VOLUME PRODUKSI
1
2 MENEKAN DELAY
3 MENEKAN COBBLE
4 TOTAL YIELD
7 KONSUMSI LISTRIK
9 YIELD OK TO ORDER
11 PLANT AVAILABILITY
PROKER
MEMAKSIMALKAN PRODUCTIVE TIME
MEMAKSIMALKAN TPH
MENGURANGI WRC YANG TIDAK DIRENCANAKAN
PENGGANTIAN RECUPERATOR
MEMAKAI ROLL FULL CVC UNTUK F1-F6 (di roll shop ada)
PENGAWASAN & PENGATURAN TERHADAP MIX PRODUCT HRC
MENGURANGI STOPPAGE RHF
MELAKUKAN SETTING MANUAL PADA NILAI WRB
MELAKUKAN PENAMBAHAN/PENGURANGAN MANUAL LEBAR TRANSFER BAR
MELAKUKAN PERBAIKAN PADA KOMPUTER M60
MENGURANGI DEFECT WIDHT OUT
MENGURANGI DEFECT WAVY PADA STRIP DENGAN LEBAR > 1500 mm
MONITORING & KOREKSI PRE PROGRAM ROLLING HRC SETIAP SHIFT
MENGURANGI RATE PEMBENTUKAN SCALE DI RHF
MEREKONDISI BANDING MACHINE & PENGADAAN SPAREPART BM
MENGURANGI FREKUENSI TERJADINYA EKOR SOBEK
MENGURANGI TERJADINYA STRIP/TRANSFER BAR CAMBER
AREA PIC TARGET
FM
FM/RM
MILL
FM
RM
Slab Yard
RM
RM
RM
RM
RM
RM
FM
DC
RM
RM
FM/RM
DC
RF
MILL
RF
RF
RF
MILL
MILL
RF
FM
RM
RM
FM
MILL
RF
DC
FM
RM
AREA PROBLEM
Mass loss karena scale tinggi
Stopage RF tinggi
Telescope
Cobble rate tinggi
DOWN COILER
Stopage DC
ANALISA
Scaling rate RF 1/2 tinggi
Optimasi pembakaran di RF
Penggantian recuperator
1
2
3
4
5
6
7
8
* Area Area Kolom Area diisi sesuai dengan : RF, SZP, RM, CS/FM, DC
Spare part Material Code Tujuan Pengadaan
diisi sesuai dengan : RF, SZP, RM, CS/FM, DC, CT, RTS, WTP, SL1, SL2, HSPM sesuai dengan dinas yang bersangkutan
Estimasi Harga Target waktu pengadaan
ersangkutan