Anda di halaman 1dari 3

Instructions to Bidders

ANNEXURE – IVA
SCHEDULE OF QUANTITIES & PRICES

Sl. Description Unit Quantity Unit Rate Total Amount Rate and Total Total (Including
No. (Excluding taxes & Type of Taxes & Duties taxes & duties)
(`) duties) Taxes & Amount
(`) Duties. (`)
(`)

1 2 3 4 5 6=4x5 7 8 9=6+8

A. Supply Portion

1. 16 port 10/100/1000 Mbps, L2, 19" No. 1


rack-mountable LAN Switch with 2
SFP Slot as per DTS.
2. 16 port 10/100/1000 Mbps, L2, 19" No. 3
rack-mountable LAN Switch as per
DTS.
3. 1 KVA UPS with 20 minute Backup No. 8
as per DTS
4. 9U Switch Rack wall mountable as No. 8
per DTS
5. UTP Cable CAT6 (305 mtr. box) as No. 8
per DTS
6. Cat6 IO with SMB / Faceplate as per No. 40
DTS
7. Patch cord 3 ft , CAT 6 as per DTS No. 40

8. Patch cord 7 ft, CAT 6 as per DTS No. 40

9. 24 port Cat6 Jack Panel, Fully No. 6


Loaded with Cable Manager as per
DTS
Instructions to Bidders

10. PVC Conduit pipe / Channel 1" with Mtr. 500


all accessories for fixing as per DTS
11. 6-core Optical Fiber indoor-outdoor Mtr. 1100
- for 9/125 micron single mode
armored as per DTS
12. 6-Port fiber SC-Style LIU, Single No. 6
mode, Patch Panel, 1U, fully Loaded
as per DTS
13. SC Style Pigtail single mode 1 meter No. 36
or above compatible with item 11 &
12 above
14. Single mode Duplex fibre Patch No. 8
Cord 3 Meter compatible with item
11 & 12 above
15. Single Mode Media Converter No. 6
10/100/1000 Mbps as per DTS
compatible with item 13 above
16. HDPE Pipe with clamps and Mtr 900
accessories
Total (Supply Portion) : X (say)
Sl. Description Unit Quantity Unit Rate Total Amount Rate and Total Total (Including
No. (Excluding taxes & Type of Taxes & taxes & duties)
(`) duties) Taxes & Duties
(`) Duties. Amount (`)
(`)

1 2 3 4 5 6=4x5 7 8 9=6+8
B. Erection Portion
1. Fixing of Rack and UPS with No. 8
accessories
Instructions to Bidders

2 Fixing of Switches with accessories No. 6


3. Laying of UTP CAT6 cable * Mtr. 2440
4. Installation & Termination of 24 No. 6
ports Jackpanel including cable
manager
5. Laying charge of PVC Conduit pipe Mtr. 500
/ Channel 1" with all accessories *
6. Installation of Information Outlet No. 40
with SMB / Faceplate, termination
and testing of Nodes
7. Laying charge of 6-core Optical Mtr 1100
Fiber indoor-outdoor *
8. Laying charge of HDPE Pipe with Mtr 900
accessories *
9. Termination charge of SC Style No. 36
Pigtail single mode
10. Installation charge of 6-Port fiber No. 6
SC-Style LIU, Single mode, Patch
Panel, 1U, fully Loaded
Total (Erection Portion) : Y (say)
Grand Total (Supply Portion + Erection Portion) : [X+Y]
Note:
¾ * Erection work payment will be released according to acutal work carried out at site
¾ All applicable taxes & duties, other levies and charges etc. on above item have been mentioned in this Schedule.
¾ The reimbursement of total taxes & duties shall be restricted to the total amount mentioned in column 8 of these Schedules subject to clause no.3.4
of ‘Special Condition of Contract’.

(Signature & Seal of the Tenderer)