DATA-DATA PERENCANAAN
Data Umum
Jarak Antar Kuda-kuda (L) = 5.4 m
Jumlah kuda-kuda = 10 buah
Panjang bentang kuda-kuda = 10 m
Tinggi Kuda-kuda = (10 m/2) x Tan(40°) =4.20 m
Jarak Gording = 1.63 m
Kemiringan atap (α) = 40°
Data Baja
Mutu Baja = BJ37
Tegangan Leleh Baja (fy) = 240.00 MPa = 2400.00 kg/cm2
Tegangan Ultimit Baja (fu) = 370.00 MPa = 3700.00 kg/cm2
Modulus Elastisitas Baja (E) = 200.000 MPa = 2.00 x 106 kg/cm2
Data Beban
Beban Hidup Terpusat = 100 kg >> Peraturan Pembangunan Gedung 1983
Beban Angin = 40.00 kg/m2 >> SNI 2013
DESAIN GORDING
A. Pembebanan Gording
1. Beban Mati
a) Penutup Atap
Berat Penutup Atap = Berat Atap x Jarak Gording
Berat Penutup Atap = 10 x 1.632
Berat Penutup Atap = 16.32 kg/m
b) Berat Gording
Berat Gording = 5.97 kg/m
Total Beban Mati (q1) = 16.32 kg/m + 5.97 kg/m
(q1) = 22.29 kg/m
Total Beban Mati Horizontal = q1 x sin α
(qx) = 22.29 x sin (40°)
(qx) = 14.33 kg/m
Total Beban Mati Vertikal = q1 x cos α
(qy) = 22.29 x cos (40°)
(qy) = 17.07 kg/m
2. Beban Hidup
a) Berat Beban Hidup (P) = 100 kg
b) Beban Hidup Horizontal (Px) = P. sin α
Px = 100 sin 40 0
Px = 64.28 kg
c) Beban Hidup Vertikal (Py) = P. cos α
Py = 100 cos 40 0
Py = 76.60 kg
3. Beban Angin
a. Beban Angin Tekan
Beban Angin (qW) = 40 kg/cm2
Koefisien Angin Tekan (C1) = 0.40
Beban Angin Tekan (qW tekan) = qW × C1 × Jarak Gording
= 40 kg/m2 × 0.40 × 1.63 m
= 26.11 kg/m
2. Beban Hidup
1
Momen Akibat Beban Hidup = x P xl
4
1
Mbh = x 1 00 x(5.4)
4
Mbh = 50 kg.m
3. Beban Angin
Momen tegak lurus bidang atap (arah y) , diambil beban angin terbesar :
A. Momen Angin Tekan
1
Momen Akibat Beban Angin = x ( qtekan ) x l 2
8
1
Mah (tekan) = x ( 26.11 kg/m ) x(5 . 4 )2
8
Mah (tekan) = 95.16 kg.m
B. Momen Angin Hisap
1
Momen Akibat Beban Angin = x ( qhisap ) x l 2
8
1
Mah (hisap) = x (−22. 11 ) x (5 . 4)2
8
Mah (hisap) = -95.16 kg.m
(-) Menandakan Angin Hisap
Maka Momen Akibat Beban Angin Tegak Lurus Bidang Atap (arah y)
= 19.34kg
= 103.42 kg.m
Momen Lentur terhadap sumbu y (My L)
1
My L = × Px L × Ly
4
1
= ×64 .28 kg × 5 . 4 m
4
= 43.39 kg.m
Gaya Lintang terhadap sumbu x (Vx L)
1
Vx L = × Py L
2
1
= ×76 . 60 kg
2
= 38.30 kg
Gaya Lintang terhadap sumbu y (Vy L)
1
Vy L = × Px L
2
1
= ×64 .28 kg
2
= 32.14 kg
3. Akibat Beban Angin
Momen Lentur akibat Beban Angin Tekan terhadap sumbu x (Mx W tekan)
1
Mx W tekan = × qW tekan × L2x
8
JIMMY YOSUA KALUMATA 17021101043
STRUKTUR BAJA
1
= × 26 .11 kg /m ' × ( 5.4 m )2
8
= 95.16 kg.m
Momen Lentur akibat Beban Angin Hisap terhadap sumbu y (Mx W hisap)
1
Mx W hisap = × qW hisap × L2x
8
1
= ×−26 . 11kg /m' × ( 5 . 4 m )2
8
= -95.16 kg.m
Momen Lentur terhadap sumbu x (Mx W)
Mx W = 95.16 kg.m (diambil yang terbesar)
Karena Beban Angin hanya bekerja tegak lurus bidang atap, maka tidak ada beban
angin yang bekerja sejajar bidang atap. Dengan demikian,Vy W = 0.
D. Momen Terfaktor
Beban Gabungan,
Berdasarkan Kombinasi Dasar (SNI 03-1729-2002)
1. Kombinasi Pembebanan Untuk Momen Lentur
Berdasarkan hasil perhitungan kombinasi pembebanan untuk gaya lintang di atas, maka
dipilih kombinasi pembebanan momen terbesar, yaitu:
Vux = 138.54 kg (Kombinasi II)
Vuy = 56.79 kg (Kombinasi II)
E. Kontrol Kekuatan Profil Gording
Maka:
272.15 69.59
+ ≤ 0,90 ×2447
33.3 7.4
2. Kontrol Lendutan
Misalkan digunakan gording baja kanal kait (lipped channel) dengan tipe C 150 × 50
× 20 × 2,8, dengan beberapa rincian sebagai berikut:
Berat Gording = 5.97 kg/m'
Momen Inersia Sumbu-X (Ix) = 250 cm4
Momen Inersia Sumbu-Y (Iy) = 26 cm4
Momen Statis Sumbu-X (Wx) = 33.3 cm3
Momen Statis Sumbu-Y (Wy) = 7.4 cm3
Dari perhitungan sebelumnya diperoleh beban mati dan beban hidup sebagai berikut:
qx = 11.55 kg/m = 0,1155 kg.cm
qy = 13.77 kg/m = 0,1377 kg.cm
Px = 45.00 kg
Py = 53.62 kg
Data lainnya:
L = 6.00 m = 600 cm
Lx = 6.00 m = 600 cm
Ly = 3.00 m = 300 cm
E = 2,04 × 106 kg/cm2
Lendutan dalam arah sumbu x (Δx):
5 q y L4x P L3
Δx = + y x
384 E I x 48 E I x
= 0.9289 cm
Lendutan dalam arah sumbu y (Δy):
5 q x L4y P L3
Δy = + x y
384 E I y 48 E I y
= 0.7071 cm
Resultan Lendutan Total (Δ):
2 2
Δ = √ Δ +Δ
x y
2 2
= √ ( 0.9289 ) +( 0.7071 )
= 1.1674 cm
Lendutan Ijin (Δijin):
L
Δijin =
300
600 cm
=
240
= 2.5000 cm
= 2749.98 kg
Hitung diameter trekstang (D) dengan menggunakan rumus kontrol tegangan:
P
ϕ f y=
A
2749.98 kg
( 0,60 ) ( 2247 kg /cm2 )=
π D2
4
( 4 ) ( 2749.98 kg )
D 2= 2
=1.54 cm2
π ( 0,60 ) ( 2247 kg/cm )
A. BEBAN KUDA-KUDA
Digunakan desain profil kuda-kuda yaitu profil baja siku-siku sama kaki sebagai berikut:
Profil Tunggal (50 × 50 × 5) Berat Profil (qkt) = 3,77 kg/m'
Profil Ganda (60 × 60 × 5) Berat Profil (qkg) = 5,42 kg/m'
Rumus yang digunakan untuk menghitung beban kuda-kuda adalah:
1
Beban Kuda−Kuda= × Panjang Area Pembebanan × Berat Profil
2
TS1 = TS1’
1
= ( × a1 × b1) × qkg ×2
2
1
= ( ×2.4 × 2.4)×5.42× 2
2
= 31.22 kg
TS2 = TS2’
a1 +b1 +a2 +b 2 d
= (( 2 ) )( )
× q kg × 2 + 1 ×q kt +(t 1 ×q kt )
2
= ( 2.4+2.4 +2.4+
2
2.44
× 5.42× 2) +(
2.55
2
×3.77 ) +(0.42× 3.77)
= 58.62 kg
TS4 = TS4’
a2 +b 2+ a3 +b3 d +d
= ( 2 )( )
× q kg × 2 + 1 2 ×q kt +(t 2 ×q kt )
2
2.4+2.44 +2.4+ 2.44 2.55+2.55
= ( 2
× 5.42×2 + )(2 )
×3.77 +(0.85× 3.77)
= 65.24 kg
TS6 = TS6’
a3 +b 3+ a4 + b4 d +d
= ( 2 )( )
× q kg ×2 + 2 3 × qkt +(t 3 × qkt )
2
2.4+2.44 +2.4+ 2.44 2.55+2.94
= ( 2
× 5.42×2 + )(2 )
× 3.77 +(1.27 ×3.77)
= 67.55 kg
TS8 = TS8’
a 4+ b4 + a5 +b5 d +d
= ( 2 )( )
× q kg ×2 + 3 4 ×q kt +(t 4 × qkt )
2
2.4+2.44 +2.4+ 2.44 2.94 +2.94
= ( 2
× 5.42×2 + )( 2 )
×3.77 +(1.69 ×3.77)
= 69.89 kg
TS10 = TS10’
a5 +b 5+ a6 +b 6 d +d
= ( 2 )( )
×q kg ×2 + 4 5 ×q kt +(t 5 ×q kt )
2
2.4+2.44 +2.4+ 2.44 2.94 +3.49
= ( 2 )(
× 5.42×2 +
2 )
×3.77 + ( 2.12 ×3.77 )
= 72.53 kg
TS12 = TS12’
a6 +b 6 +a7 +b 7 d +d
= ( 2 )( )
× qkg ×2 + 5 6 ×q kt +(t 6 ×q kt )
2
2.4+2.44 +2.4+ 2.44 3.49+3.49
= ( 2 )(
× 5.42×2 +
2 )
×3.77 + ( 2.54 ×3.77 )
= 75.18 kg
TS14 = TS14’
a7 +b 7 +a8 +b 8 d +d
= ( 2 )( )
×q kg ×2 + 6 7 ×q kt +(t 7 ×q kt )
2
2.4+2.44 +2.4+ 2.44 3.49+ 4.15
= ( 2 )(
× 5.42×2 +
2 )
× 3.77 + ( 2.96 × 3.77 )
= 79.24 kg
TS16 = TS16’
a8 +b 8 +a9 +9 d +d
= ( 2 )( )
×q kg ×2 + 7 8 × q kt +(t 8 ×q kt )
2
2.4+2.44 +2.4+ 2.44 4.15+4.15
= ( 2 )(
× 5.42×2 +
2 )
×3.77 + ( 3.39 ×3.77 )
= 82.19 kg
TS18 = TS18’
a9 +b 9 +a10 +b10 d +d
= ( 2 )( )
× q kg × 2 + 8 9 × qkt +(t 9 × qkt )
2
2.4+2.44 +2.4+ 2.44 4.15+4.87
= ( 2 )(
× 5.42×2 +
2 )
×3.77 + ( 3.81 ×3.77 )
= 85.13 kg
TS20 = TS20’
= ( a +b +a2 +b
10 10 11 11
) ( d +d2
×q kg ×2 + 9 10
)
× qkt +(t 10 × qkt )
= ( 2.4+2.44 +2.4+
2
2.53
×5.42 ×2 )+ (
4.87+ 4.87
2
×3.77 ) + ( 4.21 ×3.77 )
= 99.59 kg
TS22 = TS22’
a11 + b11 +a 12+b 12 d +d
= ( 2 )( )
× q kg ×2 + 10 11 × qkt +(t 11 × q kt )
2
2.4+2.53+ 2.4+2.53 4.87+3.58
= ( 2
× 5.42× 2 +)( 2 )
×3.77 + ( 3.44 ×3.77 )
= 79.87 kg
TS24 = TS24’
a12 +b12 +a13 +b13 d 11 +d 12
= ( 2
× q kg × 2 +)( 2 )
×q kt +(t 12 ×q kt )
= 76.90 kg
TS26 = TS26’
a13 +b13 +a 14+ b14 d +d
= ( 2 )( )
× qkg × 2 + 12 13 × qkt +(t 13 ×q kt )
2
2.4+2.53+ 2.4+2.53 3.58+ 2.63
= ( 2
× 5.42× 2 + )( 2 )
×3.77 + ( 1.87 × 3.77 )
= 72.13 kg
TS28 = TS28’
a14 +b 14+ a15+ b15 d +d
= ( 2 )( )
× qkg × 2 + 13 14 × q kt +(t 14 × q kt )
2
2.4+2.53+ 2.4+2.53 2.63+ 2.53
= ( 2
× 5.42× 2 + )( 2 )
×3.77 + ( 1.08 ×3.77 )
= 67.17 kg
TS30 = TS30’
a15 +b15 +a 16+ b16
= ( 2 )
×q kg ×2 + ( d 14 ×q kt )+(t 15 × qkt )
= 59.25 kg
TS32
1
= ×(2× a16 +2 ×b16 )× q kg × 2
2
1
= ×(2× 0.88+2 ×0.93)× 5.42× 2
2
= 19.56 kg
B. BEBAN GORDING
Digunakan desain profil gording kanal kait (lipped channel) dengan tipe C 100 × 50 × 20 ×
2,5:
Berat Gording (qg) = 4,39 kg/m'
Jarak Antar Kuda-Kuda (L) = 5,90 m
Rumus yang digunakan untuk menghitung beban gording adalah:
BebanGording=Jumlah Gording× Berat Gording × Jarak Antar Kuda−Kuda
TS1 = TS1’
= 1,5 ×q g × L
= 1,5 × 4,39× 5,90
= 38,85 kg
TS2 = TS2’ = TS4 = TS4’ = TS6 = TS6’ = TS8 = TS8’ = TS10 = TS10’ = TS12 = TS12’ = TS14 =
TS14’ = TS16 = TS16’ = TS18 = TS18’ = TS20 = TS20’ = TS22 = TS22’ = TS24 = TS24’ = TS26 =
TS26’ = TS28 = TS28’ = TS30 = TS30’
= 2 ×q g × L
= 2 ×4,39 × 5,90
= 51,80 kg
TS32
= 3 ×q g × L
= 3 × 4,39× 5,90
= 77,70 kg
C. BEBAN PENUTUP ATAP
Digunakan penutup atap tipe spandek, dengan:
Berat Penutup Atap (qa) = 10,00 kg/m2
Jarak Antar Kuda-Kuda (L) = 5,90 m
Rumus yang digunakan untuk menghitung beban penutup atap adalah:
1
Beban Penutup Atap= × Panjang Area Pembebanan ×Jarak Antar Kuda−Kuda× Berat Penutup Atap
2
TS1 = TS1’
1
= ×a 1 × L × qa
2
1
= ×2,40 ×5,90 ×10,00
2
= 70,80 kg
TS2 = TS2’
1
= × ( a1+ a2 ) × L ×q a
2
1
= × ( 2,40+2,40 ) ×5,90 × 10,00
2
JIMMY YOSUA KALUMATA 17021101043
STRUKTUR BAJA
= 141,60 kg
TS4 = TS4’
1
= × ( a2+ a3 ) × L ×q a
2
1
= × ( 2,40+2,40 ) ×5,90 × 10,00
2
= 141,60 kg
TS6 = TS6’
1
= × ( a3 +a4 ) × L× qa
2
1
= × ( 2,40+2,40 ) ×5,90 × 10,00
2
= 141,60 kg
TS8 = TS8’
1
= × ( a4 + a5 ) × L× qa
2
1
= × ( 2,40+2,40 ) ×5,90 × 10,00
2
= 141,60 kg
TS10 = TS10’
1
= × ( a5 +a6 ) × L × qa
2
1
= × ( 2,40+2,40 ) ×5,90 × 10,00
2
= 141,60 kg
TS12 = TS12’
1
= × ( a6 +a7 ) × L × qa
2
1
= × ( 2,40+2,40 ) ×5,90 × 10,00
2
= 141,60 kg
TS14 = TS14’
1
= × ( a7 +a8 ) × L × qa
2
1
= × ( 2,40+2,40 ) ×5,90 × 10,00
2
= 104,60 kg
TS32
1
= × ( a8 +a '8) × L× q a
2
1
= × ( 0.88+ 0.88 ) × 5,90× 10,00
2
= 51.86 kg
D. BEBAN PLAFOND
Digunakan plafond tipe Gipsum, dengan:
Berat Plafond (qpf) = 5,5 kg/m2
Jarak Antar Kuda-Kuda (L) = 5,90 m
Rumus yang digunakan untuk menghitung beban plafond adalah:
1
Beban Plafond= × Panjang Area Pembebanan × Jarak Antar Kuda−Kuda × Berat Plafond
2
TS1 = TS1’
1
= ×b 1 × L × q pf
2
1
= ×2,40 ×5,90 ×5,5
2
= 38,94 kg
TS3 = TS3’
1
= × ( b1+ b2 ) × L ×q pf
2
1
= × ( 2,40+2,44 ) × 5,90 ×5,5
2
= 78.48 kg
TS5 = TS5’
1
= × ( b2+ b3 ) × L ×q pf
2
1
= × ( 2,44 +2,44 ) ×5,90 ×5,5
2
= 79.08 kg
TS7 = TS7’
1
= × ( b3 +b4 ) × L× q pf
2
1
= × ( 2,40+2,40 ) ×5,90 × 5,5
2
= 79.08 kg
TS9 = TS9’
1
= × ( b4 +b 5 ) × L× q pf
2
1
= × ( 2,40+2,40 ) ×5,90 × 5,5
2
= 79.08 kg
TS11 = TS11’
1
= × ( b5 +b6 ) × L × q pf
2
1
= × ( 2,40+2,40 ) ×5,90 × 5,5
2
= 79.08 kg
TS13 = TS13’
1
= × ( b6 +b7 ) × L × q pf
2
1
= × ( 2,40+2,40 ) ×5,90 × 5,5
2
= 79.08 kg
TS15 = TS15’
1
= × ( b7 +b8 ) × L × q pf
2
1
= × ( 2,40+ 0,48 ) × 5,90× 5,5
2
= 79.08 kg
TS17 = TS17’
1
= × ( b7 +b8 ) × L × q pf
2
1
= × ( 2,40+ 0,48 ) × 5,90× 5,5
2
= 79.08 kg
TS19 = TS19’
1
= × ( b7 +b8 ) × L × q pf
2
1
= × ( 2,40+ 0,48 ) × 5,90× 5,5
2
= 79.08 kg
TS21 = TS21’
1
= × ( b7 +b8 ) × L × q pf
2
1
= × ( 2,40+ 0,48 ) × 5,90× 5,5
2
= 84.09 kg
TS3 = TS3’
1
= × ( b1+ b2 ) × L ×q ME
2
1
= × ( 2,40+2,44 ) × 5,90 ×15
2
= 214.04 kg
TS5 = TS5’
1
= × ( b2+ b3 ) × L ×q ME
2
1
= × ( 2,44 +2,44 ) ×5,90 ×15
2
= 214.04 kg
TS7 = TS7’
1
= × ( b3 +b4 ) × L× q ME
2
1
= × ( 2,44 +2,44 ) ×5,90 ×15
2
= 214.04 kg
TS9 = TS9’
1
= × ( b4 +b 5 ) × L× q ME
2
1
= × ( 2,44 +2,44 ) ×5,90 ×15
2
= 214.04 kg
TS11 = TS11’
1
= × ( b5 +b6 ) × L × q ME
2
1
= × ( 2,44 +2,44 ) ×5,90 ×15
2
= 214.04 kg
TS13 = TS13’
1
= × ( b6 +b7 ) × L × q ME
2
1
= × ( 2,44 +2,44 ) ×5,90 ×15
2
= 214.04 kg
TS15 = TS15’
1
= × ( b7 +b8 ) × L × q ME
2
1
= × ( 2,44 +2,44 ) ×5,90 ×15
2
= 214.04 kg
TS21 = TS21’
1
= × ( b10+ b11 ) × L × q ME
2
1
= × ( 2,40+2,53 ) ×5,90 × 15
2
= 229.30 kg
= 79.08+215.67
= 294.76 kg
TS6 = TS6’
TBM = P KK + P g+ Pa +2 % PKK
= 67.55+51,80+141,60+ ( 2 % × 67.55 )
= 261,41 kg
TS7 = TS7’
TBM = P pf + P ME
= 79.08+215.67
= 294.76 kg
TS8 = TS8’
TBM = P KK + P g+ Pa +2 % PKK
= 69.89+51,80+141,60+ ( 2 % × 69.89 )
= 264.69 kg
TS9 = TS9’
TBM = P pf + P ME
= 79.08+215.67
= 294.76 kg
TS10 = TS10’
TBM = P KK + P g+ Pa +2 % PKK
= 72.53+51,80+141,60+ ( 2 % × 72.53 )
= 267.39 kg
TS11 = TS11’
TBM = P pf + P ME
= 79.08+215.67
= 294.76 kg
TS12 = TS12’
TBM = P KK + P g+ Pa +2 % PKK
= 66,67+51,80+141,60+ ( 2% ×66,67 )
= 270.08 kg
TS13 = TS13’
TBM = P pf + P ME
= 79.08+215.67
= 294.76 kg
TS14 = TS14’
TBM = P KK + P g+ Pa +2 % PKK
= 66,67+51,80+141,60+ ( 2% ×66,67 )
= 274.23 kg
TS15 = TS15’
TBM = P pf + P ME
= 79.08+215.67
= 294.76 kg
TS16 = TS16’
TBM = P KK + P g+ Pa +2 % PKK
= 47,42+51,80+104,17 + ( 2 % × 47,42 )
= 277.23 kg
TS17 = TS17’
TBM = P pf + P ME
= 79.08+215.67
= 294.76 kg
TS18 = TS18’
TBM = P KK + P g+ Pa +2 % PKK
= 18,48+77,70+66,73+ ( 2 % × 18,48 )
= 280.23 kg
TS19 = TS19’
TBM = P pf + P ME
= 79.08+215.67
= 294.76 kg
TS20 = TS20’
TBM = P KK + P g+ Pa +2 % PKK
= 18,48+77,70+66,73+ ( 2 % × 18,48 )
= 294.99 kg
TS21 = TS21’
TBM = P pf + P ME
= 79.08+215.67
= 313.38 kg
TS22 = TS22’
TBM = P KK + P g+ Pa +2 % PKK
= 18,48+77,70+66,73+ ( 2 % × 18,48 )
= 274.87 kg
TS23 = TS23’
TBM = 0
TS24 = TS24’
TBM = P KK + P g+ Pa +2 % PKK
= 18,48+77,70+66,73+ ( 2 % × 18,48 )
= 271.84 kg
TS25 = TS25’
TBM = 0
TS26 = TS26’
TBM = P KK + P g+ Pa +2 % PKK
= 18,48+77,70+66,73+ ( 2 % × 18,48 )
= 266.98 kg
TS27 = TS27’
TBM = 0
TS28 = TS28’
TBM = P KK + P g+ Pa +2 % PKK
= 18,48+77,70+66,73+ ( 2 % × 18,48 )
= 261.92 kg
TS29 = TS29’
TBM = 0
TS30 = TS30’
TBM = P KK + P g+ Pa +2 % PKK
= 18,48+77,70+66,73+ ( 2 % × 18,48 )
= 253.84 kg
TS31 = TS31’
TBM = 0
TS32
TBM = 1.02 × PKK + P g+ P a
= 1.02 ×19.56+25.90+51.86
= 97.71 kg
Diketahui beban hidup terpusat sebesar 40 kg. Beban hidup terpusat dibebankan pada titik
simpul bagian atas (bagian atap) secara berselang-seling (simpul pertama, simpul ketiga,
simpul kelima, dan seterusnya), dimulai pada titik simpul bagian atap paling bawah. Dengan
demikian, titik-titik simpul yang dibebani dengan beban hidup terpusat adalah:
TS1 = TS4 = TS8 = TS12 = TS16 = TS20 = TS24 = TS30 = TS32
= 65 kg
TS1’ = TS4’ = TS8’ = TS12’ = TS16’ = TS20’ = TS24’ = TS30’ = TS32’
= 65 kg
Dimisalkan angin bertiup dari arah kiri bangunan, dengan demikian bagian kiri bangunan
menerima beban angin tekan, sedangkan bagian kanan bangunan menerima beban angin
hisap.
Rumus yang digunakan untuk menghitung beban angin adalah:
1
Beban Angin= × Panjang Area Pembebanan × Jarak Antar Kuda−Kuda× ( qW tekan atau qW hisap )
2
Ph=PW × sin α
Pv =P W × cos α
0.8885 ≤1 …( Aman)
0.1048 ≤ 1… ( Aman)
0.0800 ≤ 1… ( Aman)
b E
t
120 mm
≤ 0,45
√
fy
200000 MPa
12mm
≤ 0,45
√
400 MPa
10 ≤13,00 … (Memenuhi)
2. Menghitung Rasio Panjang Kaki
L 4865 mm
rx
= = 159.51
30.50 mm
π 2 . E π 2 . 200000 MPa
F e= =
KL 2 ( 231.39 )2 = 36.87 MPa
( )
r
KL
= 231,39
r
E 200000 MPa
4,71
√ fy
= 4,71
√ 400 MPa
= 135.97
fy 400 MPa
= = 6.509
fe 36.87 MPa
√
y
- Tekuk Elastis
Jika memenuhi :
KL E fy
r
>4,71
√ fy
, dan
fe
>2,25 f cr =0,887 . F e
b E
t
60 mm
√
≤ 0,45
fy
200000 MPa
6 mm √
≤ 0,45
400 MPa
10 ≤13,00
MEMENUHI
2. Menghitung Parameter Profil Ganda
a) Luas Penampang Profil Ganda
A g '=5520.00 mm2
b) Total Inersia dan Jari-Jari Inersia Pada Sumbu x-x (Penampang Profil Ganda)
Total Inersia
I gx =2 x I x
I gx = 7420000 mm4
Jari-Jari Inersia
I gx
r gx=
√ Ag'
7420000 mm4
r gx=
√ 5520 mm2
r gx=¿ 36.66 mm
c) Total Inersia dan Jari-Jari Inersia Pada Sumbu y-y (Penampang Profil Ganda)
Total Inersia
2
δ
( )
I gy =( 2 x I y ) +2 A g S+
2
2
I gy = (2 x 3710000) + (2 x 2760) . 34.10+ 10
( 2 )
I gy = 15859031 mm4
Jari-Jari Inersia
I gy
r gy =
√ Ag'
15859031 mm4
r gy =
√
r gy =¿ 53.60 mm
5 520 mm2
fe = 190.87 MPa
c) Menghitung Tegangan Kritis (fcr)
Berdasarkan SNI 1729 : 2015 (E3) Tekuk dibedakan menjadi 2 , yaitu
- Tekuk Inelastis
Jika memenuhi :
KL E fy F
√
y
- Tekuk Elastis
Jika memenuhi :
KL E fy
r min
>4,71
fy
, dan
√
fe
>2,25 f cr =0,887 . F e
Perhitungannya :
E 200000 MPa
4,71
√ fy
= 4,71
√ 400 MPa
= 135,966
fy 400 MPa
= = 1.257
fe 190.87 MPa
fy
=1.257> 2.25Tekuk Inelastis
fe
Maka dari perhitungan diatas, memenuhi Tekuk Inelastis
Fy
( )
Fe
f cr =0,658
x
.f y
400 MPa
( )
f cr =0,658 190.87 MPa . 400 MPa
x
MEMENUHI
MEMENUHI
√
y
- Tekuk Elastis
Jika memenuhi :
KL y E fy
r gy
>4,71
fy √
, dan
fe
>2,25 f cr =0,887 . F e
Perhitungannya :
E 200000 MPa
4,71
√ fy
= 4,71
√ 400 MPa
= 135,966
fy 400 MPa
= = 0.244
fe 984.57 MPa
fy
( )
f ey
f cr =0.658
y
.f y
400 MPa
( )
984.57 MPa
f cr =0.658
y
. 400 MPa
f cr =¿ 216.72 MPa
y
( 0 )2 + ( 28.10 mm )2
H = 1− ( (5006.83 mm2) )
H = 0.842 mm
c) Menghitung Tegangan Kritis Arah Sumbu z – z (Fcrz)
GJ
f crz=
A g ' . r 2o
- G = 77200 MPa (Modulus Elastis Geser Baja)
2
-J = ( d +b−t ) . t 3
3
2
= ( 120 mm+120 mm−12mm ) . ( 12 mm )3
3
= 262656 mm4
Sehingga didapatkan :
( 77200 MPa ) (262656 mm 4 )
f crz= = 733.67 MPa
( 5220 m m2) .(5006.83 m m2 )
(
f cr =
f cry + f crz
2.H )[
1− 1−
4 . f cry . f crz . H
√
( f cry + f crz )
2
]
fcr = ( ( 216.722MPa )+ (733.67 MPa )
.(0.842 mm) )
[ √
1− 1−
4 . ( 216.72 MPa ) . ( 733.67 MPa ) .(0.842 mm)
( ( 216.72 MPa )+(733.67 MPa) )
2
]
fcr = 204.29 MPa
f cr z
= 733.67 MPa
f cr = 204.29 MPa
Dalam perhitungan Kekuatan Nominal, digunakan fcr yang paling terkecil
fcr = 141.79 MPa
Ag = 2760 mm2
Sehingga didapatkan :
Pn = 141.79 MPa x 2760 mm2
Pn = 79811.13 kg
Kekuatan Nominal Terfaktor
Pu tekan = 79676.71 kg
Dari Kontrol Batang Tekan, terhadap Pu tekan maksimum dari tiap Profil didapatkan :
Pada Profil Tunggal (Siku-Siku Sama Kaki 100.100.10) AMAN
Pada Profil Ganda (Siku-Siku Sama Kaki 120.120.12) TIDAK AMAN
Berdasarkan hasil perhitungan gaya-gaya batang dapat dibuat perencanaan sambungan baja
menggunakan baut.
Smin = 3 x 22 mm = 60 mm
Dalam Perencanaan Diambil s yang lebih besar dari smin Untuk Profil Tunggal
s = 100 mm
Jarak Baut ke Tepi Ujung (st)
st =1,25 x d
min
Maka Perhitungannya :
Faktor Geser (Ubs) = 1 (Untuk Tegangan Merata)
Luas Bruto Penahan Geser (Agv)
A gv =L. t
Panjang Balok (L) = st + s x (n-1) = 50 + 100 x (2-1) = 150 mm
Tebal Balok (t) = 10 mm
Agv = 150 mm x 10 mm
= 1500 mm2
Luas Netto Penahan Geser (Anv)
Anv =(L−n ( d h+2 ) ) t
Anv = (150 mm – 2 x (24 mm + 2 mm )) x 10 mm
= 1110.00 mm2
Luas Neto Penahan Tarik (Ant)
Ant =( H −0.5 ( d h +2 ) ) ×t
Tinggi Balok (H) = b - Cy = 100 – 28.3 = 71.70 mm
Ant = (71.7 mm – 0,5 (22 mm + 2 mm)) 8 mm
= 587.00 mm2
Maka didapatkan
Rn fractur (Ruas Kiri)=0,60. f u A nv +U bs f u Ant
Rn fractur = (0.60) x (370 MPa) x (752 mm2) + (1) (370 MPa) (224 mm2 )
= 47275.06 kg
Maka Jumlah Kuat Sambungan Nominal Akibat Kuat Tumpu Plat (Profil Siku)
Rn (4) = Rn (a) + Rn (b)
= 17657.41 kg + 19921.18 kg = 37578.58 kg
Maka didapatkan Kuat Sambungan Nominal Profil Tunggal Siku-Siku Sama Kaki 80.80.8
1. Kuat Sambungan Nominal Kuat Geser Baut
Rn (1) = 28839.49 kg
2. Kuat Sambungan Nominal Kuat Geser Blok (Shear Block)
Rn (2) = 44173.09 kg
3. Kuat Sambungan Nominal Tinjau Shear Lag
Rn (3) = 45447.45 kg
4. Kuat Sambungan Nominal Kuat Geser Profil (Siku)
Rn (4) = 37578.58 kg
Pu
≤1
Ru
Pu 5207.30 kg
= = 0.4815
R u 21629.61 kg
Kontrol :
Pu
≤1
Ru
0.4815 ≤1
AMAN
Maka Perencanaan Baut dapat Digunakan.
1 2 1
Ab = . π .( d ¿ ¿ h ' ) ¿ = . π .(34 mm)2 = 706.86 mm2
4 4
Rn (1) = 5 x 372 MPa x 706.86 mm2 = 134067.85 kg
4. Kuat Sambungan Nominal Akibat Kuat Geser Blok (Shear Block)
Rn =R nfractur ≤ R nleleh
Rnleleh =0,60 . f y A gv +u bs f u A nt
Maka Perhitungannya :
JIMMY YOSUA KALUMATA 17021101043
STRUKTUR BAJA
Ant =( H −0.5 ( d h +2 ) ) ×t
Tinggi Balok (H) = b - Cy = 120 – 33.20 = 86.80 mm
Ant = (86.80 mm – 0.5 (32 mm + 2 mm)) x 12 mm
= 837.60 mm2
Maka didapatkan
Rn fractur (Ruas Kiri)=0.60. f u A nv +u bs f u Ant
Rn fractur = (0,60) x (370 MPa) x (4524 mm2 ) + (1) (370 MPa) (837.60 mm2 )
= 134015.18 kg
Rnleleh ( Ruas Kanan)=0.60. f y A gv +u bs f u A nt
Rn leleh = (0.60) x (240 MPa) x (6360 mm2 ) + (1) (370 MPa) (837.60 mm2 )
= 124991.92 kg
Maka didapatkan Kuat Sambungan Nominal Profil Tunggal Siku-Siku Sama Kaki 120.120.12
1. Kuat Sambungan Nominal Kuat Geser Baut
Rn (1) = 134067.85 kg
2. Kuat Sambungan Nominal Kuat Geser Blok (Shear Block)
Rn (2) = 124991.92 kg
3. Kuat Sambungan Nominal Tinjau Shear log
Rn (3) = 290396.41 kg
4. Kuat Sambungan Nominal Kuat Geser Profil (Siku)
Rn (4) = 149408.82 kg
Kontrol :
Pu
≤1
Ru
0.8499 ≤1
AMAN