Anda di halaman 1dari 2

CV.

ISTANA KARYA
REKAP MATERIAL KE PT. PURNAMA

JENIS HARGA
No HARI, TANGGAL NO. POL JUMLAH JUMLAH (Rp.) Keterangan
MATERIAL SATUAN
MUATAN (M3)

1 Sabtu - 16- DK 9386 SE BATU 3/5 6 275,000.00 1,650,000


2 November-2019 DK 9386 SE BATU 3/5 6 275,000.00 1,650,000
3 DK 9386 SE BATU 3/5 6 275,000.00 1,650,000

JUMLAH = 18 4,950,000

1 Minggu - 17- DK 9386 SE BATU 3/5 6 275,000.00 1,650,000


2 November-2019 DK 9386 SE BATU 3/5 6 275,000.00 1,650,000

JUMLAH = 12 3,300,000

1 Senin - 18- DK 9386 SE BATU 3/5 6 275,000.00 1,650,000


2 November-2019 DK 9386 SE BATU 3/5 6 275,000.00 1,650,000

JUMLAH = 12 3,300,000

1 Kamis - 28- BM 8209 FT BATU 3/5 6 275,000.00 1,650,000


November-2019

JUMLAH = 6 1,650,000

1 Senin - 2-Desember- BM 8209 FT BATU 3/5 6 275,000.00 1,650,000


2019
JENIS HARGA
No HARI, TANGGAL NO. POL JUMLAH JUMLAH (Rp.) Keterangan
MATERIAL SATUAN
MUATAN (M3)

JUMLAH = 6 1,650,000

1 Jumat - 10-Januari- DR 8683 SA BATU 3/5 6 275,000.00 1,650,000


2 2020 DK 8184 QW BATU 3/5 6 275,000.00 1,650,000
3 DR 8859 LZ BATU 3/5 6 275,000.00 1,650,000
4 BM 8209 FT BATU 3/5 6 275,000.00 1,650,000
5 DK 9330 MH BATU 3/5 6 275,000.00 1,650,000
JUMLAH = 18 8,250,000

1 Sabtu - 11-Januari- DK 8393 QC BATU 3/5 6 275,000.00 1,650,000


2 2020 DK 8184 QW BATU 3/5 6 275,000.00 1,650,000
3 DR 8677 AC BATU 3/5 6 275,000.00 1,650,000
4 DR 8683 SA BATU 3/5 6 275,000.00 1,650,000
5 DK 9330 MH BATU 3/5 6 275,000.00 1,650,000
6 BM 8209 FT BATU 3/5 6 275,000.00 1,650,000
7 DK 9330 MH BATU 3/5 6 275,000.00 1,650,000
8 DK 9386 SE BATU 3/5 6 275,000.00 1,650,000
9 DK 8184 QW BATU 3/5 6 275,000.00 1,650,000

JUMLAH = 54 14,850,000

1 Sabtu - 18-Januari- DK 9584 HE BATU 3/5 6 275,000.00 1,650,000


2 2020 BM 8209 FT BATU 3/5 6 275,000.00 1,650,000
3 DK 8393 QC BATU 3/5 6 275,000.00 1,650,000
4 DR 8859 LZ BATU 3/5 6 275,000.00 1,650,000
5 DK 9330 MH BATU 3/5 6 275,000.00 1,650,000
JUMLAH = 30 8,250,000
Total = 162.00 46,200,000.00

Anda mungkin juga menyukai