A.3. LANTAI 5
1 PEMIPAAN AIR BERSIH -
2 PEMIPAAN AIR PANAS -
3 PEMIPAAN AIR KOTOR & AIR BEKAS -
4 PEMIPAAN AIR HUJAN -
5 PEMIPAAN VENT -
6 INSTALASI PANEL -
7 INSTALASI KABEL FEEDER -
8 INSTALASI KABEL TRAY -
9 INSTALASI ARMATUR LAMPU, SAKLAR & STOP -
10 KONTAK
INSTALASI PENERANGAN & STOP KONTAK -
A.4. LANTAI 6
1 PEMIPAAN AIR BERSIH -
2 PEMIPAAN AIR PANAS -
3 PEMIPAAN AIR KOTOR & AIR BEKAS -
4 PEMIPAAN AIR HUJAN -
5 PEMIPAAN VENT -
No. 6 INSTALASI PANEL -
7 INSTALASI KABEL FEEDER -
8 INSTALASI KABEL TRAY -
9 INSTALASI ARMATUR LAMPU, SAKLAR & STOP -
KONTAK
10 INSTALASI PENERANGAN & STOP KONTAK -
LANTAI ATAP
1 PEMIPAAN AIR BERSIH -
A.5. 2 PEMIPAAN AIR HUJAN -
3 INSTALASI PANEL -
PEKERJAAN UTILITAS
1 INSTALASI PANEL -
A.6. 2 INSTALASI KABEL FEEDER -
3 INSTALASI ARMATUR LAMPU, SAKLAR & STOP -
KONTAK
4 INSTALASI PENERANGAN & STOP KONTAK -
IV PEKERJAAN CCTV -
V PEKERJAAN ACCESS CONTROL / CARD -
PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR
I PEKERJAAN INSTALASI PLAMBING -
B.4. II PENYAMBUNGAN DAYA PLN -
III PEKERJAAN INSTALASI KABEL FEEDER -
-
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA (DKH)
PEKERJAAN MEKANIKAL & ELEKTRIKAL
SUB TOTAL :
Page 3 of 22
JUMLAH HARGA
(Rp.)
-
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA (DKH)
PEKERJAAN MEKANIKAL & ELEKTRIKAL
Pekerjaa
:PEMBANGUNAN RUMAH SUSUN T-45 6LT
n
Lokasi :
Satuan :Penyediaan Rumah Susun Kementerian PU
Kegiatan
Kerja :Penyediaan Rumah
Tahun :dan
2019
Susun
Perumahan Rakyat
Anggaran IV. PEKERJAAN MEKANIKAL DAN
ELEKTRIKAL
IV. A. PEKERJAAN MEKANIKAL DAN
V
ELEKTRIKAL STANDART SA
No. URAIAN PEKERJAAN O HARGA TOTAL
T (Rp) (Rp)
L SATUAN HARGA
PEKERJAAN MEKANIKAL & ELEKTRIKAL
A.
STANDART
A.1. LANTAI DASAR -
1 PEMIPAAN AIR BERSIH -
Pipa PPR PN - 10 (Incl. Fitting & Accessories)
-PPR PN - 10 dia. 15 m 153.40 - -
-PPR PN - 10 dia. 20 m 140.04 - -
-PPR PN - 10 dia. 25 m 45.52 - -
-PPR PN - 10 dia. 40 (Riser) m 32.00 - -
-PPR PN - 10 dia. 50 (Riser) m 4.00 - -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
-dia. 40 bh - - -
-dia. 25 bh 8.00 - -
-dia. 15 bh 8.00 - -
-Meter Air c/w BV dia. bh 8.00 - -
2 25
PEMIPAAN AIR PANAS -
Pipa PPR PN - 20 (Incl. Fitting & Accessories)
-PPR PN - 20 dia. 15 m 54.66 - -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
-dia. 15 bh 8.00 - -
-Elektrik Water Heater kapasitas 15 liter bh 8.00 - -
3 PEMIPAAN AIR KOTOR & AIR BEKAS -
Pipa PVC Kelas AW (Incl. Fitting & Accessories) `
-dia. 200 : AK Horisontal m 10.65 - -
-dia. 150 : AK Horisontal m 46.24 - -
-dia. 100 : AK Horisontal m 29.48 - -
-dia. 200 : ABK Horisontal m 10.40 - -
-dia. 150 : ABK Horisontal m 38.06 - -
-dia. 100 : ABK Horisontal m 34.74 - -
-dia. 80 : ABK Horisontal m 18.40 - -
-dia. 50 : ABK Horisontal m 23.05 - -
-dia. 40 : ABK Horisontal m 22.12 - -
-dia. 150 ( riser pipa air m 32.00 - -
-dia.
kotor80
) ( riser pipa air bekas m 32.00 - -
Clean
) Out (CO)
-CO, dia. 100 bh 2.00 - -
-FCO, dia. 80 bh 8.00 - -
4 PEMIPAAN AIR HUJAN -
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
-dia. 150 m 107.86 - -
-dia. 100 ( pipa
( Horisontal m 71.18 - -
-dia.
tegak80) ( pipa) m 15.17 - -
5 balkon )
PEMIPAAN VENT -
Pipa PVC Kelas D (Incl. Fitting & Accessories)
-Dia. 80 ( pipa riser ) m 32.00 - -
-Dia. 25 m 171.64 - -
6 INSTALASI PANEL -
Pengadaan dan pemasangan SDP-LT.1 unit 1.00 - -
dengan komponen panel, sbb :
-MCCB 3P, 300 A
-MCCB 3P, 63 A
-MCCB 3P, 50 A
-Ampere-meter 50/5
-Volt-meter 0-500 Volt
-A
Volt Selector Switch
-Fuse 3 x 2 A
-Indicator Lamp
-Rel MCB 3P
-CT 300A/50A
-Cu Bar 4 x (30 x 5)mm2 + 1 x (15x5) mm2
-Accessories & Termination
-Box Panel
-MCB 3P, 20 A
-MCB 1P, 16 A
-Ampere-meter
50/5 A
-Volt-meter 0-
500 Volt
-Volt Selector
Switch
-Fuse 3 x 2 A
-Indicator Lamp
-Rel MCB 3P
-CT 50A/5A
-Cu Bar 5 x (12x
2)mm2
-Cu Bar 4 x (12x 2)mm2 + 1
-Accessories &
Termination
-Box Panel
7 INSTALASI KABEL -
a. Kabel Distribusi Daya
-NYY 1 x (4 x 16 mm2) + m 35.00 - -
9 INSTALASI ARMATUR -
-Lampu DL SL bh 3.00 - -
13 Watt
-Lampu DL LED bh 6.00 - -
7 Watt
-Lampu DL EM bh 6.00 - -
7 Watt
-Lampu Baret bh 11.00 - -
10 Watt
-Lampu TL Balk EM bh 31.00 - -
-Lampu Exit bh 8.00 - -
LED 8 Watt
-Lampu 26 Watt bh 18.00 - -
-Lampu DL SL bh 40.00 - -
13 Watt
-Lampu DL LED bh 16.00 - -
7 Watt
-Lampu Baret bh 8.00 - -
10 Watt
-Stop Kontak bh 72.00 - -
200 watt
-Stop Kontak AC bh 24.00 - -
375 watt
-Saklar 1 gang bh 32.00 - -
10 INSTALASI PENERANGAN -
-NYA 3 x 2,5 mm2 + PVC titik147.00 - -
-NYA 3 x 2,5 mm2 + PVC titik 99.00 - -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
-dia. 40 bh - - -
-dia. 25 bh 36.00 - -
-dia. 15 bh 36.00 - -
-Meter Air c/w bh 36.00 - -
BV dia. 25
5 PEMIPAAN VENT -
Pipa PVC Kelas D (Incl. Fitting & Accessories)
-Dia. 80 ( pipa riser ) m 144.00 - -
-Dia. 25 m 694.80 - -
6 INSTALASI PANEL -
Pengadaan dan pemasangan DP-LT.2 s/d 4 unit 3.00 - -
dengan komponen panel, sbb :
-MCCB 3P, 50 A
-MCB 3P, 20 A
-MCB 1P, 16 A
-Ampere-meter 50/5
-Volt-meter 0-500 Volt
-Volt Selector Switch
-Fuse 3 x 2 A
-Indicator Lamp
-Rel MCB 3P
-CT 50A/5A
-Cu Bar 5 x (12x
-Cu Bar 4 x (12x 2)mm2 + 1 x (12x2) mm2
-Accessories &
-Box Panel
-Box Hanger : 1 bh
-
-Lampu DL SL 13 bh 180.00 - -
-Lampu DL LED 7 bh 72.00 - -
-Lampu Baret 10 Watt bh 36.00 - -
-Stop Kontak 200 watt bh 324.00 - -
-Stop Kontak AC 375 bh 108.00 - -
-Saklar 1 gang bh 144.00 - -
A.3. LANTAI 5 -
5 PEMIPAAN VENT -
Pipa PVC Kelas D (Incl. Fitting & Accessories)
-Dia. 80 ( pipa riser ) m 48.00 - -
-Dia. 25 m 231.60 - -
6 INSTALASI PANEL -
Pengadaan dan pemasangan DP-LT.5 unit 1.00 - -
dengan komponen panel, sbb :
-MCCB 3P, 50 A
-MCB 3P, 20 A
-MCB 1P, 16 A
-Ampere-meter 50/5
-Volt-meter 0-500 Volt
-Volt Selector Switch
-Fuse 3 x 2 A
-Indicator Lamp
-Rel MCB 3P
-CT 50A/5A
-Cu Bar 5 x (12x
-Cu Bar 4 x (12x 2)mm2 + 1 x (12x2) mm2
-Accessories & Termination
-Box Panel
-MCB 1P, 6 A : 2 bh
-Box Hanger : 1 bh
-Lampu DL SL 13 bh 60.00 - -
-Lampu DL LED 7 bh 24.00 - -
-Lampu Baret 10 Watt bh 12.00 - -
-Stop Kontak 200 watt bh 108.00 - -
-Stop Kontak AC 375 bh 36.00 - -
-Saklar 1 gang bh 48.00 - -
5 PEMIPAAN VENT -
Pipa PVC Kelas D (Incl. Fitting & Accessories)
-Dia. 80 m 27.68 - -
-Dia. 100 m 32.04 - -
-Dia. 80 ( pipa m 48.00 - -
riser )
-Dia. 25 m 231.60 - -
6 INSTALASI PANEL -
Pengadaan dan pemasangan unit 1.00 - -
dengan komponen panel,
-MCCB 3P, 50 A
-MCB 3P, 20 A
-MCB 1P, 16 A
-Ampere-meter
50/5 A
-Volt-meter 0-
500 Volt
-Volt Selector
Switch
-Fuse 3 x 2 A
-Indicator Lamp
-Rel MCB 3P
-CT 50A/5A
-Cu Bar 5 x (12x
2)mm2
-Cu Bar 4 x (12x 2)mm2 + 1
-Accessories &
Termination
-Box Panel
7 INSTALASI KABEL -
a. Kabel Distribusi Daya
-NYY 1 x (4 x 16 mm2) + m 35.00 - -
b. Kabel Distribusi Daya
-NYM 3 x 4 mm2 ke m 15.00 - -
-NYM 3 x 4 mm2 ke m 20.00 - -
-NYM 3 x 4 mm2 ke m 25.00 - -
-NYM 3 x 4 mm2 ke m 30.00 - -
-NYM 3 x 4 mm2 ke m 35.00 - -
P-Unit/5
-NYM 3 x 4 mm2 ke m 40.00 - -
-NYM 3 x 4 mm2 ke m 15.00 - -
-NYM 3 x 4 mm2 ke m 20.00 - -
-NYM 3 x 4 mm2 ke m 25.00 - -
-NYM 3 x 4 mm2 ke m 30.00 - -
-NYM 3 x 4 mm2 ke m 35.00 - -
-NYM 3 x 4 mm2 ke m 40.00 - -
9 INSTALASI ARMATUR -
LAMPU,
-Lampu DLSAKLAR
SL & STOP bh - - -
13 Watt
-Lampu DL LED bh - - -
7 Watt
-Lampu DL EM bh 6.00 - -
7 Watt
-Lampu Baret bh 5.00 - -
10 Watt
-Lampu TL Balk EM bh 14.00 - -
-Lampu Exit bh 10.00 - -
LED 8 Watt
-Lampu 26 Watt bh - - -
-
-Lampu DL SL bh 60.00 - -
13 Watt
-Lampu DL LED bh 24.00 - -
7 Watt
-Lampu Baret bh 12.00 - -
10 Watt
-Stop Kontak bh 108.00 - -
200 watt
-Stop Kontak AC bh 36.00 - -
375 watt
-Saklar 1 gang bh 48.00 - -
10 INSTALASI PENERANGAN -
-NYA 3 x 2,5 mm2 + PVC titik 131.00 - -
-NYA 3 x 2,5 mm2 + PVC titik 148.00 - -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
-BV dia. 50 bh 2.00 - -
-GV dia. 100 bh 2.00 - -
-GV dia. 50 bh 4.00 - -
-CV dia. 50 bh 2.00 - -
-FJ dia. 50 bh 2.00 - -
-WLC + Panel set 1.00 - -
-Pressure Indikator (PI) set 1.00 - -
3 INSTALASI PANEL -
a. DP-LT.Atap unit 1.00 - -
Pengadaan dan pemasangan
b. PB-LT.Atap
Pengadaan dan pemasangan unit 1.00 - -
c. PB-Lift.P1
Pengadaan dan pemasangan unit 1.00 - -
d. P-Booster
Pengadaan dan pemasangan unit 1.00 - -
e. P-EMG Atap
Pengadaan dan pemasangan unit 1.00 - -
f. PB-TK.1
Pengadaan dan pemasangan unit 1.00 - -
g. PB-PF.1
Pengadaan dan pemasangan unit 1.00 - -
h. PK-LS
Pengadaan dan pemasangan unit 1.00 - -
4 INSTALASI ARMATUR
-Lampu taman HPL - N 2 x unit 12.00 - -
5 INSTALASI PENERANGAN
-NYA 3 x 2,5 mm2 + PVC titik 12.00 - -
1 INSTALASI PANEL -
-Box Panel : 1
uni
t
b. PUTR
Pengadaan dan pemasangan unit 1.00 - -
3 INSTALASI ARMATUR -
a. Ruang Pompa
-TL 1 x 18 W, bh 2.00 - -
TL Balk Type
b. Lampu Taman
-Lampu Taman/ Penerangan bh 16.00 - -
4 INSTALASI PENERANGAN -
a. Ruang Pompa
-NYA 3 x 2,5 mm2 + PVC ttk 2.00 - -
-NYA 3 x 2,5 mm2 + PVC ttk 1.00 - -
b. Lampu Taman
-NYFGBY 3 x 2,5 mm2 untuk ttk 16.00 - -
A.7. PEKERJAAN
1 INSTALASI -
Pentanahan
a. -Body Panel
Item SBB:
-Grounding Rod bh 1.00 - -
GIP 1' ( untuk
R lebih kecil
dari 2 ohm )
Copper Rod,
-Termination lot 1.00 - -
R.Supporting
Material
-Kabel BC 70 m 30.00 - -
mm2
-Testing & lot 1.00 - -
Commissioning
b. -Body
Peralatan
pada Sistem
Elektronik
Item SBB:
-Grounding Rod bh 1.00 - -
GIP 1' ( untuk
R lebih kecil
dari 2 ohm )
Copper Rod, -
-Termination lot 1.00 - -
R.Supporting
Material
-Kabel BC 70 m 30.00 - -
mm2
-Testing & lot 1.00 - -
Commissioning
A.8. PEKERJAAN -
1 INSTALASI
-Split penyalur unit 1.00 - -
petir non radio
aktif radius R-
80 meter
-Tiang pipa dia unit 2.00 - -
65 = 5 meter
+ acessories
B. LANTAI 2 S/D 6 -
1.
2
- OHB 66 x bh - - -
20 x 95
cm
- IHB 74 x bh 10.00 - -
18 x 25
cm
- Seamese bh - - -
- Pillar bh - - -
Hydrant
SPRINKLE
- Sch 40 m 93.88 - -
dia. 150
- Sch 40 m 33.87 - -
dia. 100
- Sch 40 m 99.19 - -
dia. 80
- Sch 40 m 69.92 - -
dia. 65
- Sch 40 m 41.77 - -
dia. 50
- Sch 40 m 196.27 - -
dia. 40
- Sch 40 dia. m 40.00 - -
- Sch 40 m 123.30 - -
dia. 32
- Sch 40 m 536.16 - -
dia. 25
- Sch 40 dia. m 36.35 - -
Peralatan Katup-katup
- GV dia. bh 10.00 - -
25
- PRV dia. bh 5.00 - -
40
- TDV dia. bh 10.00 - -
40
- Sprinkle : Pendant bh 375.00 - -
- Fire bh 20.00 - -
Extingush
er 3 kg
IPEKERJAAN MATV -
a PERALATAN UTAMA MATV -
c PERALATAN MATV
Lantai Dasar -
- Splitter 4 bh 2.00 - -
Ways
- Tap off 2 bh 1.00 - -
Ways
- TV outlet bh 12.00 - -
MDF - TS unit
Selector 20 zone unit
Power Amplier 240 Watt unit
UPS 1 KVA unit
Mixer unit
MP3 DVD/CD/CDR unit
Sirine module unit
Pre Amplifier 120 Watt unit
Microphone control unit
Surge Arrester unit
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari MDF-TS ke Selector 20 zone m
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Selektor 20 zone ke power amplifier m
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke mixer m
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke UPS m
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke Pre amplifier m
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Pre amplifier ke Microphone control m
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Mixer ke Pre amplifier m
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Mixer ke MP3 DVD dan Sirene Module m
Lantai Dasar
- JBTS bh
- Ceilling speaker 3W bh
- Wall speaker 3W bh
Lantai 2 s/d 6
- JBTS bh
- Ceilling speaker 3W bh
- Wall speaker 3W bh
- Instalasi Ceilling speaker 3W bh
- Instalasi Wall speaker 3W bh
IV PEKERJAAN CCTV
a PERALATAN UTAMA CCTV
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari MDF-TS ke Selector 20 zone m
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Selektor 20 zone ke power amplifier m
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke mixer m
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke UPS m
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Power amplifier ke Pre amplifier m
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Pre amplifier ke Microphone control m
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Mixer ke Pre amplifier m
Kabel FRC 2 x 1,5 mm ²in conduit Dia.20 dari Mixer ke MP3 DVD dan Sirene Module m
Lantai Dasar
- Fixed dome camera bh
Lantai 2 s/d 6
- Fixed dome camera bh
1.00 - -
1.00 - -
1.00 - -
1.00 - -
1.00 - -
15.00 - -
15.00 - -
25.00 - -
15.00 - -
35.00 - -
35.00 - -
35.00 - -
35.00 - -
35.00 - -
35.00 - -
35.00 - -
1.00 - -
52.00 - -
10.00 - -
11.00 - -
2.00 - -
2.00 - -
2.00 - -
2.00 - -
1.00 - -
1.00 - -
52.00 - -
10.00 - -
11.00 - -
2.00 - -
2.00 - -
2.00 - -
2.00 - -
1.00 - -
1.00 - -
5.00 - -
265.00 - -
50.00 - -
60.00 - -
10.00 - -
10.00 - -
10.00 - -
10.00 - -
5.00 - -
5.00 -
265.00 - -
50.00 - -
60.00 - -
10.00 - -
10.00 - -
10.00 - -
10.00 - -
5.00 - -
5.00 -
1.00 - -
-
1.00 - -
1.00 - -
5.00 - -
1.00 - -
1.00 - -
1.00 - -
1.00 - -
3.00 - -
2.00 - -
1.00 - -
15.00 - -
15.00 - -
15.00 - -
15.00 - -
15.00 - -
15.00 - -
15.00 - -
15.00 - -
1.00 - -
6.00 - -
4.00 - -
6.00 - -
4.00 - -
5.00 - -
30.00 - -
- - -
30.00 - -
- - -
1.00 - -
1.00 - -
1.00 - -
2.00 - -
15.00 - -
15.00 - -
15.00 - -
15.00 - -
15.00 - -
15.00 - -
15.00 - -
15.00 - -
4.00 - -
4.00 - -
20.00 - -
20.00 - -
1.00 - -
V PEKERJAAN SARANA DAN PRASARANA LINGKUN
7 INSTALASI PEMIPAAN
Pengadaan dan pemasangan unit.
Pemipaan PPR PN-10 (Incl. Fitting & All Accessories)
a SITE PLAN
1. Dari Box Meter PDAM ke GWT
- PVC AW dia. 50 (Dari Box Meter PDAM ke GWT) m
2. Pemipaan R.Pompa ke Tanki Air Atas
- GIP dia. 50 m
2 Resapan unit
Kapasitas : 5 m3
- Struktur Pondasi By Sipil
PUTM unit
Pengadaan dan pemasangan PUTM
Genset unit
Pengadaan dan pemasangan Genset
(250 KVA, 1500 RPM, 380/220V, 3P + N, 50 Hz, Prime)
Dari SDP-Hydrant ke :
Pekerjaan termasuk clamb, support, cable ladder, hanger
dan perlengkapan lainnya.
Panel Control Electric Fire Pump (PC-EFP):
Kabel : FRC 4 x 185 mm2 m
Panel Control Jockey Fire Pump (PC-JFP):
Kabel : FRC 4 x 4 mm2 + m
VI PEKERJAAN LIFT
Drive Da:
Drive Sy : ACVVVF Gearless
Main Pow: 380 V/ 50 Hz
Lighting : 220 V/ 50 Hz
Power Re: TBA KW
Electric :
Control : Collective Selective
Group Si : 2
Layout T : Inline
COP Butt: Linea 100
COP Numb : 2 / Front
COP Indi: Linea 100
COP Face: HLSS
No. of Risers
Main Floo: 1
Other Flo: 1
LOP Butt: Linea 100
LOP Faceplate
Main Floo: HLSS
Other Flo: HLSS
LIP (Indicator) Type
Main Floo: Linea 100 (Above Door)
Other Flo: Linea 100 (Combined w/ LOP)
LIP (Indicator) Faceplate
Main Floo: HLSS
Other Flo: HLSS
Landing :
Door Typ: 2-Panel Center Opening
Landing D: 800 x 2100
Door Panel Finish
Main Floo: HLSS
Other Flo: HLSS
Frame Type
Main Floo: Box Frame 50x50
Other Flo: Box Frame 50x50
Door Frame Finish
Main Floo: HLSS
Other Flo: HLSS
Door Sill : Aluminum
Car :
Car Door: 2-Panel Center Opening
Car Size : 1350 x 1400 x 2500mm
Car Clear: 2400 mm
Car Door : 800 x 2100 mm
Car Door : Light Curtain
Car Door : HLSS
Car Door : Aluminum
Car Decor: Times Square 2.0
Front Wal: Expression
Front Wal: HLSS
Side Wall: HLSS
Rear Wall: HLSS
Mirror : Not Provided
Handrail : Not Provided
Floor Dec: Granite
Ceiling D: Squares
Max. Add: -
Counterw:
C/W Locat: Side
C/W Safe: Not Provided
Accessibl: No
Other Re:
Air Condi: Not Provided
Attendant: Standard
Automati: Provided
Car Call : Provided
Card Read : Provided
CCTV Int: Provided
Earthquak : Provided
Emergenc: Provided
Emergency : Not provided
Emergenc: Standard
Fireman C: BR1 (Fire Homing)
Hall Lant: Not Provided
Independe : Provided
Intercom: 3-way (Car-MR-Control)
Multimedi: Not Provided
Out of Se: Standard
PORT Sy : Not Provided
Pre-Arriv : On Car
Superviso: CRT Monitoring
Voice Syn: Not Provided
Other Spe: -
Drive Dat:
Drive Sy : ACVVVF PM Gearless
Main Pow: 380 V/ 50 Hz
Lighting : 220 V/ 50 Hz
Power Re: TBA KW
Electrica :
Control : Collective Selective
Group Si : 2
Layout T : Inline
COP Butt: Linea 100
COP Numb : 2 / Side
COP Indi: Linea 100
COP Face: HLSS
No. of Risers
Main Floo: 1
Other Flo: 1
LOP Butt: Linea 100
LOP Faceplate
Main Floo: HLSS
Other Flo: HLSS
LIP (Indicator) Type
Main Floo: Linea 100 (Above Door)
Other Flo: Linea 100 (Combined w/ LOP)
LIP (Indicator) Faceplate
Main Floo: HLSS
Other Flo: HLSS
Landing :
Door Typ: 2-Panel Side Opening
Landing D: 1200 x 2100
Door Panel Finish
Main Floo: HLSS
Other Flo: HLSS
Frame Type
Main Floo: Box Frame 50x50
Other Flo: Box Frame 50x50
Door Frame Finish
Main Floo: HLSS
Other Flo: HLSS
Door Sill : Aluminum
Car :
Car Door: 2-Panel Side Opening
Car Size : 1500 x 2300 x 2500mm
Car Clear: 2400 mm
Car Door : 1200 x 2400 mm
Car Door : Light Curtain
Car Door : HLSS
Car Door : Aluminum
Car Decor: Times Square 2.0
Front Wal: Expression
Front Wal: HLSS
Side Wall: HLSS
Rear Wall: HLSS
Mirror : Not Provided
Handrail : Not Provided
Floor Dec: Rubber
Ceiling D: Square Spot
Max. Add: -
Counterw:
C/W Locat: Side
C/W Safe: Not Provided
Accessibl: No
Other Re:
Air Condi: Not Provided
Attendant: Standard
Automati: Provided
Car Call : Provided
Card Read : Provided
CCTV Int: Provided
Earthquak : Provided
Emergenc: Provided
Emergency : Not provided
Emergenc: Standard
Fireman C: BR2 (Fire Homing)
Hall Lant: Not Provided
Independe : Provided
Intercom: 3-way (Car-MR-Control)
Multimedi: Not Provided
Out of Se: Standard
PORT Sy : Not Provided
Pre-Arriv : On Car
Superviso: CRT Monitoring
Voice Syn: Not Provided
Other Spe: -
AC
1 LANTAI DASAR
AC Wall mounted (3/4 PK) (R. Pengelola, Musholla, R. Serbagun unit 4.00
- Pipa refrigerant + isolasi dia. 1/4" dan 3/8" m 48.00
- Pipa drain Pvc AW + isolasi dia. 1/2" m 40.00
- Kabel NYM 3 x 2,5 mm² + conduit 20 mm m 60.00
- Alat bantu dan Test Commissioning lot 1.00
2 LANTAI 2
3 LANTAI 3
4 LANTAI 4
5 LANTAI 5
6 LANTAI 6
VENTILASI UDARA
LANTAI DASAR
1 - Exhaust Fan (EF-01 s/d 8/LT.D Toilet unit 8.00
(Termasuk Pipa Pvc D + Grille + Support, dll)
Capacity : 50 Cfm
Type : Ceiling Fan
1.00
ed Booster Pump
0 lpm / 3 Bar
lel Alternate
2.00
1.00
rsible multistage
/ 380V / 3 Ph / 50Hz.
on / standard temperature
1.00
1.00
4.00
2.00
2.00
4.00
2.00
2.00
1.00
1.00
1.00
1.00
20.00
84.00
1.00
1.00
2.00
1.00
279,000
1.00
1.00
1.00
68.00
1.00
1.00
10.00
10.00
20.00
1.00
1.00
ntal Split Casing
GPM / 10 Bar
1.00
ntal Split Casing
GPM / 10 Bar
1.00
GPM / 11 bar
atic on - off
10.75
10.57
6.98
7.97
2.00
1.00
1.00
64.00
60.00
12.00
12.00
4.00
1.00
2.00
2.00
1.00
1.00
1.00
2.00
1.00
73.00
292.00
73.00
146.00
1.00
1.00
1.00
-
-
-
Include
Include
Include
Include
Include
Include
Include
Include
Include
Include
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-