I. PEKERJAAN PERSIAPAN
A. Pembersihan Lahan (m²) 0.000
Bahan
Tenaga
Pekerja OH 0.100 0.000
B. Memasang Bouwplank (m¹) 0.000
Bahan
Kayu 5/7 M3 0.012 0.000
Paku Biasa 2"-5" Kg 0.020 0.000
Papan 3/20 M3 0.007 0.000
Tenaga
Pekerja OH 0.100 0.000
Tukang Kayu OH 0.100 0.000
V. PEKERJAAN BEKISTING
A. Pasang Bekisting (m²) ( Dua Kali Pakai ) 0.720
Bahan
Kayu Kelas III M3 0.040 0.029
Paku Biasa 2" - 5" Kg 0.400 0.288
Minyak Bekisting Ltr 0.200 0.144
Plywood 9 mm Lbr 0.350 0.252
Dolken Kayu Galam Ø 8 - 10 / 4m Btg 3.000 2.160
Tenaga
Pekerja OH 4.000 2.880
Tukang Kayu OH 0.330 0.238
B T L J. Kolom/Balok/Plat Dia. Tul Panj. 1 Tul Jml Tul Tot. Panj.Tul Berat Tul Dia. Begel Panj.1 Begel Jml Begel Tot. Panj. Begel Berat Begel
KOLOM/BALOK/PLAT
m m m btg mm m btg m kg mm m m m kg
1. PONDASI TAPAK 30/30
0.30 0.30 0.10 1.00 8.00 0.30 2.00 0.60 0.237 8.00 0.30 2.00 0.60 0.237
2. KOLOM 15/15
0.15 0.15 1.30 1.00 8.00 1.30 4.00 5.20 2.054 6.00 0.46 7.50 3.48 0.773
PERHITUNGAN VOLUME PEKERJAAN TCT
UKURAN
NO. JENIS PEKERJAAN SATUAN RUMUS QTY
P L T
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2
2 Pemasangan Bowplank M
VII. PLESTERAN
1 Plesteran Kolom 15/15 M2 0.15 0.15 1 4xLxT 0.6
EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO RIKI ANDRIAN, Amd BASUKI RAHMAN SULISTYO
NIP : 19801022 200904 1 003
RENCANA ANGGARAN BIAYA (REALISASI-CCO)
B T L J. Kolom/Balok/Plat Dia. Tul Panj. 1 Tul Jml Tul Tot. Panj.Tul Berat Tul Dia. Begel Panj.1 Begel Jml Begel Tot. Panj. Begel Berat Begel
KOLOM/BALOK/PLAT
m m m btg mm m btg m kg mm m m m kg
1. SLOOF 20/20
0.20 0.20 2.50 4.00 8.00 2.50 4.00 40.00 15.800 6.00 0.66 17.67 46.92 10.417
0.20 0.20 1.25 1.00 8.00 1.25 4.00 5.00 1.975 6.00 0.66 9.33 6.20 1.376
0.20 0.20 0.50 2.00 8.00 0.50 4.00 4.00 1.580 6.00 0.66 4.33 5.75 1.278
2. KOLOM 15/15
0.15 2.00 0.15 4.00 8.00 2.00 4.00 32.00 12.640 6.00 0.46 14.33 26.60 5.906
0.15 1.20 0.15 3.00 8.00 1.20 4.00 14.40 5.688 6.00 0.46 9.00 12.53 2.781
3. BALOK 15/15
0.15 0.15 2.5 4 8.00 2.50 4.00 40.00 15.800 6.00 0.46 17.67 32.79 7.279
0.15 0.15 1.25 1 8.00 1.25 4.00 5.00 1.975 6.00 0.46 9.33 4.33 0.961
0.15 0.15 0.5 2 8.00 0.50 4.00 4.00 1.580 6.00 0.46 4.33 4.02 0.893
4. PLAT ATAP
3 0.1 3 1 8.00 2.96 21.00 62.16 24.553 8.00 2.96 21.00 62.16 24.553
ANALISA BAHAN DAN UPAH
I. PEKERJAAN PERSIAPAN
A. Pembersihan Lahan (m²) 9.000
Bahan
Tenaga
Pekerja OH 0.100 0.900
B. Memasang Bouwplank (m¹) 16.000
Bahan
Kayu 5/7 M3 0.012 0.192
Paku Biasa 2"-5" Kg 0.020 0.320
Papan 3/20 M3 0.007 0.112
Tenaga
Pekerja OH 0.100 1.600
Tukang Kayu OH 0.100 1.600
V. PEKERJAAN BEKISTING
A. Pasang Bekisting (m²) ( Dua Kali Pakai ) 8.800
Bahan
Kayu Kelas III M3 0.040 0.352
Paku Biasa 2" - 5" Kg 0.400 3.520
Minyak Bekisting Ltr 0.200 1.760
Plywood 9 mm Lbr 0.350 3.080
Dolken Kayu Galam Ø 8 - 10 / 4m Btg 3.000 26.400
Tenaga
Pekerja OH 4.000 35.200
Tukang Kayu OH 0.330 2.904
UKURAN
NO. JENIS PEKERJAAN SATUAN RUMUS QTY
P L T
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2 3 3 - PxL 9.00
2 Pemasangan Bowplank M 3.5 2.5 2 x (( P + 1 ) + ( L + 1 )) 16.00
KEGIATAN : PROGRAM PENYEDIAAN AIR MINUM DAN SANITASI BERBASISI MASARAKAT (PAMSIMAS)
DESA : SUNGAI GOLANG
KECAMATAN : KELAYANG
KABUPATEN : INDRAGIRI HULU
PROPINSI : RIAU
TB TB TB
NO URAIAN SATUAN IDJRIA KARYA BANGUNAN DIFA HARGA TERENDAH
(Rp) (Rp) (Rp) (Rp)
I. UPAH HARIAN
A. BAHAN PASANGAN
B. BAHAN KAYU
D. BAHAN CAT/FINISHING
H. BAHAN SANITAIR/PLUMBING
RRJ
1 Pipa PVC RRJ 4'' Btg 410,000.00 410,000.00
2 Pipa PVC RRJ 3'' Btg 315,000.00 315,000.00
3 Pipa PVC RRJ 2,5'' Btg 0.00
4 Pipa PVC RRJ 2'' Btg 185,000.00 185,000.00 185,000.00 185,000.00
PVC
1 Pipa PVC 4'' Btg 128,000.00 128,000.00 130,000.00 128,000.00
2 Pipa PVC 3'' Btg 80,000.00 80,000.00 81,000.00 80,000.00
4 Pipa PVC 2,5'' Btg 180,000.00 180,000.00 180,000.00 180,000.00
5 Pipa PVC 2'' Btg 55,000.00 50,000.00 55,000.00 50,000.00
6 Pipa PVC 1'' Btg 80,000.00 80,000.00 80,000.00 80,000.00
7 Pipa PVC 1 1/4'' Btg 48,000.00 48,000.00 50,000.00 48,000.00
8 Pipa PVC 3/4'' Btg 0.00 0.00
9 Pipa PVC 1/2'' Btg 0.00 0.00
10 Elbu/Soket/4'' Buah 35,000.00 35,000.00 35,000.00 35,000.00
11 Elbu/Soket/3'' Buah 15,000.00 15,000.00 16,000.00 15,000.00
12 Elbu/Soket/2,5'' Buah 30,000.00 30,000.00 30,000.00 30,000.00
13 Elbu/Soket/2'' Buah 8,000.00 8,000.00 8,000.00 8,000.00
14 Elbu/Soket/1 1/4'' Buah 7,000.00 7,000.00 7,000.00 7,000.00
15 Elbu/Soket/1'' Buah 10,000.00 10,000.00 10,000.00 10,000.00
16 Elbu/Soket/3/4'' Buah 5,000.00 5,000.00
17 Elbu/Soket/1/2'' Buah 5,000.00 5,000.00
18 Reducer 4x3 Buah 0.00
19 Reducer 3x2 Buah 0.00
20 Kran Air 1'' Buah 40,000.00 40,000.00 40,000.00 40,000.00
21 Kran Air 3/4'' Buah 30,000.00 10,000.00 10,000.00 10,000.00
22 Kran Air 1/2'' Buah 0.00 0.00 0.00
TB TB TB
NO URAIAN SATUAN IDJRIA KARYA BANGUNAN DIFA HARGA TERENDAH
(Rp) (Rp) (Rp) (Rp)
23 Stop Kran 3'' Buah 50,000.00 50,000.00 50,000.00 50,000.00
TB TB TB
NO URAIAN SATUAN IDJRIA KARYA BANGUNAN DIFA HARGA TERENDAH
(Rp) (Rp) (Rp) (Rp)
24 Stop Kran 2,5'' Buah 0.00
25 Stop Kran 2'' Buah 45,000.00 45,000.00 45,000.00 45,000.00
26 Stop Kran 1'' Buah 45,000.00 - 45,000.00 45,000.00
27 Stop Kran 3/4'' Buah 10,000.00 10,000.00
28 Stop Kran 1/2'' Buah 20,000.00 20,000.00 20,000.00
29 Dop 2" Buah 12,000.00 15,000.00 15,000.00 12,000.00
GIV
1 Pipa 4" Gi Btg 1,200,000.00 1,200,000.00 1,200,000.00 1,200,000.00
2 Pipa 3" Gi Btg 960,000.00 950,000.00 960,000.00 950,000.00
3 Pipa 2,5" Gi Btg 0.00 0.00
4 Pipa 2" Gi Btg 720,000.00 720,000.00 710,000.00 710,000.00
5 Pipa 1" Gi Btg 250,000.00 250,000.00 250,000.00 250,000.00
6 Pipa 3/4" Gi Btg 0.00
7 Pipa besi 4" Btg 650,000.00 550,000.00 650,000.00 550,000.00
8 Pipa besi 3" Btg 650,000.00 450,000.00 450,000.00 450,000.00
9 Kran Air 1/2" GIV Bh 50,000.00 50,000.00 50,000.00
10 Meter Air 1/2" Bh 275,000.00 275,000.00 275,000.00 275,000.00
11 Clamp sadle 3" Giv Bh 135,000.00 100,000.00 135,000.00 100,000.00
12 Clamp sadle 2" Giv Bh 88,000.00 80,000.00 88,000.00 80,000.00
13 Elbu/Soket/4'' Bh 15,000.00 150,000.00 15,000.00 15,000.00
14 Elbu/Soket/3'' Bh 8,000.00 8,000.00 8,000.00 8,000.00
15 Elbu/Soket/2.5'' Bh 0.00
16 Elbu/Soket/2'' Bh 6,000.00 5,000.00 50,000.00 5,000.00
17 Mesin Diesel Bh 14,000,000.00 14,000,000.00
18 Instalasi Listrik Ls 0.00
19 Kabel Listrik m 0.00
20 Sling m 0.00
21 Pompa Submersible Bh 14,000,000.00 14,000,000.00
22 Spoon Lembar 50,000.00 50,000.00
23 Arang Kg 5,000.00 5,000.00
24 Pipa Spiral M 60,000.00 60,000.00
25 Kawat Harmonika M2 0.00
DAFTAR ANALISA HARGA SATUAN PERPIPAAN
EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO RIKI ANDRIAN, Amd BASUKI RAHMAN SULISTYO
NIP : 19801022 200904 1 003
RENCANA ANGGARAN BIAYA (REALISASI - CCO)
EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO RIKI ANDRIAN, Amd BASUKI RAHMAN SULISTYO
NIP : 19801022 200904 1 003
RENCANA ANGGARAN BIAYA (REALIASI - CCO)
EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO RIKI ANDRIAN, Amd BASUKI RAHMAN SULISTYO
NIP : 19801022 200904 1 003
RENCANA ANGGARAN BIAYA (REALISASI - CCO)
n
SURVEY
aa
No. Uraian Satuan Embung Tower Air Pompa
ip
Mesin Energi ALAT PERBANDINGAN PELAKSANAAN
rp
( Rp ) ( Rp ) TB. HIDUP BARU TB. SINAR TANI TB.VIVI TEKNIK
Pe
JASA HARGA
I Barang/Material
A. Paket 1
1 Semen PC, berat 50 kg Zak 62 192 37 291.00 70,000.00 20,370,000.00 20,370,000
2 Tulangan Polos dia 12 Btg 70 70.00 95,000.00 6,650,000.00 6,650,000.00
3 Tulangan Polos dia 10 Btg 43 180 223.00 75,000.00 16,725,000.00 16,725,000.00
4 Tulangan Polos dia 8 Btg 48 24 72.00 60,000.00 4,320,000.00 4,320,000.00
5 Tulangan Polos dia 6 Btg 13 13.00 35,000.00 455,000.00 455,000.00
6 Kawat Beton Kg 5 33 3 41.00 20,000.00 820,000.00 820,000.00
7 Paku Biasa 2"-5" Kg 39 52.5 4 95.50 20,000.00 1,910,000.00 1,910,000.00
8 Kawat Duri Rol 18.00 18.00 130,000.00 2,340,000.00 2,340,000.00
9 Besi Siku 50 x 50 x 4 mm Btg 14.00 14.00 155,000.00 2,170,000.00 2,170,000.00
B
10 Cat Dasar Kg 5 14 3 22.00 12,000.00 264,000.00 264,000.00
U
11 Cat Penutup / Cat Tembok Kg 13 37 8 58.00 38,000.00 2,204,000.00 2,204,000.00
L
12 Minyak Bekisting Kg 19 38 2 59.00 12,000.00 708,000.00 708,000.00
13 Cat Minyak Kg 2 2.00 55,000.00 110,000.00 110,000.00
A
14 Plamir Kg 5 14 3 22.00 20,000.00 440,000.00 440,000.00
N
JUMLAH PAKET 1 59,486,000.00 8,652,000.00 30,464,000.00 20,370,000.00
B. Paket 2 K
1 Pasir Pasang M3 1 1.00 155,000.00 155,000.00 155,000.00 E
2 Pasir Urug M3 1 1.00 155,000.00 155,000.00 155,000.00 -
3 Pasir Beton M3 5 17 4 26.00 155,000.00 4,030,000.00 4,030,000.00 1
4 Kerikil M3 6.5 18 3 27.50 180,000.00 4,950,000.00 4,950,000.00
5 Batu Bata Bh 90 1,940 2,030.00 800.00 1,624,000.00 1,624,000.00 S
6 Ijuk Kg 25 25.00 25,000.00 625,000.00 625,000.00 .
7 Arang Batok M3 1 1.00 300,000.00 300,000.00 300,000.00 D
JUMLAH PAKET 2 11,839,000.00 2,549,000.00 - 9,290,000.00
C. Paket 3 B
1 Kayu Klas III M3 2 5 7.00 1,800,000.00 12,600,000.00 12,600,000.00 U
2 Kayu 5/7 M3 0.25 0.25 0.2 0.70 1,800,000.00 1,260,000.00 1,260,000.00 L
3 Papan 3/20 M3 0.15 0.15 0.2 0.50 1,800,000.00 900,000.00 900,000.00 A
4 Plywood 9 mm M3 34 45 4 83.00 125,000.00 10,375,000.00 10,375,000.00 N
5 Dolken Kayu Dia.8-10 Panjang 4 m' M3 101 280 381.00 8,000.00 3,048,000.00 3,048,000.00
JUMLAH PAKET 3 28,183,000.00 28,183,000.00 - - K
D. Paket 4 E
1 Pipa SNI dia. 2" RRJ Btg 136 136.00 180,000.00 24,480,000.00 24,480,000.00 -
2 Pipa SNI dia. 3" RRJ Btg 50 50.00 330,000.00 16,500,000.00 16,500,000.00 3
4 Pipa Galvanis SNI dia. 3" , Pj 6 meter Btg 1 1 2.00 550,000.00 1,100,000.00 1,100,000.00
5 Pipa Galvanis SNI dia. 2" , Pj 6 meter Btg 3 1 4.00 350,000.00 1,400,000.00 1,400,000.00
6 Elbow GI dia.3'' Bh 2 2.00 105,000.00 210,000.00 210,000.00
7 Elbow GI dia.2'' Bh 4 4.00 90,000.00 360,000.00 360,000.00
9 Stop Kran GI dia.3'' Bh 1 1.00 380,000.00 380,000.00 380,000.00
10 Stop Kran GI dia.2'' Bh 1 1.00 350,000.00 350,000.00 350,000.00
11 Pipa Hawa Bh 1 1.00 100,000.00 100,000.00 100,000.00
13 Pipa PVC dia. 3'' Btg 1 1.00 270,000.00 270,000.00 270,000.00
14 Perlengkapan Pipa Ls 1 1.00 4,098,000.00 4,098,000.00 4,098,000.00
JUMLAH PAKET 4 49,248,000.00 3,330,000.00 45,348,000.00 570,000.00
TOTAL HARGA TOTAL METODE PENGADAAN
Rumah Sumber BAHAN SATUAN HARGA SURVEY PERBANDINGAN HARGA WAKTU
n
SURVEY
aa
No. Uraian Satuan Embung Tower Air Pompa
ip
Mesin Energi ALAT PERBANDINGAN PELAKSANAAN
rp
( Rp ) ( Rp ) TB. HIDUP BARU TB. SINAR TANI TB.VIVI TEKNIK
Pe
JASA HARGA
E. Paket 5 -
1 Tangga Ls 1 1.00 1,500,000.00 1,500,000.00 1,500,000.00
2 Pagar Besi Selasar Ls 1 1.00 1,750,000.00 1,750,000.00 1,750,000.00
3 Manhole Bh 2 2.00 500,000.00 1,000,000.00 1,000,000.00
5 Mesin Diesel Unit 1 1.00 14,000,000.00 14,000,000.00 14,000,000.00
6 Pompa Centrifugal Unit 1 1.00 14,000,000.00 14,000,000.00 14,000,000.00
JUMLAH PAKET 5 32,250,000.00 4,250,000.00 28,000,000.00 -
TOTAL JUMLAH BARANG/MATERIAL 181,006,000.00 46,964,000.00 103,812,000.00 30,230,000.00 -
.D
F. Paket 6
S
-1
KE
1 Sewa Alat Berat Excavator Jam 49 49.00 450,000.00 22,050,000.00 22,050,000.00
N
LA
2 Mobilisasi Dan Demobilisasi PP 1 1.00 3,000,000.00 3,000,000.00 3,000,000.00
BU
TOTAL JUMLAH JASA 25,050,000.00 - - - 25,050,000.00
G. Paket 7 (Upah)
1 Pekerja OH 48 15 53 - 116.00 100,000.00 11,600,000.00
2 Tukang OH 30 100 - 77 207.00 120,000.00 24,840,000.00
TOTAL JUMLAH JASA 36,440,000.00 - - - -
n
SURVEY
aa
No. Uraian Satuan Intake Tower Air Pompa
ip
Energi ALAT PERBANDINGAN PELAKSANAAN
rp
( Rp ) ( Rp ) TB. HIDUP BARU TB. SINAR TANI TB.VIVI TEKNIK
Pe
JASA HARGA
H Paket 8 Sumber Dana APBDes
A. Bahan
-3
1 Pipa SNI S 12.5 diameter 2" Btg 114.00 114 180,000 20,520,000 20,520,000.00
KE
N
2 DOP Diameter.2'' Bh 1.00 1 68,000 68,000 68,000.00
LA
BU
TOTAL JUMLAH MATERIAL 20,588,000.00 20,588,000.00 - - -
D
S.
B. Upah
-1
KE
1 Pekerja OH 84.00 84 100,000 8,400,000
N
LA
BU
2 Tukang OH 58.00 58 120,000 6,960,000
TOTAL JUMLAH JASA 15,360,000.00
EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO RIKI ANDRIAN, Amd BASUKI RAHMAN SULISTYO
NIP : 19801022 200904 1 003
RENCANA ANGGARAN BIAYA (REALISASI - CCO)
No Uraian Sat Vol Harga Satuan APBD Masyarakat APB-Des Total Biaya
70% INCASH (4%) INKIND (16%) 10%
RKM
I Kegiatan Pelatihan Masyarakat
1.1. Pelatihan Administrasi dan Keuangan Paket 1 450,000 450,000 - - - 450,000
1.2. Pelatihan Teknik Paket 1 763,000 763,000 - - - 763,000
1.3. Pelatihan Timp Pengadaan Paket 1 252,000 252,000 - - - 252,000
Sub Total I 1,465,000 - - 1,465,000
II Pelatihan BPS
2.1. Pelatihan BP-SPAM Paket 1 300,000 300,000 - - - 300,000
Sub Total II 300,000 - - - 300,000
III PHBS
3.1. Peningkatan PHBS di Masyarakat Paket 1 492,000 492,000 - - - 492,000
3.2. Media Promkes di Masyarakat Paket 1 4,530,000 4,530,000 - - - 4,530,000
3.3. Media Promkes di Sekolah Paket 1 1,780,000 1,780,000 - - - 1,780,000
Sub Total III 6,802,000 - - - 6,802,000
IV Operasional KKM
4.1. Administrasi dan Operasional KKM Paket 1 12,010,800 - 12,010,800 - - 12,010,800
Sub Total IV - 12,010,800 - - 12,010,800
V Pembangunan Sarana Air Minum
5.1. Embung Unit 1 67,058,000 59,960,000 - 7,098,000 - 67,058,000
5.2. Pengadaan Sumber Energi Paket 1 14,000,000 14,000,000 - - - 14,000,000
5.3. Pengadaan Pompa Paket 1 14,000,000 14,000,000 - - - 14,000,000
5.4. Tower Air Unit 1 112,595,800 85,037,000 - 27,558,800 - 112,595,800
5.5. Perpipaan M 1,079 67,555 55,318,000 - 17,560,000 - 72,878,000
5.6. Perpipaan (APBDes) M 661 54,368 - - - 35,948,000 35,948,000
Sub Total V 228,315,000 - 52,216,800 35,948,000 316,479,800
Total Pembiayaan RKM 236,882,000 12,010,800 52,216,800 35,948,000 337,057,600
A. Bahan Bangunan
1 Pasir Beton Lokal M3 160,000 160,000 155,000 155,000
2 Pasir Urug M3 160,000 160,000 155,000 155,000
3 Pasir Pasang M3 160,000 160,000 155,000 155,000
4 Koral Beton M3 240,000 240,000 180,000 180,000
5 Semen PC, berat 50 kg Zak 70,000 80,000 70,000 70,000
6 Tulangan Polos dia 12 Batang 97,000 95,000 110,000 95,000
7 Tulangan Polos dia 10 Batang 75,000 75,000 75,000 75,000
8 Tulangan Polos dia 8 Batang 60,000 60,000 60,000 60,000
9 Tulangan Polos dia 6 Batang 35,000 35,000 35,000 35,000
10 Kawat Beton Kg 20,000 25,000 25,000 20,000
11 Paku Biasa 2"-5" Kg 20,000 20,000 20,000 20,000
12 Plamir Kg 20,000 30,000 20,000 20,000
13 Cat Dasar Zak 12,000 12,000 12,000 12,000
14 Cat Air Tembok Kg 45,000 38,000 40,000 38,000
15 Cat Lapis Anti Bocor Kg 65,000 65,000 65,000 65,000
16 Cat Minyak Kg 55,000 55,000 55,000 55,000
17 Kayu Klas III M3 1,800,000 1,900,000 1,900,000 1,800,000
18 Kayu 5/7 M3 1,800,000 1,900,000 1,900,000 1,800,000
19 Papan 3/20 M3 1,800,000 1,900,000 1,900,000 1,800,000
20 Batu Bata Ukuran Standar Bh 800 800 800 800
21 Plywood 9 mm lbr 125,000 125,000 130,000 125,000
22 Minyak Bekisting Ltr 12,000 12,000 12,000 12,000
23 Dolken Kayu Dia.8-10 P.4 M Batang 8,000 8,500 8,500 8,000
24 Arang Batok M3 300,000 300,000 300,000 300,000
25 Ijuk Kg 25,000 25,000 25,000 25,000
26 Pompa Centrifugal Unit 14,500,000 14,000,000 14,250,000 14,000,000
27 Manhole Unit 500,000 500,000 500,000 500,000
28 Besi Siku 50 x 50 x 4 mm Batang 155,000 155,000 160,000 155,000
29 Kawat Duri Rol 130,000 130,000 130,000 130,000
30 Tangga Ls 1,500,000 1,500,000 1,500,000 1,500,000
31 Pagar Besi Selasar Ls 1,750,000 1,850,000 1,900,000 1,750,000
32 Mesin Diesel Unit 14,500,000 14,000,000 14,750,000 14,000,000
B. Perpipaan
1 PVC SNI dia. 2" RRJ Batang 180,000 180,000 185,000 180,000
2 PVC SNI dia. 3" RRJ Batang 330,000 330,000 330,000 330,000
3 PVC dia. 1 1/4'' Batang 90,000 90,000 91,000 90,000
4 Elbow PVC dia 1 1/4'' Bh 12,000 12,000 12,000 12,000
5 PVC dia.3'' Btg 270,000 270,000 270,000 270,000
PIPA Galvanis
1 SNI dia. 3" , Pj 6 meter Batang 550,000 550,000 550,000 550,000
2 SNI dia. 2" , Pj 6 meter Batang 350,000 350,000 350,000 350,000
3 SNI dia. 1" , Pj 6 meter Batang 250,000 250,000 250,000 250,000
4 SNI dia. 1 1/4" , Pj 6 meter Batang 255,000 270,000 260,000 255,000
5 Elbow GI dia.3'' Bh 110,000 110,000 105,000 105,000
6 Elbow GI dia.2'' Bh 90,000 90,000 90,000 90,000
7 Elbow GI dia.1 1/4'' Bh 50,000 55,000 55,000 50,000
8 Stop Kran GI dia.3'' Bh 380,000 380,000 400,000 380,000
9 Stop Kran GI dia.2'' Bh 350,000 350,000 350,000 350,000
10 Pipa Hawa Bh 100,000 100,000 100,000 100,000
yang menetapkan ;
3.
4.
5
RENCANA ANGGARAN BIAYA
I. Bahan
1 Kayu Kaso 5/7 (borneo) 0.50 - - - 0.50 M3 Rp 2,000,000 Rp 1,000,000 Rp - Rp - Rp - Rp 1,000,000
2 Paku Biasa 2" - 5" 50.00 - - - 50.00 Kg Rp 18,000 Rp 900,000 Rp - Rp - Rp - Rp 900,000
3 Kayu Papan 3/20 borneo 0.50 - - - 0.50 M3 Rp 2,000,000 Rp 1,000,000 Rp - Rp - Rp - Rp 1,000,000
4 Pasir Urug 2.00 - - - 2.00 M3 Rp 100,000 Rp 200,000 Rp - Rp - Rp - Rp 200,000
5 Semen Portland 195.00 - - - 195.00 Zak Rp 70,000 Rp 13,650,000 Rp - Rp - Rp - Rp 13,650,000
6 Pasir Beton 12.00 - - - 12.00 M3 Rp 100,000 Rp 1,200,000 Rp - Rp - Rp - Rp 1,200,000
7 Kerikil 24.00 - - - 24.00 M3 Rp 250,000 Rp 6,000,000 Rp - Rp - Rp - Rp 6,000,000
8 Kayu Kelas III 3.00 - - - 3.00 M3 Rp 2,000,000 Rp 6,000,000 Rp - Rp - Rp - Rp 6,000,000
9 Minyak Bekisting 43.00 - - - 43.00 Ltr Rp 10,000 Rp 430,000 Rp - Rp - Rp - Rp 430,000
10 Plywood tebal 9 mm 70.00 - - - 70.00 Lbr Rp 145,000 Rp 10,150,000 Rp - Rp - Rp - Rp 10,150,000
11 Dolken Kayu galam 329.00 - 329.00 - - Btg Rp 10,000 Rp 3,290,000 Rp - Rp 3,290,000 Rp - Rp -
12 Besi Beton (Polos/Ulir) Ǿ12 123.00 - - - 123.00 Btg Rp 110,000 Rp 13,530,000 Rp - Rp - Rp - Rp 13,530,000
13 Besi Beton (Polos/Ulir) Ǿ10 32.00 - - - 32.00 Btg Rp 85,000 Rp 2,720,000 Rp - Rp - Rp - Rp 2,720,000
14 Besi Beton (Polos/Ulir) Ǿ8 246.00 - - - 246.00 Btg Rp 60,000 Rp 14,760,000 Rp - Rp - Rp - Rp 14,760,000
15 Besi Beton (Polos/Ulir) Ǿ6 1.00 - - - 1.00 Btg Rp 40,000 Rp 40,000 Rp - Rp - Rp - Rp 40,000
16 Kawat Beton 24.00 - - - 24.00 Kg Rp 20,000 Rp 480,000 Rp - Rp - Rp - Rp 480,000
17 Pasir Pasang 6.00 - - - 6.00 M3 Rp 100,000 Rp 600,000 Rp - Rp - Rp - Rp 600,000
18 Plamir 21.00 - - - 21.00 Kg Rp 10,000 Rp 210,000 Rp - Rp - Rp - Rp 210,000
19 Cat Dasar 21.00 - - - 21.00 Kg Rp 15,000 Rp 315,000 Rp - Rp - Rp - Rp 315,000
20 Cat Tembok 55.00 - - - 55.00 Kg Rp 65,000 Rp 3,575,000 Rp - Rp - Rp - Rp 3,575,000
21 Tangga Besi 1.00 - - - 1.00 Ls Rp 2,500,000 Rp 2,500,000 Rp - Rp - Rp - Rp 2,500,000
23 Pipa Galvanis diameter 3 inchi 2.00 - - - 2.00 Btg Rp 700,000 Rp 1,400,000 Rp - Rp - Rp - Rp 1,400,000
24 Pipa Galvanis diameter 2 inchi 2.00 - - - 2.00 Btg Rp 350,000 Rp 700,000 Rp - Rp - Rp - Rp 700,000
25 Pipa Galvanis diameter 1 1/2" inchi 6.00 - - - 6.00 Btg Rp 300,000 Rp 1,800,000 Rp - Rp - Rp - Rp 1,800,000
25 Pipa Galvanis diameter 1 inchi 4.00 - - - 4.00 Btg Rp 250,000 Rp 1,000,000 Rp - Rp - Rp - Rp 1,000,000
25 Cat Minyak 1.00 - - - 1.00 Kg Rp 51,000 Rp 51,000 Rp - Rp - Rp - Rp 51,000
Sub Total I Rp 87,501,000 Rp - Rp 3,290,000 Rp - Rp 84,211,000
II. Upah
1 Pekerja 350.00 - 300.00 - 50.00 Hok Rp 80,000 Rp 28,000,000 Rp - Rp 24,000,000 Rp - Rp 4,000,000
2 Tukang 168.00 - - - 168.00 Hok Rp 100,000 Rp 16,800,000 Rp - Rp - Rp - Rp 16,800,000
Sub Total II Rp 44,800,000 Rp - Rp 24,000,000 Rp - Rp 20,800,000
TOTAL Rp 132,301,000 Rp - Rp 27,290,000 Rp - Rp 105,011,000
EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO RIKI ANDRIAN, Amd BASUKI RAHMAN SULISTYO
NIP : 19801022 200904 1 003
RENCANA ANGGARAN BIAYA (REALISASI-CCO)
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : Desa Kerubung Jaya
3 Kondisi waduk : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fh 1.20 -
Waktu siklus
- Menggali / memuat Te1 0.55 menit
- Lain-lain Te2 0.25 menit
Te 0.80 menit
File : 469091998.xlsx
URAIAN ANALISA ALAT
No. URAIAN KODE KOEF. SATUAN KET. VOL VOL BAHAN VOL UPAH
A. URAIAN PERALATAN
1 Jenis Peralatan EXCAVATOR 80-140 HP E10
2 Tenaga Pw 80.0 HP
3 Kapasitas Cp 0.8 M3
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,468,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Alat yang dipakai
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam Alat yang dipakai
c. Harga Alat (*) B' 1,247,800,000 Rupiah Alat yang dipakai
D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 655,000 Rupiah Sewa Alat 31,782,000
E. Mobilisasi 2,000,000 Rupiah Total Sewa Alat 33,782,000
F. LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 50,000.00 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 15,000.00 Rp./Jam
4 Bahan Bakar Bensin Mb 8,000.00 Liter
5 Bahan Bakar Solar Ms 8,000.00 Liter
6 Minyak Pelumas Mp 27,000.00 Liter
File : 469091998.xlsx
FORMULA PERHITUNGAN BIAYA TARIF PEMAKAIAN AIR PER M3
B. Biaya Operasional
- Honor penjaga air 2 orang @ Rp 300,000 = Rp 7,200,000-
- Honor pemungut iuran 1 orang @ Rp 50,000 = Rp 600,000-
- ATK per bulan Rp 50,000 = Rp 600,000-
- Kegiatan kesehatan/PHBS Rp 100,000 = Rp 1,200,000-
- Mesin:
Solar 5 liter/hari @ Rp 10,000 = Rp 18,000,000-
Oli 5 liter/bulan Rp 30,000 = Rp 1,800,000-
Biaya Operasional per tahun = Rp 29,400,000-
Biaya Operasional per bulan = Rp 2,450,000-
C. Biaya pemeliharaan
Asumsikan 1% per tahun dari nilai investasi Sarana Air Minum
Rp #NAME? per KK
per bln
Maka Tarif Harga Air Berdasarkan Perhitungan adalah Rp #NAME? per KK/bln
= Rp #NAME? per m3
= Rp #NAME? /rmh/bln
No Kebutuhan Jumlah Satuan Pembulatan Satuan Pembulatan
1 2 3 4 5 6 5
1 Pekerja 349.862 Hok 349.86 Hok 350.00
2 Tukang 167.610 Hok 167.61 Hok 168.00
3 Kayu Kaso 5/7 (borneo) 0.220 M3 0.22 M3 0.50
4 Paku Biasa 2" - 5" 88.356 Kg 88.36 Kg 89.00
5 Kayu Papan 3/20 borneo 0.154 M3 0.15 M3 0.50
6 Pasir Urug 1.200 M3 1.20 M3 2.00
7 Semen Portland 9713.753 Kg 194.28 Zak 195.00
8 Pasir Beton 11.358 M3 11.36 M3 12.00
9 Kerikil 23.478 M3 23.48 M3 24.00
10 Kayu Kelas III 8.43 M3 8.43 M3 8.50
11 Minyak Bekisting 42.52 Ltr 42.52 Ltr 43.00
12 Balok Kayu 3.37 M3 3.37 M3 3.50
13 Plywood tebal 9 mm 69.37 Lbr 69.37 Lbr 70.00
14 Dolken Kayu galam 428.80 Btg 428.80 Btg 429.00
15 Besi Beton (Polos/Ulir) Ǿ12 1320.07 Kg 1320.07 Btg 123.91
16 Kawat Beton 23.64 Kg 23.64 Kg 24.00
17 Besi Beton (Polos/Ulir) Ǿ8 1160.12 Kg 245.02 Btg 246.00
18 Besi Beton (Polos/Ulir) Ǿ10 235.49 Kg 31.83 Btg 32.00
19 Besi Beton (Polos/Ulir) Ǿ6 2.40 Kg 0.90 Btg 1.00
20 Pasir Pasang 5.65 M3 5.65 M3 6.00
21 Plamir 20.93 Kg 20.93 Kg 21.00
22 Cat Dasar 20.93 Kg 20.93 Kg 21.00
23 Cat Tembok 54.41 Kg 54.41 Kg 55.00
DAFTAR ANALISA HARGA SATUAN
1 2 3 4 5
43) 1 M2 Pengecatan Tembok baru (1 Plamir, 1 lapis cat dasar, 2 lapis cat penutup) 209.280
Bahan Plamir kg 0.100 20.928
Cat Dasar kg 0.100 20.928
Cat Tembok kg 0.260 54.413
Tenaga Pekerja Oh 0.020 4.186
Tukang cat Oh 0.063 13.185
Beton Besi
Total Beton
No Uraian Gambar Volume Luas (A) Volume
P L T Jumlah (n) Ø Besi P Jumlah (n) (m3)
(m3) (m2) (m3)
1 Pekerjaan Pondasi
5.000 4.000 0.400 1.000 8.000 Ø12 0.00015 8.600 33.333 0.088 7.912
Ø8-15
6Ø14 35
35
6Ø14 30
20
4 Pekerjaan Kolom 30 x 30
a. Tulangan Pokok 10.000 0.300 0.300 4.000 3.600 Ø12 0.00015 10.000 24.000 0.037 3.560
b. Tulangan Begel Ø8 0.00005 1.000 66.667 0.003
Ø8-15
6Ø14 30
30
Ø8-15
25
6Ø14
20
Ø8-15
20
6Ø14
20
7 Pekerjaan Plat Tb 20 cm
5.600 4.600 0.200 5.152 Ø8 0.00005 20.200 68.000 0.069 5.083
5 ,60
4,9 5
Tang ga
BALOK 20/20
LO
BA K20/20
Ø8-15
Ø8-15 4,60
BALOK 20/20
BALOK 20/2 0
Ø8-15
Ø8-15
DAFTAR IN KIND
A. Bahan Bangunan
1 Pasir Beton Lokal M3 160,000 160,000 160,000 100,000
2 Pasir Urug M3 125,000 125,000 125,000 100,000
3 Pasir Pasang M3 160,000 160,000 160,000 100,000
4 Kerikil M3 250,000 250,000 250,000 250,000
5 Batu Bata, ukuran standar buah 700 800 850 #REF!
6 Semen PC, berat 50 kg Zak 70,000 73,000 70,000 70,000
7 Tulangan Polos dia 12 batang 96,000 98,000 95,000 110,000
8 Tulangan Polos dia 10 batang 75,000 78,000 75,000 85,000
9 Tulangan Polos dia 8 batang 62,000 65,000 60,000 60,000
10 Tulangan Polos dia 6 batang 37,000 35,000 40,000 40,000
11 Kawat Beton Kg 19,000 22,000 20,000 20,000
12 Paku Biasa 2"-5" Kg 20,000 24,000 20,000 18,000
13 Plamir Kg 15,000 13,000 10,000 10,000
14 Cat Minyak Kg 60,000 55,000 58,000 51,000
15 Cat Dasar Kg 18,000 20,000 15,000 15,000
16 Cat Tembok Kg 25,000 30,000 25,000 65,000
17 Amplas Lbr 5,000 7,000 10,000 5,000
18 Kayu Klas III M3 1,500,000 1,650,000 1,700,000 2,000,000
19 Kayu 5/7 M3 1,800,000 1,900,000 1,900,000 2,000,000
19 Kayu 5/7 Btg 26,000 27,000 27,000 #REF!
20 Papan 3/20 M3 1,500,000 1,600,000 1,700,000 2,000,000
21 Papan 3/20 Lbr 36,000 39,000 36,000 2,000,000
22 plywood 9 mm lbr 145,000 147,000 148,000 145,000
23 Kayu Cerocok/Perancah Btg 12,000 13,000 15,000 10,000
24 Minyak Bekisting Ltr 10,000 10,000 12,000 10,000
25 Jet Pump Kapasitas hisap 30 m Unit 3,200,000 3,500,000 3,000,000 Err:509
26 Pompa Ebara Unit 13,000,000 13,000,000 12,000,000 12,000,000
27 Mesin Diesel + Perlengkapan Unit 15,000,000 18,000,000 17,000,000 Err:509
B. Perpipaan
1 PVC SNI dia. 3" RRJ batang 330,000 320,000 325,000 Err:509
2 PVC SNI dia. 2" RRJ batang 170,000 170,000 173,000 180,000
PIPA PVC
1 PVC AW dia. 1 1/4" batang 52,000 50,000 60,000 #REF!
2 PVC AW dia. 1" batang 40,000 30,000 45,000 #REF!
3 PVC AW dia. 3/4" batang 33,000 22,000 33,000 22,000
PIPA Galvanis
1 SNI dia. 3" , Pj 6 meter batang 670,000 680,000 650,000 700,000
2 SNI dia. 2" , Pj 6 meter batang 380,000 370,000 350,000 350,000
3 SNI dia. 1" , Pj 6 meter batang 250,000 280,000 280,000 250,000
Aksesoris Pipa:
1 Elbow Ukuran dia. 3/4" buah 6,000 7,000 5,000 5,000
2 Socket Ukuran dia. 3/4" buah 6,000 7,000 5,000 5,000
3 Socket Drat Ukuran dia. 3/4" buah 16,000 17,000 15,000 15,000
4 Tee Ukuran dia. 3/4" buah 6,000 7,000 5,000 5,000
Perlengkapan :
1 Kran Air antik Ø 3/4" buah 35,000 45,000 40,000 35,000
2 Lem PVC bh 17,000 20,000 15,000 15,000
3 Seal Tape M' 5,000 5,000 5,000 5,000
yang menetapkan ;
2.
3.
4.
5
VERIFIKASI RENCANA PENGADAAN BARANG DAN JASA
B. Paket 2 K
E
1 Pasir Beton Lokal M3 3.0 #REF! 12.0 0.5 #REF! 160,000.00 #REF! #REF!
-
2 Pasir Urug M3 2.0 2.0 125,000.00 250,000.00 250,000.00 1
3 Pasir Pasang M3 2.0 6.0 8.0 160,000.00 1,280,000.00 1,280,000.00
S
4 Kerikil Ayak/Koral M3 4.0 #REF! 24.0 0.5 #REF! 250,000.00 #REF! #REF!
.
5 Kayu Klas III M3 1.0 3.0 4.0 1,500,000.00 6,000,000.00 6,000,000.00 D
6 Kayu 5/7 Btg 0.5 #REF! 35.0 #REF! 26,000.00 #REF! #REF!
7 Papan 3/20 Lbr 0.2 #REF! 21.0 #REF! 36,000.00 #REF! #REF! B
U
8 Batu Bata, ukuran standar Bh #REF! #REF! 700.00 #REF! #REF! L
JUMLAH PAKET 2 #REF! #REF! #REF! #REF! - A
- N
C. Paket 3 - K
1 Pipa SNI dia. 3" Btg Err:509 Err:509 320,000.00 Err:509 Err:509 E
2 Pipa SNI dia. 2" Btg #REF! - #REF! 170,000.00 #REF! #REF! -
3 Perlengkapan Pipa 3
Ls - -
4 PVC AW dia. 3/4" Btg 8.0 8.0 22,000.00 176,000.00 176,000.00
5 PVC AW dia. 1" Btg #REF! #REF! 30,000.00 #REF! #REF!
6 PVC AW dia. 1 1/4" Btg #REF! #REF! 50,000.00 #REF! #REF!
7 Elbow 3/4 Inch Bh 12.0 12.0 5,000.00 60,000.00 60,000.00
8 Kran Air Giv 3/4 Inch Bh 6.0 6.0 35,000.00 210,000.00 210,000.00
9 Socket Drat 3/4 Inch Bh 6.0 6.0 5,000.00 30,000.00 30,000.00
10 Tee 3/4 Inch Bh 6.0 6.0 15,000.00 90,000.00 90,000.00
11 Socket 3/4 Inch Bh 8.0 8.0 5,000.00 40,000.00 40,000.00
12 Pipa Galvanis SNI dia. 3" , Pj 6 meter Btg #REF! 2.0 #REF! 650,000.00 #REF! #REF!
13 Pipa Galvanis SNI dia. 2" , Pj 6 meter Btg 2.0 2.0 350,000.00 700,000.00 700,000.00
14 Pipa Galvanis SNI dia. 1" , Pj 6 meter Btg 4.0 4.0 250,000.00 1,000,000.00 1,000,000.00
JUMLAH PAKET 3 Err:509 1,210,000.00 #REF! #REF! -
TOTAL HARGA TOTAL METODE PENGADAAN
Pengadaan Pengadaan BAHAN SATUAN HARGA SURVEY PERBANDINGAN HARGA PENUNJUKAN WAKTU PELAKSANAAN
No. Uraian Satuan Bak Filter Rumah Mesin Tower Air Perpipaan TCT
Sumber Energi Pompa ALAT BINTANG TIMUR LANGSUNG PENGADAAN
( Rp ) ( Rp ) SINAR TANI BANGUNAN FAJAR BARU
JASA KERAMIK REKANAN PLN
D. Paket 4 -
1 Mesin Diesel Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1 Pompa Sentrifugal Set 1.0 1.0 14,000,000.00 14,000,000.00 12,000,000.00
-3
2 Pompa Jet Pump Set Err:509 Err:509 Err:509 Err:509 Err:509
KE
N
3 Pengadaan KWH Listrik Ls Err:509 Err:509 14,000,000.00 Err:509 Err:509
LA
BU
JUMLAH PAKET 4 Err:509 Err:509 - Err:509 Err:509
.D
1S
TOTAL JUMLAH BARANG/MATERIAL #REF! #REF! #REF! #REF! Err:509
-
KE
N
-
LA
BU
E. Upah
1 Pekerja OH 154.0 #REF! 350.0 - 19.0 #REF! 100,000.00 #REF!
2 Tukang OH 98.0 #REF! 168.0 - 3.0 #REF! 120,000.00 #REF!
TOTAL JUMLAH JASA #REF! - - - -
-3
KE
N
2 Perlengkapan Pipa Ls Err:509 Err:509 Err:509 Err:509 Err:509
LA
BU
JUMLAH PAKET Err:509 - Err:509 - -
.DS
-1
B. Upah
KE
N
1 Pekerja OH - #REF! - 84.0 - #REF! 100,000.00 #REF!
LA
BU
2 Tukang OH - #REF! - 58.0 - #REF! 120,000.00 #REF!
TOTAL JUMLAH UPAH #REF! - - - -
VOLUME
UNIT/ HARGA JUMLAH (Rp)
NO URAIAN KEBUTUHAN REAL S/D PENGAJUAN JUMLAH TOTAL APBN TOTAL INCASH TOTAL INKIND
SISA APBN INCASH INKIND SATUAN SATUAN (Rp)
TAHAP LALU SEKARANG KOMULATIF
1 2 3 4 5 6=4+5 7=3-6 8 9 10 11 12 13 14 15 16
I PELATHAN
- PEL. ADM & KEUANGAN 1.0 - 1.0 1.0 - - 1.0 - Paket 450,000.00 - 450,000.00 - 450,000.00
- PEL. TEKNIK 1.0 - 1.0 1.0 - - 1.0 - Paket 252,000.00 - 252,000.00 - 252,000.00
- PENINGKATAN PHBS DI MASYARAKAT 1.0 - - - 1.0 - - - Paket 492,000.00 - - - -
- PENINGKATAN PHBS DI SEKOLAH 1.0 - - - 1.0 - - - Paket #NAME? #NAME? #NAME? #NAME? #NAME?
- PEL. BP-SPAM ( PENGELOLA ) 1.0 - - - 1.0 - - - Paket 300,000.00 - - - -
II OPERASIONAL KKM
II.1 Administrasi KKM (ATK)
- Pulpen 1.0 - 1.0 1.0 - - 1.0 - Lusin 18,000.00 - 18,000.00 - 18,000.00
- Penggaris (Mistar) 1.0 - 1.0 1.0 - - 1.0 - Buah 6,000.00 - 6,000.00 - 6,000.00
- Spidol 3.0 - 3.0 3.0 - - 3.0 - Buah 8,000.00 - 24,000.00 - 24,000.00
- Pensil 1.0 - 1.0 1.0 - - 1.0 - kotak 15,000.00 - 15,000.00 - 15,000.00
- Peruncing Pensil 1.0 - 1.0 1.0 - - 1.0 - Buah 3,000.00 - 3,000.00 - 3,000.00
- Penghapus Pensil 1.0 - 1.0 1.0 - - 1.0 - Buah 3,000.00 - 3,000.00 - 3,000.00
- Buku Folio 5.0 - 5.0 5.0 - - 5.0 - Buah 16,000.00 - 80,000.00 - 80,000.00
- Kalkulator 1.0 - 1.0 1.0 - - 1.0 - Buah 60,000.00 - 60,000.00 - 60,000.00
- Kertas HVS 70 gr 1.0 - 1.0 1.0 - - 1.0 - Rim 50,000.00 - 50,000.00 - 50,000.00
- Kertas A4 70 gr 3.0 - 3.0 3.0 - - 3.0 - Rim 40,000.00 - 120,000.00 - 120,000.00
- Map Kertas/stopmap folio 11.0 - 11.0 11.0 - - 11.0 Buah 2,000.00 - 22,000.00 - 22,000.00
- Map Plastik/clear bag 4.0 - 4.0 4.0 - - 4.0 Buah 7,000.00 - 28,000.00 - 28,000.00
- Map Binder/file 2.0 - 2.0 2.0 - - 2.0 Buah 40,000.00 - 80,000.00 - 80,000.00
- Map tulang 8.0 - 8.0 8.0 - - 8.0 - Buah 8,500.00 - 68,000.00 - 68,000.00
- Strepler Besar 1.0 - 1.0 1.0 - - 1.0 - Buah 18,000.00 - 18,000.00 - 18,000.00
- Strepler Kecil 1.0 - 1.0 1.0 - - 1.0 - Buah 13,000.00 - 13,000.00 - 13,000.00
- Isi Strepler Besar 4.0 - 4.0 4.0 - - 4.0 - Kotak 4,000.00 - 16,000.00 - 16,000.00
- Isi Strepler Kecil 4.0 - 4.0 4.0 - - 4.0 - Kotak 3,000.00 - 12,000.00 - 12,000.00
- Pembolong Kertas 1.0 - 1.0 1.0 - - 1.0 - Buah 35,000.00 - 35,000.00 - 35,000.00
- Materai 6000 25.0 - 25.0 25.0 - - 25.0 - Lembar 7,000.00 - 175,000.00 - 175,000.00
- Kwitansi 5.0 - 5.0 5.0 - - 5.0 - Buku 5,000.00 - 25,000.00 - 25,000.00
- Lakban Hitam Besar 1.0 - 1.0 1.0 - - 1.0 - Buah 15,000.00 - 15,000.00 - 15,000.00
- Lakban Kertas Besar 3.0 - 3.0 3.0 - - 3.0 - Buah 15,000.00 - 45,000.00 - 45,000.00
- Lem kertas Povinol 4.0 - 4.0 4.0 - - 4.0 - Buah 4,000.00 - 16,000.00 - 16,000.00
- Stempel KKM 1.0 - 1.0 1.0 - - 1.0 - Buah 100,000.00 - 100,000.00 - 100,000.00
- Tinta Print (hitam dan warna) 4.0 - 4.0 4.0 - - 4.0 - Botol 60,000.00 - 240,000.00 - 240,000.00
- Buku Tulis 3.0 - 3.0 3.0 - - 3.0 - Buah 20,000.00 - 60,000.00 - 60,000.00
- Lemari arsip kecil 1.0 - 1.0 1.0 - - 1.0 - Buah 300,000.00 - 300,000.00 - 300,000.00
- Akta Notaris 1.0 - 1.0 1.0 - - 1.0 - Paket 500,000.00 - 500,000.00 - 500,000.00
VOLUME
UNIT/ HARGA JUMLAH (Rp)
NO URAIAN KEBUTUHAN REAL S/D PENGAJUAN JUMLAH TOTAL APBN TOTAL INCASH TOTAL INKIND
SISA APBN INCASH INKIND SATUAN SATUAN (Rp)
TAHAP LALU SEKARANG KOMULATIF
1 2 3 4 5 6=4+5 7=3-6 8 9 10 11 12 13 14 15 16
III.2 UPAH
- #REF! #REF! - 40.0 40.0 #REF! - - 40.0 #REF! #REF! #REF! #REF! #REF! #REF!
- #REF! #REF! - 10.0 10.0 #REF! 10.0 - - #REF! #REF! #REF! #REF! #REF! #REF!
1 2 3 4 5 6=4+5 7=3-6 8 9 10 11 12 13 14 15 16
VI.2 UPAH
- Pekerja 154.0 - 54.0 54.0 100.0 - - 54.0 OH 80,000.00 - - 4,320,000.00 4,320,000.00
- Tukang 98.0 - 35.0 35.0 63.0 35.0 - - OH 100,000.00 3,500,000.00 - - 3,500,000.00
1 2 3 4 5 6=4+5 7=3-6 8 9 10 11 12 13 14 15 16
VII. 2 UPAH
- Pekerja 350.0 - 150.0 150.0 200.0 - - 150.0 Hok 80,000.00 - - 12,000,000.00 12,000,000.00
- Tukang 168.0 - 74.0 74.0 94.0 74.0 - - Hok 100,000.00 7,400,000.00 - - 7,400,000.00
TOTAL Err:509 - - -
VIII PERPIPAAN
VIII.1 BAHAN
- Err:509 Err:509 - - - Err:509 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- Pipa SNI S 12.5 diameter 2" 114.0 - - - 114.0 - - - Btg 180,000.00 - - - -
- Err:509 Err:509 - - - Err:509 - - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
- - - - - - - - - - - - - -
VIII.2 UPAH - -
- Pekerja 84.0 - - - 84.0 - - - Oh 100,000.00 - - - -
- Tukang 58.0 - - - 58.0 - - - Oh 120,000.00 - - - -
1 2 3 4 5 6=4+5 7=3-6 8 9 10 11 12 13 14 15 16
IX.2 UPAH
- Pekerja 19.0 - 19.0 19.0 - - - 19.0 Oh 80,000.00 - - 1,520,000.00 1,520,000.00
- Tukang 3.0 - 3.0 3.0 - 3.0 - - Oh 100,000.00 300,000.00 - - 300,000.00
PUJIANTO SUHUD
Diperiksa Oleh:
Diketahui Oleh:
PPK Program Pamsimas
EFRI MARYONI, ST
VOLUME
UNIT/ HARGA JUMLAH (Rp)
NO URAIAN KEBUTUHAN REAL S/D PENGAJUAN JUMLAH TOTAL APBN TOTAL INCASH TOTAL INKIND
SISA APBN INCASH INKIND SATUAN SATUAN (Rp)
TAHAP LALU SEKARANG KOMULATIF
1 2 3 4 5 6=4+5 7=3-6 8 9 10 11 12 13 14 15 16
NIP. 19801022 200904 1 003
FORMULA PERHITUNGAN BIAYA TARIF PEMAKAIAN AIR
B. Biaya Operasional
- Honor penjaga air 2 orang @ Rp 500,000 = Rp 12,000,000-
- Honor pemungut iuran 1 orang @ Rp 100,000 = Rp 1,200,000-
- ATK per bulan Rp 50,000 = Rp 600,000-
- Kegiatan kesehatan/PHBS Rp 255,000 = Rp 3,060,000-
- Biaya Listrik Rp 400,000 = Rp 4,800,000-
- Mesin:
Solar 5 liter/hari @ Rp 10,000 = Rp 18,000,000-
Oli 5 liter/bulan Rp 30,000 = Rp 1,800,000-
Biaya Operasional per tahun = Rp 41,460,000-
Biaya Operasional per bulan = Rp 3,455,000-
C. Biaya pemeliharaan
Asumsikan 1% per tahun dari nilai investasi Sarana Air Minum
Maka Tarif Harga Air Berdasarkan Perhitungan adalah Rp 51,000 per KK/bln
= Rp 4179 per m3
@ Rp 4500 per m3
Harga (Rp) per sambungan rumah = Total Biaya Pengelolaan = Rp 5,037,399- / bln
Jumlah rumah 93 Rmh
= Rp 54,165.58.- /rmh/bln
= Rp 56,000.00.- /rmh/bln
FORMULA PERHITUNGAN BIAYA TARIF PEMAKAIAN AIR
JADWAL PELAKSANAAN KEGIATAN RKM
Harga Satuan
No URAIAN Volume Satuan Bobot (%) 1 2 3
Rp
I Operasional KKM
1 Administrasi dan Operasional KKM 1 Paket 12,010,800 #NAME? ### ### ### ### ### ### ### ### ### ### ### ###
II Kegiatan Pelatihan di Masyarakat
1 Pelatihan Administrasi Keuangan 1 Paket 450,000 #NAME? ###
2 Pelatihan Teknik 1 Paket 252,000 #NAME? ###
III Pembangunan SAM
1 Rumah Mesin 1 Unit #NAME? #NAME? ### ###
2 Peng. Sumber Energi 1 Paket 14,000,000 #NAME? ### ### ###
3 Peng. Pompa 1 Paket 14,000,000 #NAME? ### ### ###
4 Bak Filter 1 Unit 67,058,000 #NAME? ### ### ### ###
5 Tower Air 1 Unit 112,595,800 #NAME? ### ### ### ### ### ### ### ###
6 Perpipaan 1,079 M 72,878,000 #NAME? ### ### ###
IV Pembangunan SAN
1 Tempat Cuci Tangan (TCT) 6 Unit #REF! #REF! #REF! #REF!
V Pelatihan Badan Pengelola Sarana
1 Pelatihan Badan Pengelola Sarana 1 Paket 300,000 #NAME? ###
VI PHBS
1 Peningkatan PHBS di Masyarakat 1 Paket 492,000 #NAME? ###
2 Peningkatan PHBS di Sekolah 1 Paket #NAME? #NAME? ###
Total Pembiayaan #NAME? #NAME?
Rencana ### ### #REF! #REF! ### ### ### ### ### ### ### ###
Jumlah Komulatif Rencana ### ### ### ### ### ### ### ### ### ### ### ###
Realisasi
Deviasi
Mengetahui :
PPK PAMSIMAS
Kabupaten Indragiri Hulu
EFRI MARYONI, ST
NIP : 19801022 200904 1 003
ANALISA BAHAN DAN UPAH BAK FILTER
Tenaga
Pekerja OH 0.100 4.900
B. Memasang Bouwplank (m¹) 24.800
Bahan
Kayu 5/7 M3 0.012 0.298
Paku Biasa 2"-5" Kg 0.020 0.496
Papan 3/20 M3 0.007 0.174
Tenaga
Pekerja OH 0.100 2.480
Tukang Kayu OH 0.100 2.480
V. PEKERJAAN BEKISTING
A. Pasang Bekisting (m²) ( Dua Kali Pakai ) 196.400
Bahan
Kayu Kelas III M3 0.040 7.856
Paku Biasa 2" - 5" Kg 0.400 78.560
Minyak Bekisting Ltr 0.200 39.280
Plywood 9 mm Lbr 0.350 68.740
Dolken Kayu Galam Ø 8 - 10 / 4m Btg 2.000 392.800
Tenaga
Pekerja OH 0.300 58.920
Tukang Kayu OH 0.330 64.812
UKURAN
NO. JENIS PEKERJAAN SATUAN RUMUS QTY
P L T
A. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2 7 7 - PxL 49
2 Pemasangan Bowplank M 5.2 5.2 2 x (( P + 1 ) + ( L + 1 )) 24.8
4. KOLOM (20/20)
Ø8-15 20
0.20 0.20 2.90 8.00 10.00 2.90 4.00 92.80 57.258 8.00 0.67 146.67 98.56 38.931
4Ø10 20
5. KOLOM (15/15)
Ø6-15 15 0.15 0.15 2.90 4.00 10.00 2.90 4.00 46.40 28.629 8.00 0.47 20.33 38.39 15.164
4Ø8 15
1.10 0.10 2.60 1.00 10.00 2.60 18.33 47.67 29.410 10.00 4.28 8.33 35.67 22.006
2.65 1.10 0.10 1.10 1.00 10.00 1.10 8.33 9.17 5.656 10.00 4.28 8.33 35.67 22.006
Ø10 -15
Ø10 -15
7. PLAT DINDING
UKURAN
NO. JENIS PEKERJAAN SATUAN RUMUS QTY
P L T
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2 3.5 3.5 - PxL 12.25
2 Pemasangan Bowplank M 3.5 3.5 2 x (( P + 1 ) + ( L + 1 )) 18
II PEKERJAAN TANAH
1. Galian Tanah Biasa ( U0 ): 4.25
M' 5 0.7 1.5 PxLxT 1.5
M' 5 0.7 1 ( 0,7 + 0,4 )/2 ) x T x P 2.75
Urugan Tanah Kembali M' 5 0.7 1.5 PxLxT 1.5
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
A. Pembersihan Lapangan 12.250
Tenaga
Pekerja Oh 0.100 1.225
V. PEKERJAAN PENGECATAN
1 m2 Pengecatan Tembok baru (1 Plamir, 1 lapis cat dasar, 2 lapis cat penutup) 4.898
Bahan
Plamir kg 0.100 0.490
Cat Dasar kg 0.100 0.490
Cat Tembok kg 0.260 1.274
Tenaga
Pekerja Oh 0.020 0.098
Tukang cat Oh 0.063 0.309
VOLUME PEMBESIAN INTAKE
Tulangan Horizontal:
Tulangan Horizontal:
I. PEKERJAAN PERSIAPAN
A. Pembersihan Lahan (m²) 27.500
Bahan
Tenaga
Pekerja OH 0.100 2.750
B. Memasang Bouwplank (m¹) 16.000
Bahan
Kayu 5/7 M3 0.012 0.192
Paku Biasa 2"-5" Kg 0.020 0.320
Papan 3/20 M3 0.007 0.112
Tenaga
Pekerja OH 0.100 1.600
Tukang Kayu OH 0.100 1.600
UKURAN
NO. JENIS PEKERJAAN SATUAN RUMUS QTY
P L T
A. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2 5.5 5 - PxL 27.50
2 Pemasangan Bowplank M 4.5 3 2 x (( P + 2 ) + ( L + 2 )) - 7 16.00
B. PEKERJAAN TANAH
M3 749.89
1 Galian Tanah Embung M3 60 6 2 PxLxT 720.00
2 Galian Tanah Bak Filter M3 2 1.3 2.15 ( P + 0,4 ) x ( L + 0,4 ) x ( T ) 8.77
3 Galian Tanah Bak Penampung M3 2 2 4 ( P + 0,2 ) x ( L + 0,4 ) x ( T ) 21.12
4 Galian Tanah Tapak Pondasi Pagar M3 0.2 0.2 0.5 50 x P x L x T 1.00
A. Bahan Bangunan
1 Pasir Beton Lokal M3 140,000 140,000
2 Pasir Urug M3 165,000 140,000
3 Pasir Pasang M3 165,000 140,000
4 Koral Beton M3 240,000 210,000
5 Semen PC, berat 50 kg Zak 69,000 67,000
6 Tulangan Polos dia 12 Batang 105,000 100,000
7 Tulangan Polos dia 10 Batang 75,000 62,000
8 Tulangan Polos dia 8 Batang 55,000 48,000
9 Tulangan Polos dia 6 Batang 38,000 30,000
10 Kawat Beton Kg 21,000 20,000
11 Paku Biasa 2"-5" Kg 20,000 20,000
12 Plamir Kg 30,000 20,000
13 Cat Dasar Zak 12,000 12,000
14 Cat Air Tembok Kg 45,000 38,000
15 Cat Lapis Anti Bocor Kg 65,000 65,000
16 Cat Minyak Kg 56,000 55,000
17 Kayu Klas III M3 1,950,000 1,800,000
18 Kayu 5/7 M3 1,950,000 1,900,000
19 Papan 3/20 M3 1,950,000 1,900,000
20 Batu Bata Ukuran Standar Bh 850 800
21 Plywood 9 mm lbr 138,000 135,000
22 Minyak Bekisting Ltr 12,000 12,000
23 Dolken Kayu Dia.8-10 P.4 M Batang 8,000 7,000
24 Arang Batok M3 310,000 300,000
25 Ijuk Kg 26,000 25,000
26 Pompa Centrifugal Unit 14,550,000 14,000,000
27 Manhole Unit 550,000 500,000
28 Besi Siku 50 x 50 x 4 mm Batang 160,000 155,000
29 Kawat Duri Rol 130,000 120,000
30 Tangga Ls 1,550,000 1,500,000
31 Pagar Besi Selasar Ls 1,800,000 1,750,000
32 Mesin Diesel Unit 14,500,000 14,000,000
B. Perpipaan
1 PVC SNI dia. 2" RRJ Batang 185,000 180,000
2 PVC SNI dia. 3" RRJ Batang 335,000 330,000
3 PVC dia. 1 1/4'' Batang 90,000 80,000
4 Elbow PVC dia 1 1/4'' Bh 13,000 12,000
5 PVC dia.3'' Btg 225,000 220,000
PIPA Galvanis
1 SNI dia. 3" , Pj 6 meter Batang 500,000 485,000
2 SNI dia. 2" , Pj 6 meter Batang 400,000 375,000
3 SNI dia. 1" , Pj 6 meter Batang 255,000 175,000
4 SNI dia. 1 1/4" , Pj 6 meter Batang 260,000 225,000
5 Elbow GI dia.3'' Bh 115,000 110,000
6 Elbow GI dia.2'' Bh 92,000 90,000
7 Elbow GI dia.1 1/4'' Bh 55,000 55,000
8 Stop Kran GI dia.3'' Bh 380,000 360,000
9 Stop Kran GI dia.2'' Bh 350,000 150,000
10 Pipa Hawa Bh 100,000 100,000
KKM :
Desa/Kelurahan :
Kecamatan :
Kabupaten :
Provinsi :
Tanggal Penetapan :
A. Bahan Bangunan
155,000 140,000 0 1 Pasir Beton Lokal M3
155,000 140,000 0 2 Pasir Urug M3
155,000 140,000 0 3 Pasir Pasang M3
230,000 210,000 0 4 Koral Beton M3
70,000 67,000 0 5 Semen PC, berat 50 kg Zak
108,000 100,000 0 6 Tulangan Polos dia 12 Batang
70,000 62,000 0 7 Tulangan Polos dia 10 Batang
58,000 48,000 0 8 Tulangan Polos dia 8 Batang
35,000 30,000 0 9 Tulangan Polos dia 6 Batang
22,000 20,000 0 10 Kawat Beton
20,000 20,000 0 11 Paku Biasa 2"-5"
30,000 20,000 0 12 Plamir
12,000 12,000 0 13 Cat Dasar
40,000 38,000 0 14 Cat Air Tembok
66,000 65,000 0 15 Cat Lapis Anti Bocor
55,000 55,000 0 16 Cat Minyak
1,900,000 1,800,000 0 17 Kayu Klas III M3
1,900,000 1,900,000 0 18 Kayu 5/7 M3
1,900,000 1,900,000 0 19 Papan 3/20
900 800 0 20 Batu Bata Ukuran Standar
140,000 135,000 0 21 Plywood 9 mm
12,000 12,000 0 22 Minyak Bekisting
8,500 7,000 0 23 Dolken Kayu Dia.8-10 P.4 M
305,000 300,000 0 24 Arang Batok
28,000 25,000 0 25 Ijuk
14,250,000 14,000,000 0 26 Pompa Centrifugal
525,000 500,000 0 27 Manhole
165,000 155,000 0 28 Besi Siku 50 x 50 x 4 mm
125,000 120,000 0 29 Kawat Duri
1,600,000 1,500,000 0 30 Tangga
1,900,000 1,750,000 0 31 Pagar Besi Selasar
14,750,000 14,000,000 0 32 Mesin Diesel
0
0 B. Perpipaan
183,000 180,000 0 1 PVC SNI dia. 2" RRJ Batang
330,000 330,000 0 2 PVC SNI dia. 3" RRJ
91,000 80,000 0 3 PVC dia. 1 1/4''
15,000 12,000 0 4 Elbow PVC dia 1 1/4''
230,000 220,000 0 5 PVC dia.3''
0
0 PIPA Galvanis
515,000 485,000 0 1 SNI dia. 3" , Pj 6 meter Batang
385,000 375,000 0 2 SNI dia. 2" , Pj 6 meter Batang
250,000 175,000 0 3 SNI dia. 1" , Pj 6 meter
260,000 225,000 0 4 SNI dia. 1 1/4" , Pj 6 meter Batang
110,000 110,000 0 5 Elbow GI dia.3''
95,000 90,000 0 6 Elbow GI dia.2''
57,000 55,000 0 7 Elbow GI dia.1 1/4''
400,000 360,000 0 8 Stop Kran GI dia.3''
350,000 150,000 0 9 Stop Kran GI dia.2''
100,000 100,000 0 10 Pipa Hawa
yang menetapkan ;
Tirta Indah
Bukit Indah
Rakit Kulim
Indragiri Hulu
Riau
yang menetapkan ;
Perpipaan
180,000 PVC SNI dia. 2" RRJ 180000
330,000 PVC SNI dia. 3" RRJ 330000
80,000 PVC dia. 1 1/4'' 90000
12,000 Elbow PVC dia 1 1/4'' 12000
220,000 PVC dia.3'' 270000
PIPA Galvanis
485,000 SNI dia. 3" , Pj 6 meter 550000
375,000 SNI dia. 2" , Pj 6 meter 350000
175,000 SNI dia. 1" , Pj 6 meter 250000
225,000 SNI dia. 1 1/4" , Pj 6 meter 255000
110,000 Elbow GI dia.3'' 110000
90,000 Elbow GI dia.2'' 90000
55,000 Elbow GI dia.1 1/4'' 50000
360,000 Stop Kran GI dia.3'' 380000
150,000 Stop Kran GI dia.2'' 350000
100,000 Pipa Hawa 100000
HARGA LAMA
TB. SINAR TANI TB.VIVI TEKNIK
(Rp). (Rp).
160000 155000
160000 155000
160000 155000
240000 180000
80000 70000
95000 110000
75000 75000
60000 60000
35000 35000
25000 25000
20000 20000
30000 20000
12000 12000
38000 40000
65000 65000
55000 55000
1900000 1900000
1900000 1900000
1900000 1900000
800 800
125000 130000
12000 12000
8500 8500
300000 300000
25000 25000
14000000 14250000
500000 500000
155000 160000
130000 130000
1500000 1500000
1850000 1900000
14000000 14750000
180000 185000
330000 330000
90000 90000
12000 12000
270000 270000
550000 550000
350000 350000
250000 250000
270000 260000
110000 105000
90000 90000
55000 55000
380000 400000
350000 350000
100000 100000
RENCANA ANGGARAN BIAYA
EFRI MARYONI, ST Ir. BAMBANG SUPRIHARTONO RIKI ANDRIAN, Amd BASUKI RAHMAN SULISTYO
NIP : 19801022 200904 1 003
RENCANA ANGGARAN BIAYA (REALISASI-CCO)
P L T J. Kolom/Balok/Plat Dia. Tul Panj. 1 Tul Jml Tul Tot. Panj.Tul Berat Tul Dia. Begel Panj.1 Begel Jml Begel Tot. Panj. Begel Berat Begel
KOLOM/BALOK/PLAT
m m m btg mm m btg m kg mm m m m kg
KOLOM PONDASI 30/30
0.30 0.30 2.20 4.00 12.00 2.20 8.00 73.92 65.641 8.00 1.04 15.33 66.98 26.456
0.30 0.30 6.60 4.00 12.00 6.60 8.00 221.76 196.923 8.00 1.04 44.73 195.40 77.181
0.20 0.30 14.00 1.00 12.00 14.00 6.00 88.20 78.322 8.00 0.84 94.00 82.91 32.749
BALOK 20/25
0.20 0.25 18.00 1.00 12.00 18.00 6.00 113.40 100.699 8.00 0.74 120.67 93.76 37.034
0.20 0.20 21.00 1.00 12.00 21.00 4.00 88.20 78.322 8.00 0.64 140.67 94.53 37.339
PLAT PONDASI
Ø12-15 0,30 1.00 1.00 1.00 4.00 12.00 3.64 7.00 107.02 95.030 12.00 3.64 7.00 107.02 95.030
0,35 0,35
1,00
PLAT LANTAI + DINDING
Plat Dinding:
14.00 0.15 2.75 1.00 10.00 5.64 94.00 556.67 343.464 10.00 28.14 19.00 561.39 346.379
Plat Lantai
5.50 0.20 4.50 1.00 10.00 9.24 37.33 362.21 223.482 10.00 11.24 30.67 361.93 223.310
Plat Atap
4.30 0.10 3.30 1.00 10.00 3.34 29.33 102.87 63.472 10.00 4.34 22.67 103.29 63.731
ANALISA BAHAN DAN UPAH MENARA
I. PEKERJAAN PERSIAPAN
A. Pembersihan Lahan (m²) 24.750
Bahan
Tenaga
Pekerja OH 0.100 2.475
B. Memasang Bouwplank (m¹) 24.000
Bahan
Kayu 5/7 M3 0.012 0.288
Paku Biasa 2"-5" Kg 0.020 0.480
Papan 3/20 M3 0.007 0.168
Tenaga
Pekerja OH 0.100 2.400
Tukang Kayu OH 0.100 2.400
UKURAN
NO. JENIS PEKERJAAN SATUAN RUMUS QTY
P L T
A. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan M2 5.5 4.5 - PxL 24.75
2 Pemasangan Bowplank M 5.5 4.5 - 2 x (( P + 0,5 ) + ( L + 0,5)) 24.00
B. PEKERJAAN TANAH
1 Galian Tanah Biasa ( U0 ) M3 1.1 1.1 1.75 4xPxLxT 8.47
2 Urugan Tanah Kembali
- U1 = Volume Tapak Pondasi M3 1 1 1 4xPxLxT 4.00
- U2 = Volume Kolom Pondasi M3 0.3 0.3 0.65 4xPxLxT 0.23
- U3 = Volume Isian Tanah Sisi Tapak Pondasi M3 4.2 0.1 1 4xPxLxT 1.68
- U4 = Volume Urugan Pasir Bawah Pondasi M3 1.1 1.1 0.05 4xPxLxT 0.24
- U5 = Volume Lantai Kerja M3 1.1 1.1 0.05 4xPxLxT 0.24
U0 - U1 - U2 - U3 - U4 - U5 2.07
3 Urugan Pasir Bawah Pondasi M3 1.1 1.1 0.05 4xPxLxT 0.24
4 Pembuatan Cor Lantai Kerja 1:3:6 (m3) M3 1.1 1.1 0.05 4xPxLxT 0.24
H. PEKERJAAN BAK
1 Membuat Bak Kontrol (1 Unit ) Bh 1
4 Memasang Pipa Galvaniz Ø 2" (m¹) M 14
5 Memasang Pipa Galvaniz Ø 3" (m¹) M 6
6 Memasang Stop Kran 3''(bh) Bh 1
7 Memasang Stop Kran 2''(bh) Bh 1
8 Memasang Pipa Hawa Bh 1
I. PEKERJAAN BESI -
1 Memasang Tangga Tinggi ± 7,5 m Ls 1
2 Penutup Manhole Bh 2
3 Memasang Pagar Selasar Ls 1
LAMPIRAN BERITA ACARA REVISI
II OPEASIONAL KKM
II.1 Operasional KKM 1 Paket 14,379,200 14,379,200 1 Paket 14,379,200 14,379,200 0 -
Menyetujui : Mengetahui :
Koordinator Kabupaten INHU Ketua DPMU INHU
Berita acara revisi dibuat untuk hal-hal yang menyangkut perubahan volume atau perubahan item pekerjaan
NO Hal Yang Di Revisi Keadaan Sebelum Di revisi Keadaan Setelah Di Revisi Alasan Di Revisi
1
Kegiatan PROMKES di masyarakat Kegiatan PROMKES di masyarakat Kegiatan PROMKES di masyarakat Pada proses perencanaan RKM belum dianggarkannya kegiatan
(Sample Air Pasca Konstruksi) Pagu dana Rp 4,530,000.00 Pagu dana Rp 4,530,000.00 pengambilan Sample Air Pasca Konstruksi
dalam juknis kegiatan untuk sample air harus dilaksanakan untuk Pra Konstruksi dan Pasca Konstruksi
Pagu dana Rp.1.530.000
dana berasal dari sisa pengadaan barang dan jasa dan dari survey update harga pada kegiatan
(Embung, Menara, Rumah mesin,Pengadaan pompa, Pengadaan sumber energi)
2
Kegiatan Pembangunan Embung Kegiatan Pembangunan Embung Kegiatan Pembangunan Embung - Pembuatan peluap air embung untuk mengantisipasi tanggul jebol karena debit air yang tinggi
(Pembuatan Peluap Air) Pagu dana Rp 67,058,000.00 Pagu dana Rp 66,386,000.00 - Pembuatan casing untuk SPL sebagai penahan komponen (Pasir, Ijuk ,Kerikil, dan Arang)
(Pembuatan Casing Dan Saringan) Pagu dana terdiri dari Apbn dan Inkind Rp.3.071.000
dana berasal dari sisa pengadaan barang dan jasa dan dari survey update harga pada kegiatan
(Embung, Menara, Rumah mesin,Pengadaan pompa, Pengadaan sumber energi)
3
Kegiatan Pembangunan Menara Kegiatan Pembangunan Menara Kegiatan Pembangunan Menara Setelah dilakukan proses pengadaan barang dan jasa diperoleh sisa dana
Pagu dana Rp 112,595,800.00 Pagu dana Rp 109,638,800.00 Pagu dana terdiri dari Apbn dan Inkind Rp.2.957.000
4
Kegiatan Pembangunan Kegiatan Pembangunan Kegiatan Pembangunan Setelah dilakukan proses pengadaan barang dan jasa diperoleh sisa dana
Rumah Mesin Rumah Mesin Rumah Mesin Pagu dana terdiri dari Apbn Rp.394.000
Pagu dana Rp 19,581,000.00 Pagu dana Rp 19,187,000.00
5 Kegiatan Pengadaan Pompa Kegiatan Pengadaan Pompa Kegiatan Pengadaan Pompa Setelah dilakukan proses survey update harga diperoleh sisa dana
Pagu dana Rp 14,000,000.00 Pagu dana Rp 13,300,000.00 Pagu dana terdiri dari Apbn Rp.700.000
6
Kegiatan Pengadaan Sumber Energi Kegiatan Pengadaan Sumber Energi Kegiatan Pengadaan Sumber Energi Setelah dilakukan proses survey update harga diperoleh sisa dana
Pagu dana Rp 14,000,000.00 Pagu dana Rp 13,450,000.00 Pagu dana terdiri dari Apbn Rp.550.000
Menyetujui : Mengetahui :
Koordinator Kabupaten INHU Ketua DPMU INHU
IV Pekerjaan Beton
1 Pekerjaan lantai kerja 0.18 M³ 5 0.7 0.05 1 0.18
2 Pekerjaan beton lantai saluran 0.08 M³ 5 0.3 0.05 1 0.08
I PEKERJAAN PERSIAPAN
A 1 M2 Membersihkan Lapangan Dan Perataan (SNI 2002)
V PEKERJAAN PEMBESIAN
A 1 KG PEMBESIAN DENGAN BESI POLOS (ANALISA KONSTRUKSI)