - - - - - - -
3 List Profil m' 260.50 18,810.00 4,900,005.00 1.16 - - - - - - -
SUB TOTAL 54,903,585.00 12.96 - - -
E PEKERJAAN KOSEN, PINTU, JENDELA DAN VENTILASI
PEMERINTAH ACEH
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
Jalan Pemancar No. 5 Simpang Tiga
Telp. (0651) 42882 Fax. (0651) 41130, Banda Aceh

PEKERJAAN : PEMBANGUNAN KANTOR BADAN NARKOTIKA NASIONAL BANDA ACEH (LANJUTAN) (OA)
LOKASI : KOTA BANDA ACEH
TAHUN ANGGARAN : 2017
DEPARTEMEN/INSTANSI : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
NOMOR KONTRAK : 602.1/100/TB-PML.06/PERKIM/APBA-P/2017 SERTIFIKAT : 01 (SATU)
TANGGAL KONTRAK : 06 November 2017 BULAN : NOVEMBER
NILAI KONTRAK : Rp. 465.865.000,00 TANGGAL : 25/11/2017
NOMOR KONTRAK ADD : 602.1/100-ADD.1/TB-PML.06/PERKIM/APBA-P/2017
TANGGAL KONTRAK ADD : 28 November 2017
NILAI KONTRAK ADD : Rp. 465.865.000,00
KONTRAKTOR PELAKSANA : CV. SYAQILA JAYA
KONSULTAN : CV. KANA PRATAMA JAYA

MONITORING PROGRESS FISIK


KUANTITAS
KUANTITAS BOBOT (%) %
HARGA SATUAN JUMLAH HARGA KONTRAK S/D S/D S/D S/D PROGRESS /
NO URAIAN PEKERJAAN SAT. BOBOT (%) KET.
(Rp) (Rp) ITEM (MAX
ADD-1 BULAN BULAN BULAN BULAN BULAN BULAN 100%)
LALU INI INI LALU INI INI
1 Pintu Kaca Buka Dua Type P1 (Lengkap Bingkai) Pkt 1.00 14,000,000.00 14,000,000.00 3.31 - - - - - - -
2 Kosen Pintu, Jendela dan Ventilasi m3 0.95 10,825,925.00 10,284,628.75 2.43 - 0.95 0.95 - 2.43 2.43 100.00
3 Daun Pintu Buka Dua Type P2 Set 1.00 2,000,000.00 2,000,000.00 0.47 - - - - - - -
4 Daun Pintu Type P3 Unit 10.00 1,000,000.00 10,000,000.00 2.36 - - - - - - -
5 Daun Pintu Type P4 Unit 6.00 1,000,000.00 6,000,000.00 1.42 - - - - - - -
6 Daun Pintu Type P5 Unit 1.00 700,000.00 700,000.00 0.17 - - - - - - -
7 kosen dan Daun Jendela Type J1 alumenium Set 1.00 5,000,000.00 5,000,000.00 1.18 - - - - - - -
8 kosen dan Daun Jendela Type J2 alumenium Set 5.00 3,500,000.00 17,500,000.00 4.13 - - - - - - -
9 Ventilasi Kaca Mati alumenium Bh - 2,000,000.00 - - - - - - - - -
10 Ventilasi Kaca Mati diatas Pintu Masuk Utama alumenium Set 1.00 1,500,000.00 1,500,000.00 0.35 - - - - - - -
11 Daun Ventilasi Type V1 Bh 16.00 500,000.00 8,000,000.00 1.89 - - - - - - -
12 Daun Ventilasi Type V2 Bh 4.00 500,000.00 2,000,000.00 0.47 - - - - - - -
SUB TOTAL 76,984,628.75 18.18 - 2.43 2.43
F PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam 2 Slaag Bh 18.00 200,000.00 3,600,000.00 0.85 - - - - - - -
2 Engsel Pintu Bh 54.00 25,000.00 1,350,000.00 0.32 - - - - - - -
3 Engsel Jendela Bh 90.00 20,000.00 1,800,000.00 0.43 - - - - - - -
4 Pacok Jendela Bh 90.00 15,000.00 1,350,000.00 0.32 - - - - - - -
5 Hak Angin Bh 90.00 15,000.00 1,350,000.00 0.32 - - - - - - -
6 Tarikan Jendela Bh 45.00 15,000.00 675,000.00 0.16 - - - - - - -
SUB TOTAL 10,125,000.00 2.39 - - -
G PEKERJAAN INSTALASI LISTRIK
1 Armatur
- Lampu HE 20 Watt Bh 27.00 75,000.00 2,025,000.00 0.48 - - - - - - -
- Lampu HE 18 Watt Bh 8.00 60,000.00 480,000.00 0.11 - - - - - - -
2 Saklar Lampu
- Saklar Tunggal Bh 12.00 20,000.00 240,000.00 0.06 - - - - - - -
- Saklar Ganda Bh 8.00 25,000.00 200,000.00 0.05 - - - - - - -
- Saklar Triple Bh 1.00 30,000.00 30,000.00 0.01 - - - - - - -
3 Stop Kontak Bh 18.00 35,000.00 630,000.00 0.15 - - - - - - -
4 Instlasi titik penerangan, instalasi termasuk kabel NYA 2,5 Titik 35.00 150,000.00 5,250,000.00 1.24 - - - - - - -
mm dalam pipa PVC fitting lampu dan kelengkapan instalasi
terpasang
5 Instalasi titik Stop kontak, instalasi termasuk kabel NYA Titik 18.00 150,000.00 2,700,000.00 0.64 - - - - - - -
2,5 mm dalam pipa PVC, kotak kontak dan kelengkapan
instalasi terpasang. -
6 MCB Unit 1.00 400,000.00 400,000.00 0.09 - - - - - - -
SUB TOTAL 11,955,000.00 2.82 - - -
H PEKERJAAN SANITASI
1 Pemasangan Intalasi Pipa Air Bersih Sampai ke titik
(Sudah termasuk Galian, Pembobokan, penyambungan
Koneksi dan Aksesories) Ttk 6.00 200,000.00 1,200,000.00 0.28 - - - - - - -
2 Pemasangan Intalasi Pipa Air Kotor Sampai ke titik
titik (Sudah termasuk Galian, Pembobokan, penyambungan
Koneksi dan Aksesories) Ttk 12.00 200,000.00 2,400,000.00 0.57 - - - - - - -
3 Kran Air Bh 6.00 35,000.00 210,000.00 0.05 - - - - - - -
4 Bak Air Fiber Bh 6.00 350,000.00 2,100,000.00 0.50 - - - - - - -
5 Kloset Jongkok Bh 6.00 400,000.00 2,400,000.00 0.57 - - - - - - -
6 Floor Drain Bh 6.00 30,000.00 180,000.00 0.04 - - - - - - -
PEMERINTAH ACEH
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
Jalan Pemancar No. 5 Simpang Tiga
Telp. (0651) 42882 Fax. (0651) 41130, Banda Aceh

PEKERJAAN : PEMBANGUNAN KANTOR BADAN NARKOTIKA NASIONAL BANDA ACEH (LANJUTAN) (OA)
LOKASI : KOTA BANDA ACEH
TAHUN ANGGARAN : 2017
DEPARTEMEN/INSTANSI : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
NOMOR KONTRAK : 602.1/100/TB-PML.06/PERKIM/APBA-P/2017 SERTIFIKAT : 01 (SATU)
TANGGAL KONTRAK : 06 November 2017 BULAN : NOVEMBER
NILAI KONTRAK : Rp. 465.865.000,00 TANGGAL : 25/11/2017
NOMOR KONTRAK ADD : 602.1/100-ADD.1/TB-PML.06/PERKIM/APBA-P/2017
TANGGAL KONTRAK ADD : 28 November 2017
NILAI KONTRAK ADD : Rp. 465.865.000,00
KONTRAKTOR PELAKSANA : CV. SYAQILA JAYA
KONSULTAN : CV. KANA PRATAMA JAYA

MONITORING PROGRESS FISIK


KUANTITAS
KUANTITAS BOBOT (%) %
HARGA SATUAN JUMLAH HARGA KONTRAK S/D S/D S/D S/D PROGRESS /
NO URAIAN PEKERJAAN SAT. BOBOT (%) KET.
(Rp) (Rp) ITEM (MAX
ADD-1 BULAN BULAN BULAN BULAN BULAN BULAN 100%)
LALU INI INI LALU INI INI
SUB TOTAL 8,490,000.00 2.00 - - -
I PEKERJAAN LAIN - LAIN
1 Pembuatan Papan Nama Kantor Ls 1.00 2,750,000.00 2,750,000.00 0.65 - 1.00 1.00 - 0.65 0.65 100.00
SUB TOTAL 2,750,000.00 0.65 - 0.65 0.65
TOTAL HARGA 423,514,054.67
TOTAL BOBOT 100.00 REALISASI - 40.78 40.78
MASA PELAKSANAAN RENCANA BULAN INI
MASA PELAKSANAAN S/D SAAT INI SELISIH

MENYETUJUI OLEH : DIPERIKSA/DISETUJUI OLEH : DIBUAT OLEH :


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BANDA ACEH WILAYAH I CV. KANA PRATAMA JAYA CV. SYAQILA JAYA

Ir. JASWANDI AYA SOFIA, ST SUPRAHAWATI


Nip. 19600314 198301 1 001 Inspector Direktur
PEMERINTAH ACEH
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
Jalan Pemancar No. 5 Simpang Tiga
Telp. (0651) 42882 Fax. (0651) 41130, Banda Aceh
PROGRES REPORT
PEKERJAAN : PEMBANGUNAN KANTOR BADAN NARKOTIKA NASIONAL BANDA ACEH (LANJUTAN) (OA)
LOKASI : KOTA BANDA ACEH
TAHUN ANGGARAN : 2017
DEPARTEMEN/INSTANSI : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
NOMOR KONTRAK : 602.1/100/TB-PML.06/PERKIM/APBA-P/2017
TANGGAL KONTRAK : 06 November 2017 PROGRES : 02 (DUA)
NILAI KONTRAK : Rp. 465.865.000,00 BULAN : DESEMBER
NOMOR KONTRAK ADD : 602.1/100-ADD.1/TB-PML.06/PERKIM/APBA-P/2017 TANGGAL : 08/12/2017
TANGGAL KONTRAK ADD : 28 November 2017
NILAI KONTRAK ADD : Rp. 465.865.000,00
KONTRAKTOR PELAKSANA : CV. SYAQILA JAYA
KONSULTAN : CV. KANA PRATAMA JAYA

NILAI KONTRAK
S/D BULAN LALU BULAN INI S/D BULAN INI
NO URAIAN PEKERJAAN KET.
ADD-1 BOBOT KEMAJUAN KEMAJUAN KEMAJUAN
(%) BOBOT (%) (%) BOBOT (%) (%) BOBOT (%)
(%)
1 2 3 4 7 8 9 10 11

I PEKERJAAN PERSIAPAN 5,400,000.00 1.28 100.00 1.28 - - 100.00 1.28

II PEKERJAAN LANTAI I

A PEKERJAAN BETON BERTULANG 32,049,611.29 7.57 66.13 5.00 33.87 2.56 100.00 7.57

B PEKERJAAN PASANGAN DAN PLESTERAN 108,456,096.92 25.61 100.00 25.61 - - 100.00 25.61

C PEKERJAAN LANTAI 112,400,132.71 26.54 40.32 10.70 59.68 15.84 100.00 26.54

D PEKERJAAN PLAFOND 54,903,585.00 12.96 45.54 5.90 54.46 7.06 100.00 12.96

E PEKERJAAN KOSEN, PINTU, JENDELA DAN VENTILASI 76,984,628.75 18.18 - - 100.00 18.18 100.00 18.18

F PEKERJAAN KUNCI DAN PENGGANTUNG 10,125,000.00 2.39 - - 100.00 2.39 100.00 2.39

G PEKERJAAN INSTALASI LISTRIK 11,955,000.00 2.82 - - 100.00 2.82 100.00 2.82

H PEKERJAAN SANITASI 8,490,000.00 2.00 21.20 0.43 78.80 1.58 100.00 2.00

I PEKERJAAN LAIN - LAIN 2,750,000.00 0.65 50.00 0.32 50.00 0.32 100.00 0.65

A JUMLAH 423,514,054.67 100.00 49.24 50.76 100.00

B PAJAK PERTAMBAHAN NILAI (PPn 10%) 42,351,405.47

C JUMLAH HARGA TERMASUK PPn 10% 465,865,460.13

D JUMLAH KOTOR SERTIFIKAT BULAN INI ( C ) 465,865,000.00

TERBILANG : #NAME?

MENYETUJUI OLEH : DIPERIKSA/DISETUJUI OLEH : DIBUAT OLEH :


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BANDA ACEH WILAYAH I CV. KANA PRATAMA JAYA CV. SYAQILA JAYA

Ir. JASWANDI AYA SOFIA, ST SUPRAHAWATI


Nip. 19600314 198301 1 001 Inspector Direktur

MENGETAHUI OLEH :
KUASA PENGGUNA ANGGARAN/KUASA PENGGUNA BARANG
BIDANG TATA BANGUNAN DAN KONSTRUKSI
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH

Ir. T. MIRZUAN, MT
Nip. 19650803 199502 1 001
PEMERINTAH ACEH
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
Jalan Pemancar No. 5 Simpang Tiga
Telp. (0651) 42882 Fax. (0651) 41130, Banda Aceh
SERTIFIKAT BULANAN
PEKERJAAN : PEMBANGUNAN KANTOR BADAN NARKOTIKA NASIONAL BANDA ACEH (LANJUTAN) (OA)
LOKASI : KOTA BANDA ACEH
TAHUN ANGGARAN : 2017
DEPARTEMEN/INSTANSI : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
NOMOR KONTRAK : 602.1/100/TB-PML.06/PERKIM/APBA-P/2017
TANGGAL KONTRAK : 06 November 2017 SERTIFIKAT : 02 (DUA)
NILAI KONTRAK : Rp. 465.865.000,00 BULAN : DESEMBER
NOMOR KONTRAK ADD : 602.1/100-ADD.1/TB-PML.06/PERKIM/APBA-P/2017 TANGGAL : 08/12/2017
TANGGAL KONTRAK ADD : 28 November 2017
NILAI KONTRAK ADD Rp. 465.865.000,00
KONTRAKTOR PELAKSANA : CV. SYAQILA JAYA
KONSULTAN : CV. KANA PRATAMA JAYA
NILAI KONTRAK JUMLAH PEMBAYARAN
S/D S/D BOBOT PEKERJAAN
NO URAIAN PEKERJAAN KET.
ADD-1 BOBOT BULAN BULAN BULAN (%)
(%) LALU INI INI
1 2 3 4 7 8 9 10 11

I PEKERJAAN PERSIAPAN 5,400,000.00 1.28 5,400,000.00 - 5,400,000.00 1.28%

II PEKERJAAN LANTAI I -

A PEKERJAAN BETON BERTULANG 32,049,611.29 7.57 32,049,611.29 - 32,049,611.29 7.57%

B PEKERJAAN PASANGAN DAN PLESTERAN 108,456,096.92 25.61 88,014,162.77 20,441,934.15 108,456,096.92 25.61%

C PEKERJAAN LANTAI 112,400,132.71 26.54 34,229,965.99 78,170,166.72 112,400,132.71 26.54%

D PEKERJAAN PLAFOND 54,903,585.00 12.96 - 54,903,585.00 54,903,585.00 12.96%

E PEKERJAAN KOSEN, PINTU, JENDELA DAN VENTILASI 76,984,628.75 18.18 10,284,628.75 66,700,000.00 76,984,628.75 18.18%

F PEKERJAAN KUNCI DAN PENGGANTUNG 10,125,000.00 2.39 - 10,125,000.00 10,125,000.00 2.39%

G PEKERJAAN INSTALASI LISTRIK 11,955,000.00 2.82 - 11,955,000.00 11,955,000.00 2.82%

H PEKERJAAN SANITASI 8,490,000.00 2.00 - 8,490,000.00 8,490,000.00 2.00%

I PEKERJAAN LAIN - LAIN 2,750,000.00 0.65 2,750,000.00 - 2,750,000.00 0.65%

A JUMLAH 423,514,054.67 100.00 172,728,368.80 250,785,685.87 423,514,054.67 S/D BULAN INI


B PAJAK PERTAMBAHAN NILAI (PPn 10%) 42,351,405.47 17,272,836.88 25,078,568.59 42,351,405.47
100.00%
C JUMLAH HARGA TERMASUK PPn 10% 465,865,460.13 190,001,205.68 275,864,254.46 465,865,460.13
D JUMLAH KOTOR SERTIFIKAT BULAN INI ( C ) 465,865,000.00 190,001,000.00 275,864,000.00 465,865,000.00 S/D BULAN LALU

TERBILANG : DUA RATUS TIGA PULUH JUTA SEMBILAN RATUS SEBELAS RIBU RUPIAH

MENYETUJUI OLEH : DIPERIKSA/DISETUJUI OLEH : DIBUAT OLEH :


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BANDA ACEH WILAYAH I CV. KANA PRATAMA JAYA CV. SYAQILA JAYA

Ir. JASWANDI AYA SOFIA, ST SUPRAHAWATI


Nip. 19600314 198301 1 001 Inspector Direktur

MENGETAHUI OLEH :
KUASA PENGGUNA ANGGARAN/KUASA PENGGUNA BARANG
BIDANG TATA BANGUNAN DAN KONSTRUKSI
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH

Ir. T. MIRZUAN, MT
Nip. 19650803 199502 1 001
PEMERINTAH ACEH
DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
Jalan Pemancar No. 5 Simpang Tiga
Telp. (0651) 42882 Fax. (0651) 41130, Banda Aceh

PEKERJAAN : PEMBANGUNAN KANTOR BADAN NARKOTIKA NASIONAL BANDA ACEH (LANJUTAN) (OA)
LOKASI : KOTA BANDA ACEH
TAHUN ANGGARAN : 2017
DEPARTEMEN/INSTANSI : DINAS PERUMAHAN RAKYAT DAN KAWASAN PERMUKIMAN ACEH
NOMOR KONTRAK : 602.1/100/TB-PML.06/PERKIM/APBA-P/2017 SERTIFIKAT : 02 (DUA)
TANGGAL KONTRAK : 06 November 2017 BULAN : DESEMBER
NILAI KONTRAK : Rp. 465.865.000,00 TANGGAL : 08/12/2017
NOMOR KONTRAK ADD : 602.1/100-ADD.1/TB-PML.06/PERKIM/APBA-P/2017
TANGGAL KONTRAK ADD : 28 November 2017
NILAI KONTRAK ADD ; Rp. 465.865.000,00
KONTRAKTOR PELAKSANA : CV. SYAQILA JAYA
KONSULTAN : CV. KANA PRATAMA JAYA

MONITORING PROGRESS FISIK


KUANTITAS
KUANTITAS BOBOT (%) %
NO URAIAN PEKERJAAN SAT. HARGA SATUAN JUMLAH HARGA KONTRAK BOBOT (%) S/D S/D S/D S/D PROGRESS / KET.
(Rp) (Rp) ITEM (MAX
ADD-1 BULAN BULAN BULAN BULAN BULAN BULAN 100%)
LALU INI INI LALU INI INI

I PEKERJAAN PERSIAPAN
1 Papan nama Proyek Ls 1.00 400,000.00 400,000.00 0.09 1.00 - 1.00 0.09 - 0.09 100.00
2 Direksi Keet / Gudang Material Ls 1.00 5,000,000.00 5,000,000.00 1.18 1.00 - 1.00 1.18 - 1.18 100.00
SUB TOTAL 5,400,000.00 1.28 1.28 - 1.28
II PEKERJAAN LANTAI I (SATU)
A PEKERJAAN BETON BERTULANG
1 Tangga
a. Beton K-250 m3 1.77 1,078,170.50 1,908,361.79 0.45 1.77 - 1.77 0.45 - 0.45 100.00
b. Bekisting m2 15.77 411,895.00 6,495,584.15 1.53 15.77 - 15.77 1.53 - 1.53 100.00
c. Besi Beton Polos Kg 374.51 14,428.70 5,403,692.44 1.28 374.51 - 374.51 1.28 - 1.28 100.00

2 Plat Bordes T = 12 cm
a. Beton K-250 m3 0.92 1,078,170.50 991,916.86 0.23 0.92 - 0.92 0.23 - 0.23 100.00
b. Bekisting m2 8.90 524,700.00 4,669,830.00 1.10 8.90 - 8.90 1.10 - 1.10 100.00
c. Besi Beton Polos Kg 155.44 14,428.70 2,242,797.13 0.53 155.44 - 155.44 0.53 - 0.53 100.00

3 Balok Latai 13/13


a. Beton K-250 m3 0.93 1,078,170.50 1,002,698.57 0.24 0.93 - 0.93 0.24 - 0.24 100.00
b. Bekisting m2 14.23 411,895.00 5,861,265.85 1.38 14.23 - 14.23 1.38 - 1.38 100.00
c. Besi Beton Polos Kg 193.05 14,428.70 2,785,460.54 0.66 193.05 - 193.05 0.66 - 0.66 100.00
-
4 Kolom Praktis 13/13 -
a. Beton K-250 m3 0.06 1,078,170.50 64,690.23 0.02 0.06 - 0.06 0.02 - 0.02 100.00
b. Bekisting m2 0.95 411,895.00 391,300.25 0.09 0.95 - 0.95 0.09 - 0.09 100.00
c. Besi Beton Polos Kg 16.08 14,428.70 232,013.50 0.05 16.08 - 16.08 0.05 - 0.05 100.00
SUB TOTAL 32,049,611.29 7.57 7.57 - 7.57
B PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan Bata 1 Pc : 2 Ps m2 109.79 125,791.88 13,810,690.51 3.26 109.79 - 109.79 3.26 - 3.26 100.00
2 Pasangan Bata 1 Pc : 4 Ps m2 341.68 115,348.75 39,412,360.90 9.31 341.68 - 341.68 9.31 - 9.31 100.00
3 Plesteran Bata 1 Pc : 2 Ps m2 220.32 65,128.80 14,349,177.22 3.39 220.32 - 220.32 3.39 - 3.39 100.00
4 Plesteran Bata 1 Pc : 4 Ps m2 684.10 59,763.00 40,883,868.30 9.65 342.05 342.05 684.10 4.83 4.83 9.65 50.00
SUB TOTAL 108,456,096.92 25.61 20.78 4.83 25.61
C PEKERJAAN LANTAI
1 Timbunan Tanah Bawah Lantai m3 145.08 105,578.00 15,317,256.24 3.62 145.08 - 145.08 3.62 - 3.62 100.00
2 Urugan Pasir Bawah Lantai m3 24.38 200,750.00 4,894,285.00 1.16 24.38 - 24.38 1.16 - 1.16 100.00
3 Beton Cor Lantai Kerja m3 17.05 822,195.00 14,018,424.75 3.31 17.05 - 17.05 3.31 - 3.31 100.00
4 Keramik Lantai Ruangan dan Teras 40 x 40 cm m2 267.98 208,945.00 55,993,498.86 13.22 - 267.98 267.98 - 13.22 13.22 100.00
5 Keramik 20 x 20 cm Lantai KM/WC m2 20.04 214,321.80 4,295,008.87 1.01 - 20.04 20.04 - 1.01 1.01 100.00
6 Keramik 20 x 25 cm Dinding KM/WC m2 74.52 239,957.85 17,881,658.98 4.22 - 74.52 74.52 - 4.22 4.22 100.00
SUB TOTAL 112,400,132.71 26.54 8.08 18.46 26.54
D PEKERJAAN PLAFOND
1 Pemasangan Rangka Plafond m2 239.00 155,870.00 37,252,930.00 8.80 - 239.00 239.00 - 8.80 8.80 100.00
2 Plafond Triplek m2 239.00 53,350.00 12,750,650.00 3.01 - 239.00 239.00 - 3.01 3.01 100.00
3 List Profil m' 260.50 18,810.00 4,900,005.00 1.16 - 260.50 260.50 - 1.16 1.16 100.00
SUB TOTAL 54,903,585.00 12.96 - 12.96 12.96
E PEKERJAAN KOSEN, PINTU, JENDELA DAN VENTILASI
1 Pintu Kaca Buka Dua Type P1 (Lengkap Bingkai) Pkt 1.00 14,000,000.00 14,000,000.00 3.31 - 1.00 1.00 - 3.31 3.31 100.00
2 Kosen Pintu, Jendela dan Ventilasi m3 0.95 10,825,925.00 10,284,628.75 2.43 0.95 - 0.95 2.43 - 2.43 100.00
3 Daun Pintu Buka Dua Type P2 Set 1.00 2,000,000.00 2,000,000.00 0.47 - 1.00 1.00 - 0.47 0.47 100.00
4 Daun Pintu Type P3 Unit 10.00 1,000,000.00 10,000,000.00 2.36 - 10.00 10.00 - 2.36 2.36 100.00
5 Daun Pintu Type P4 Unit 6.00 1,000,000.00 6,000,000.00 1.42 - 6.00 6.00 - 1.42 1.42 100.00
6 Daun Pintu Type P5 Unit 1.00 700,000.00 700,000.00 0.17 - 1.00 1.00 - 0.17 0.17 100.00
7 kosen dan Daun Jendela Type J1 alumenium Set 1.00 5,000,000.00 5,000,000.00 1.18 - 1.00 1.00 - 1.18 1.18 100.00
8 kosen dan Daun Jendela Type J2 alumenium Set 5.00 3,500,000.00 17,500,000.00 4.13 - 5.00 5.00 - 4.13 4.13 100.00
9 Ventilasi Kaca Mati alumenium Bh - 2,000,000.00 - - - - - - - - -
10 Ventilasi Kaca Mati diatas Pintu Masuk Utama alumenium Set 1.00 1,500,000.00 1,500,000.00 0.35 - 1.00 1.00 - 0.35 0.35 100.00
11 Daun Ventilasi Type V1 Bh 16.00 500,000.00 8,000,000.00 1.89 - 16.00 16.00 - 1.89 1.89 100.00
12 Daun Ventilasi Type V2 Bh 4.00 500,000.00 2,000,000.00 0.47 - 4.00 4.00 - 0.47 0.47 100.00
SUB TOTAL 76,984,628.75 18.18 2.43 15.75 18.18
F PEKERJAAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam 2 Slaag Bh 18.00 200,000.00 3,600,000.00 0.85 - 18.00 18.00 - 0.85 0.85 100.00
2 Engsel Pintu Bh 54.00 25,000.00 1,350,000.00 0.32 - 54.00 54.00 - 0.32 0.32 100.00
3 Engsel Jendela Bh 90.00 20,000.00 1,800,000.00 0.43 - 90.00 90.00 - 0.43 0.43 100.00
4 Pacok Jendela Bh 90.00 15,000.00 1,350,000.00 0.32 - 90.00 90.00 - 0.32 0.32 100.00
5 Hak Angin Bh 90.00 15,000.00 1,350,000.00 0.32 - 90.00 90.00 - 0.32 0.32 100.00
6 Tarikan Jendela Bh 45.00 15,000.00 675,000.00 0.16 - 45.00 45.00 - 0.16 0.16 100.00
SUB TOTAL 10,125,000.00 2.39 - 2.39 2.39
G PEKERJAAN INSTALASI LISTRIK
1 Armatur
- Lampu HE 20 Watt Bh 27.00 75,000.00 2,025,000.00 0.48 - 27.00 27.00 - 0.48 0.48 100.00
- Lampu HE 18 Watt Bh 8.00 60,000.00 480,000.00 0.11 - 8.00 8.00 - 0.11 0.11 100.00
2 Saklar Lampu -
- Saklar Tunggal Bh 12.00 20,000.00 240,000.00 0.06 - 12.00 12.00 - 0.06 0.06 100.00
- Saklar Ganda Bh 8.00 25,000.00 200,000.00 0.05 - 8.00 8.00 - 0.05 0.05 100.00
- Saklar Triple Bh 1.00 30,000.00 30,000.00 0.01 - 1.00 1.00 - 0.01 0.01 100.00
3 Stop Kontak Bh 18.00 35,000.00 630,000.00 0.15 - 18.00 18.00 - 0.15 0.15 100.00
4 Instlasi titik penerangan, instalasi termasuk kabel NYA 2,5 Titik 35.00 150,000.00 5,250,000.00 1.24 - 35.00 35.00 - 1.24 1.24 100.00
mm dalam pipa PVC fitting lampu dan kelengkapan instalasi -
terpasang -
5 Instalasi titik Stop kontak, instalasi termasuk kabel NYA Titik 18.00 150,000.00 2,700,000.00 0.64 - 18.00 18.00 - 0.64 0.64 100.00
2,5 mm dalam pipa PVC, kotak kontak dan kelengkapan -
instalasi terpasang. -
6 MCB Unit 1.00 400,000.00 400,000.00 0.09 - 1.00 1.00 - 0.09 0.09 100.00
SUB TOTAL 11,955,000.00 2.82 - 2.82 2.82
H PEKERJAAN SANITASI
1 Pemasangan Intalasi Pipa Air Bersih Sampai ke titik
(Sudah termasuk Galian, Pembobokan, penyambungan
Koneksi dan Aksesories) Ttk 6.00 200,000.00 1,200,000.00 0.28 - 6.00 6.00 - 0.28 0.28 100.00
2 Pemasangan Intalasi Pipa Air Kotor Sampai ke titik -
titik (Sudah termasuk Galian, Pembobokan, penyambungan -
Koneksi dan Aksesories) Ttk 12.00 200,000.00 2,400,000.00 0.57 - 12.00 12.00 - 0.57 0.57 100.00
3 Kran Air Bh 6.00 35,000.00 210,000.00 0.05 - 6.00 6.00 - 0.05 0.05 100.00
4 Bak Air Fiber Bh 6.00 350,000.00 2,100,000.00 0.50 - 6.00 6.00 - 0.50 0.50 100.00
5 Kloset Jongkok Bh 6.00 400,000.00 2,400,000.00 0.57 - 6.00 6.00 - 0.57 0.57 100.00
6 Floor Drain Bh 6.00 30,000.00 180,000.00 0.04 - 6.00 6.00 - 0.04 0.04 100.00
SUB TOTAL 8,490,000.00 2.00 - 2.00 2.00
I PEKERJAAN LAIN - LAIN
1 Pembuatan Papan Nama Kantor Ls 1.00 2,750,000.00 2,750,000.00 0.65 1.00 - 1.00 0.65 - 0.65 100.00
SUB TOTAL 2,750,000.00 0.65 - 0.65 - 0.65
TOTAL HARGA 423,514,054.67
TOTAL BOBOT 100.00 REALISASI 40.78 59.22 100.00
MASA PELAKSANAAN RENCANA BULAN INI
MASA PELAKSANAAN S/D SAAT INI SELISIH

MENYETUJUI OLEH : DIPERIKSA/DISETUJUI OLEH : DIBUAT OLEH :


PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BANDA ACEH WILAYAH I CV. KANA PRATAMA JAYA CV. SYAQILA JAYA

Ir. JASWANDI AYA SOFIA, ST SUPRAHAWATI


Nip. 19600314 198301 1 001 Inspector Direktur