VOLUME BEBAN SUMBU (kg)
JENIS KENDARAAN KENDARAAN KENDARAAN GANDENGAN
(Kend/Hari) DEPAN BELAKANG DEPAN BELAKANG
MOBIL PENUMPANG 8069 1000 1000 0 0
BUS 5004 3000 5000 0 0
TRUK 10 TON 1000 4000 6000 0 0
TRUK 20 TON 335 6000 2X7000 = 14000 0 0
TRUK 30 TON 129 6000 2X7000 = 14000 5000 5000

Angka Pertumbuhan LHR Sebesar = 6%


Usia Rencana = 20 tahun
Rencanakan Lalu Lintas Rencana Jalan tersebut dengan menggunakan metode AASHTO 72 dan Bina Marga 87!
Tipe Jalan adalah 6 Lajur 2 Arah, maka:
c Kendaraan Ringan = 0.2
c Kendaraan Berat = 0.4
Ipo = 4 cm
Ipt = 2.5 cm
FR = 1
CBR Base = 100%
CBR Sub Base = 50%
CBR Sub Grade = 7%
TIPE RODA
KENDARAAN GANDENGAN
DEPAN BELAKANG DEPAN BELAKANG
SAST SAST - -
SAST SATT - -
SAST SATT - -
SAST TATT - -
SAST TATT SAST SAST

O 72 dan Bina Marga 87!


VOLUME BEBAN SUMBU (k
JENIS
KEND. (LHR) KENDARAAN
KENDARAAN BELAKA
(Kend/Hari) DEPAN
NG
MOBIL PENUMPANG 8069 1000 1000
BUS 5004 3000 5000
TRUK 10 TON 1000 4000 6000
TRUK 20 TON 335 6000 14000
TRUK 30 TON 129 6000 14000

MENCARI NILAI VDF DAN EKIVALEN SUMBU STANDAR


VOLUME
NILAI VDF
JENIS KENDARAA
KENDARAAN
KENDARAAN N BELAKA
(Kend/Hari) DEPAN
NG
MOBIL PENUMPANG 8069 0.00023 0.00023
BUS 5004 0.01827 0.14097
TRUK 10 TON 1000 0.05774 0.29231
TRUK 20 TON 335 0.29231 0.74516
TRUK 30 TON 129 0.29231 0.74516

MENCARI NILAI LINTAS EKIVALEN PERMULAAN (LEP)


VOLUME
JENIS KENDARAA
C
KENDARAAN N
(Kend/Hari)
MOBIL PENUMPANG 8069 0.2
BUS 5004 0.4
TRUK 10 TON 1000 0.4
TRUK 20 TON 335 0.4
TRUK 30 TON 129 0.4
LALU LINTAS EKIVALEN PERMULAAN (LEP)

DATA LINTAS EKIVALEN SUMBU STAN


LINTAS EKIVALEN PERMULAAN (LEP)
LINTAS EKIVALEN TAHUN KE-1
LINTAS EKIVALEN TAHUN KE-2
LINTAS EKIVALEN TAHUN KE-3
LINTAS EKIVALEN TAHUN KE-4
LINTAS EKIVALEN TAHUN KE-5
LINTAS EKIVALEN TAHUN KE-6
LINTAS EKIVALEN TAHUN KE-7 1
LINTAS EKIVALEN TAHUN KE-8 1
LINTAS EKIVALEN TAHUN KE-9 1
LINTAS EKIVALEN TAHUN KE-10 1
LINTAS EKIVALEN TAHUN KE-11 1
LINTAS EKIVALEN TAHUN KE-12 1
LINTAS EKIVALEN TAHUN KE-13 1
LINTAS EKIVALEN TAHUN KE-14 1
LINTAS EKIVALEN TAHUN KE-15 1
LINTAS EKIVALEN TAHUN KE-16 1
LINTAS EKIVALEN TAHUN KE-17 1
LINTAS EKIVALEN TAHUN KE-18 1
LINTAS EKIVALEN TAHUN KE-19 2
LINTAS EKIVALEN TAHUN KE-20 (LEA) 2

DATA LINTAS EKIVALEN SUMBU STAN


LINTAS EKIVALEN PERMULAAN (LEP)
LINTAS EKIVALEN TENGAH (LET) 1
LINTAS EKIVALEN AKHIR (LEA) 2
MENGHITUNG LINTAS EKIVALEN DESAIN (N desain)
METODE AASHTO
TOTAL LHR 2
N Desain
DIBULATKAN
N Desain (CARA LAIN)
DIBULATKAN

METODE BINA MARGA


fp
LER = LET X FP 2
N Desain
DIBULATKAN

7.01
AN SUMBU (kg) TIPE RODA
GANDENGAN KENDARAAN GANDENGAN
DEPAN BELAKANGDEPANBELAKANGDEPANBELAKANG
0 0 SAST SAST - -
0 0 SAST SATT - -
0 0 SAST SATT - -
0 0 SAST TATT - -
5000 5000 SAST TATT SAST SAST

U STANDAR (E)
NILAI VDF
GANDENGAN EKIVALEN SUMBU STANDAR (E)
DEPAN BELAKANG
0 0 0.000451
0 0 0.159237
0 0 0.350051
0 0 1.037471
0.14097 0.14097 1.319406

LAAN (LEP)
EKIVALEN SUMBU vXCXE
STANDAR (E)
(SS/Hari)
0.000451 0.727979
0.159237 318.728837
0.350051 140.020322
1.037471 139.021140
1.319406 68.081373
ULAAN (LEP) 666.579652

Angka Pertumbuhan LHR Sebesar = 6%


666.579652 SS/Hari
706.574431 SS/Hari
748.968897 SS/Hari
793.907031 SS/Hari
841.541452 SS/Hari
892.033940 SS/Hari
945.555976 SS/Hari
1002.289335 SS/Hari
1062.426695 SS/Hari
1126.172296 SS/Hari
1193.742634 SS/Hari
1265.367192 SS/Hari
1341.289224 SS/Hari
1421.766577 SS/Hari
1507.072572 SS/Hari
1597.496926 SS/Hari
1693.346742 SS/Hari
1794.947546 SS/Hari
1902.644399 SS/Hari
2016.803063 SS/Hari
2137.811246 SS/Hari

Angka Pertumbuhan LHR Sebesar = 6%


666.579652 SS/Hari
1402.195449 SS/Hari
2137.811246 SS/Hari
N desain)
Usia Rencana = 20 tahun
25991.758171
9486992 SS
9490000 SS
9215885 SS
9220000 SS

Usia Rencana = 20 tahun


2
2804.390898
10236027 SS
10240000 SS

7.01029995663981
AKANG
0
1 Grafik Lintas Ekivalen Sumbu Standar per Hari
2 2500

3
2000
4
5
1500
6
SS/Hari

7 1000
8
9 500
10
11 0

12 0 2 4 6 8 10 12 14 16 18

TAHUN KE-
13
14 METODE AASHTO METODE BINA MARGA

15
16
17
18
19
20

0
10
20
per Hari

16 18 20
IP0 = 4 cm
IPT = 2.5 cm
CARA 1 (METODE NUMERIK SETENGAH INTERVAL)
MENCARI NILAI ITP 2 (MENGGUNAKAN NILAI CBR BASE
IP0 = 4 cm
IPt = 2.5 cm
FR = 1
N Desain = 10240000 SS
CBR Base = 100%
Hasil Perhitungan: Nilai ITP 2 = 5.26861187726673 cm

log(N N
Iterasi d ITP
Desain) DESAIN
1 1 0 2.51537 327.617
2 1 1 3.86372 7306.73
3 1 2 4.87168 74418.5
4 1 3 5.67252 470462
5 1 4 6.33005 2138213
6 1 5 6.87862 7561780
7 1 6 7.33942 2.2E+07
8 0.5 5.5 7.11892 1.3E+07
9 0.25 5.25 7.00137 1E+07
10 0.125 5.375 7.06078 1.2E+07
11 0.0625 5.3125 7.03124 1.1E+07
12 0.03125 5.28125 7.01635 1E+07
13 0.01563 5.26563 7.00887 1E+07
14 0.00781 5.27344 7.01261 1E+07
15 0.00391 5.26953 7.01074 1E+07
16 0.00195 5.26758 7.0098 1E+07
17 0.00098 5.26855 7.01027 1E+07
18 0.00049 5.26904 7.01051 1E+07
19 0.00024 5.2688 7.01039 1E+07
20 0.00012 5.26868 7.01033 1E+07
21 6.1E-05 5.26862 7.0103 1E+07
22 3.1E-05 5.26859 7.01029 1E+07
23 1.5E-05 5.2686 7.01029 1E+07
24 7.6E-06 5.26861 7.0103 1E+07
25 3.8E-06 5.26861 7.0103 1E+07
26 1.9E-06 5.26861 7.0103 1E+07
27 9.5E-07 5.26861 7.0103 1E+07
28 4.8E-07 5.26861 7.0103 1E+07
29 2.4E-07 5.26861 7.0103 1E+07
30 1.2E-07 5.26861 7.0103 1E+07
31 6E-08 5.26861 7.0103 1E+07
32 3E-08 5.26861 7.0103 1E+07
33 1.5E-08 5.26861 7.0103 1E+07
34 7.5E-09 5.26861 7.0103 1E+07
35 3.7E-09 5.26861 7.0103 1E+07
36 1.9E-09 5.26861 7.0103 1E+07
37 9.3E-10 5.26861 7.0103 1E+07
38 4.7E-10 5.26861 7.0103 1E+07
39 2.3E-10 5.26861 7.0103 1E+07
40 1.2E-10 5.26861 7.0103 1E+07
41 5.8E-11 5.26861 7.0103 1E+07
42 2.9E-11 5.26861 7.0103 1E+07
43 1.5E-11 5.26861 7.0103 1E+07
44 7.3E-12 5.26861 7.0103 1E+07
45 3.6E-12 5.26861 7.0103 1E+07
46 1.8E-12 5.26861 7.0103 1E+07
47 9.1E-13 5.26861 7.0103 1E+07
48 4.5E-13 5.26861 7.0103 1E+07
49 2.3E-13 5.26861 7.0103 1E+07
50 1.1E-13 5.26861 7.0103 1E+07
51 5.7E-14 5.26861 7.0103 1E+07
52 2.8E-14 5.26861 7.0103 1E+07
53 1.4E-14 5.26861 7.0103 1E+07
54 7.1E-15 5.26861 7.0103 1E+07
55 3.6E-15 5.26861 7.0103 1E+07
56 1.8E-15 5.26861 7.0103 1E+07
57 8.9E-16 5.26861 7.0103 1E+07
58 4.4E-16 5.26861 7.0103 1E+07
59 2.2E-16 5.26861 7.0103 1E+07
60 1.1E-16 5.26861 7.0103 1E+07
61 5.6E-17 5.26861 7.0103 1E+07
62 2.8E-17 5.26861 7.0103 1E+07
63 1.4E-17 5.26861 7.0103 1E+07
64 6.9E-18 5.26861 7.0103 1E+07
65 3.5E-18 5.26861 7.0103 1E+07
66 1.7E-18 5.26861 7.0103 1E+07
67 8.7E-19 5.26861 7.0103 1E+07
68 4.3E-19 5.26861 7.0103 1E+07
69 2.2E-19 5.26861 7.0103 1E+07
70 1.1E-19 5.26861 7.0103 1E+07
71 5.4E-20 5.26861 7.0103 1E+07
72 2.7E-20 5.26861 7.0103 1E+07
73 1.4E-20 5.26861 7.0103 1E+07
74 6.8E-21 5.26861 7.0103 1E+07
75 3.4E-21 5.26861 7.0103 1E+07
76 1.7E-21 5.26861 7.0103 1E+07
77 8.5E-22 5.26861 7.0103 1E+07
78 4.2E-22 5.26861 7.0103 1E+07
79 2.1E-22 5.26861 7.0103 1E+07
80 1.1E-22 5.26861 7.0103 1E+07
81 5.3E-23 5.26861 7.0103 1E+07
82 2.6E-23 5.26861 7.0103 1E+07
83 1.3E-23 5.26861 7.0103 1E+07
84 6.6E-24 5.26861 7.0103 1E+07
85 3.3E-24 5.26861 7.0103 1E+07
86 1.7E-24 5.26861 7.0103 1E+07
87 8.3E-25 5.26861 7.0103 1E+07
88 4.1E-25 5.26861 7.0103 1E+07
89 2.1E-25 5.26861 7.0103 1E+07
90 1E-25 5.26861 7.0103 1E+07
91 5.2E-26 5.26861 7.0103 1E+07
92 2.6E-26 5.26861 7.0103 1E+07
93 1.3E-26 5.26861 7.0103 1E+07
94 6.5E-27 5.26861 7.0103 1E+07
95 3.2E-27 5.26861 7.0103 1E+07
96 1.6E-27 5.26861 7.0103 1E+07
97 8.1E-28 5.26861 7.0103 1E+07
98 4E-28 5.26861 7.0103 1E+07
99 2E-28 5.26861 7.0103 1E+07
100 1E-28 5.26861 7.0103 1E+07

 
 
  IPo  IPt  
 Log   
 ITP 2 atau 3 atau 4   4,2  1,5 
Log (N desain )  9,36 Log   1  0,2   
 2,54   0,4  1094 
  ITP 2 atau 3 atau 4 
5 ,19 
   1  
  2,54  
 
 
  IPo  IPt  
 Log   
 ITP 2 atau 3 atau 4   4,2  1,5 
Log (N desain )  9,36 Log   1  0,2   
 2,54   0,4  1094 
  ITP 2 atau 3 atau 4 
5 ,19 
   1 
  2,54  
 1 
 Log    0,372  4,3 Log CBR Lapisan Tertentu  1,7   3
 RF 
ILAI CBR BASE)MENCARI NILAI ITP 3 (MENGGUNAKAN NILAI CBR S
IP0 = 4 cm
IPt = 2.5 cm
FR = 1
N Desain = 10240000 SS
CBR Sub Base = 50%
187726673 cmHasil Perhitungan: Nilai ITP 3 = 6.3720631892473

log(N
Iterasi d ITP
Desain)
1 1 0 2.03384
2 1 1 3.3822
3 1 2 4.39015
4 1 3 5.191
5 1 4 5.84852
6 1 5 6.3971
7 1 6 6.85789
8 1 7 7.24745
9 0.5 6.5 7.06058
10 0.25 6.25 6.96133
11 0.125 6.375 7.01147
12 0.0625 6.3125 6.98653
13 0.03125 6.34375 6.99903
14 0.01563 6.35938 7.00526
15 0.00781 6.36719 7.00836
16 0.00391 6.37109 7.00991
17 0.00195 6.37305 7.01069
18 0.00098 6.37207 7.0103
19 0.00049 6.37158 7.01011
20 0.00024 6.37183 7.01021
21 0.00012 6.37195 7.01025
22 6.1E-05 6.37201 7.01028
23 3.1E-05 6.37204 7.01029
24 1.5E-05 6.37206 7.0103
25 7.6E-06 6.37206 7.0103
26 3.8E-06 6.37207 7.0103
27 1.9E-06 6.37206 7.0103
28 9.5E-07 6.37206 7.0103
29 4.8E-07 6.37206 7.0103
30 2.4E-07 6.37206 7.0103
31 1.2E-07 6.37206 7.0103
32 6E-08 6.37206 7.0103
33 3E-08 6.37206 7.0103
34 1.5E-08 6.37206 7.0103
35 7.5E-09 6.37206 7.0103
36 3.7E-09 6.37206 7.0103
37 1.9E-09 6.37206 7.0103
38 9.3E-10 6.37206 7.0103
39 4.7E-10 6.37206 7.0103
40 2.3E-10 6.37206 7.0103
41 1.2E-10 6.37206 7.0103
42 5.8E-11 6.37206 7.0103
43 2.9E-11 6.37206 7.0103
44 1.5E-11 6.37206 7.0103
45 7.3E-12 6.37206 7.0103
46 3.6E-12 6.37206 7.0103
47 1.8E-12 6.37206 7.0103
48 9.1E-13 6.37206 7.0103
49 4.5E-13 6.37206 7.0103
50 2.3E-13 6.37206 7.0103
51 1.1E-13 6.37206 7.0103
52 5.7E-14 6.37206 7.0103
53 2.8E-14 6.37206 7.0103
54 1.4E-14 6.37206 7.0103
55 7.1E-15 6.37206 7.0103
56 3.6E-15 6.37206 7.0103
57 1.8E-15 6.37206 7.0103
58 8.9E-16 6.37206 7.0103
59 4.4E-16 6.37206 7.0103
60 2.2E-16 6.37206 7.0103
61 1.1E-16 6.37206 7.0103
62 5.6E-17 6.37206 7.0103
63 2.8E-17 6.37206 7.0103
64 1.4E-17 6.37206 7.0103
65 6.9E-18 6.37206 7.0103
66 3.5E-18 6.37206 7.0103
67 1.7E-18 6.37206 7.0103
68 8.7E-19 6.37206 7.0103
69 4.3E-19 6.37206 7.0103
70 2.2E-19 6.37206 7.0103
71 1.1E-19 6.37206 7.0103
72 5.4E-20 6.37206 7.0103
73 2.7E-20 6.37206 7.0103
74 1.4E-20 6.37206 7.0103
75 6.8E-21 6.37206 7.0103
76 3.4E-21 6.37206 7.0103
77 1.7E-21 6.37206 7.0103
78 8.5E-22 6.37206 7.0103
79 4.2E-22 6.37206 7.0103
80 2.1E-22 6.37206 7.0103
81 1.1E-22 6.37206 7.0103
82 5.3E-23 6.37206 7.0103
83 2.6E-23 6.37206 7.0103
84 1.3E-23 6.37206 7.0103
85 6.6E-24 6.37206 7.0103
86 3.3E-24 6.37206 7.0103
87 1.7E-24 6.37206 7.0103
88 8.3E-25 6.37206 7.0103
89 4.1E-25 6.37206 7.0103
90 2.1E-25 6.37206 7.0103
91 1E-25 6.37206 7.0103
92 5.2E-26 6.37206 7.0103
93 2.6E-26 6.37206 7.0103
94 1.3E-26 6.37206 7.0103
95 6.5E-27 6.37206 7.0103
96 3.2E-27 6.37206 7.0103
97 1.6E-27 6.37206 7.0103
98 8.1E-28 6.37206 7.0103
99 4E-28 6.37206 7.0103
100 2E-28 6.37206 7.0103



IPt  
 
1,5 

94 
atau 4 
5 ,19 
 1 
 


IPt  
 
1,5 

94 
atau 4 
5 ,19 
 1 
 
NAKAN NILAI CBR SUB BMENCARI NILAI ITP 4 (MENGGUNAKAN NI
IP0 = 4 cm
IPt = 2.5 cm
FR = 1
N Desain = 10240000 SS
CBR Sub Grade = 7%
6.37206318924733 cmHasil Perhitungan: Nilai ITP 4 = 10.90232

N
Iterasi d ITP
DESAIN
108.103 1 1 0
2410.99 2 1 1
24555.7 3 1 2
155238 4 1 3
705543 5 1 4
2495149 6 1 5
7209225 7 1 6
1.8E+07 8 1 7
1.1E+07 9 1 8
9148185 10 1 9
1E+07 11 1 10
9694599 12 1 11
9977690 13 0.5 10.5
1E+07 14 0.25 10.75
1E+07 15 0.125 10.875
1E+07 16 0.0625 10.9375
1E+07 17 0.03125 10.9063
1E+07 18 0.01563 10.8906
1E+07 19 0.00781 10.8984
1E+07 20 0.00391 10.9023
1E+07 21 0.00195 10.9004
1E+07 22 0.00098 10.9014
1E+07 23 0.00049 10.9019
1E+07 24 0.00024 10.9021
1E+07 25 0.00012 10.9022
1E+07 26 6.1E-05 10.9023
1E+07 27 3.1E-05 10.9023
1E+07 28 1.5E-05 10.9023
1E+07 29 7.6E-06 10.9023
1E+07 30 3.8E-06 10.9023
1E+07 31 1.9E-06 10.9023
1E+07 32 9.5E-07 10.9023
1E+07 33 4.8E-07 10.9023
1E+07 34 2.4E-07 10.9023
1E+07 35 1.2E-07 10.9023
1E+07 36 6E-08 10.9023
1E+07 37 3E-08 10.9023
1E+07 38 1.5E-08 10.9023
1E+07 39 7.5E-09 10.9023
1E+07 40 3.7E-09 10.9023
1E+07 41 1.9E-09 10.9023
1E+07 42 9.3E-10 10.9023
1E+07 43 4.7E-10 10.9023
1E+07 44 2.3E-10 10.9023
1E+07 45 1.2E-10 10.9023
1E+07 46 5.8E-11 10.9023
1E+07 47 2.9E-11 10.9023
1E+07 48 1.5E-11 10.9023
1E+07 49 7.3E-12 10.9023
1E+07 50 3.6E-12 10.9023
1E+07 51 1.8E-12 10.9023
1E+07 52 9.1E-13 10.9023
1E+07 53 4.5E-13 10.9023
1E+07 54 2.3E-13 10.9023
1E+07 55 1.1E-13 10.9023
1E+07 56 5.7E-14 10.9023
1E+07 57 2.8E-14 10.9023
1E+07 58 1.4E-14 10.9023
1E+07 59 7.1E-15 10.9023
1E+07 60 3.6E-15 10.9023
1E+07 61 1.8E-15 10.9023
1E+07 62 8.9E-16 10.9023
1E+07 63 4.4E-16 10.9023
1E+07 64 2.2E-16 10.9023
1E+07 65 1.1E-16 10.9023
1E+07 66 5.6E-17 10.9023
1E+07 67 2.8E-17 10.9023
1E+07 68 1.4E-17 10.9023
1E+07 69 6.9E-18 10.9023
1E+07 70 3.5E-18 10.9023
1E+07 71 1.7E-18 10.9023
1E+07 72 8.7E-19 10.9023
1E+07 73 4.3E-19 10.9023
1E+07 74 2.2E-19 10.9023
1E+07 75 1.1E-19 10.9023
1E+07 76 5.4E-20 10.9023
1E+07 77 2.7E-20 10.9023
1E+07 78 1.4E-20 10.9023
1E+07 79 6.8E-21 10.9023
1E+07 80 3.4E-21 10.9023
1E+07 81 1.7E-21 10.9023
1E+07 82 8.5E-22 10.9023
1E+07 83 4.2E-22 10.9023
1E+07 84 2.1E-22 10.9023
1E+07 85 1.1E-22 10.9023
1E+07 86 5.3E-23 10.9023
1E+07 87 2.6E-23 10.9023
1E+07 88 1.3E-23 10.9023
1E+07 89 6.6E-24 10.9023
1E+07 90 3.3E-24 10.9023
1E+07 91 1.7E-24 10.9023
1E+07 92 8.3E-25 10.9023
1E+07 93 4.1E-25 10.9023
1E+07 94 2.1E-25 10.9023
1E+07 95 1E-25 10.9023
1E+07 96 5.2E-26 10.9023
1E+07 97 2.6E-26 10.9023
1E+07 98 1.3E-26 10.9023
1E+07 99 6.5E-27 10.9023
1E+07 100 3.2E-27 10.9023
MENGGUNAKAN NILAI CBR SUB GRADE)

ai ITP 4 = 10.9023298835821 cm

log(N N
Desain) DESAIN
0.66799 4.65571
2.01634 103.834
3.0243 1057.55
3.82514 6685.64
4.48267 30385.7
5.03124 107459
5.49204 310481
5.8816 761379
6.21608 1644656
6.51138 3246270
6.78107 6040518
7.03451 1.1E+07
6.90941 8117319
6.97233 9382716
7.00351 1E+07
7.01903 1E+07
7.01127 1E+07
7.00739 1E+07
7.00933 1E+07
7.0103 1E+07
7.00982 1E+07
7.01006 1E+07
7.01018 1E+07
7.01024 1E+07
7.01027 1E+07
7.01029 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
CARA 2 (METODE NUMERIK SECANT)
MENCARI NILAI ITP 2 (MENGGUNAKAN NILAI CBR BASE
IP0 = 4 cm
IPt = 2.5 cm
FR = 1
N Desain = 10240000 SS
CBR Base = 100%
Hasil Perhitungan: Nilai ITP 2 = 5.26861187726674 cm

log(N N
Iterasi d ITP
Desain) DESAIN
1 0 0 2.51537 327.617
2 10 10 8.62846 4.3E+08
3 -2.647 7.35297 7.85249 7.1E+07
4 -2.8729 4.48002 6.60549 4031692
5 0.93264 5.41266 7.07843 1.2E+07
6 -0.1344 5.27831 7.01494 1E+07
7 -0.0098 5.26849 7.01024 1E+07
8 0.00012 5.26861 7.0103 1E+07
9 -1E-07 5.26861 7.0103 1E+07
10 -1E-12 5.26861 7.0103 1E+07
11 0 5.26861 7.0103 1E+07
12 0 5.26861 7.0103 1E+07
13 0 5.26861 7.0103 1E+07
14 0 5.26861 7.0103 1E+07
15 0 5.26861 7.0103 1E+07
16 0 5.26861 7.0103 1E+07
17 0 5.26861 7.0103 1E+07
18 0 5.26861 7.0103 1E+07
19 0 5.26861 7.0103 1E+07
20 0 5.26861 7.0103 1E+07
21 0 5.26861 7.0103 1E+07
22 0 5.26861 7.0103 1E+07
23 0 5.26861 7.0103 1E+07
24 0 5.26861 7.0103 1E+07
25 0 5.26861 7.0103 1E+07
26 0 5.26861 7.0103 1E+07
27 0 5.26861 7.0103 1E+07
28 0 5.26861 7.0103 1E+07
29 0 5.26861 7.0103 1E+07
30 0 5.26861 7.0103 1E+07

 
 
  IPo  IPt  
 Log   
 ITP 2 atau 3 atau 4   4,2  1,5 
Log (N desain )  9,36 Log   1  0,2   
 2,54   0,4  1094 
  ITP 2 atau 3 atau 4 
5 ,19 
   1 
  2,54  
 1 
 Log    0,372  4,3 Log CBR Lapisan Tertentu  1,7   3
 RF 
ILAI CBR BASE)MENCARI NILAI ITP 3 (MENGGUNAKAN NILAI CBR S
IP0 = 4 cm
IPt = 2.5 cm
FR = 1
N Desain = 10240000 SS
CBR Sub Base = 50%
187726674 cmHasil Perhitungan: Nilai ITP 3 = 6.3720631892473

log(N
Iterasi d ITP
Desain)
1 0 0 2.03384
2 10 10 8.14693
3 -1.8593 8.14067 7.62549
4 -2.1936 5.94705 6.83542
5 0.48556 6.43261 7.03423
6 -0.0584 6.37418 7.01114
7 -0.0021 6.37205 7.0103
8 1.1E-05 6.37206 7.0103
9 -2E-09 6.37206 7.0103
10 0 6.37206 7.0103
11 0 6.37206 7.0103
12 0 6.37206 7.0103
13 0 6.37206 7.0103
14 0 6.37206 7.0103
15 0 6.37206 7.0103
16 0 6.37206 7.0103
17 0 6.37206 7.0103
18 0 6.37206 7.0103
19 0 6.37206 7.0103
20 0 6.37206 7.0103
21 0 6.37206 7.0103
22 0 6.37206 7.0103
23 0 6.37206 7.0103
24 0 6.37206 7.0103
25 0 6.37206 7.0103
26 0 6.37206 7.0103
27 0 6.37206 7.0103
28 0 6.37206 7.0103
29 0 6.37206 7.0103
30 0 6.37206 7.0103



IPt  
 
1,5 

94 
atau 4 
5 ,19 
 1 
 
NAKAN NILAI CBR SUB BMENCARI NILAI ITP 4 (MENGGUNAKAN NI
IP0 = 4 cm
IPt = 2.5 cm
FR = 1
N Desain = 10240000 SS
CBR Sub Grade = 7%
6.37206318924734 cmHasil Perhitungan: Nilai ITP 4 = 10.90232

N
Iterasi d ITP
DESAIN
108.103 1 0 0
1.4E+08 2 10 10
4.2E+07 3 0.37498 10.375
6845671 4 0.51503 10.89
1.1E+07 5 0.01217 10.9022
1E+07 6 0.00015 10.9023
1E+07 7 4.3E-08 10.9023
1E+07 8 1.5E-13 10.9023
1E+07 9 0 10.9023
1E+07 10 0 10.9023
1E+07 11 0 10.9023
1E+07 12 0 10.9023
1E+07 13 0 10.9023
1E+07 14 0 10.9023
1E+07 15 0 10.9023
1E+07 16 0 10.9023
1E+07 17 0 10.9023
1E+07 18 0 10.9023
1E+07 19 0 10.9023
1E+07 20 0 10.9023
1E+07 21 0 10.9023
1E+07 22 0 10.9023
1E+07 23 0 10.9023
1E+07 24 0 10.9023
1E+07 25 0 10.9023
1E+07 26 0 10.9023
1E+07 27 0 10.9023
1E+07 28 0 10.9023
1E+07 29 0 10.9023
1E+07 30 0 10.9023
MENGGUNAKAN NILAI CBR SUB GRADE)

ai ITP 4 = 10.9023298835822 cm

log(N N
Desain) DESAIN
0.66799 4.65571
6.78107 6040518
6.87765 7544853
7.00724 1E+07
7.01026 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07
7.0103 1E+07

Anda mungkin juga menyukai