80,787.50 189,042.75
239,315.00 21,538.35
879,066.69 79,116.00
1,144,821.25 721,237.39
16,609.45 1,326,762.87
264,937.00 519,276.52
1,144,821.25 435,032.08
16,609.45 2,048,609.56
-
1,144,821.25 4,327,424.33
16,609.45 12,397,791.76
-
80,787.50 140,570.25
239,315.00 40,683.55
879,066.69 149,441.34
1,144,821.25 1,591,301.54
16,609.45 1,246,373.13
16,609.45 1,264,809.62
285,062.00 2,645,375.36
1,144,821.25 274,757.10
16,609.45 1,301,848.69
-
1,144,821.25 2,198,056.80
16,609.45 7,067,985.35
-
80,787.50 545,315.63
239,315.00 165,127.35
879,066.69 597,765.35
1,144,821.25 6,182,034.76
1. GALIAN PONDASI
A TENAGA
Pekerja OH 0.750 90,000.00
Mandor OH 0.025 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
2. PEKERJAAN URUG
A TENAGA
Pekerja OH 0.300 90,000.00
Mandor OH 0.010 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug M3 1.200 150,000.00
JUMLAH HARGA BAHAN
C PERALATAN
3. LANTAI KERJA
A TENAGA
Pekerja OH 1.200 90,000.00
Tukang OH 0.200 110,000.00
Kepala Tukang OH 0.020 120,000.00
Mandor 0.060 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 230.00 1,300.00
Pasir Pasangan Kg 893.00 125.00
Kerikil Guli (maks. 30 mm) Kg 1027.00 189.66
Air Liter 200.00 100.00
JUMLAH HARGA BAHAN
C PERALATAN
4. BETON MUTU
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN (RP)
A TENAGA
Pekerja OH 1.650 90,000.00
Tukang OH 0.275 110,000.00
Kepala Tukang OH 0.028 120,000.00
Mandor 0.083 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 384.00 1,300.00
Pasir Pasangan Kg 692.00 125.00
Batu Pecah 2-3 cm Kg 1039.00 189.66
Air Liter 215.00 100.00
JUMLAH HARGA BAHAN
C PERALATAN
5. BESI POLOS
NO URAIAN SATUAN KOEFISIEN HARGA SATUAN (RP)
A TENAGA
Pekerja OH 0.070 90,000.00
Tukang OH 0.070 110,000.00
Kepala Tukang OH 0.007 120,000.00
Mandor 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Beton Polos Kg 10.50 12,000.00
Kawat Beton Kg 0.150 21,000.00
JUMLAH HARGA BAHAN
C PERALATAN
67,500.00
2,750.00
70,250.00
70,250.00
10,537.50
80,787.50
JUMLAH HARGA
27,000.00
1,100.00
28,100.00
180,000.00
208,100.00
31,215.00
239,315.00
JUMLAH HARGA
108,000.000
22,000.000
2,400.000
6,600.000
139,000.000
299,000.00
111,625.00
194,780.82
20,000.00
625,405.82
764,405.82
114,660.87
879,066.69
JUMLAH HARGA
148,500.000
30,250.000
3,360.000
9,130.000
191,240.000
499,200.00
86,500.00
197,056.74
21,500.00
804,256.74
995,496.74
149,324.51
1,144,821.25
JUMLAH HARGA
6,300.000
7,700.000
840.000
440.000
15,280.000
126,000.00
3,150.00
129,150.00
144,430.00
21,664.50
166,094.50
16,609.45
JUMLAH HARGA
6,300.000
7,700.000
840.000
440.000
15,280.000
126,000.00
3,150.00
129,150.00
144,430.00
21,664.50
166,094.50
16,609.45
JUMLAH HARGA
46,800.000
28,600.000
3,120.000
2,860.000
81,380.000
140,000.00
7,500.00
1,500.00
149,000.00
230,380.00
34,557.00
264,937.00
JUMLAH HARGA
46,800.000
28,600.000
3,120.000
2,860.000
81,380.000
157,500.00
7,500.00
1,500.00
166,500.00
247,880.00
37,182.00
285,062.00
NO URAIAN PEKERJAAN SATUAN HARGA (RP)
I HARGA UPAH
1 Pekerja Hari 90,000.00
2 Tukang Batu, Kayu, Cat, Besi, Aluminium, Gypsum Hari 110,000.00
3 Kepala Tukang Batu, Kayu, Cat, Besi, Aluminium, Gypsum Hari 120,000.00
4 Mandor Hari 110,000.00
5 Instalator Hari 150,000.00
6 Kepala Tukang Pasang Pipa/Leding Hari 120,000.00
7 Tukang Pasang Pipa/Leding Hari 100,000.00
8 Operator Alat Berat Hari 200,000.00
9 Pembantu Operator Alat Berat Hari 150,000.00
10 Tukang Las Hari 150,000.00
II BAHAN
1 Pasir Urug /M3 150,000.00
2 Semen Portland /Kg 1,300.00
3 Kerikil Guli /Kg 189.66
4 Air /liter 100.00
5 Pasir Pasangan /Kg 125.00
6 Batu Pecah 2-3 cm /Kg 189.66
7 Besi Beton Polos /Kg 12,000.00
8 Besi Beton Ulir /Kg 15,000.00
9 Kawat Beton /Kg 21,000.00
10 Kayu Kelas III /M3 3,500,000.00
11 Paku Biasa 2" - 4" /Kg 25,000.00
12 Minyak bekisting /liter 15,000.00