Arizona
Energy
Conference
Update:
Solana Project
27 January, 2010
Phoenix, Arizona
ABENGOA SOLAR Index
4 Project Benefits
Site Location:
The Solana site is
located west of
Gila Bend, AZ,
approximately Gila Bend
•
~70 miles Solana Site
southwest of
Phoenix. The site
is owned by
Abengoa Solar’s
Subsidiary Map Extent
Arizona Solar
One, LLC.
Solar Power for a Sustainable World 7
ABENGOA SOLAR What: Plant Components
Project Facts
• 280 MW gross output with
conventional steam turbines
• “Solar Field” will cover 1,920 acres (3
square miles) and contain ~ 3,200
trough collectors
• Collectors are ~ 18 feet wide, over 400
feet long, and roughly 19 feet in height
• Plant water consumption approximately
eight times less than current agricultural
use
• Thermal storage tanks allow electricity
to be produced on cloudy days or
several hours after sunset
Constructing
Solana will
require over
80,000 tons of
steel – enough to
build a second
Golden Gate
Bridge.
Environmental
Environmental Certificate
Aquifer Protection
Land Use
Construction Permits
Encroachment Permit
Class C Permit
Temporary Construction
Excavation Grading
Temporary Power
Building Permits
Permit to Drill
AZPDES
1.2 600
Plant Output
1.0 500
0.8 400
0.6 300
0.4 200
0.2 100
0.0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hour E nding
Relative Value of Generation Trough Plant w/6hrs TES Solar Radiation
1.4 700
1.0 500
Plant Output
0.8 400
0.6 300
0.4 200
0.2 100
0.0 0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hour E nding
Environmental Benefits
Annual Emissions Abated:
• Over 475,000 tons carbon
dioxide
• 1,065 tons of nitrogen
oxides
• 520 tons of sulfur dioxide
This
Thisisisthe
theequivalent
equivalenttotoremoving
removing
almost
almost80,000
80,000cars
carsfrom
fromthetheroad
roadeach
each
year,
year, or half the vehicles that travelon
or half the vehicles that travel on
the Valley’s US Highway 60 every
the Valley’s US Highway 60 every
day.
day.
Asia
12% Europe
6%
South America
9%
USA
73%
800
600
Subcontracts
400
50%
200
0
Peak workforce
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
Non-USA
KS OR TX
5%
CA 5% 3% 10% CO
9% 8%
MO
8%
AZ
USA 57%
Workforce origin 95%
US subcontractors origin
Economic Benefits
• Jobs
– 1,500 – 2,000 during construction phase
– 85 – 100 skilled for operating
• Total Arizona benefit
– Nearly $1B in direct investment
• $300M to $400M in 30-year tax revenues
• Mirror manufacturing facility to be located
in Surprise, AZ
– Additional 180 permanent jobs created
Kate Maracas
Vice President, Operations
ABENGOA SOLAR INC.