Anda di halaman 1dari 13

REKAPITULASI ENGINEER ESTIMATE ( E E )

PEMBANGUNAN JALAN RABAT BETON JALAN LINGKUNGAN WEH ILANG ACEH TENGAH
PEKERJAAN :

LOKASI : KABUPATEN ACEH TENGAH


TAHUN ANGGARAN : 2020
DIBUAT OLEH : CV.GRAHA KARYA CONSULTANT

REKAPITULASI
A. PEKERJAAN PERSIAPAN Rp 1,877,772.00
B. PEKERJAAN RABAT BETON Rp 272,535,600.32
C. PEKERJAAN GORONG - GORONG DIA 60 Cm 1 Unit Rp 4,231,017.80
D. PEKERJAAN GORONG - GORONG DIA 30 Cm 3 Unit Rp 2,942,814.47

JUMLAH Rp 281,587,204.59
PPn 10% Rp 28,158,720.46
TOTAL Rp 309,745,925.05
DIBULATKAN Rp 309,745,925.00

TERBILANG : TIGA RATUS SEMBILAN JUTA TUJUH RATUS EMPAT PULUH LIMA RIBU SEMBILAN RATUS DUA PULUH LIMA RUPIAH

BANDA ACEH, 2016


DIBUAT OLEH:
KONSULTAN PERENCANA
CV.GRAHA KARYA CONSULTANT

IWAN AZKAR, ST
Team Leader
ENGINEER ESTIMATE ( E E )
PEKERJAAN : PEMBANGUNAN JALAN RABAT BETON JALAN LINGKUNGAN WEH ILANG ACEH TENGAH
LOKASI : KABUPATEN ACEH TENGAH
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN HARGA
(RP) (RP)
1 2 3 4 5 6 7

A. PEKERJAAN PERSIAPAN
1 Papan Nama dan Penunjuk Arah Proyek 1.000 Ls Taksir Rp 1,000,000.00 Rp 1,000,000.00
2 Direksi Ket ( Sewa ) 1.000 Ls Taksir Rp 500,000.00 Rp 500,000.00
3 P3K 1.000 Ls Taksir Rp 377,772.00 Rp 377,772.00
Sub Jumlah Rp 1,877,772.00
B. PEKERJAAN RABAT BETON
1 Pekerjaan Urug Pasir Alas T = 5 Cm 72.750 M3 A.2.3.1.11. Rp 158,379 Rp 11,522,079.53
2 Pekerjaan Batu Kosong T = 15 Cm 218.250 M3 A.3.2.1.9. Rp 452,129 Rp 98,677,235.00
3 Pekerjaan Beton K.175 T = 10 Cm 145.500 M3 A.4.1.1.5 Rp 958,986 Rp 139,532,473.83
4. Pekerjaan Bekesting Kiri Kanan 72.750 M3 A.4.1.1.21 Rp 313,454 Rp 22,803,811.97
Sub Jumlah Rp 272,535,600.32
C. PEKERJAAN GORONG - GORONG DIA 60 Cm 1 Unit
1 Galian Gorong - Gorong 3.200 M3 A.2.3.1.1. Rp 71,228 Rp 227,928.80
2 Urug Pasir Alas T = 20 Cm 0.544 M3 A.2.3.1.11. Rp 158,379 Rp 86,158.23
3 Timbunan Tanah Biasa 1.895 M3 A.2.3.1.11a. Rp 134,025 Rp 253,999.01
4 Pasangang Batu Gunung Untuk Leaning 1.198 M3 A.3.2.1.2. Rp 855,829 Rp 1,025,659.89
5 Plasteran 1 : 4 Untuk Leaning 5.280 M3 A.4.4.2.4 Rp 60,089 Rp 317,271.87
6 Gorong - gorong Beton Bertulang Dia 60 Cm Lengkap Terpasang 4.000 M1 Taksir Rp 580,000 Rp 2,320,000.00
Sub Jumlah Rp 4,231,017.80
D. PEKERJAAN GORONG - GORONG DIA 30 Cm 3 Unit
1 Galian Gorong - Gorong 1.620 M3 A.2.3.1.1. Rp 71,228 Rp 115,388.96
2 Urug Pasir Alas T = 20 Cm 0.540 M3 A.2.3.1.11. Rp 158,379 Rp 85,524.71
3 Timbunan Tanah Biasa 0.984 M3 A.2.3.1.11a. Rp 134,025 Rp 131,900.80
4 Gorong - gorong Beton Bertulang Dia 30 Cm Lengkap Terpasang 9.000 M1 Taksir Rp 290,000 Rp 2,610,000.00
Sub Jumlah Rp 2,942,814.47
ANALISA HARGA SATUAN PEKERJAAN

A.2.3.1.1. Menggali 1 m³ tanah biasa sedalam 1 meter Rp 71,227.75


Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga
Tenaga Kerja Pekerja OH 0.750 Rp 82,600.00 Rp 61,950.00
Mandor OH 0.025 Rp 112,100.00 Rp 2,802.50
Jumlah Rp 64,752.50
Overhead & Profit (10%) Rp 6,475.25
Harga Satuan Pekerajaan Rp 71,227.75

A.2.3.1.11. Mengurug 1 m³ pasir urug Rp 158,379.10


Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga
Bahan Pasir Urug (PU) m³ 1.200 Rp 98,400.00 Rp 118,080.00
Tenaga Kerja Pekerja OH 0.300 Rp 82,600.00 Rp 24,780.00
Mandor OH 0.010 Rp 112,100.00 Rp 1,121.00

Jumlah Rp 143,981.00

Overhead & Profit (10%) Rp 14,398.10


Harga Satuan Pekerajaan Rp 158,379.10

A.2.3.1.11a. Mengurug 1 m³ tanah urug Rp 134,025.10

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga

Bahan Tanah Urug (TU) m³ 1.200 Rp 79,950.00 Rp 95,940.00


Tenaga Kerja Pekerja OH 0.300 Rp 82,600.00 Rp 24,780.00
Mandor OH 0.010 Rp 112,100.00 Rp 1,121.00

Jumlah Rp 121,841.00

Overhead & Profit (10%) Rp 12,184.10


Harga Satuan Pekerajaan Rp 134,025.10

A.3.2.1.2. Memasang 1 m³ pondasi batu belah, campuran 1 PC : 4 PP Rp 855,829.15

Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga

Bahan Batu belah 15 cm/20 cm m³ 1.200 Rp 215,250.00 Rp 258,300.00


PC Kg 163.000 Rp 1,535.00 Rp 250,205.00
PP m³ 0.520 Rp 110,700.00 Rp 57,564.00
Tenaga Kerja Pekerja OH 1.500 Rp 82,600.00 Rp 123,900.00
Tukang batu OH 0.750 Rp 94,400.00 Rp 70,800.00
Kepala Tukang OH 0.075 Rp 118,000.00 Rp 8,850.00
Mandor OH 0.075 Rp 112,100.00 Rp 8,407.50
Jumlah Rp 778,026.50

Overhead & Profit (10%) Rp 77,802.65


Harga Satuan Pekerajaan Rp 855,829.15

A.3.2.1.9. Memasang 1 m³ batu kosong (aanstamping) Rp 452,129.37


Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga
Bahan Batu belah 15 cm/20 cm m³ 1.200 Rp 215,250.00 Rp 258,300.00
Pasir urug m³ 0.432 Rp 98,400.00 Rp 42,508.80
Tenaga Kerja Pekerja OH 0.780 Rp 82,600.00 Rp 64,428.00
Tukang batu OH 0.390 Rp 94,400.00 Rp 36,816.00
Kepala Tukang OH 0.039 Rp 118,000.00 Rp 4,602.00
Mandor OH 0.039 Rp 112,100.00 Rp 4,371.90
Jumlah Rp 411,026.70

Overhead & Profit (10%) Rp 41,102.67


Harga Satuan Pekerajaan Rp 452,129.37
A.4.4.1.1. Memasang 1 m² dinding Batu Bata ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2 PP Rp 278,422.65
Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga
Bahan Batu Bata Buah 140.000 Rp 738.00 Rp 103,320.00
PC Kg 43.500 Rp 1,535.00 Rp 66,772.50
PP m³ 0.080 Rp 110,700.00 Rp 8,856.00
Tenaga Kerja Pekerja OH 0.600 Rp 82,600.00 Rp 49,560.00
Tukang batu OH 0.200 Rp 94,400.00 Rp 18,880.00
Kepala Tukang OH 0.020 Rp 118,000.00 Rp 2,360.00
Mandor OH 0.030 Rp 112,100.00 Rp 3,363.00
Jumlah Rp 253,111.50
Overhead & Profit (10%) Rp 25,311.15
Harga Satuan Pekerajaan Rp 278,422.65

A.4.4.2.4 Memasang 1 m² plesteran 1 PC : 4 PP, tebal 15 mm Rp 60,089.37


Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga
Bahan PC Kg 6.240 Rp 1,535.00 Rp 9,578.40
PP m³ 0.024 Rp 110,700.00 Rp 2,656.80
Tenaga Kerja Pekerja OH 0.300 Rp 82,600.00 Rp 24,780.00
Tukang batu OH 0.150 Rp 94,400.00 Rp 14,160.00
Kepala Tukang OH 0.015 Rp 118,000.00 Rp 1,770.00
Mandor OH 0.015 Rp 112,100.00 Rp 1,681.50
Jumlah Rp 54,626.70
Overhead & Profit (10%) Rp 5,462.67
Harga Satuan Pekerajaan Rp 60,089.37

A.4.1.1.5 Membuat 1 m³ beton mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 Rp 958,986.07
Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga
Bahan PC Kg 326.000 Rp 1,535.00 Rp 500,410.00
PB Kg 760 Rp 127.56 Rp 96,942.22
KR (maksimum 30 mm) Kg 1029 Rp 55.00 Rp 56,595.00
Air Liter 215 Rp 200.00 Rp 43,000.00
Tenaga Kerja Pekerja OH 1.650 Rp 82,600.00 Rp 136,290.00
Tukang batu OH 0.275 Rp 94,400.00 Rp 25,960.00
Kepala Tukang OH 0.028 Rp 118,000.00 Rp 3,304.00
Mandor OH 0.083 Rp 112,100.00 Rp 9,304.30
Jumlah Rp 871,805.52

Overhead & Profit (10%) Rp 87,180.55


Harga Satuan Pekerajaan Rp 958,986.07

A.4.1.1.21 Memasang 1 m² bekisting untuk sloof Rp 313,454.46


Kebutuhan Satuan Indeks Harga Satuan Jumlah Harga
Bahan Kayu kelas III m³ 0.045 Rp 4,428,000.00 Rp 199,260.00
Paku 5 cm - 10 cm Kg 0.300 Rp 25,500.00 Rp 7,650.00
Minyak bekisting Liter 0.100 Rp 45,700.00 Rp 4,570.00
Tenaga Kerja Pekerja OH 0.520 Rp 82,600.00 Rp 42,952.00
Tukang kayu OH 0.260 Rp 94,400.00 Rp 24,544.00
Kepala Tukang OH 0.026 Rp 118,000.00 Rp 3,068.00
Mandor OH 0.026 Rp 112,100.00 Rp 2,914.60
Jumlah Rp 284,958.60
Overhead & Profit (10%) Rp 28,495.86
Harga Satuan Pekerajaan Rp 313,454.46
DAFTAR HARGA UPAH DAN MATERIAL

NO TENAGA SATUAN JUMLAH HARGA


1 Pekerja OH Rp 82,600
2 Mandor OH Rp 112,100
3 Tukang batu OH Rp 94,400
4 Kepala tukang OH Rp 118,000
5 Tukang besi OH Rp 94,400
6 Tukang kayu OH Rp 94,400
7 Tukang Cat OH Rp 94,400
8 Tukang OH Rp 94,400
9 Tukang Las Konstruksi OH Rp 94,400
10 Tukang Khusus alluminium OH Rp 94,400
11 Tukang Las Biasa OH Rp 94,400
12 Tukang Las OH Rp 94,400
13 Tukang Pipa OH Rp 94,400
14 Tukang besi Konstruksi OH Rp 94,400
15 Tukang Alluminium/Kaca OH Rp 94,400
16 Operator Alat Berat OH Rp 153,400
NO MATERIAL JUMLAH HARGA
1 Air Liter Rp 200
2 Akustik Lembar Rp 187,550
3 Akustik 60 cm x 120 cm Lembar Rp 227,550
4 Alluminium strip m Rp 15,000
5 Ampelas Lbr Rp 3,000
6 Asbes semen m² Rp 79,950
7 Atap spandek m2 Rp 83,000
8 Bahan teraso cor m³ Rp -
9 Baja strip (0,2 x 2) cm Kg Rp 15,000
10 Baja Tulangan Kg Rp 82,508
11 Bak cuci piring Unit Rp 467,400
12 Bak fiberglass Unit Rp 430,000
13 Bak mandi fiberglass Vol 1 m3 Unit Rp 591,000
14 Bak teraso Unit Rp 364,000
15 Balok kayu m³ Rp 4,950,000
16 Balok kayu II m³ Rp 3,925,000
17 Balok kayu kelas II m³ Rp 3,925,000
18 Bata berongga ekspose Buah Rp 12,000
19 Bata pelapis dinding Buah Rp 600
20 Bathup Unit Rp -
21 Batu bata bh Rp 738
22 Batu belah 15 cm/20 cm m³ Rp 215,250
23 Batu granit Kg Rp -
24 Batu paras m² Rp -
25 Batu tempel hitam m² Rp 265,000
26 Batu teraso Kg Rp 12,000
27 Baut Truss Bh Rp 500
28 Baut Reng Bh Rp 400
29 Besi angkur Ø=8 mm Kg Rp -
30 Besi baja IWF Kg Rp 32,900
31 Besi beton Kg Rp 15,000
32 besi beton Ulir Kg Rp 12,300
33 Besi beton polos Kg Rp 11,070
34 Besi lis kaca (1 x 1) cm M Rp -
35 Besi plat baja Kg Rp -
NO MATERIAL JUMLAH HARGA
36 Besi profil Kg Rp 42,435
37 Besi scuare tube M Rp -
38 Besi siku L 30.30.3 Kg Rp -
39 Besi strip Kg Rp -
40 Besi strip tebal 5 mm Kg Rp 5,000
41 Beton 1:2:3 M3 Rp 687,568
42 Bilik bambu m² Rp -
43 Cat Dasar Kg Rp 43,050
44 Cat kilat minyak kg Rp 49,200
45 Cat menie Kg Rp 30,750
46 Cat Minyak kg Rp 49,200
47 Cat penutup Kg Rp 30,750
48 Cat Tembok Kg Rp 30,750
49 Closet duduk Unit Rp 1,800,000
50 Closet jongkok Unit Rp 161,000
51 Dolken kayu galam (kaso), Batang Rp 60,000
52 Dolken kayu galam, Batang Rp 60,000
53 Door closer set Rp -
54 door holder Bh Rp -
55 door stop Bh Rp -
56 Engsel angin Bh Rp 18,900
57 Engsel jendela Bh Rp 6,150
58 Engsel pintu Bh Rp 9,200
59 Floor drain Unit Rp 24,600
60 Floor hardener Kg Rp -
61 Formika Lembar Rp -
62 Formite/penjaga jarak bekisting/spacer Bh Rp 25,000
63 Genteng Metal Lbr Rp 62,000
64 grendel jendela Bh Rp 6,150
65 Gymfloor m² Rp -
66 Gypsum board Lembar Rp 98,400
67 HB 10 Buah Rp -
68 HB 15 Buah Rp -
69 HB 20 Buah Rp -
70 Ijuk kg Rp 24,600
71 Internal cove Buah Rp -
72 Jaring kawat baja dilas Kg Rp 37,400
73 Jendela nako m² Rp -
74 Kaca buram 12 mm M2 Rp -
75 Kaca cermin tebal 5 mm M2 Rp -
76 Kaca cermin tebal 8 mm M2 Rp -
77 Kaca patri tebal 5mm M2 Rp -
78 Kaca tebal 3 mm M2 Rp 116,850
79 Kaca Tebal 5 mm M2 Rp 141,450
80 Kaca tebal 8 mm M2 Rp -
81 Kaca wiredglassed M2 Rp -
82 Kait angin Bh Rp 25,000
83 Kapur Padam (KP) m³ Rp -
84 Karpet m² Rp -
85 Kaso-kaso (5 x 7) cm m³ Rp 3,500,000
86 Kawat beton Kg Rp 17,220
87 Kawat diameter 4 mm Kg Rp -
88 Kawat las Kg Rp -
89 Kawat las listrik Kg Rp -
90 Kawat nyamuk m² Rp 18,450
NO MATERIAL JUMLAH HARGA
91 kayu bekisting m2 Rp 3,500,000
92 Kayu kelas II m³ Rp 5,043,000
93 Kayu kelas II balok m³ Rp 5,043,000
94 Kayu kelas III m³ Rp 4,428,000
95 Kayu kelas III (papan) m³ Rp 4,428,000
96 Kayu papan m³ Rp 3,800,000
97 Keramik 40x40 Cm Bh Rp 11,000
98 Keramik 20x25 Cm Bh Rp 2,100
99 Keramik 20x20 Cm Bh Rp 2,100
100 Keramik 10x20 Cm Bh Rp 1,700
100 Keramik artistik Buah Rp 5,500
101 kerikil M3 Rp 172,200
102 Kloset jongkok bh Rp 184,500
103 KP m³ Rp 2,800
104 KR m³ Rp 3,200
105 KR (Kerikil 2cm/3cm) m³ Rp 172,200
106 KR (maksimum 30 mm) Kg Rp 55
107 Kran air m Rp 15,000
108 Kuas Bh Rp 15,000
109 kunci lemari Bh Rp 73,800
110 Kunci silinder Bh Rp 46,000
111 kunci slot Bh Rp -
112 Kunci tanam antik Bh Rp 155,100
113 Kunci tanam Biasa Bh Rp 104,000
114 Kunci tanam kamar mandi Bh Rp 73,000
115 Lem Kg Rp -
116 Lem kayu Kg Rp 27,900
117 Lem vinyl Kg Rp 20,000
118 List gypsum profil m' Rp 7,000
119 List kayu 2/4 m³ Rp -
120 List kayu profil m' Rp 6,600
121 Marmer Buah Rp -
122 Marmer m² Rp 615,000
123 Minyak bekisting Liter Rp 45,700
124 Minyak pelumas Liter Rp 55,300
125 Mosaik Buah Rp -
126 Nok Seng Genteng Lbr Rp 49,200
127 Paku Kg Rp 20,910
128 Paku / Skrup 5 cm Kg Rp -
129 Paku 1 cm - 2,5 cm Kg Rp 19,900
130 Paku 1 cm dan 2,5 cm Kg Rp 18,500
131 Paku 10 cm Kg Rp 25,000
132 Paku 12 cm Kg Rp 25,500
133 Paku 5 cm - 10 cm Kg Rp 25,500
134 Paku 5 cm - 12 cm Kg Rp 25,500
135 Paku 5 cm - 7 cm Kg Rp 25,500
136 Paku 5 cm dan 10 cm Kg Rp 25,500
137 Paku 5 cm dan 7 cm Kg Rp 25,500
138 Paku 5 cm sampai 10 cm Kg Rp 25,500
139 Paku 7 cm - 10 cm Kg Rp 25,500
140 Paku Biasa ½" - 1" Kg Rp 20,000
141 Paku Biasa 2" - 5" Kg Rp 20,000
142 Paku skrup Kg Rp 19,000
143 Paku skrup 1 cm - 2,5 cm Buah Rp 19,000
144 Paku skrup 10 cm Kg Rp 25,000
NO MATERIAL JUMLAH HARGA
145 Paku tripleks Kg Rp 19,900
146 Papan kayu m³ Rp 4,428,000
147 Papan kayu kelas II m³ Rp 5,043,000
148 Papan kayu kelas II atau III m³ Rp 4,428,000
149 Parquet m² Rp -
150 Pasir beton m³ Rp 172,200
151 Pasir pasang m3 Rp 110,700
152 Pasir Pasang (PP) m³ Rp 110,700
153 Pasir urug m³ Rp 98,400
154 Pasir Urug (PU) m³ Rp 98,400
155 PB m³ Rp 128
156 PC Kg Rp 1,535
157 Pengelasan Cm Rp -
158 Pengencer L Rp -
159 Perlengkapan Ls Rp 112,362
160 Pintu alluminium m Rp -
161 Pintu gulung besi M² Rp -
162 Pintu lipat M² Rp -
163 Pipa baja φ 100 mm m Rp -
164 Pipa baja φ 1000 mm m Rp -
165 Pipa baja φ 1200 mm m Rp -
166 Pipa baja φ 150 mm m Rp -
167 Pipa baja φ 200 mm m Rp -
168 Pipa baja φ 300 mm m Rp -
169 Pipa baja φ 400 mm m Rp -
170 Pipa baja φ 500 mm m Rp -
171 Pipa baja φ 800 mm m Rp -
172 Pipa baja φ 900 mm m Rp -
173 Pipa DCL φ 100 mm m Rp -
174 Pipa DCL φ 1000 mm m Rp -
175 Pipa DCL φ 1200 mm m Rp -
176 Pipa DCL φ 150 mm m Rp -
177 Pipa DCL φ 200 mm m Rp -
178 Pipa DCL φ 300 mm m Rp -
179 Pipa DCL φ 500 mm m Rp -
180 Pipa DCL φ 800 mm m Rp -
181 Pipa DCL φ 900 mm m Rp -
182 pipa galvanis diameter 1 1/2" m Rp 38,950
183 pipa galvanis diameter 1" m Rp 28,700
184 pipa galvanis diameter 1/2" m Rp 17,425
185 pipa galvanis diameter 3" m Rp 106,600
186 pipa galvanis diameter 3/4" m Rp -
187 pipa galvanis diameter 4" m Rp 149,650
188 Pipa GIP φ 100 mm m Rp -
189 Pipa GIP φ 1000 mm m Rp -
190 Pipa GIP φ 1200 mm m Rp -
191 Pipa GIP φ 150 mm m Rp -
192 Pipa GIP φ 300 mm m Rp -
193 Pipa GIP φ 400 mm m Rp -
194 Pipa GIP φ 600 mm m Rp -
195 Pipa GIP φ 63 mm m Rp -
196 Pipa GIP φ 800 mm m Rp -
197 Pipa GIP φ 900 mm m Rp -
198 Pipa HDPE φ 100 mm m Rp -
199 Pipa HDPE φ 1000 mm m Rp -
NO MATERIAL JUMLAH HARGA
200 Pipa HDPE φ 1200 mm m Rp -
201 Pipa HDPE φ 125 mm m Rp -
202 Pipa HDPE φ 150 mm m Rp -
203 Pipa HDPE φ 200 mm m Rp -
204 Pipa HDPE φ 500 mm m Rp -
205 Pipa HDPE φ 600 mm m Rp -
206 Pipa HDPE φ 63 mm m Rp -
207 Pipa HDPE φ 800 mm m Rp -
208 Pipa HDPE φ 900 mm m Rp -
209 pipa PVC 1 1/2" m Rp 14,760
210 pipa PVC 1" m Rp 8,200
211 pipa PVC 1/2" m Rp 4,920
212 pipa PVC 2 1/2" m Rp 20,527
213 pipa PVC 2" m Rp 18,860
214 pipa PVC 3" m Rp 36,900
215 pipa PVC 3/4" m Rp 6,150
216 pipa PVC 4" m Rp 58,425
217 Pipa PVC φ 1000 mm m Rp -
218 Pipa PVC φ 110 mm m Rp -
219 Pipa PVC φ 1100 mm m Rp -
220 Pipa PVC φ 1200 mm m Rp -
221 Pipa PVC φ 150 mm m Rp -
222 Pipa PVC φ 200 mm m Rp -
223 Pipa PVC φ 250 mm m Rp -
224 Pipa PVC φ 300 mm m Rp -
225 Pipa PVC φ 400 mm m Rp -
226 Pipa PVC φ 450 mm m Rp -
227 Pipa PVC φ 500 mm m Rp -
228 Pipa PVC φ 600 mm m Rp -
229 Pipa PVC φ 63 mm m Rp -
230 Pipa PVC φ 800 mm m Rp -
231 Pipa PVC φ 90 mm m Rp -
232 Pipa PVC φ 900 mm m Rp -
233 Plamur Kg Rp 14,760
234 Plint keramik artistik Buah Rp 12,300
235 Plint ubin Buah Rp 3,690
236 Plint ubin granit Buah Rp -
237 Plint ubin PC warna Buah Rp 4,920
238 Plint ubin teralux kerang Buah Rp -
239 Plint ubin teralux marmer Buah Rp -
240 Plint ubin teraso Buah Rp -
241 plywood 9 mm Lembar Rp 183,900
242 Plywood tebal 4 mm Lembar Rp 88,400
243 plywood tebal 9 mm Lbr Rp 182,300
244 Porselen 11x11 Bh Rp 1,915
245 Porselin Buah Rp -
246 PP m³ Rp 110,700
247 Profil alluminium m Rp 10,000
248 Profil alluminium "T" m' Rp -
249 Profil C 75.75 m1 Rp 10,000
250 Profil kaca m Rp -
251 Profil kaca m Rp -
252 Rabung Seng Spandek Lbr Rp 45,000
253 Ramset Buah Rp -
254 Rel pintu sorong Set Rp -
NO MATERIAL JUMLAH HARGA
255 Reng (3 x 4) cm m³ Rp 3,000,000
256 Err:509 m1 Rp 8,000
256 Rolling door alluminium M² Rp 600,000
257 Sealant Tube Rp 194,118
258 Sealtape bh Rp 3,500
259 Semen Merah (SM) m³ Rp -
260 Semen portland kg Rp 1,630
261 Semen Portland (PC) Kg Rp 1,630
262 Semen warna Kg Rp 2,500
263 Seng Gelombang Lbr Rp 67,650
264 Seng plat m' Rp 73,800
265 Sewa alat Jam Rp -
266 Sewa Exavator type 225 Hari Rp 421,401
267 Sewa Tripot/Tricket & handle crane 2T Hari Rp -
268 Sirtu m³ Rp 98,400
269 Skrup fixer Buah Rp 300
270 SM m³ Rp 2,784
271 Solar Liter Rp 12,175
272 Strorox - 100 Kg Rp -
273 Sunscreen alluminium M² Rp -
274 Tanah Liat (TL) m³ Rp -
275 Tanah Urug (TU) m³ Rp 79,950
276 Teakwood tebal 4 mm Lembar Rp 88,400
277 Tepung gypsum Kg Rp 20,000
278 Terawang (roster) Buah Rp 12,000
279 Tripleks Lembar Rp 80,000
280 Ubin abu-abu Buah Rp 8,856
281 Ubin granit Uk.60x60 cm Buah Rp 70,000
282 Ubin granit Uk.30x30 cm Buah Rp 16,650
282 Ubin keramik Buah Rp -
283 Ubin keramik artisktik Buah Rp -
284 ubin porselen bh Rp 1,944
285 Ubin teralux kerang Buah Rp -
286 Ubin teralux marmer Buah Rp -
287 Ubin teraso Buah Rp -
288 Ubin warna Buah Rp 8,856
289 Underlayer/rubber corrugated m² Rp -
290 Urinoir Unit Rp 1,202,000
291 Vertikal blinds (tirai) m2 Rp -
292 Vinyl Buah Rp 18,000
293 Vinyl karet Buah Rp -
294 Wall paper m Rp -
295 Water Drain Bh Rp 50,000
296 Waterstop m' Rp -
297 Waterstop lebar 150 mm m' Rp -
298 Waterstop lebar 200 mm m' Rp -
299 Westafel Unit Rp 370,000

BENER MERIAH, 2016


DIBUAT OLEH:
KONSULTAN PERENCANA
CV.GRAHA KARYA CONSULTANT
NO MATERIAL JUMLAH HARGA

IWAN AZKAR, ST
Team Leader
JUMLAH TINGGI / LUAS VOLUME
NO URAIAN PEKERJAAN DIMENSI PANJANG LEBAR
UNIT TEBAL M2 M3
PEKERJAAN RABAT BETON
1 Urug Pasir Alas 485.00 M1 3.00 M1 0.05 M1 72.75 M3

2 Pekerjaan Batu Gunung 485.00 M1 3.00 M1 0.15 M1 218.25 M3

3 Pekerjaan Beton K.175 485.00 M1 3.00 M1 0.10 M1 145.50 M3

4 Bikesting Rabat Beton 485.00 M1 0.30 M1 72.75 M2

PEKERJAAN GORONG - GORONG DIA 60"

1. Galian Gorong - Gorong 1 Unit 4.00 M1 0.80 M1 1.00 M1 3.20 M3

2. Pasir Urug 3.40 M1 0.80 M1 0.20 M1 0.54 M3

3. Pemasangan Batu Gunung / leaning 2.00 Unit 1.20 M1 1.90 M1 0.30 M1 1.20 M3

4. Plasteran Leaning 2.00 Unit 5.28 M2

5. Timbunan Tanah 3.40 M1 1.20 M1 0.70 M1 1.90 M3

6 Gorong - Gorong Dia 60 Cm 4.00 M1


JUMLAH TINGGI / LUAS VOLUME
NO URAIAN PEKERJAAN DIMENSI PANJANG LEBAR
UNIT TEBAL M2 M3
PEKERJAAN GORONG - GORONG DIA 30"

1. Galian Gorong - Gorong 3.00 Unit 9.00 M1 0.40 M1 0.45 M1 1.62 M3

2. Pasir Urug 9.00 M1 0.40 M1 0.15 M1 0.54 M3

3. Timbunan Tanah 9.00 M1 0.40 M1 0.45 M1 0.98 M3

4. Gorong - Gorong Dia 30 Cm 9.00 M1