HARGA SATUAN SUMBER DANA (Rp.) JUMLAH KODE


NO URAIAN PEKERJAAN SATUAN VOLUME
(Rp) DAK DAU (Rp) ANALISA
I PEKERJAAN PERSIAPAN
1 Laporan dan dokumentasi - 2,000,000.00 1,818,181.82 181,818.18 2,000,000.00
2 Pengukuran m' 2,850.00 1,000.00 2,590,909.09 259,090.91 2,850,000.00
3 Bangsal kerja bh - 1,650,000.00 1,500,000.00 150,000.00 1,650,000.00
4 Papan nama proyek bh 1.00 350,000.00 318,181.82 31,818.18 350,000.00
5 Landasan Mitting - 6,262,452.38 5,693,138.52 569,313.85 6,262,452.38
6 Mobilisasi dan Demobilisasi - 25,000,000.00 22,727,272.73 2,272,727.27 25,000,000.00
Sub total 1 34,647,683.98 3,464,768.40 38,112,452.38

II PEKERJAAN SALURAN
1 Galian tanah dengan Alat Berat m3 15,649.50 21,079.75 299,897,770.57 29,989,777.06 329,887,547.63 K.111B
Sub total 2 299,897,770.57 29,989,777.06 329,887,547.63
Total 1 s/d 2 334,545,454.55 33,454,545.45 368,000,000.00
Dibulatkan 334,545,454.55 33,454,545.45 368,000,000.00

Terbilang : ## Tiga Ratus Enam Puluh Delapan Juta Rupiah ##

Sukamara, Juni 2009

Disetujui : Dibuat oleh :


Pejabat Pelaksana Teknis Kegiatan Konsultan Perencana
Rehabilitasi/Pemeliharaan Jaringan Irigasi CV. KASUMA JAYA ENGINEERING
Cabang Sukamara

AGUS MULYANTO, ST. ABDUL RAFIK, ST.


NIP. 19660807 199403 1 007 Direktur Cabang

Menyetujui:
Kuasa Pengguna Anggaran Bidang Pengairan
Dinas Pekerjaan Umum
Kabupaten Sukamara

ARIEF RAHMAN HAKIM


NIP. 19680814 198803 1 006

Mengetahui :
Kepala Dinas Pekerjaan Umum
Kabupaten Sukamara

Ir. HARIADI HAMZAH


NIP. 19550303 198603 1 013
ANALISA HARGA SATUAN
MEMBUAT SALURAN GALIAN TANAH (MENGGUNAKAN ALAT)

PROGRAM : PENGEMBANGAN DAN PENGELOLAAN JARINGAN IRIGASI RAWA


DAN JARINGAN PENGAIRAN LAINNYA.
KEGIATAN : REHABILITASI/PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

DIREKTORAT JENDERAL BINA MARGA ANALISA HARGA SATUAN


DIREKTORAT BINA PROGRAM JALAN MEMBUAT SALURAN GALIAN TANAH KODE
SUB.DIT. PERENCANAAN JALAN LOKAL (Menggunakan alat) K.111.B
DAN KABUPATEN
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
KALIMANTAN TENGAH 62 SUKAMARA
1 Galian saluran daerah rawa menggunakan 1 Menggunakan alat berat 1 hari efektif 5 jam
alat Excavator 2 Penggalian saluran dilakukan dengan menggunakan excavator
2 Hasil galian dibentuk tanggul 3 Hasil galian saluran dibentuk tanggul
0,7 l / m2 4 Kapasitas alat 0,7 m3 diperlukan waktu menggali dan
meratakan 0,81 menit
5 Produk alat 33 m3/jam

JUMLAH UPAH BIAYA


PEKERJA VOLUME HARI KODE SUB TOTAL
(org/hari) (Rp.org/hari) (Rp)
P Mandor 1.00 1.00 L.061 1.00 80,784.00 80,784.00
K Operator terampil 1.00 1.00 L.081 1.00 74,052.00 74,052.00
E Pembantu operato 1.00 1.00 L.083 1.00 53,856.00 53,856.00
R Buruh tak terampil 6.00 1.00 L.101 6.00 53,856.00 323,136.00
J
A PEKERJA 531,828.00

TOTAL HARGA BIAYA


MATERIAL SAT. KODE SUB TOTAL
VOLUME (Rp./Org/hari) (Rp)
M Alat bantu Set M.170 0.50 90,880.00 45,440.00
A
T
E
R
I
A MATERIAL 45,440.00
L
HARI JAM HARGA
PERALATAN JUMLAH KODE BIAYA SUB TOTAL
KERJA KERJA (Rp.org/hari)
A Hidrolik Excavator 1.00 1.00 E.020 5.00 Rp 580,178 2,900,891.44
L
A
T
PERALATAN 2,900,891.44

TOTAL (Rp) 3,478,159.44


VOLUME……………… 165 m3 HARGA SATUAN Rp. ………… 21,079.75 PER M3
ANALISA BIAYA ALAT BERAT EXCAVATOR

PROGRAM : PENGEMBANGAN DAN PENGELOLAAN JARINGAN IRIGASI RAWA


DAN JARINGAN PENGAIRAN LAINNYA.
KEGIATAN : REHABILITASI/PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PERALATAN


KODE
DIREKTORAT BINA PROGRAM JALAN
HIDRAULIC EXAVATOR
SUB.DIT. PERENCANAAN JALAN
E.020
LOKAL & KABUPATEN

PROPINSI : KALIMANTAN TENGAH KODE : OLEH :

KABUPATEN : SUKAMARA KODE : TANGGAL :

1. Jenis Peralatan : HIDRAULIC EXAVATOR


2. Kapasitas Alat : 90 HP
3. Harga Alat : Rp. 1,450,000,000.00
4. Total Tahun Pemakaian : 6 Tahun
5. Umur Pemakaian : 9,000 jam ( 1 tahun : 300 hari kerja )
6. Umur Pemakaian / tahun : 1,500 jam ( dengan : 5 jam/hari )

A. BIAYA PEMILIKAN ( OWNERSHIP COST ) Rp./JAM


a. Biaya Pengembalian Modal
Nilai Sisa : 90.00%
Faktor CRF ( pada 12,5 % ) : 0.24668
Biaya Pengembalian Modal = Harga Alat x Nilai Sisa x CRF / Waktu Operasi (jam/tahun)
Rp. 1,450,000,000.00 x 90.00% x 0.24668 / 1,500
= Rp. 214,612

b. Asuransi dan pajak ( PPN ) : 3.30%


Asuransi dan pajak ( PPN ) = Harga Alat x Asuransi & Pajak / Waktu Operasi (jam/tahun)
Rp. 1,450,000,000.00 x 3.30% / 1,500
= Rp. 31,900

TOTAL BIAYA PEMILIKAN = Rp. 214,612 + Rp. 31,900 = Rp. 246,511.60

B. BIAYA OPERASI ( OPERATION COST ) Rp./JAM


a. Bahan Bakar dan Pelumas
Harga solar = Rp. 11,849.60 per liter Kebutuhan = 0.160 Liter/HP/jam
Harga bensin = Rp. 13,542.40 per liter Kebutuhan = 0.170 Liter/HP/jam
Harga oli = Rp. 63,454.61 per liter Kebutuhan = 0.006 Liter/HP/jam
Bahan Bakar dan Pelumas :
Bahan Bakar = 0.160 x 90 x Rp 11,849.60 = Rp 170,634
Pelumas = 0.006 x 90 x Rp 63,454.61 = Rp 34,265
+
Rp 204,900

b. Biaya Peralatan dan Pemeliharaan = 60.00% x Depresiasi


= 60.00% x Rp 214,612
= Rp. 128,767

TOTAL BIAYA OPERASI = Rp. 204,900 + Rp. 128,767 = Rp. 333,667

TOTAL BIAYA PEMILIKAN DAN OPERASIONAL PER JAM ( A + B ) = Rp. 580,178


MENGHITUNG KAPASITAS PRODUK PERALATAN/ KAPASITAS ALAT EXCAVATOR

PROGRAM : PENGEMBANGAN DAN PENGELOLAAN JARINGAN IRIGASI RAWA


DAN JARINGAN PENGAIRAN LAINNYA.
KEGIATAN : REHABILITASI/PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

SATUAN : M3
NO URAIAN KODE KOEFISIEN SATUAN KETERANGAN
1 2 3 4 5 6

I ASUMSI
1 Menggunakan alat berat (cara Mekanik)
2 Lokasi pekerjaan : sepanjang saluran
3 Kondisi J : sedang
4 Jam kerja efektif per-hari Tk 5.00 Jam
5 Faktor pengembangan bahan Fk 1.20

II URUTAN KERJA
1 Tanah yang digali umumnya berada daerah rawa
2 Penggalian dilakukan dengan menggunakan Excavator
3 Selanjutnya Excavator menuangkan material hasil
galian dikanan dan dikiri saluran hasil galian
4 dan meratakan / membentuk menjadi tanggul

III PRODUK PERALATAN / KAPASITAS ALAT

1 BAHAN
Tidak ada bahan yang diperlukan

2 Alat
2.a EXAVATOR (E10)
Kapasitas Bucket V 0.70 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.85 -

2.b Waktu siklus Ts1 menit


Menggali menuang dan meratakan T1 0.66 menit
Lain-lain T2 0.15 menit
Ts1 0.81 menit

Kap. Prod/jam = V x Fb x Fa x 60 Q1 33.06 M3/Jam


Ts1 x Fk

3 TENAGA
Produksi menentukan : EXCAVATOR Q1 33.06 M3/Jam
Produk Galian Dibulatkan Q1 33.00 M3/Jam

Produk Galian / hari = Tk x Q1 Qt 165.00 M3/Hari


DAFTAR UPAH TENAGA KERJA DAN
HARGA SATUAN MATERIAL BAHAN

PROGRAM : PENGEMBANGAN DAN PENGELOLAAN JARINGAN IRIGASI RAWA


DAN JARINGAN PENGAIRAN LAINNYA.
KEGIATAN : REHABILITASI/PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

HARGA
NO UPAH/BAHAN SATUAN (Rp.)

A TENAGA KERJA
1 Mandor Lapangan Orang / Hari 80,784.00
2 Operator terlatih Orang / Hari 74,052.00
3 Pembantu operator Orang / Hari 53,856.00
4 Buruh tak terlatih Orang / Hari 53,856.00

B MATERIAL/BAHAN
1 Alat Bantu set 90,880.00
2 Bensin Liter 13,542.40
3 Solar Liter 11,849.60
4 Oli Liter 63,454.61
XXII. TABEL HARGA SATUAN UPAH, BAHAN BANGUNAN, DAN ALAT BERAT
KABUPATEN SUKAMARA TAHUN 2009

HARGA HARGA HARGA HARGA HARGA


NO. JENIS UPAH / BAHAN SATUAN Kec. Sukamara Kec. Balai Riam Kec. P. Kecubung Kec. Jelai Kec. Pantai Lunci
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1 2 3 4 5 6 7 8
I. UPAH :

1 Mandor Orang / Hari 80,784.00 80,784.00 80,784.00 80,784.00 80,784.00


2 Tukang galian tanah Orang / Hari 53,856.00 53,856.00 53,856.00 53,856.00 53,856.00
3 Kepala tukang batu Orang / Hari 80,784.00 80,784.00 80,784.00 80,784.00 80,784.00
4 Tukang batu Orang / Hari 74,052.00 74,052.00 74,052.00 74,052.00 74,052.00
5 Pembantu tukang batu Orang / Hari 53,856.00 53,856.00 53,856.00 53,856.00 53,856.00
6 Kepala tukang kayu Orang / Hari 80,784.00 80,784.00 80,784.00 80,784.00 80,784.00
7 Tukang kayu Orang / Hari 74,052.00 74,052.00 74,052.00 74,052.00 74,052.00
8 Pembantu tukang kayu Orang / Hari 53,856.00 53,856.00 53,856.00 53,856.00 53,856.00
9 Kepala tukang besi Orang / Hari 80,784.00 80,784.00 80,784.00 80,784.00 80,784.00
10 Tukang besi Orang / Hari 74,052.00 74,052.00 74,052.00 74,052.00 74,052.00
11 Pembantu tukang besi Orang / Hari 53,856.00 53,856.00 53,856.00 53,856.00 53,856.00
12 Kepala tukang cat Orang / Hari 80,784.00 80,784.00 80,784.00 80,784.00 80,784.00
13 Tukang cat Orang / Hari 74,052.00 74,052.00 74,052.00 74,052.00 74,052.00
14 Pembantu tukang cat Orang / Hari 53,856.00 53,856.00 53,856.00 53,856.00 53,856.00
15 Penjaga malam Orang / Hari 40,392.00 40,392.00 40,392.00 40,392.00 40,392.00
16 Mekanik Orang / Hari 74,052.00 74,052.00 74,052.00 74,052.00 74,052.00
17 Pembantu mekanik Orang / Hari 60,588.00 60,588.00 60,588.00 60,588.00 60,588.00
18 Operator terlatih Orang / Hari 74,052.00 74,052.00 74,052.00 74,052.00 74,052.00
19 Operator kurang terlatih Orang / Hari 60,588.00 60,588.00 60,588.00 60,588.00 60,588.00
20 Pembantu operator Orang / Hari 53,856.00 53,856.00 53,856.00 53,856.00 53,856.00
21 Sopir matrial / truck Orang / Hari 60,588.00 60,588.00 60,588.00 60,588.00 60,588.00
22 Sopir personil Orang / Hari 60,588.00 60,588.00 60,588.00 60,588.00 60,588.00
23 Pembantu sopir / kenek Orang / Hari 53,856.00 53,856.00 53,856.00 53,856.00 53,856.00
24 Buruh tak terlatih Orang / Hari 53,856.00 53,856.00 53,856.00 53,856.00 53,856.00
25 Buruh lapangan agak terlatih Orang / Hari 53,856.00 53,856.00 53,856.00 53,856.00 53,856.00
26 Buruh lapangan terlatih Orang / Hari 57,222.00 57,222.00 57,222.00 57,222.00 57,222.00
27 Tukang listrik Orang / Hari 74,052.00 74,052.00 74,052.00 74,052.00 74,052.00
28 Tukang las Orang / Hari 74,052.00 74,052.00 74,052.00 74,052.00 74,052.00
29 Tukang pancang Orang / Hari 53,856.00 53,856.00 53,856.00 53,856.00 53,856.00
30 Tukang tebas Orang / Hari 53,856.00 53,856.00 53,856.00 53,856.00 53,856.00
31 Tukang anyam Orang / Hari 53,856.00 53,856.00 53,856.00 53,856.00 53,856.00
HARGA HARGA HARGA HARGA HARGA
NO. JENIS UPAH / BAHAN SATUAN Kec. Sukamara Kec. Balai Riam Kec. P. Kecubung Kec. Jelai Kec. Pantai Lunci
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1 2 3 4 5 6 7 8

II KOMPONEN BANGUNAN
1 Alat alat bantu set 90,880.00 90,880.00 90,880.00 90,880.00 90,880.00
2 Ampelas kw. 1 lembar 3,840.00 4,416.00 5,078.40 5,078.40 5,078.40
3 Asbes gelombang lembar 34,560.00 39,744.00 45,705.60 45,705.60 45,705.60
4 Aspal bitumen kg 12,373.34 14,229.34 16,363.74 16,363.74 16,363.74
5 Atap multi roof uk. 77 x 100 cm pakai pasir lembar 143,942.40 165,533.76 190,363.82 190,363.82 190,363.82
6 Atap sakura roof uk. 80 x 77 cm merpati lembar 44,800.00 51,520.00 59,248.00 59,248.00 59,248.00
7 Atap sirap lembar 873.60 1,004.64 1,155.34 1,155.34 1,155.34
8 Atap surya roof uk. 77 x 80 cm pakai pasir lembar 104,832.00 120,556.80 138,640.32 138,640.32 138,640.32
9 Atap tora- tora uk 80 x 80 cm lembar 52,496.64 60,371.14 69,426.81 69,426.81 69,426.81
10 Baja tulang beton kg 27,840.00 32,016.00 36,818.40 36,818.40 36,818.40
11 Bak air fiber 1.100 lt Buah 1,792,000.00 2,060,800.00 2,369,920.00 2,369,920.00 2,369,920.00
12 Bak air fiber 1.200 lt Buah 1,920,000.00 2,208,000.00 2,539,200.00 2,539,200.00 2,539,200.00
13 Bak air fiber 550 lt Buah 1,024,000.00 1,177,600.00 1,354,240.00 1,354,240.00 1,354,240.00
14 Bak air fiber 650 lt Buah 1,088,000.00 1,251,200.00 1,438,880.00 1,438,880.00 1,438,880.00
15 Bak cuci piring aluminium 1 lobang (viega) Buah 384,000.00 441,600.00 507,840.00 507,840.00 507,840.00
16 Bak cuci piring aluminium 2 lobang (viega) Buah 576,000.00 662,400.00 761,760.00 761,760.00 761,760.00
17 Bak cuci piring teraso Buah 458,304.00 527,049.60 606,107.04 606,107.04 606,107.04
18 Bak cuci tangan / westapel komposit Buah 470,400.00 540,960.00 622,104.00 622,104.00 622,104.00
19 Bak mandi fiber 40 x 40 cm Buah 320,000.00 368,000.00 423,200.00 423,200.00 423,200.00
20 Bak mandi fiber 50 x 50 cm Buah 384,000.00 441,600.00 507,840.00 507,840.00 507,840.00
21 Bak mandi fiber 60 x 60 cm Buah 384,000.00 441,600.00 507,840.00 507,840.00 507,840.00
22 Bak mandi fiber 70 x 70 cm Buah 403,200.00 463,680.00 533,232.00 533,232.00 533,232.00
23 Balok kayu lanan M3 1,024,000.00 800,000.00 800,000.00 1,024,000.00 1,024,000.00
24 Batako Buah 2,560.00 2,944.00 3,385.60 3,385.60 3,385.60
25 Batu bata Buah 768.00 768.00 768.00 921.60 883.20

BAHAN GALIAN GOLONGAN C.


26 Batu belah M3 416,000.00 357,500.00 357,500.00 438,750.00 422,500.00
27 Batu pecah / Agregate kasar M3 640,000.00 575,000.00 575,000.00 675,000.00 650,000.00
28 Batu pecah / Agregat halus hasil pemecah batu M3 672,000.00 603,750.00 603,750.00 708,750.00 682,500.00
29 Batu kerikil sungai ayak tanpa pasir M3 672,000.00 603,750.00 603,750.00 708,750.00 682,500.00
30 Batu pecah 0.5 - 1 cm M3 672,000.00 603,750.00 603,750.00 708,750.00 682,500.00

Hal . 1
HARGA HARGA HARGA HARGA HARGA
NO. JENIS UPAH / BAHAN SATUAN Kec. Sukamara Kec. Balai Riam Kec. P. Kecubung Kec. Jelai Kec. Pantai Lunci
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1 2 3 4 5 6 7 8
31 Batu pecah 1 - 2 cm M3 704,000.00 632,500.00 632,500.00 659,137.50 715,000.0
32 Batu pecah 10 - 15 / 10 - 12 cm M3 704,000.00 632,500.00 632,500.00 545,737.50 715,000.0
33 Batu pecah 2 - 3 cm M3 704,000.00 632,500.00 632,500.00 659,137.50 715,000.0
34 Batu pecah 3 - 5 cm M3 704,000.00 632,500.00 632,500.00 659,137.50 715,000.0
35 Batu pecah 5 - 7 cm M3 620,800.00 557,750.00 557,750.00 602,437.50 630,500.0
36 Batu pecah 7 - 10 cm M3 557,760.00 501,112.50 501,112.50 588,262.50 566,475.0
37 Pasir pasang untuk beton M3 43,680.00 106,375.00 106,375.00 43,680.00 34,125.00
38 Pasir urug / timbunan M3 43,680.00 106,375.00 106,375.00 43,680.00 34,125.00
39 Tanah bahan timbunan pilihan jarak angkut s/d 10 km M3 46,176.00 41,486.25 41,486.25 55,916.25 46,897.50
40 Tanah bahan timbunan pilihan jarak angkut s/d 20 km M3 53,280.00 47,868.75 47,868.75 60,916.25 54,112.50
41 Tanah bahan timbunan pilihan jarak angkut s/d 30 km M3 60,384.00 54,251.25 54,251.25 65,916.25 61,327.50
42 Tanah bahan timbunan pilihan jarak angkut s/d 40 km M3 67,488.00 60,633.75 60,633.75 70,916.25 68,542.50
43 Tanah urug biasa M3 46,176.00 41,486.25 41,486.25 48,701.25 46,897.50
44 Tanah urug subur M3 49,728.00 44,677.50 44,677.50 52,447.50 50,505.00
45 Tanah Laterit M3 170,496.00 66,600.00 66,600.00 179,820.00 173,160.00
46 Baut baja kg 29,696.00 32,665.60 32,665.60 32,665.60 34,298.9
47 Besi beugel/ baut ( kuda- kuda ) kg 29,696.00 32,665.60 32,665.60 32,665.60 34,298.9
48 Besi beton polos 6 mm kg 8,821.03 10,144.19 10,144.19 10,144.19 10,651.4
49 Besi beton polos 8 mm kg 15,877.86 18,259.54 18,259.54 18,259.54 19,172.5
50 Besi beton polos 10 mm kg 15,655.91 18,004.30 18,004.30 18,004.30 18,904.5
51 Besi beton polos 12 mm kg 20,323.19 23,371.66 23,371.66 23,371.66 24,540.2
52 Besi beton polos 16 mm kg 19,746.84 22,708.86 22,708.86 22,708.86 23,844.3
53 Beton karawang Buah 16,000.00 18,400.00 21,160.00 21,160.00 21,160.0
54 Bubungan atap asbes Buah 31,180.80 35,857.92 41,236.61 41,236.61 41,236.6
55 Bubungan genteng multi roof pakai pasir Buah 48,115.20 55,332.48 63,632.35 63,632.35 63,632.4
56 Bubungan genteng surya roof pakai pasir Buah 48,115.20 55,332.48 63,632.35 63,632.35 63,632.4
57 Bubungan genteng sakura elang Buah 30,643.20 35,239.68 40,525.63 40,525.63 40,525.6
58 Bubungan Seng Plat M 19,200.00 22,080.00 25,392.00 25,392.00 25,392.0
59 Buis beton dia 1 meter Buah 192,000.00 220,800.00 253,920.00 253,920.00 253,920.0
60 Plitur liter 51,200.00 58,880.00 67,712.00 67,712.00 67,712.0
61 Cat danabrite 5 kg Kg 21,312.00 24,508.80 28,185.12 28,185.12 28,185.1
62 Cat jembatan kg 89,510.40 102,936.96 118,377.50 118,377.50 118,377.5
63 Cat kayu dasar kg 32,000.00 36,800.00 42,320.00 42,320.00 42,320.0
64 Cat kayu mengkilap avian kg 51,200.00 58,880.00 67,712.00 67,712.00 67,712.0
65 Cat menie kg 24,153.60 27,776.64 31,943.14 31,943.14 31,943.1
66 Cat merk glotex kg 51,200.00 58,880.00 67,712.00 67,712.00 67,712.0
67 Cat tembok avitex @ 25 kg kg 17,760.00 20,424.00 23,487.60 23,487.60 23,487.6
68 Cat tembok virgo @ 20 kg kg 7,487.62 8,610.76 9,902.37 9,902.37 9,902.4
69 Cat tembok fres @ 25 kg kg 24,864.00 28,593.60 32,882.64 32,882.64 32,882.6
70 Cat Genteng kg 29,836.80 34,312.32 39,459.17 39,459.17 39,459.2
71 Cat Besi kg 38,006.40 43,707.36 50,263.46 50,263.46 50,263.5

Hal. 2
HARGA HARGA HARGA HARGA HARGA
NO. JENIS UPAH / BAHAN SATUAN Kec. Sukamara Kec. Balai Riam Kec. P. Kecubung Kec. Jelai Kec. Pantai Lunci
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1 2 3 4 5 6 7 8
72 Dempul kayu kg 44,044.80 50,651.52 58,249.25 58,249.25 58,249.2
73 Engsel jendela DPJ 3'' Buah 31,752.00 36,514.80 41,992.02 41,992.02 41,992.0
74 Engsel pintu DPJ 5 '' Buah 50,803.20 58,423.68 67,187.23 67,187.23 67,187.2
75 Floor drain Buah 15,805.44 18,176.26 20,902.69 20,902.69 20,902.7
76 Gemuk liter 33,945.60 39,037.44 44,893.06 44,893.06 44,893.1
77 Genteng beton Buah 13,071.36 15,032.06 17,286.87 17,286.87 17,286.9
78 Grendel lokal 2'' biasa Buah 12,800.00 14,720.00 16,928.00 16,928.00 16,928.0
79 Glas block 20 x 20 Buah 38,400.00 44,160.00 50,784.00 50,784.00 50,784.0
80 Hak angin besar kuningan 8 '' Buah 14,634.24 16,829.38 19,353.78 19,353.78 19,353.8
81 Hak angin kecil kuningan Buah 14,634.24 16,829.38 19,353.78 19,353.78 19,353.8
82 Ijuk kg 18,470.40 21,240.96 24,427.10 24,427.10 24,427.1
83 Kaca bening ukuran 3 mm M2 110,822.40 127,445.76 146,562.62 146,562.62 146,562.6
84 Kaca bening ukuran 5 mm M2 136,396.80 156,856.32 180,384.77 180,384.77 180,384.8
85 Kaca buram ukuran 3 mm M2 142,080.00 163,392.00 187,900.80 187,900.80 187,900.8
86 Kaca buram ukuran 5 mm M2 185,414.40 213,226.56 245,210.54 245,210.54 245,210.5
87 Kaca ryben ukuran 3 mm M2 123,609.60 142,151.04 163,473.70 163,473.70 163,473.7
88 Kaca ryben ukuran 5 mm M2 166,400.00 191,360.00 220,064.00 220,064.00 220,064.0
89 Kerpus asbes Biji 40,492.80 46,566.72 53,551.73 53,551.73 53,551.7
90 Kerpus geteng beton Biji 15,984.00 18,381.60 21,138.84 21,138.84 21,138.8
91 Kawat duri Rol 121,600.00 139,840.00 160,816.00 160,816.00 160,816.0
92 Kawat harmonika tinggi 1.5 m Rol 576,000.00 662,400.00 761,760.00 761,760.00 761,760.0
93 Kawat beton kg 25,600.00 29,440.00 33,856.00 33,856.00 33,856.0
94 Kawat galvanis (kawat bronjong) kg 38,272.00 44,012.80 50,614.72 50,614.72 50,614.7
95 Kawat nyamuk/ kaca besi M2 32,000.00 36,800.00 42,320.00 42,320.00 42,320.0
96 Kawat nyamuk/ kaca plastik M2 19,200.00 22,080.00 25,392.00 25,392.00 25,392.0
97 Kayu bakar M3 160,000.00 184,000.00 211,600.00 211,600.00 211,600.0
98 Kayu bulat untuk cerucuk bt 6,400.00 7,360.00 8,464.00 8,464.00 8,464.0

Hal. 3
HARGA HARGA HARGA HARGA HARGA
NO. JENIS UPAH / BAHAN SATUAN Kec. Sukamara Kec. Balai Riam Kec. P. Kecubung Kec. Jelai Kec. Pantai Lunci
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1 2 3 4 5 6 7 8
99 Kayu ulin 10 x 10 cm M3 3,520,000.00 2,612,500.00 2,612,500.00 3,575,000.00 3,575,000.00
100 Kayu ulin 15 x 15 cm M3 3,200,000.00 2,375,000.00 2,375,000.00 3,250,000.00 3,250,000.00
101 Kayu ulin 2 x 20 cm ( Papan ) M3 4,300,800.00 3,192,000.00 3,192,000.00 4,368,000.00 4,368,000.00
102 Kayu ulin 3 x 20 cm ( Papan ) M3 4,368,000.00 3,241,875.00 3,241,875.00 4,436,250.00 4,436,250.00
103 Kayu ulin 20 x 20 cm M3 3,200,000.00 2,375,000.00 2,375,000.00 3,250,000.00 3,250,000.00
104 Kayu ulin 25 x 25 cm M3 3,200,000.00 2,375,000.00 2,375,000.00 3,250,000.00 3,250,000.00
105 Kayu ulin 5 x 10 cm M3 3,840,000.00 2,850,000.00 2,850,000.00 3,900,000.00 3,900,000.00
106 Kayu ulin 5 x 20 cm M3 3,840,000.00 2,850,000.00 2,850,000.00 3,900,000.00 3,900,000.00
107 Kayu untuk perancah/bekisting (kayu lokal) M3 1,280,000.00 950,000.00 950,000.00 1,280,000.00 1,280,000.00
108 Keramik 20 x 25 M2 94,003.20 108,103.68 124,319.23 124,319.23 124,319.2
109 Keramik 20 x 20 diamond / putih polos M2 70,400.00 80,960.00 93,104.00 93,104.00 93,104.0
110 Keramik 30 x 30 putih polos M2 70,400.00 80,960.00 93,104.00 93,104.00 93,104.0
111 Keramik 30 x 30 motif M2 76,800.00 88,320.00 101,568.00 101,568.00 101,568.0
112 Keramik 40 x 40 cm M2 83,200.00 95,680.00 110,032.00 110,032.00 110,032.0
113 Kloset duduk keramik INA lengkap Buah 2,266,521.60 2,606,499.84 2,997,474.82 2,997,474.82 2,997,474.8
114 Kloset jongkok keramik Buah 192,000.00 220,800.00 253,920.00 253,920.00 253,920.0
115 Kran leding biasa Buah 26,112.00 30,028.80 34,533.12 34,533.12 34,533.1
116 Kunci pintu tanam kuningan Buah 156,672.00 180,172.80 207,198.72 207,198.72 207,198.7
117 Kunci pintu tanam biasa Buah 97,920.00 112,608.00 129,499.20 129,499.20 129,499.2
118 Kunci gembok Buah 62,146.56 71,468.54 82,188.83 82,188.83 82,188.8
119 Lampu mercuri ML 250 philips Buah 113,587.20 130,625.28 150,219.07 150,219.07 150,219.1
120 Lampu mercuri philips 160 watt Buah 78,336.00 90,086.40 103,599.36 103,599.36 103,599.4
121 Lampu pijar philips 100 watt Buah 18,017.28 20,719.87 23,827.85 23,827.85 23,827.9
122 Lampu TL bambu philips 20watt Buah 109,670.40 126,120.96 145,039.10 145,039.10 145,039.1
123 Lampu TL bambu philips 40watt Buah 133,171.20 153,146.88 176,118.91 176,118.91 176,118.9
124 Lem kayu fox expres Buah 61,885.44 71,168.26 81,843.49 81,843.49 81,843.5
125 MCB 1 x 16 A - MC 45 A Buah 74,256.00 85,394.40 98,203.56 98,203.56 98,203.6
126 MCB 1 x 10 A - MC 45 A Buah 97,920.00 112,608.00 129,499.20 129,499.20 129,499.2
127 Milamin lembar 99,225.60 114,109.44 131,225.86 131,225.86 131,225.9
128 Minyak cat liter 26,112.00 30,028.80 34,533.12 34,533.12 34,533.1
129 Minyak tanah untuk non Rumah Tangga liter 16,108.80 18,525.12 21,303.89 21,303.89 21,303.9
130 Minyak tanah untuk Rumah Tangga liter 7,680.00 8,832.00 10,156.80 10,156.80 10,156.8
131 Maulding papan lap lanan keping 21,312.00 24,508.80 28,185.12 28,185.12 28,185.1
132 Maulding papan lap ramin keping 24,864.00 28,593.60 32,882.64 32,882.64 32,882.6
133 Mozaik 30 x 30 M2 73,113.60 84,080.64 96,692.74 96,692.74 96,692.7
Hal. 4
HARGA HARGA HARGA HARGA HARGA
NO. JENIS UPAH / BAHAN SATUAN Kec. Sukamara Kec. Balai Riam Kec. P. Kecubung Kec. Jelai Kec. Pantai Lunci
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1 2 3 4 5 6 7 8

NUSABOARD PENGGANTI PLYWOOD


134 Metric 2400 x 1200 x 3,5 mm Lembar 71,808.00 82,579.20 94,966.08 94,966.08 94,966.1
135 Metric 1800 x 1200 x 3,5 mm Lembar 54,835.20 63,060.48 72,519.55 72,519.55 72,519.6
136 Metric 2400 x 1200 x 4,5 mm Lembar 92,697.60 106,602.24 122,592.58 122,592.58 122,592.6
137 Metrik 1800 x 1200 x 4,5 mm Lembar 70,502.40 81,077.76 93,239.42 93,239.42 93,239.4
138 Metric 2400 x 1200 x 6 mm Lembar 130,560.00 150,144.00 172,665.60 172,665.60 172,665.6
139 Metric 1800 x 1200 x 6 mm Lembar 97,920.00 112,608.00 129,499.20 129,499.20 129,499.2
140 Metric 2400 x 1200 x 9 mm Lembar 204,979.20 235,726.08 271,084.99 271,084.99 271,085.0
141 Metrik 1800 x 1200 x 9 mm Lembar 154,060.80 177,169.92 203,745.41 203,745.41 203,745.4
142 Metric 2400 x 1200 x 12 mm Lembar 261,120.00 300,288.00 345,331.20 345,331.20 345,331.2
143 Metrik 1800 x 1200 x 12 mm Lembar 208,896.00 240,230.40 276,264.96 276,264.96 276,265.0
144 Metrik 1200 x 600 x 3,5 mm Lembar 18,278.40 21,020.16 24,173.18 24,173.18 24,173.2
145 Imperial 2440 x 1220 x 3,5 mm (berat 15 Kg) Lembar 78,336.00 90,086.40 103,599.36 103,599.36 103,599.4
146 Imperial 1830 x 1220 x 3,5 mm (berat 11 Kg) Lembar 57,446.40 66,063.36 75,972.86 75,972.86 75,972.9
147 Imperial 2440 x 1220 x 4,5 mm (berat 19 Kg) Lembar 97,920.00 112,608.00 129,499.20 129,499.20 129,499.2
148 Imperial 1830 x 1220 x 4,5 mm (berat 14 Kg) Lembar 73,113.60 84,080.64 96,692.74 96,692.74 96,692.7
149 Imperial 2440 x 1220 x 6 mm (berat 25 Kg) Lembar 130,560.00 150,144.00 172,665.60 172,665.60 172,665.6
150 Imperial 1830 x 1220 x 6 mm (berat 18,5 Kg) Lembar 97,920.00 112,608.00 129,499.20 129,499.20 129,499.2
151 Imperial 2440 x 1220 x 9 mm (berat 37 Kg) Lembar 215,424.00 247,737.60 284,898.24 284,898.24 284,898.2
152 Imperial 1830 x 1220 x 9 mm (berat 27 Kg) Lembar 163,200.00 187,680.00 215,832.00 215,832.00 215,832.0
153 Imperial 2440 x 1220 x 12 mm (berat 50 Kg) Lembar 287,232.00 330,316.80 379,864.32 379,864.32 379,864.3
154 Imperial 1830 x 1220 x 12 mm (berat 37,5 Kg) Lembar 215,424.00 247,737.60 284,898.24 284,898.24 284,898.2
155 Paku Nusa board isi 30.000 Bh ( Dos besar ) Dos besar 724,608.00 833,299.20 958,294.08 958,294.08 958,294.1
156 Paku Nusa board isi 3.000 Bh ( Dos kecil ) Dos Kecil 74,419.20 85,582.08 98,419.39 98,419.39 98,419.4
Hal. 5
HARGA HARGA HARGA HARGA HARGA
NO. JENIS UPAH / BAHAN SATUAN Kec. Sukamara Kec. Balai Riam Kec. P. Kecubung Kec. Jelai Kec. Pantai Lunci
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1 2 3 4 5 6 7 8
157 Fiber tape Nusaboard (Fiber tape 90 m) Roll 39,072.00
-
SEKRUP NUSABOARD -
158 Sekrup isi 15 000 Bh Dos bsr 1,650,539.52 1,898,120.45 2,182,838.52 2,182,838.52 2,182,838.5
159 Sekrup isi 1.500 Bh Dos Kcl 169,728.00 195,187.20 224,465.28 224,465.28 224,465.3
160 Kompon Nusaboard isi 20 Kg Zak 125,030.40 143,784.96 165,352.70 165,352.70 165,352.7
161 Nako ( kerangka dan daun ) 12 daun set 143,616.00 165,158.40 189,932.16 189,932.16 189,932.2
162 Nako ( kerangka dan daun ) 8 daun set 107,059.20 123,118.08 141,585.79 141,585.79 141,585.8
163 Oli Liter 47,980.80 55,177.92 63,454.61 63,454.61 63,454.6
164 Pacul/cangkul Buah 57,600.00 66,240.00 76,176.00 76,176.00 76,176.0
165 Paku asbes kg 35,840.00 41,216.00 47,398.40 47,398.40 47,398.4
166 Paku atap metal dan sejenisnya kg 38,400.00 44,160.00 50,784.00 50,784.00 50,784.0
167 Paku jembatan kg 32,000.00 36,800.00 42,320.00 42,320.00 42,320.0
168 Paku kait biji 17,600.00 20,240.00 23,276.00 23,276.00 23,276.0
169 Paku kayu kg 25,600.00 29,440.00 33,856.00 33,856.00 33,856.0
170 Paku plywood / tekwood kg 25,600.00 29,440.00 33,856.00 33,856.00 33,856.0
171 Paku seng 13/4'' kg 32,000.00 36,800.00 42,320.00 42,320.00 42,320.0
172 Paku sirap kg 25,600.00 29,440.00 33,856.00 33,856.00 33,856.0
173 Paku ulin kg 32,000.00 36,800.00 42,320.00 42,320.00 42,320.0
174 Papan lanan M3 1,410,048.00 1,621,555.20 1,864,788.48 1,864,788.48 1,864,788.5
175 Patok penuntun Buah -
176 Paving stone Biji 2,304.00 2,649.60 3,047.04 3,047.04 3,047.0

III KOMPONEN JEMBATAN RANGKA BAJA


177 Perletakkan elastomer buah 2,664,710.40 3,064,416.96 3,524,079.50 3,524,079.50 3,524,079.5
178 Baja untuk konstruksi jembatan kg 37,651.20 43,298.88 49,793.71 49,793.71 49,793.7
179 Pintu aluminium uk. 70 x 170 cm batang 639,360.00 735,264.00 845,553.60 845,553.60 845,553.6
180 Pipa PVC dia. 4'' batang 192,000.00 220,800.00 253,920.00 253,920.00 253,920.0
181 Pipa PVC dia. 1'' batang 57,600.00 66,240.00 76,176.00 76,176.00 76,176.0
182 Pipa PVC dia. 1/2'' batang 25,600.00 29,440.00 33,856.00 33,856.00 33,856.0
183 Pipa PVC dia. 2'' AW batang 75,828.48 87,202.75 100,283.16 100,283.16 100,283.2
184 Pipa PVC dia. 3'' AW batang 149,990.40 172,488.96 198,362.30 198,362.30 198,362.3
185 Pipa PVC dia. 4'' AW batang 296,688.00 341,191.20 392,369.88 392,369.88 392,369.9
Hal. 6
HARGA HARGA HARGA HARGA HARGA
NO. JENIS UPAH / BAHAN SATUAN Kec. Sukamara Kec. Balai Riam Kec. P. Kecubung Kec. Jelai Kec. Pantai Lunci
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1 2 3 4 5 6 7 8
186 Pipa PVC dia. 3/4'' batang 24,893.57 28,627.60 32,921.74 32,921.74 32,921.7
187 Pipa PVC dia. 4'' D batang 192,000.00 220,800.00 253,920.00 253,920.00 253,920.0
188 Pipa sandaran M' 236,234.88 271,670.11 312,420.63 312,420.63 312,420.6
189 Plamur tembok kg 44,800.00 51,520.00 59,248.00 59,248.00 59,248.0
190 Wastafel buah 402,192.00 462,520.80 531,898.92 531,898.92 531,898.9
191 Plywood 3 mm lembar 66,662.40 76,661.76 88,161.02 88,161.02 88,161.0
192 Pompa air merk dragon buah 480,000.00 552,000.00 634,800.00 634,800.00 634,800.0
193 Pompa air 125 watt buah 480,000.00 552,000.00 634,800.00 634,800.00 634,800.0
194 Pompa air 200 watt buah 698,880.00 803,712.00 924,268.80 924,268.80 924,268.8
195 Rambu lalu lintas buah -
196 Residu / teer liter 52,708.99 54,290.26 62,433.80 62,433.80 62,433.8
197 Semen PC ( 50 kg/zak) zak 83,200.00 84,864.00 84,864.00 84,864.00 84,864.0
198 Semen putih ( isi 40 kg/ zak) zak 149,752.32 152,747.37 175,659.47 175,659.47 175,659.5
199 Semen warna kg 14,321.66 14,608.10 16,799.31 16,799.31 16,799.3
200 Seng gelombang BJLS 30 lembar 61,440.00 70,656.00 81,254.40 81,254.40 81,254.4
201 Seng plastik gelombang lembar 51,200.00 58,880.00 67,712.00 67,712.00 67,712.0
202 Seng plat lembar 57,137.47 65,708.09 75,564.31 75,564.31 75,564.3
203 Seng plat BJLS (lebar 30 cm ) lembar 25,958.02 29,851.72 34,329.48 34,329.48 34,329.5
204 Seng plat BJLS 27 lembar 55,496.45 63,820.92 73,394.05 73,394.05 73,394.1
205 Seng plat BJLS 30 lembar -
206 Seng talang 45 cm M 32,000.00 36,800.00 42,320.00 42,320.00 42,320.0
207 Solar untuk non industri liter 8,960.00 10,304.00 11,849.60 11,849.60 11,849.6
208 Solar untuk industri liter 15,852.80 18,230.72 20,965.33 20,965.33 20,965.3
209 Stell plat girder + rang baja kg 44,755.20 51,468.48 59,188.75 59,188.75 59,188.8
210 Talang PVC 1/2 lingkaran batang 95,904.00 110,289.60 126,833.04 126,833.04 126,833.0
211 Talang PVC siku siku batang 121,600.00 139,840.00 160,816.00 160,816.00 160,816.0
212 Talang seng patahan BJLS 27 M' 67,488.00 77,611.20 89,252.88 89,252.88 89,252.9
213 Tarikan jendela buah 12,800.00 14,720.00 16,928.00 16,928.00 16,928.0
214 Teakwood ukuran 122 x 244 lembar 160,000.00 184,000.00 211,600.00 211,600.00 211,600.0
215 Tiang pacang pipa baja 400 mm M' 3,200,000.00 3,680,000.00 4,232,000.00 4,232,000.00 4,232,000.0
216 Tiang pancang pipa baja 500 mm M' 3,400,000.00 3,910,000.00 4,496,500.00 4,496,500.00 4,496,500.0
217 Tinner liter 27,686.40 31,839.36 36,615.26 36,615.26 36,615.3
218 Titik lampu + instalasi beton titik 228,480.00 262,752.00 302,164.80 302,164.80 302,164.8
219 Titik lampu + instalasi kayu titik 208,896.00 240,230.40 276,264.96 276,264.96 276,265.0
220 Premium bensin Liter 10,240.00 11,776.00 13,542.40 13,542.40 13,542.4

HAL. 7
HARGA HARGA HARGA HARGA HARGA
NO. JENIS UPAH / BAHAN SATUAN Kec. Sukamara Kec. Balai Riam Kec. P. Kecubung Kec. Jelai Kec. Pantai Lunci
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1 2 3 4 5 6 7 8
221 Pipa PVC SNI dia. 50 mm (2") Mof S12,5 meter 26,199.55 30,129.48 34,648.91 34,648.91 34,648.9
222 Pipa PVC SNI dia. 63 mm (2") RR S12,5 meter 82,690.56 95,094.14 109,358.27 109,358.27 109,358.3
223 Pipa PVC SNI dia. 75 mm (2") RR S12,5 meter 82,690.56 95,094.14 109,358.27 109,358.27 109,358.3
224 Pipa PVC SNI dia. 90 mm (3") RR S12,5 meter 156,003.84 179,404.42 206,315.08 206,315.08 206,315.1
225 Pipa PVC SNI dia. 110 mm (4") RR S12,5 meter 245,088.00 281,851.20 324,128.88 324,128.88 324,128.9
226 Pipa PVC SNI dia. 160 mm (6") RR S12,5 meter 463,322.88 532,821.31 612,744.51 612,744.51 612,744.5
227 Pipa PVC SNI dia. 200 mm (8") RR S12,5 meter 667,491.84 767,615.62 882,757.96 882,757.96 882,758.0
228 Pipa PVC SNI dia. 250 mm (10") RR S12,5 meter 1,893,358.08 2,177,361.79 2,503,966.06 2,503,966.06 2,503,966.1
229 Pipa PVC SNI dia. 280 mm (10") RR S12,5 meter 1,893,358.08 2,177,361.79 2,503,966.06 2,503,966.06 2,503,966.1
230 Pipa PVC SNI dia. 315 mm (12") RR S 12,5 meter 2,669,114.88 3,069,482.11 3,529,904.43 3,529,904.43 3,529,904.4
231 Pipa PVC SNI dia. 355 mm (14") RR S12,5 meter 1,338,997.44 1,539,847.06 1,770,824.11 1,770,824.11 1,770,824.1
232 Pipa PVC SNI dia. 400 mm (16") RR S12,5 meter 1,700,603.83 1,955,694.40 2,249,048.56 2,249,048.56 2,249,048.6
233 Pipa Steel SNI dia. 400 mm (16") RR S12,5 meter -
234 Bend All Socket PVC 90° SNI dia. 63 mm Buah 197,584.97 227,222.72 261,306.13 261,306.13 261,306.1
235 Bend All Socket PVC 90° SNI dia. 90 mm Buah 307,309.09 353,405.46 406,416.28 406,416.28 406,416.3
236 Bend All Socket PVC 90° SNI dia. 400 mm Buah 19,173,917.64 22,050,005.29 25,357,506.09 25,357,506.09 25,357,506.1
237 Bend All Socket PVC 45° SNI dia. 63 mm Buah 172,286.21 198,129.14 227,848.51 227,848.51 227,848.5
238 Bend All Socket PVC 45° SNI dia. 90 mm Buah 258,295.76 297,040.12 341,596.14 341,596.14 341,596.1
239 Bend All Socket PVC 45° SNI dia. 400 mm Buah 14,655,802.06 16,854,172.37 19,382,298.23 19,382,298.23 19,382,298.2
240 Bend All Socket PVC 22° SNI dia. 63 mm Buah 163,301.07 187,796.23 215,965.66 215,965.66 215,965.7
241 Bend All Socket PVC 22° SNI dia. 90 mm Buah 242,510.67 278,887.27 320,720.36 320,720.36 320,720.4
242 Bend All Socket PVC 22° SNI dia. 400 mm Buah 11,224,632.58 12,908,327.46 14,844,576.58 14,844,576.58 14,844,576.6
243 Bend All Socket PVC 11° SNI dia. 63 mm Buah 133,683.07 153,735.53 176,795.86 176,795.86 176,795.9
244 Bend All Socket PVC 11° SNI dia. 90 mm Buah 190,969.73 219,615.19 252,557.47 252,557.47 252,557.5
245 Bend All Socket PVC 11° SNI dia. 400 mm Buah 11,224,632.58 12,908,327.46 14,844,576.58 14,844,576.58 14,844,576.6
246 Flange Socket PVC SNI dia. 63 mm RR Buah 215,167.37 247,442.48 284,558.85 284,558.85 284,558.9
247 Flange Socket PVC SNI dia. 90 mm RR Buah 286,308.25 329,254.49 378,642.66 378,642.66 378,642.7
248 Flange Socket PVC SNI dia. 400 mm RR Buah -
249 TEE All Socket PVC SNI dia. 63 x 63 mm Buah 194,783.16 224,000.63 257,600.72 257,600.72 257,600.7
250 TEE All Socket PVC SNI dia. 90 x 63 mm Buah 349,011.00 401,362.64 461,567.04 461,567.04 461,567.0
251 TEE All Socket PVC SNI dia. 90 x 90 mm Buah 397,107.92 456,674.10 525,175.22 525,175.22 525,175.2
252 Clamp Saddle SNI dia. 63 x 20 mm Buah 59,724.75 68,683.46 78,985.98 78,985.98 78,986.0
253 Clamp Saddle SNI dia. 90 x 20 mm Buah 96,281.93 110,724.22 127,332.86 127,332.86 127,332.9
254 Hidran Umum (HU) Kap 3000 ltr Buah 8,808,960.00 10,130,304.00 11,649,849.60 11,649,849.60 11,649,849.6
255 Hidran Umum (HU) Kap 2000 ltr Buah 7,047,168.00 8,104,243.20 9,319,879.68 9,319,879.68 9,319,879.7
256 Gate Valve dia. 63 mm Buah 795,648.00 914,995.20 1,052,244.48 1,052,244.48 1,052,244.5
257 Gate Valve dia. 90 mm Buah 1,497,523.20 1,722,151.68 1,980,474.43 1,980,474.43 1,980,474.4
258 Gate Valve dia. 150 mm Buah 4,404,480.00 5,065,152.00 5,824,924.80 5,824,924.80 5,824,924.8
259 Gate Valve dia. 250 mm Buah 7,047,168.00 8,104,243.20 9,319,879.68 9,319,879.68 9,319,879.7
HAL. 8
HARGA HARGA HARGA HARGA HARGA
NO. JENIS UPAH / BAHAN SATUAN Kec. Sukamara Kec. Balai Riam Kec. P. Kecubung Kec. Jelai Kec. Pantai Lunci
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1 2 3 4 5 6 7 8
260 Flange Steel dia. 160 mm Buah 1,551,222.34 1,783,905.69 2,051,491.54 2,051,491.54 2,051,491.5
261 Flange Steel dia. 250 mm Buah 5,007,629.49 5,758,773.91 6,622,590.00 6,622,590.00 6,622,590.0
262 Flange Steel dia. 400 mm Buah 12,177,699.53 14,004,354.46 16,105,007.63 16,105,007.63 16,105,007.6
263 Reducer PVC SNI dia. 90 x 63 mm Buah 182,345.47 209,697.29 241,151.89 241,151.89 241,151.9
264 Pipa Steel SNI dia. 3" M 123,609.60 142,151.04 163,473.70 163,473.70 163,473.7
265 Mesin Pompa Type LQ 370 Buah 5,328,000.00 6,127,200.00 7,046,280.00 7,046,280.00 7,046,280.0
266 Roducer PVC SNI dia. 400 x 250mm Buah 9,235,200.00 10,620,480.00 12,213,552.00 12,213,552.00 12,213,552.0
267 Roducer PVC SNI dia. 90 x 63mm Buah 165,523.20 190,351.68 218,904.43 218,904.43 218,904.4
268 Springkle PVC SNI dia. 20 mm Buah 284,160.00 326,784.00 375,801.60 375,801.60 375,801.6
269 Dreaser Joint dia. 250 Buah 4,546,560.00 5,228,544.00 6,012,825.60 6,012,825.60 6,012,825.6
270 Kawat Las Buah 32,000.00 36,800.00 42,320.00 42,320.00 42,320.0
271 Pompa Test Buah 517,171.20 594,746.88 683,958.91 683,958.91 683,958.9
272 Drum Buah 177,600.00 204,240.00 234,876.00 234,876.00 234,876.0
273 Elbow Steel 45º SNI dia. 90 mm Buah 454,656.00 522,854.40 601,282.56 601,282.56 601,282.6
274 Elbow PVC 90º SNI dia. 90 mm Buah 293,395.20 337,404.48 388,015.15 388,015.15 388,015.2
275 Elbow PVC 90º SNI dia. 63 mm Buah 188,966.40 217,311.36 249,908.06 249,908.06 249,908.1
276 Elbow PVC 45º SNI dia. 90 mm Buah 257,875.20 296,556.48 341,039.95 341,039.95 341,040.0
277 Elbow PVC 45º SNI dia. 63 mm Buah 171,916.80 197,704.32 227,359.97 227,359.97 227,360.0
278 Sock drat luar dia. 90 mm Buah 130,713.60 150,320.64 172,868.74 172,868.74 172,868.7
279 Sock drat luar dia. 63 mm Buah 86,668.80 99,669.12 114,619.49 114,619.49 114,619.5
280 Sock drat dalam dia. 90 mm Buah 130,713.60 150,320.64 172,868.74 172,868.74 172,868.7
281 Sock drat dalam dia. 63 mm Buah 86,668.80 99,669.12 114,619.49 114,619.49 114,619.5
-
IV JENIS TANAMAN BUNGA -
282 Palm Raja tinggi 1,5 M Batang 522,240.00 600,576.00 690,662.40 690,662.40 690,662.4
283 Palm Putri Batang 240,230.40 276,264.96 317,704.70 317,704.70 317,704.7
284 Palm Ekor Tupai Batang 391,680.00 450,432.00 517,996.80 517,996.80 517,996.8
285 Palm Botol Kecil Batang 97,136.64 111,707.14 128,463.21 128,463.21 128,463.2
286 Palm Botol Besar Batang 323,788.80 372,357.12 428,210.69 428,210.69 428,210.7
287 Nusa Indah Batang 63,713.28 73,270.27 84,260.81 84,260.81 84,260.8
288 Bougenville 3 warna (± 1 m) Batang 259,031.04 297,885.70 342,568.55 342,568.55 342,568.6
289 Krokot Merah, Putih, Kuning Batang 7,833.60 9,008.64 10,359.94 10,359.94 10,359.9
290 Lantana Batang 15,667.20 18,017.28 20,719.87 20,719.87 20,719.9
291 Asoka Jepang Batang 11,750.40 13,512.96 15,539.90 15,539.90 15,539.9
Hal. 9 -
HARGA HARGA HARGA HARGA HARGA
NO. JENIS UPAH / BAHAN SATUAN Kec. Sukamara Kec. Balai Riam Kec. P. Kecubung Kec. Jelai Kec. Pantai Lunci
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1 2 3 4 5 6 7 8
292 Pangkas Kuning Batang 5,875.20 6,756.48 7,769.95 7,769.95 7,770.0
293 Pangkas Merah Batang 5,875.20 6,756.48 7,769.95 7,769.95 7,770.0
294 Pangkas Hijau Batang 5,875.20 6,756.48 7,769.95 7,769.95 7,770.0
295 Pisang-pisangan Batang 6,475.78 7,447.14 8,564.21 8,564.21 8,564.2
296 Teh - Tehan Batang 8,094.72 9,308.93 10,705.27 10,705.27 10,705.3
297 Tri Colour Batang 45,043.20 51,799.68 59,569.63 59,569.63 59,569.6
298 Rumput Gajah Mini M2 64,757.76 74,471.42 85,642.14 85,642.14 85,642.1
299 Rumput Jepang M2 24,284.16 27,926.78 32,115.80 32,115.80 32,115.8
300 Rumput Manila M2 60,057.60 69,066.24 79,426.18 79,426.18 79,426.2
301 Rumput Pita M2 5,666.30 6,516.25 7,493.69 7,493.69 7,493.7
302 Jatrofa Batavia Batang 27,926.78 32,115.80 36,933.17 36,933.17 36,933.2
303 Kana Batang 7,507.20 8,633.28 9,928.27 9,928.27 9,928.3
304 Kalpataru / Junjung Langit Batang 30,028.80 34,533.12 39,713.09 39,713.09 39,713.1
305 Kenari Batang 92,279.81 106,121.78 122,040.05 122,040.05 122,040.0
306 Kacang-kacangan Batang 4,896.00 5,630.40 6,474.96 6,474.96 6,475.0
307 Pandan Bali Kecil Batang 75,072.00 86,332.80 99,282.72 99,282.72 99,282.7
308 Pandan Bali Sedang Batang 300,288.00 345,331.20 397,130.88 397,130.88 397,130.9
309 Pandan Bali Besar Batang 652,800.00 750,720.00 863,328.00 863,328.00 863,328.0
310 Pohon Tanjung Batang 75,072.00 86,332.80 99,282.72 99,282.72 99,282.7
311 Agave Batang 71,808.00 82,579.20 94,966.08 94,966.08 94,966.1
312 Cemara Lilin Batang 150,144.00 172,665.60 198,565.44 198,565.44 198,565.4
313 Cemara Udang Batang 300,288.00 345,331.20 397,130.88 397,130.88 397,130.9
314 Cemara Gimbal Batang 150,144.00 172,665.60 198,565.44 198,565.44 198,565.4
315 Cikas Batang 176,582.40 203,069.76 233,530.22 233,530.22 233,530.2
316 Lidah Vertua Kecil Batang 6,475.78 7,447.14 8,564.21 8,564.21 8,564.2
317 Lidah Vertua Besar Batang 16,320.00 18,768.00 21,583.20 21,583.20 21,583.2
318 Tombak Raja Batang 99,225.60 114,109.44 131,225.86 131,225.86 131,225.9
319 Lili Pari Batang 7,507.20 8,633.28 9,928.27 9,928.27 9,928.3
320 Seruni Rambat Batang 7,507.20 8,633.28 9,928.27 9,928.27 9,928.3
321 Sikat Botol Batang 92,279.81 106,121.78 122,040.05 122,040.05 122,040.0
322 Star Blue Batang 16,189.44 18,617.86 21,410.53 21,410.53 21,410.5
323 Wali Songo Batang 28,331.52 32,581.25 37,468.44 37,468.44 37,468.4
324 RTM batu kuning 10 x 10 isi 100 biji M2 153,799.68 176,869.63 203,400.08 203,400.08 203,400.1
325 RTM batu kuning 8 x 20 isi 62,5 biji M2 161,894.40 186,178.56 214,105.34 214,105.34 214,105.3
326 RTM batu kuning 10 x 20 isi 50 biji M2 161,894.40 186,178.56 214,105.34 214,105.34 214,105.3
327 RTM batu kuning 15 x 15 isi 45 biji M2 169,989.12 195,487.49 224,810.61 224,810.61 224,810.6
328 RTM batu kuning 15 x 30 isi 23 biji M2 178,083.84 204,796.42 235,515.88 235,515.88 235,515.9
329 RTM batu kuning 20 x 20 isi 25 biji M2 178,083.84 204,796.42 235,515.88 235,515.88 235,515.9
330 RTM batu kuning 20 x 30 isi 17 biji M2 194,273.28 223,414.27 256,926.41 256,926.41 256,926.4
331 RTM batu kuning 20 x 40 isi 12,5 biji M2 218,557.44 251,341.06 289,042.21 289,042.21 289,042.2
-
Hal. 10 -
HARGA HARGA HARGA HARGA HARGA
NO. JENIS UPAH / BAHAN SATUAN Kec. Sukamara Kec. Balai Riam Kec. P. Kecubung Kec. Jelai Kec. Pantai Lunci
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )

1 2 3 4 5 6 7 8
332 RTA batu kuning 10 x 10 isi 100 biji M2 153,799.68 176,869.63 203,400.08 203,400.08 203,400.1
333 RTA batu kuning 7 x 15 isi 95 biji M2 153,799.68 176,869.63 203,400.08 203,400.08 203,400.1
334 RTA batu kuning 5 x 20 isi 100 biji M2 161,894.40 186,178.56 214,105.34 214,105.34 214,105.3
335 RTA batu kuning 8 x 20 isi 62,5 biji M2 161,894.40 186,178.56 214,105.34 214,105.34 214,105.3
336 RTA batu kuning 10 x 20 isi 50 biji M2 161,894.40 186,178.56 214,105.34 214,105.34 214,105.3
337 RTA batu kuning 15 x 30 isi 23 biji M2 186,178.56 214,105.34 246,221.15 246,221.15 246,221.1
338 RTA batu kuning 20 x 20 isi 25 biji M2 178,083.84 204,796.42 235,515.88 235,515.88 235,515.9
339 RTA batu kuning 20 x 30 isi 17 biji M2 194,273.28 223,414.27 256,926.41 256,926.41 256,926.4
340 RTA batu hijau 10 x 10 isi 100 biji M2 153,799.68 176,869.63 203,400.08 203,400.08 203,400.1
341 RTA batu hijau 8 x 20 isi 62,5 biji M2 169,989.12 195,487.49 224,810.61 224,810.61 224,810.6
342 RTA batu hijau 10 x 20 isi 50 biji M2 178,083.84 204,796.42 235,515.88 235,515.88 235,515.9
343 RTA batu hijau 15 x 15 isi 45 biji M2 218,557.44 251,341.06 289,042.21 289,042.21 289,042.2
344 RTM batu hitam candi 10 x 20 isi 50 biji M2 226,652.16 260,649.98 299,747.48 299,747.48 299,747.5
345 RTM batu hitam candi 15 x 30 isi 23 biji M2 242,841.60 279,267.84 321,158.02 321,158.02 321,158.0
346 Relief (lukisan) 60 x 80 tebal 5 cm biji 809,472.00 930,892.80 1,070,526.72 1,070,526.72 1,070,526.7
347 Relief (lukisan) 100 x 100 tebal 5 cm biji 1,295,155.20 1,489,428.48 1,712,842.75 1,712,842.75 1,712,842.8
348 Ornamen 10 x 10 biji 48,568.32 55,853.57 64,231.60 64,231.60 64,231.6
349 Ornamen 15 x 15 biji 64,757.76 74,471.42 85,642.14 85,642.14 85,642.1
350 Ornamen 20 x 20 biji 80,947.20 93,089.28 107,052.67 107,052.67 107,052.7
351 Ornamen 30 x 30 biji 97,136.64 111,707.14 128,463.21 128,463.21 128,463.2
352 Ornamen 40 x 40 biji 113,326.08 130,324.99 149,873.74 149,873.74 149,873.7
353 Loster 15 x 15 biji 80,947.20 93,089.28 107,052.67 107,052.67 107,052.7
354 Loster 20 x 20 biji 97,136.64 111,707.14 128,463.21 128,463.21 128,463.2
355 Loster 30 x 30 biji 105,231.36 121,016.06 139,168.47 139,168.47 139,168.5
356 Loster 40 x 40 biji 145,704.96 167,560.70 192,694.81 192,694.81 192,694.8
357 Batu alam andesit 3 x 30 / 3 x 25 sis 112 biji M2 242,841.60 279,267.84 321,158.02 321,158.02 321,158.0
358 Batu alam andesit alur 1/2 10 x 20 isi 50 biji M2 275,220.48 316,503.55 363,979.08 363,979.08 363,979.1
359 Batu alam andesit napoli 10 x 20 isi 50 biji M2 299,504.64 344,430.34 396,094.89 396,094.89 396,094.9

HAL. 11
HARGA HARGA HARGA HARGA HARGA
SATUAN Kec. Sukamara Kec. Balai Riam Kec. P. Kecubung Kec. Jelai Kec. Pantai Lunci
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
III. SEWA ALAT BERAT
1 2 3 4 5 6 7 8
1 HIDRAULIC EXCAVATOR, 80 - 140 HP Hari 908,250.00 966,000.00 966,000.00 966,000.00 966,000.00
2 BULLDOZER, 95 - 150 HP Hari 834,500.00 959,675.00 959,675.00 959,675.00 959,675.00
3 LOADER, 95 - 120 HP Hari 1,034,250.00 1,131,900.00 1,131,900.00 1,131,900.00 1,131,900.00
4 DUMP TRUCK, 3,5 TON Hari 367,500.00 385,800.00 385,800.00 385,800.00 385,800.00
5 DUMP TRUCK, 5 TON Hari 771,685.00 887,437.75 887,437.75 887,437.75 887,437.75
6 TRUCK TANGKI AIR, 4000 LT Hari 632,640.00 727,536.00 727,536.00 727,536.00 727,536.00
7 MOTOR GRADER, 75 - 125 HP Hari 1,034,250.00 1,131,900.00 1,131,900.00 1,131,900.00 1,131,900.00
8 TANDEM ROLLER, 6 - 10 TON Hari 840,000.00 882,000.00 882,000.00 882,000.00 882,000.00
9 BABY ROLLER, 6 TON Hari 750,000.00 787,500.00 787,500.00 787,500.00 787,500.00
10 VIBRO ROLLER, 10 TON Hari 840,000.00 882,000.00 882,000.00 882,000.00 882,000.00
11 COMPRESSOR, 125 - 150 CFM Hari 420,000.00 441,000.00 441,000.00 441,000.00 441,000.00
12 POMPA AIR, dia. 50 - 100 mm Hari 53,975.00 62,071.25 62,071.25 62,071.25 62,071.25
13 CONCRETE MIXER, 0,25 - 0,60 M3 Hari 67,990.00 78,188.50 78,188.50 78,188.50 78,188.50
14 CONCRETE VIBRATOR, 3 - 5 HP Hari 33,935.00 39,025.25 39,025.25 39,025.25 39,025.25
15 SPRAYER, SELFPROP 1000 lt Hari 378,000.00 396,900.00 396,900.00 396,900.00 396,900.00
15 Upright Rammer / Stamper Hari 105,000.00 110,250.00 110,250.00 110,250.00 110,250.00
16 TRAILLER / KM 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00

HAL. 12

Mengetahui :
KEPALA DINAS PEKERJAAN UMUM
Kabupaten Sukamara

Ir. HARIADI HAMZAH


NIP. 010 236 520
KETERANGAN

9
KETERANGAN

9
KETERANGAN

9
KETERANGAN

9
KETERANGAN

9
KETERANGAN

9
KETERANGAN

9
KETERANGAN

9
KETERANGAN

9
KETERANGAN

9
KETERANGAN

9
KETERANGAN

9
KETERANGAN

9
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

1 0 + 0 8.00 6.50 1.80 6.30 5.30 1.30 5.51

LUAS DIMENSI LUAS DIMENSI


LAR
LAEX
JA LAN KABUPATEN TANGGUL HASIL GALIAN

13.05 7.54
SUKAMARA - JELAI

TEX

RENCANA EXISTING
TR

LB EX
LBR

2 0 + 50 8.00 6.50 1.80 6.30 5.30 1.30 5.51 50.00 275.50

LUAS DIMENSI LUAS DIMENSI


13.05 7.54
RENCANA EXISTING

3 0 + 100 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 285.25

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

4 0 + 150 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 295.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

5 0 + 200 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 295.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

6 0 + 250 8.00 6.50 1.80 6.50 5.50 1.20 5.85 50.00 293.75
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

LUAS DIMENSI LUAS DIMENSI


13.05 7.20
RENCANA EXISTING

7 0 + 300 8.00 6.50 1.80 6.50 5.50 1.20 5.85 50.00 292.50

LUAS DIMENSI LUAS DIMENSI


13.05 7.20
RENCANA EXISTING
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

8 0 + 350 8.00 6.50 1.80 6.50 5.50 1.20 5.85 50.00 292.50

LUAS DIMENSI LUAS DIMENSI


13.05 7.20
RENCANA EXISTING

9 0 + 400 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 293.75

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

10 0 + 450 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 295.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

11 0 + 500 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 295.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

12 0 + 550 8.00 6.50 1.80 6.00 5.00 1.35 5.63 50.00 288.13

LUAS DIMENSI LUAS DIMENSI


13.05 7.43
RENCANA EXISTING

13 0 + 600 8.00 6.50 1.80 6.00 5.00 1.35 5.63 50.00 281.25
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

LUAS DIMENSI LUAS DIMENSI


13.05 7.43
RENCANA EXISTING

14 0 + 650 8.00 6.50 1.80 6.80 5.80 1.35 4.55 50.00 254.25

LUAS DIMENSI LUAS DIMENSI


13.05 8.51
RENCANA EXISTING
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

15 0 + 700 8.00 6.50 1.80 6.80 5.80 1.35 4.55 50.00 227.25

LUAS DIMENSI LUAS DIMENSI


13.05 8.51
RENCANA EXISTING

16 0 + 750 8.00 6.50 1.80 7.00 6.00 1.35 4.28 50.00 220.50

LUAS DIMENSI LUAS DIMENSI


13.05 8.78
RENCANA EXISTING

17 0 + 800 8.00 6.50 1.80 7.00 6.00 1.35 4.28 50.00 213.75

LUAS DIMENSI LUAS DIMENSI


13.05 8.78
RENCANA EXISTING

18 0 + 850 8.00 6.50 1.80 6.50 5.50 1.30 5.25 50.00 238.13

LUAS DIMENSI LUAS DIMENSI


13.05 7.80
RENCANA EXISTING

19 0 + 900 8.00 6.50 1.80 6.50 5.50 1.30 5.25 50.00 262.50

LUAS DIMENSI LUAS DIMENSI


13.05 7.80
RENCANA EXISTING

20 0 + 950 8.00 6.50 1.80 6.50 5.50 1.30 5.25 50.00 262.50
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

LUAS DIMENSI LUAS DIMENSI


13.05 7.80
RENCANA EXISTING

21 0 + 1000 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 278.75

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

22 0 + 1050 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 295.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

23 0 + 1100 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 295.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

24 0 + 1150 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 295.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

25 0 + 1200 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 295.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

26 0 + 1250 8.00 6.50 1.80 6.50 5.50 1.40 4.65 50.00 263.75

LUAS DIMENSI LUAS DIMENSI


13.05 8.40
RENCANA EXISTING

27 0 + 1300 8.00 6.50 1.80 6.50 5.50 1.30 5.25 50.00 247.50
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

LUAS DIMENSI LUAS DIMENSI


13.05 7.80
RENCANA EXISTING

28 0 + 1350 8.00 6.50 1.80 6.50 5.50 1.30 5.25 50.00 262.50

LUAS DIMENSI LUAS DIMENSI


13.05 7.80
RENCANA EXISTING
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

29 0 + 1400 8.00 6.50 1.80 6.50 5.50 1.40 4.65 50.00 247.50

LUAS DIMENSI LUAS DIMENSI


13.05 8.40
RENCANA EXISTING

30 0 + 1450 8.00 6.50 1.80 6.50 5.50 1.20 5.85 50.00 262.50

LUAS DIMENSI LUAS DIMENSI


13.05 7.20
RENCANA EXISTING

31 0 + 1500 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 293.75

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

32 0 + 1550 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 295.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

33 0 + 1600 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 295.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

34 0 + 1650 8.00 6.50 1.80 6.00 5.00 1.20 6.45 50.00 308.75
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

LUAS DIMENSI LUAS DIMENSI


13.05 6.60
RENCANA EXISTING

35 0 + 1700 8.00 6.50 1.80 6.00 5.00 1.20 6.45 50.00 322.50

LUAS DIMENSI LUAS DIMENSI


13.05 6.60
RENCANA EXISTING
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

36 0 + 1750 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 308.75

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

37 0 + 1800 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 295.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

38 0 + 1850 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 295.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

39 0 + 1900 8.00 6.50 1.80 6.30 5.30 1.35 5.22 50.00 278.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.83
RENCANA EXISTING

40 0 + 1950 8.00 6.50 1.80 6.30 5.30 1.35 5.22 50.00 261.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.83
RENCANA EXISTING

41 0 + 2000 8.00 6.50 1.80 6.00 5.00 1.20 6.45 50.00 291.75
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

LUAS DIMENSI LUAS DIMENSI


13.05 6.60
RENCANA EXISTING

42 0 + 2050 8.00 6.50 1.80 6.00 5.00 1.20 6.45 50.00 322.50

LUAS DIMENSI LUAS DIMENSI


13.05 6.60
RENCANA EXISTING
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

43 0 + 2100 8.00 6.50 1.80 6.00 5.00 1.45 5.08 50.00 288.13

LUAS DIMENSI LUAS DIMENSI


13.05 7.98
RENCANA EXISTING

44 0 + 2150 8.00 6.50 1.80 6.00 5.00 1.45 5.08 50.00 253.75

LUAS DIMENSI LUAS DIMENSI


13.05 7.98
RENCANA EXISTING

45 0 + 2200 8.00 6.50 1.80 6.50 5.50 1.45 4.35 50.00 235.63

LUAS DIMENSI LUAS DIMENSI


13.05 8.70
RENCANA EXISTING

46 0 + 2250 8.00 6.50 1.80 6.50 5.50 1.45 4.35 50.00 217.50

LUAS DIMENSI LUAS DIMENSI


13.05 8.70
RENCANA EXISTING

47 0 + 2300 8.00 6.50 1.80 6.50 5.50 1.30 5.25 50.00 240.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.80
RENCANA EXISTING

48 0 + 2350 8.00 6.50 1.80 6.50 5.50 1.30 5.25 50.00 262.50
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

LUAS DIMENSI LUAS DIMENSI


13.05 7.80
RENCANA EXISTING

49 0 + 2400 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 278.75

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

50 0 + 2450 8.00 6.50 1.80 6.00 5.00 1.30 5.90 50.00 295.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.15
RENCANA EXISTING

51 0 + 2500 8.00 6.50 1.80 6.50 5.50 1.30 5.25 50.00 278.75

LUAS DIMENSI LUAS DIMENSI


13.05 7.80
RENCANA EXISTING

52 0 + 2550 8.00 6.50 1.80 6.50 5.50 1.25 5.55 50.00 270.00

LUAS DIMENSI LUAS DIMENSI


13.05 7.50
RENCANA EXISTING

53 0 + 2600 8.00 6.50 1.80 6.50 5.50 1.25 5.55 50.00 277.50

LUAS DIMENSI LUAS DIMENSI


13.05 7.50
RENCANA EXISTING

54 0 + 2650 8.00 6.50 1.80 6.80 5.80 1.30 4.86 50.00 260.25

LUAS DIMENSI LUAS DIMENSI


13.05 8.19
RENCANA EXISTING

55 0 + 2700 8.00 6.50 1.80 6.80 5.80 1.30 4.86 50.00 243.00
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

LUAS DIMENSI LUAS DIMENSI


13.05 8.19
RENCANA EXISTING

56 0 + 2750 8.00 6.50 1.80 6.50 5.50 1.30 5.25 50.00 252.75

LUAS DIMENSI LUAS DIMENSI


13.05 7.80
RENCANA EXISTING
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

57 0 + 2800 8.00 6.50 1.80 6.50 5.50 1.30 5.25 50.00 262.50

LUAS DIMENSI LUAS DIMENSI


13.05 7.80
RENCANA EXISTING

58 0 + 2850 8.00 6.50 1.80 6.50 5.50 1.30 5.25 50.00 262.50

LUAS DIMENSI LUAS DIMENSI


13.05 7.80
RENCANA EXISTING

JUMLAH I 15,649.50

KETERANGAN :
LAR : LEBAR ATAS RENCANA
LBR : LEBAR BAWAH RENCANA
JA LAN KABUPATEN
SUKAMARA - JELAI
LAEX
LAR

TANGGUL HASIL GALIAN


TR : TINGGI RENCANA
LAEX : LEBAR ATAS EXISTING
TEX
TR

LB EX
LBR

LBEX : LEBAR BAWAH EXISTING


TEX : TINGGI EXISTING

Sukamara, 10 Mei 2009

Diperiksa Oleh : Dibuat oleh :


KASI Operasi Konsultan Perencana
Kegiatan Rehabilitasi/Pemeliharaan CV. KASUMA JAYA ENGINEERING
Jaringan Irigasi Cabang Sukamara

HASAN BASYUNI, ST. ABDUL RAFIK, ST.


NIP. 19770420 200501 1 009 Direktur Cabang
Menyetujui :
Kepala Bidang Pengairan
Dinas Pekerjaan Umum
Kabupaten Sukamara

ARIEF RAHMAN HAKIM


NIP. 19680814 198803 1 006
PERHITUNGAN KUANTITAS
KEGIATAN : REHABILITASI / PEMELIHARAAN JARINGAN IRIGASI
PEKERJAAN : REHABILITASI SALURAN PRIMER I 460 Ha
LOKASI : D.R. SUNGAI BARU KEC. JELAI KAB. SUKAMARA
TAHUN ANGGARAN : 2009

KONTRAKTOR PELAKSANA : CV. MUFIDAH BACK UP DATA


KONSULTAN PENGAWAS : CV. PARAMADIPTA ENGINEERING
VOLUME GALIAN SALURAN
PEKERJAAN GALIAN TANAH
SALURAN SEKUNDER

DIMENSI RENCANA DIMENSI EXISTING


SELISIH PANJANG
NO STA KETERANGAN GAMBAR VOLUME (M3)
LAR LBR TR LAEX LBEX TEX LUAS (M)

Mengetahui :
Kepala Dinas Pekerjaan Umum
Kabupaten Sukamara

Ir. HARIADI HAMZAH


NIP. 19550303 198603 1 013