LAPORAN MINGGUAN Asir - Asir
LAPORAN MINGGUAN Asir - Asir
MINGGU - 12
PERIODE
30 September 2019 S.D 07 Oktober 2019
BULAN LALU BILAN INI S.D BULAN INI
No. Mata HARGA SATUAN JUMLAH HARGA
URAIAN PEKERJAAN VOLUME SATUAN BOBOT (%) VOLUME PERSEN BOBOT(%) VOLUME PERSEN BOBOT(%) VOLUME PERSEN BOBOT(%)
Pembayaran (Rp.) (Rp.)
DIVISI 1. UMUM
1.2 Mobilisasi 1,00 Ls 63.300.000,00 Rp 63.300.000,00 8,741 0,750 75,000% 6,556 0,250 25,000% 2,185 1,000 100,000% 8,741
Sub Jumlah Rp 63.300.000,00 8,741 6,556 2,185 8,741
DIVISI 2. PEKERJAAN DRAINASE
2.1.(1) Galian Selokan Drainase Dan Saluran Air 130,000 M3 Rp 41.500,00 Rp 5.395.000,00 0,745 0,000 0,000% 0,000 0,000 0,000 0,000 0,000% 0,000
2.2.(1) Pasangan Batu Dengan Mortal - M3 Rp - Rp - 0,000 0,000 0,000% 0,000 0,000 0,000 0,000 0,000% 0,000
2.3. (1) Gorong-gorong Pipa Beton Bertulang, diameter 35 - 45 cm - Rp - Rp - 0,000 0,000 0,000% 0,000 0,000 0,000 0,000 0,000% 0,000
2.3.(2) Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm - Rp 869.600,00 Rp - 0,000 0,000 0,000% 0,000 0,000 0,000 0,000 0,000% 0,000
Sub Jumlah Rp 5.395.000,00 0,745 0,000 0,000 0,000