RENCANA ANGGARAN BIAYA

PROYEK : RENOVASI RUMAH


LOKASI : PEDAN, KLATEN
TAHUN : 2017
RAB

No. URAIAN PEKERJAAN Volume HARGA SATUAN JUMLAH HARGA

I PEKERJAAN BONGKARAN
1 Bongkaran pasangan bata 8.64 m2 27,857.50 240,688.80
2 Bobokan jalur kabel 40.00 m' 10,000.00 400,000.00
JUMLAH I 640,688.80
II PEKERJAAN PASANGANN DAN PLESTERAN
1 Pasangan hebel 1pc : 3ps Trasram 18.00 m2 84,427.50 1,519,695.00
2 Pasangan hebel 1pc : 8ps 31.50 m2 78,357.50 2,468,261.25
Pasangan hebel 1pc : 8ps (tambahan kamar) 15.00 m2 78,357.50 1,175,362.50
3 Plesteran 1pc : 3ps Trasram 18.00 m2 43,761.00 787,698.00
4 Plesteran 1pc : 8ps 63.00 m2 40,521.00 2,552,823.00
Plesteran 1pc : 8ps (tambahan kamar) 30.00 m2 40,521.00 1,215,630.00
5 Acian 63.00 m2 24,480.00 1,542,240.00
Acian (tambahan kamar) 30.00 m2 24,480.00 734,400.00
6 Sponengan 107.20 m' 9,588.00 1,027,833.60
7 Meja dapur beton 1pc : 2ps : 3kr 1.00 ls 500,000.00 500,000.00
JUMLAH II 13,523,943.35
III PEKERJAAN KERAMIK
1 Keramik KM/WC 25 x 25 9.00 m2 184,378.33 1,659,405.00
2 Keramik KM/WC 25 x 50 20.40 m2 138,455.00 2,824,482.00
6 Keramik mushola 9.00 m2 154,755.00 1,392,795.00
Keramik meja dapur 3.85 m2 154,755.00
7 Keramik dinding meja dapur 3.60 m2 138,455.00 498,438.00
JUMLAH III 5,876,682.00
IV PEKERJAAN SANITASI DAN PLUMBING
1 Bathup + aksesories 1.00 unt 4,500,000.00 4,500,000.00
2 Kloset duduk + aksesories 1.00 unt 2,848,872.50 2,848,872.50
3 Jet shower 1.00 unt 250,000.00 250,000.00
4 Kran shower (panas dingin) 1.00 unt 750,000.00 750,000.00
Kran tembok (panas dingin) 1.00 unt 650,000.00 650,000.00
6 Kran wudhu 1.00 bh 45,000.00 45,000.00
Ember mandi 1.00 bh 100,000.00 100,000.00
Tempat tisu 1.00 bh 64,000.00 64,000.00
Tempat handuk 1.00 bh 210,000.00 210,000.00
Water heater 1.00 bh 2,650,000.00 2,650,000.00
7 Floordrain steinlees 1.00 bh 75,000.00 75,000.00
8 Kichen zink 1.00 unt 750,000.00 750,000.00
Kran leher angsa 1.00 unt 250,000.00 250,000.00
9 Pipa air bersih 3/4" 22.00 m' 19,370.90 426,159.80
10 Pipa air kotor 3" 16.00 m' 93,139.20 1,490,227.20
JUMLAH IV 15,059,259.50
V PEKERJAAN PARTISI DAN PINTU RANGKA ALLUMUNIUM
1 Partisi 2 muka gipsum board 9mm rangka metal stud 99.43 m2 170,000.00 16,903,100.00
2 Kusen pinru dan jendela Allumunium 4" 47.00 m' 110,000.00 5,170,000.00
Daun pintu multipleks lapis HPL rangka allumunium (P01) lengkap
3 3.00 unt 1,650,000.00 4,950,000.00
dengan aksesories

4 Daun pintu allumunium KM/WC (P02) lengkap dengan aksesories 1.00 unt 1,050,000.00 1,050,000.00

5 Daun jendela kaca rangka allumunium lengkap dengan aksesories 8.00 unt 750,000.00 6,000,000.00

6 Daun pintu multipleks lapis HPL rangka allumunium (Pj) lengkap 1.00 unt 2,750,000.00 2,750,000.00
dengan aksesories
Perbaikan lis plafond 90.00 m 18,000.00 1,620,000.00
JUMLAH V 36,823,100.00
VI PEKERJAAN LISTRIK
1 Instalasi titik lampu 16.00 ttk 75,000.00 1,200,000.00
2 Instalasi titik stop kontak 11.00 ttk 100,000.00 1,100,000.00
3 Lampu SL 18 watt 16.00 bh 45,000.00 720,000.00
4 Saklar tunggal 8.00 bh 48,000.00 384,000.00
5 Saklar ganda 5.00 bh 54,000.00 270,000.00
6 Stop kontak 8.00 bh 54,000.00 432,000.00
Stop kontak AC 3.00 bh 65,000.00 195,000.00
MCB Panel 1.00 unt 500,000.00 500,000.00
JUMLAH VI
VII PEKERJAAN PENGECATAN
1 Cat tembok 454.00 m2 27,736.50 12,592,371.00
2 Cat partisi 198.86 m2 27,736.50 5,515,680.39
JUMLAH VII 18,108,051.39
No. URAIAN PEKERJAAN Volume HARGA SATUAN JUMLAH HARGA

JUMLAH TOTAL 93,491,444.04

DIBULATKAN 93,491,000.00

TERBILANG : SEMBILAN PULUH TIGA JUTA EMPAT RATUS SEMBILAN PULUH SATU RIBU RUPIAH.
BORONGAN SIPIL

PROYEK RENOVASI RUMAH PEDAN


LOKASI PEDAN KLATEN

No. URAIAN VOLUME HARGA SATUAN

1 Persiapan 1.00 ls 500,000.00


2 Pasang Habel 64.50 m2 25,000.00
3 Plester aci 129.00 m2 27,000.00
4 Openingan 34.00 m' 20,000.00
5 Keramik (+ keramik meja dapur) 45.85 m2 35,000.00
6 Pasang buthup + aksesories 1.00 unt 500,000.00
7 Pasang Koset duduk+aksesories 1.00 unt 150,000.00
8 Pasang pipa 3/4" 22.00 m' 5,000.00
9 Pasang pipa 4" 16.00 m' 6,000.00
10 Cat 652.86 m2 5,000.00
11 Pasang kitcen zing +aksesories 1.00 unt 100,000.00
12 Meja dapur 1.00 unt 350,000.00

JUMLAH

RENCANA ANGGARAN PELAKSANAAN

No. URAIAN PEKERJAAN VOLUME HARGA SATUAN


(Rp.)

1 Upah borongan
2 semen lemkra 2.00 zak 171,000.00
3 Bathup + aksesories 1.00 unt 3,500,000.00
4 Kloset duduk + aksesories 1.00 unt 2,000,000.00
5 Water haatar 1.00 unt 2,250,000.00
6 Jet shower 1.00 unt 200,000.00
7 Kran shower 2.00 unt 650,000.00
8 Bak mandi 1.00 unt 100,000.00
9 Kran wudhu 1.00 unt 75,000.00
10 Floordrain steinlees 1.00 unt 85,000.00
11 Kichen zink 1.00 unt 350,000.00
12 Pipa air bersih 3/4" 22.00 btg 27,000.00
13 Pipa air kotor 3" 4.00 btg 111,000.00
14 Kne dll 1.00 ls 100,000.00
15 cat 6.00 peil 500,000.00
16 list plafond 45.00 btg 20,000.00
17 hebel 4.00 m3 850,000.00
18 semen 20.00 m3 40,000.00
19 pasir 3.00 rit 900,000.00
20 Keramik 25x25 9.00 m2 54,000.00
21 Keramik 25x50 21.00 m2 82,000.00
22 Keramik 40x40 9.00 m2 62,000.00
23 Keramik 60x60 4.00 m2 64,000.00
24 Keramik 20x25 4.00 m2 64,000.00
25 Akomodasi
26 Bayar kontrakan
27 Pasang in ternet

JUMLAH
JUMLAH HARGA

500,000.00
1,612,500.00
3,483,000.00
680,000.00
1,604,750.00
500,000.00
150,000.00
110,000.00
96,000.00
3,264,300.00
100,000.00
350,000.00

12,450,550.00

JUMLAH HARGA
(Rp.)

41,206,450.00
342,000.00
3,500,000.00
2,000,000.00
2,250,000.00
200,000.00
1,300,000.00
100,000.00
75,000.00
85,000.00
350,000.00
594,000.00
444,000.00
100,000.00
3,000,000.00
900,000.00
3,400,000.00
800,000.00
2,700,000.00
486,000.00
1,722,000.00
558,000.00
256,000.00
256,000.00
7,000,000.00
500,000.00
2,000,000.00

76,124,450.00
BORONGAN PARTISI & KUSEN

PROYEK RENOVASI RUMAH PEDAN


LOKASI PEDAN KLATEN

No. URAIAN VOLUME HARGA SATUAN

1 Partisi 2 muka gipsum board 9mm rangka metal stud 99.43 m2 130,000.00
2 Kusen pinru dan jendela Allumunium 4" 47.00 m' 90,000.00
Daun pintu multipleks lapis HPL rangka allumunium
3 (P01) lengkap dengan aksesories 3.00 unt 1,850,000.00
Daun pintu allumunium KM/WC (P02) lengkap
4 dengan aksesories 1.00 unt 1,250,000.00
Daun jendela kaca rangka allumunium lengkap
5 dengan aksesories 8.00 unt 600,000.00

JUMLAH
JUMLAH HARGA

12,925,900.00
4,230,000.00

5,550,000.00

1,250,000.00

4,800,000.00

28,755,900.00