Demolish Existing Trench Wall
Demolish Existing Trench Wall
TINGKAT JENIS B1, DI ATAS PT 38076 HINGGA PT 38083, 8 UNIT RUMAH SESEBUAH JENIS 3 TINGKAT JENIS B2, DI ATAS PT
38069 HINGGA PT 38075 DAN PT 38084, 22 UNIT RUMAH BERKEMBAR 2 TINGKAT JENIS SD1, DI ATAS PT 38087 HINGGA PT 38094,
PT 38113 HINGGA PT 38116 DAN PT 38123 HINGGA PT 38128, 4 UNIT RUMAH BERKEMBAR 2 TINGKAT JENIS SD2, DI ATAS PT
38117, PT 38118, PT 38151 DAN PT 38152, 8 UNIT RUMAH BERKEMBAR 2 TINGKAT JENIS SD3, DI ATAS PT 38085, PT 38086, PT
38119 HINGGA PT 38122, PT 38153 DAN PT 38154 SERTA SEBUAH PENCAWANG ELEKTRIK, MUKIM CHERAS, BANDAR HULU
LANGAT, SELANGOR DARUL EHSAN
ADDITION
TOTAL
NGI 8 UNIT RUMAH SESEBUAH 2
3 TINGKAT JENIS B2, DI ATAS PT
I ATAS PT 38087 HINGGA PT 38094,
TINGKAT JENIS SD2, DI ATAS PT
3, DI ATAS PT 38085, PT 38086, PT
, MUKIM CHERAS, BANDAR HULU
AMOUNT
(RM)
7,200.00
5,600.00
17,600.00
3,200.00
6,400.00
40,000.00
CADANGAN PEMBANGUNAN AVENUE 6 BANDAR TUN HUSSEIN ONN YANG MENGANDUNGI 8 UNIT RUMAH SESEBUAH 2
TINGKAT JENIS B1, DI ATAS PT 38076 HINGGA PT 38083, 8 UNIT RUMAH SESEBUAH JENIS 3 TINGKAT JENIS B2, DI ATAS
PT 38069 HINGGA PT 38075 DAN PT 38084, 22 UNIT RUMAH BERKEMBAR 2 TINGKAT JENIS SD1, DI ATAS PT 38087
HINGGA PT 38094, PT 38113 HINGGA PT 38116 DAN PT 38123 HINGGA PT 38128, 4 UNIT RUMAH BERKEMBAR 2 TINGKAT
JENIS SD2, DI ATAS PT 38117, PT 38118, PT 38151 DAN PT 38152, 8 UNIT RUMAH BERKEMBAR 2 TINGKAT JENIS SD3, DI
ATAS PT 38085, PT 38086, PT 38119 HINGGA PT 38122, PT 38153 DAN PT 38154 SERTA SEBUAH PENCAWANG ELEKTRIK,
MUKIM CHERAS, BANDAR HULU LANGAT, SELANGOR DARUL EHSAN
V.O Description : To Install 1 no Yard Tap complete with tee-off piping from existing pipeline to kitchen sink including accessories
for every unit
ADDITION
V.O Descriptiion : i) To construct and install 9 nos pedestrial plinth complete with 2w pipe from JB-30 as indicated in the drawing
ii) To install 300 x 300 telephone pit complete with concrete cover for each unit and to be located at connection box
ADDITION
V.O Descriptiion : i) To supply and install 17 nos of termination busbar at TNB meter of 38 no semi-detached type house
ii) To supply and install mounting bracket for TNB meter where the distance from the viewing window shall be 300mm
ADDITION
V.O Descriptiion : i) To construct and install the bracket and support for ceiling fan as per method statement to the specification
NO OF NETT
ITEM DESCRIPTION RATE REF. UNIT QUANTITY POINT / HOUSE RATE (OMISSION) / ADDITION
NO (M) UNIT UNIT AMOUNT
(RM)
ADDITION
Built Up Rate
To construct and install athe bracket and support for ceiling fan
a) Material Cost
i) M.S Steel Hollow Section
Cost/m = RM8.00 /M
b) Labour Cost
i) Total No of Worker
2 general worker
V.O Descriptiion : i) To construct and install 70mm2 aluminium 4 core cable from TNB feeder pillar
ADDITION
ITEM DESCRIPTION RATE REF. UNIT RATE
NO QTY AMOUNT
(RM)
NB feeder pillar
NETT
ADDITION
AMOUNT
(RM)
3,600.00
72.00
72.00
225.90
90.00
168.00
108.00
4,000.00
8,335.90
MENGANDUNGI 8 UNIT RUMAH
NIT RUMAH SESEBUAH JENIS 3
22 UNIT RUMAH BERKEMBAR 2
T 38116 DAN PT 38123 HINGGA PT
PT 38118, PT 38151 DAN PT 38152,
6, PT 38119 HINGGA PT 38122, PT
ERAS, BANDAR HULU LANGAT,
CADANGAN MEREKABENTUK, MEMBINA DAN MENYIAPKAN 16 BILIK DARJAH, ASRAMA PELAJAR, RUMAH GURU DAN LAIN-LAIN
KEMUDAHAN DI SMV PASIR PUTEH, KELANTAN
Built Up Rate
TNB SUBSTATION
………………………………………………..
a) Mobilisation RM 250.00
b) Demobilisation RM 250.00
= RM1,000.00 RM 1,000.00
1 Pneumatic Jackhammers
= RM500.00 RM 500.00
d) Labour Cost
i) Total No of Worker
2 Pneumatic Tool Operator
2 general worker