Anda di halaman 1dari 20

R U N N I N G A N D M A I N T E N A N C E

The future of water treatment


2 - Running & Maintenance - Elysator

Index

SERTIFICATIONS ................................................................................................................. 3-4

NEW BUILDINGS - SHIPYARD .......................................................................................6

COOLING WATER SYSTEMS ........................................................................................... 7

BOILER INSTALLATIONS ................................................................................................... 8

RUNNING ..................................................................................................................................... 9

RUNNING AND MAINTENANCE PRACTICE ......................................................... 10

REPLACING THE ANODE ................................................................................................ 11

ANODE MOUNTING .............................................................................................................. 12

FLOW METER........................................................................................................................... 13

BOILER EQUIPMENT .......................................................................................................... 14

SERVICE AND MOUNTLY REPORTS ........................................................................ 15

ACCESORIES/SPAREPARTS ......................................................................................... 16

LABORATORIES ...................................................................................................................... 17

SPAREPART LIST ORDER CODE ................................................................................ 18


3 - Running & Maintenance - Elysator

Sertification
4 - Running & Maintenance - Elysator

Sertifications
5 - Running & Maintenance - Elysator

RUNNING & MAINTENANCE

RUNNING & MAINTENANCE OF


6 - Running & Maintenance - Elysator

New buildings - Shipyard

New buildings shipyard


We must strongly underline that the Elysator does not replace any traditional
conservation liquid, antifreeze or and flushing liquid during the building period and
start up of the machinery prior to delivery.
It is entirely the shipyard / shipbuilders property and responsibility to perform this
procedure.
When all machinery is prepared to be taken over, the Elysator can then be taken into
use with “ non” chemical water, and the maintenance to be followed

Warranty.
The anodes are designed to last a number of years, and are therefore dependent on the
conductivity and volume of the water, which is to be treated. It will be to the benefit of the
user/owner that the water should be drained down, and renewed with new fresh water
without chemicals at the start up of Elysator.
If this is done, the producer then guaranties the living time (functioning) of the anodes to
minimum 3 years. If the anodes are consummated before in spite of renewal of the water,
new anodes will be delivered free of charge.

Functioning.
The function of the Elysator is based on the anodic/cathodic principle i.e. by letting a less
noble metal (magnesium) to be sacrificed (corroded) instead of the system itself.
During the corrosion process of the anodes, oxygen will be consummated creating H2O, and
magnesium hydroxide.
The Elysator tank is built up as a cyclone filter & magnet which will sediment impurities .

THE ELYSATOR IS NOT AND SHALL NOT BE SUPPLIED WITH EXTERNAL VOLTAGE.
When installing the Elysator, the entire system will be protected against corrosion. Even
aluminium and aluminium alloys are protected.

The following is achieved:


Increased pH value (aprox. 8,5-10) Magnesium hydroxide
Precipitation of sludge Cyclonfilter, magnet
De-aeration (oxygen consumption) New water H2O
Protective layer Oxide incrustation
Low conductivity (50-200 uS/cm) Sulphate & chloride sedimentation

The purpose of the Elysator system is to protect against corrosion and precipitation of
sediments, which in turn gives a better, economic, safer and more environmental protection
of the plant. And absolute no chemicals is longer necessary.

Installation / Components.
The Elysator delivery consists of the following:
1 PC Airvent
1 PC Water counter
1 PC Regulating valve
2 PC Plugs
3 PC Ball valves
1 PC Milliampere indicator (analogue)
1 PC Circulation pump (boiler systems)
1 PC Mounting package (pipe, fittings, non-return valves etc.) optional
1 PC Digital indicator with connections for alarm Hi-Lo optional
Spare parts on request: One milliampere meter, water counter, one set anodes optional
7 - Running & Maintenance - Elysator

Cooling water systems


Cooling water systems (closed systems reheat & preheat. etc.)
The Elysator to be mounted as shown on the illustration (fig. 1) in a by-pass position
preferably over the main pumps, discharge line to be connected to the lower half (inlet) and
suction line to upper half outlet. The inlet/outlet not in use are to be plugged (only on type15,
25,,25, 50, 75 and 100). The water flow to be adjusted with the regulating valve after the
water counter, while the ball valve on the inlet remains full open. Pipes to be of mild steel
(galvanized pipes Is not permited) and with diameter not less than 1” Elysator to be
installed as close as possible to the connection point, and as low as possible in the
system.

For high range medium speed engines with attached HT and LT pumps and separately
driven St-By pre-heat pump, 2-two separate Elysators to be mounted 1-one for each system.
The pipe connection to be such as preheat pump gives flow through the Elysator when
working / operating.

Principle closed systems (fw. Cooling, aircon. Systems etc.)

Service

Flussrichtung

Elysator type 15 25 50 75 100 260 500 800 1000


Height in mm 750 825 880 1141 1141 1233 2135 2005 2405
Diam. in mm 285 355 422 495 495 700 700 900 900
8 - Running & Maintenance - Elysator

Boiler installations

Boiler water treatment


Condensate Filter Filter
The Elysator should be located preferably as shown on Installation
the illustration (fig. 14-1). Both suction and discharge
principle
line to be joined in below of «low level» alarm in the hot
well. A separate circulation pump to be mounted low for hot well
as possible (normally from drain valve).
The water flow to be adjusted with the regulating valve Feed water
after the water counter, while the ball valve on the inlet
remains fully open. We underline the importance
that the Elysator should be located as low
as possible in above system (preferably deck The suction to elysator should preferably
be from the lowest part of the hot well. The

Drain
return should be connected to the tank,
near the feed pump suction line

Regulating valve

Airvent

To feed water pump


Baseplate for Type 260
Service

Feed pump suction valve


Circulation pump

Drain fig 14-1

below hot well) or use by meens of goose


neck for compensation of deck below. in order
that no air pocket will be built up inside in the Elysa-
tor, avoid cavitation in circulation pump and that the
existing sludge in the system will enter more easily /
faster into the Elysator. Some boiler plant might have
been fitted with the anodes built-in in the hot well (feed
w.tank). PS ! If it`s not possible to install the Elysator
below hotwell, there should be made a “goose neck”
(above hight of hot well) to avoid any air inside the
Elysator. Notice that hot well temperature to be kept
from 90 to 95ºc. When boiler is idle the boiler should be
topped up and if possible a circulation should be es-
tablished between hot well and boiler(s). If the boiler is
not under pressure then the Elysator circulating pump
can be fitted with a recirculating line to the Boiler filling
line with a valve.
9 - Running & Maintenance - Elysator

Running
Digital indicator
Digital indicator (west 8010)
Analog indicator

8 mm

Retrofit Wiring Scheme


Transmitter for remote signal output When using the digital
2-wire programmable
4 5 indicator, this can either replace
transmitter
Pretop 5331A 3 6 the analogue or be mounted in
Power supply
-2 +1
serial with the analogue. (When
90-264 V AC Alarm 2 1
mounting in parallel only half
N/C C N/O
the current will be read out).
13 14 19 20 21
The indicator can either be
( mA ) Signal

installed in the control room or


Supply

West 8010 Power supply


90-264 V AC
13 14
Alarm
N /C C N /O
19 20 21
nearby the Elysator.
-10
+12
+4 -1

-10 +4
-1
DIGITAL REMOTE INDICATOR
WEST INSTRUMENTS
Running. MODEL N8010

Version: Sept. 2, 2004

Before start.
A water sample to be taken on a clean distilled bottle and sent to a laboratory or IWTM A/S
for physical analysis.
Make sure the Elysator is correctly installed and that the Elysator is correct calculated for the
water volume.

Start up.
Open the inlet valve (lower half) slowly while outlet remain closed in order to permit all air to
enter out through the de-aerator. When there is no more whistling from the de-aerator, open
the outlet valve and adjust for correct flow according to fig.3.
1-one step on the counter (0,001) gives 1-one litre. Correct direction is clockwise on the
counter. If not, water counter is opposite mounted, or the water flow through the Elysator is
wrong. Check out that the indicator gives a reading (to the right), if not the cables are
opposite or broken.
10 - Running & Maintenance - Elysator

Running and maintenance practice

Running and Maintenance practice.


Draining for sludge is to be done frequently after experience obtained.
Normally 1-once a day in the beginning. Depending on the condition of the system the
anodes might have to be taken out several times in the beginning for «cleaning off»
the insulating glazed layer, which might occur as a result of remaining chemicals in
the system.
The anodes when opened for cleaning, should not be dismantled from the anode stack, but
instead cleaned with the sharp edge of a knife while still in the stack. If dismantled from
the stack,the washers and nuts can be spoiled and may need replacement. The stack is
designed so that the anodes should not be dismantled for the life of the anodes, so that the
teflon washers and nuts etc last the lifetime of the anodes.
We recommend that the Elysator is opened up and cleaned once every 4-week.
However, this is up to the general condition of the system. But, Ignore of maintenance
will lead to Non functioning.

Renewal / cleaning of the anode.


When the indicator is more or less on the zero point (to left), the anode might been corroded
away or an insulating layer is covering the anode (or the entire water system has been
COMPLETELY passivated), so the galvanic current is minimal.

Step by step
1.0 Inlet and outlet valves to be closed. Attention to warm parts & water!!!
1.1 Drain valve to be opened, (for faster emptying unscrew the de-aerator)
1.2 Remove insulating cover for access to manhole / flange.
1.3 Release cables gently.
1.4 Lift out flange and release anode from flange. (Not valid for type 25-50 and 100)
1.5 Clean the anode(s) by means of using a sharp steel edge, knife etc.
1.6 CAUTION!! DO NEVER USE A ROTATING BRUSH OR EXPOSE THE ANODES FOR
WELDING.
1.7 When mounting back new or cleaned anode, use always-correct 10 mm and 15 mm
wrench, and keep attention to the insulated bolt through the flange.
1.8 Clean the Elysator internally with cold water (no chemicals).
1.9 The Elysator to be reassembled and adjusted to correct flow
(one step on 0,001 counter= 1 litre.)
11 - Running & Maintenance - Elysator

Replacing the anode

Replacing the Anode

If the indicator of the instrument is completely in the red area, showing "service", fill the
ELYSATOR with fresh water to check if the display is changing. This way it is possible to test
the function of the anode without opening the ELYSATOR. If the indicator stays in the red
area, the ELYSATOR should be opened to check or replace the anode.

1. Close inlet and outlet, empty the


ELYSATOR through the drain cock.

2. Open the lid to the flange and unplug the


electrical contacts softly

3. Open the flange and pull out the anode


together with the flange. Check as follows:

a) The anode is all used up; only the steel


core is left
= Replace anode

b) The anode is not used up but covered


with a protection layer of oxides, stopping
the anode from functioning
= The anode must be cleaned with a
sharp tool

c) If the anode has more than one


centimetre in diameter left
= The anode can be used for further
time after cleaning

4. The isolation screw going through the flange


has two special washers on both sides of
the flange. Once opened, they cannot be
reused. These washers are not part of the
replacement kit. So do not open the
isolation screw.
When replacing the anode hold the isolation screw going through the flange and unscrew
only the small inner screw at the end oft the steel core of the anode.
After having mounted a new anode make sure, that all screws are tight and that the
electrical wiring is properly reinstalled. If there is no indication on the meter, the
ELYSATOR is not working.

If you have no indication after changing the anodes, check if:


- The ELYSATOR has been refilled with water
- The white isolation washers are both in place (no shortcut between anode and cathode)
- The electrical wiring has been reinstalled properly
- The instrument is not working (use an external mA-meter for testing)

Airvent
If the de-aerator is leaking, close both the inlet and outlet valves. Open drain for release
pressure. Dismantle the de-aerator and clean all parts.
Reassemble, mount back and adjust for correct flow.
12 - Running & Maintenance - Elysator

Anode mounting

Principle for Anode mounting for


Elysator T260, 500, 800, 1000
Montage-Anleitung Anodenbaum Maritime

Caution!
Do not tightened
the bolt to hard after
maintenance. When
tightening to hard, risk
of cracking the teflon
washer will occure
13 - Running & Maintenance - Elysator

Flow meter

Flow meter. The fraction counter on the left (x


The running wheel is not running. 0.0001) is one litre at a full turn It
Is the valves (inlet/outlet) opened? is also important to know, that the
Close the inlet and outlet valves, open drain for to release pressure.
Release the counter from the Elysator and clean the inlet filter.
fraction counters and the full coun-
Reassemble and adjust for correct flow. ter are on the same clockwork,
they cannot have different (indi-
Reading the ELYSATOR Watermeter vidual) readings. It is possible that
the daily total on the counter is not
equivalent to the calculated total if
the flow is not constantly the same.
x 0,0001 0 0 0 0 0 m3 The instrument is very precise. It is
all digits represent m3, sure that the total of the full counter
no fractions.
02 330993
does represent the exact amount
00001 = 1 m3
0 0 0 0 0 m3
GWF
of treated water in m3 (unless it is
broken).
one full turn fraction counter
130°

x0,0001 SWISS x0,1


MADE
90 1 90 1

on the left
/3 h

x 0,1
8 2 8 2

= 10 x 0,0001
C 1

7 3 x0,001 x0,01 7 3
6 54 6 54
m

90 1
6

90 1 8 2
5

8 2
ba

, 7 3 7 3
6 54 6 54
n2 r

= 0,001
B-
VQ
MTH- H

= 1 litre

The current stands for the aggres-


sivity of the water as well as for the
fraction counter
on the right one full turn oxygen molecules combined in the
= 10 x 0,01 ELYSATOR.
= 1,0 with an analog meter it is the only
= 1 m3 way to measure in full short cut.
If you had a by-pass, you would
Galvanometer /indicator Analogue measure less than the full produc-
The instrument is not giving any reading on the scale tion of electrons and interpretation
Are the cables correctly mounted to the flange under the cover or cables broken? would be difficult.
If cables are OK. The entire system might have been totally passivated. We have digital indicators that
At start up the galvanic current might be up to 100mA, but while Elysator is increasing pH measure with a shunt and have no
and scavenging oxygen the water gets less aggressive and the current wil decrease and resistance, but the analog indicator
stabilize. (normally from 4-15 mA). If some chlorides or sulphates should interfere resulting a is most common and very reliable.
higher conductivity or oxygen increasment (feed water), the ampere & output will increase • Low resistance of the meter gives
again. a better function of the electrode.
• Our analog mA meters have an in-
Water measurements. ternal resistance of 1.5 ohm which
Since the Elysator work without chemicals (inhibitors) the following parameters to be is neglectable at the current range
measured, pH, conductivity, chlorides and sulphates. For boilers also hardness dH. we are working in.
It is advised that water-samples should be sent for laboratory analysis 3-4 times a year • The red switch does not brake the
For complete analysis i.e. e. Iron and copper. (IWTM A/S, Norway does this on request) circuit, it only makes a short cut.
This is for safety reasons. If the
switch could brake the circuit, it
could lead to a permanent brake
Raw water qualities not only of the instrument but of
Property Limit the whole function. The purpose
pH Minimum 6 of the switch is only to check if the
Conductivity µS/cm 50 - 600 the analog mA meter is mechani-
Total hardness Maximum 10 dH cally o.k. (it could be blocked and
Chlorides (Cl) Maximum 80 mg/l lead to misinterpretation). Since
Sulphates (SO4) Maximum 150 mg/l the resistance of our mA-meters
is so low, it can happen, that while
Normal water properties when use of Elysator pressing the button the indica-
Property Average tor does not fall totally to zero
pH 8-10,5 (although the contacts ar gold
Conductivity PS/cm 50-800 ( normally below 400) plated, they resistance may grow
Total hardness (boiler system) <10 with time). But knowing what the
Chlorides (Cl) < 40 mg/l switch is for, this is no problem as
Sulphates (SO4) <100 mg/l long as the needle of the indicator
Iron (Fe) mg/l < 1 mg/l moves a bit. All you need to know
Copper (Cu) mg/l < 1 mg/l is that it is not blocked.
14 - Running & Maintenance - Elysator

Boiler equipment

1L 1
2L 3
3L 5
60729

3T

IWTM Start panel pump


3x440V - 60Hz, Connection diagram

Pumps for boiler watertreatment

Elysator type 75 100 260 500 800 1000


Order no. 10 00 03 10 01 52 10 00 14 10 00 09 10 00 15 10 00 19
Height mm. 1141 1141 1233 2135 2005 2405
Diam.mm 495 495 700 700 900 900
Pump type 3x440V - 60Hz 3x440V - 60Hz 3x440V - 60Hz 3x440V - 60Hz 3x440V - 60Hz 3x440V - 60Hz
Control panel 0,65A 0,65A 0,65 1,6A 1,6A 1,6A
System volume m3 20 30 70 120 220 300
Flow l/min (norm) 10 15 20 40 60 80
Flow l/min start up 15 20 50 100 150 200
15 - Running & Maintenance - Elysator

Service and monthly reports

The Elysator requires minimum of following up, however Water measurements


some service is required, to ease the monitoring and As the Elysator works without chemicals
routines we have an internet based monthly report system (inhibitors) the following parameters to be
which makes it easy to share information & results between measured, pH, conductivity. It is advised that
owner, superintendent ship and supplier. water-samples should be sent for laboratory
analysis 3-4 times a year for complete analysis
i.e. e. Iron and copper. (IWTM A/S, Norway does
this on request). Free of cost the first year
after installation.

Raw water qualities


Property Limit
pH Minimum 6
Conductivity µS/cm 50 - 600
Total hardness Maximum 10 dH
Chlorides (Cl) Maximum 80 mg/l
Sulphates (SO4) Maximum 150 mg/l

Radiance of The Seas2 Normal water properties when use of


Elysator
Property Average
• IWTM will provide a login name & password to be pH 8-10,5
used on iwtm.no / customers. Conductivity µS/cm 50-800 ( normally below 400)
• Here you will find information regarding type of Total hardness <10
Elysators mounted on witch systems. Chlorides (Cl) < 50 mg/l
• You will be able to fill in your own comments re- Sulphates (SO4) <100 mg/l
garding maintenance etc. Iron (Fe) mg/l < 1 mg/l
• Here you will also find comments on result from Copper (Cu) mg/l < 1 mg/l
water analyses of samples received by us from you.
• Here you will download your own personalized
monthly report form feed.
• End of each month an excel spreadsheet to be sent
to iwtm for evaluation
• PH & conductivity to be measured together with
readings from indicator and flow meter.
• (Flow l/min. will be calculated by spreadsheet).
• Also fill in remarks for repair work done and when
Elysator was last opened up and cleaned.
• An excellent tool for information and communication
between us as supplier and you as Customer.
• If photos of boilers, engines etc are sent to us after
any inspection, they can be downloaded to the
vessels web page, thus keeping a paperless record
and condition of water treatment.

Remark
The reports must be sent without fail at the end of every
month to ensure effective and correct usage of Elysator.
IWTM will not be responsible if timely reports are not
received and reserves the right to cancel warranty under
these conditions.
16 - Running & Maintenance - Elysator

Accesories/Spareparts

Options & spare parts


The Elysator can be connected to comput-
ers or digital indicators; this will give the
option to have an alarm for certain anode
levels (high / low) or reading of history.
When using the digital indicator, this can
either replace the analogue or be mounted
in serial with the analogue indicator (gal-
vanometer). The indicator can either be
installed in the control room or nearby the
Elysator. The transmitter is premounted in Carnival Conquest
the Elysator

Digital indicator order no.100080

Automatic drain
valve with timer

Startpanel (complete) with digital Transmitter o.no.100180


indicator

Select filters
External Wiring Sceme Signal Output
to remote indicator Power supply
90-264 V AC
Alarm
External Wiring Scheme 13 14
N /C C N /O
19 20 21

signal output to remote indicator +12

Supply
-10
2
+4 -1
1 ( mA ) Signal

Plug, goes into socket on Elysator

Connection diagram for built in transmitter


(Elysators type 15-100)
Version: Sept. 11, 2003
17 - Running & Maintenance - Elysator

Laboratories

Batteries

PC Multidirect Parameters Handheld devices


Order Code:100210 The PC MultiDirect can be used PH order:100045
The PC MultiDirect (replacing PC22) for the following tests: Conduct.HR 0 -19,90mS: 100047
is a modern, microprocessor- Conduct.LR 0 - 1990uS : 100046
controlled photometer with a user • Alkalinity-m • Manganese The new CHECKIT®micro WP
friendly keyboard and large graphic • Alkalinity-p • Molybdate series is a range of waterproof
display. It features a broad selection • Aluminium • Nitrate and dust-tight (IP67) units for
of pre-programmed methods based • Ammonia • Nitrite determination of pH value, redox,
on the proven range of Lovibond® • Bromine • Ozone conductivity, TDS, salinity and
reagent tablets, liquid reagents, vial • Calcium Hardness • pH temperature. The compact, robust
tests and powder reagents (VARIO • Chloride • Phosphate housing and the electrode re-
Powder Packs). Moreover, you can • Chlorine • Potassium placement option meet the high
also store your own methods. The • Chlorine Dioxide • Silica standards required of state-of-the-
calibration option, including software- • COD • Sulphate art technology.
supported adjustment, means that • Copper • Sulphide All units are equipped with an
the PC MultiDirect photometer can • Cyanuric Acid • Sulphite automatic switch-off and a “Hold”
be used as a testing instrument. The • DEHA • Total Hardness function which “freezes” the result
7 standard rechargeable batteries • Fluoride • Total Nitrogen in the display with a single key-
(supplied) allow portable use. These • Hydrogen Peroxide • Urea press. The range includes several
standard batteries are available all over • Iron • Zinc versions with different measuring
the world and are easy to change. Parameters in bold letters: ranges and levels of accuracy for
An intelligent, integrated this detailed tests are recommended every 3 different applications.
months
charge controller allows
battery charging
(using the supplied
power pack)
whilst the
instrument is in
operation. The
PC MultiDirect
can also be
operated without
power pack using
alkaline manganese
batteries.
18 - Running & Maintenance - Elysator

Sparepart list order code Elysator & optionals Standard Elysators

Art.no. Art.no. Art.no.


Type TRIO Elysator T 500 (complete) Water analysing equipment
Elysator Trio (complete) 10 02 17 Chilled water (armaflex insulation) 10 01 53 PC Multidirect colorometric
Flowmeter 10 00 77 Elysator T 500 Boiler, with pump etc. 10 00 09 laboratory (and old PC 22)
Airvent 10 00 00 Flowmeter 1 ½” 10 01 09 PC Multidirect Photometer in
Indicator (analog) 10 00 78 Airvent 10 00 00 case with tablets, charger etc. 10 02 10
Anodes set 10 02 24 Indicator 10 00 78 PC Multidirect charger 10 00 42
Anodes (1 set) 10 01 59 PC rechargeable battery 9 V 10 00 44
Type15 Ballvalves (inlet / outlet) 10 01 24 Measuring Beaker (100 ml) 10 01 51
Elysator T 15 (complete) 10 01 64 Regulating valve 10 01 25 Moulded cell (pack of 5) 10 00 41
Flowmeter 10 00 77 Battery for PC Multidirect 10 00 44
TACOSETTER 10 02 20 Type 800 Printer for PC Multidirect 10 00 39
Airvent 10 00 00 Elysator T 800 (complete) Paper for printer 10 01 79
Indicator (analog) 10 00 78 Hot water (rockwool insulation 10 00 07 Glas stiring rod (crussing pin) 10 01 92
Anodes set (3 pcs) 10 02 02 Elysator T 800 (complete) (100 tablets) 10 00 28
Ballvalves (inlet / outlet) 10 00 71 Chilled water (armaflex insulation) 10 00 16 ALKA M
Regulating valve R15 ¾” 10 00 74 Elysator T 800 Boiler, with pump etc 10 00 15 (100 tablets) 10 02 14
Flowmeter 1 ½” 10 01 09 ALKA P
Type 25 Airvent 3/8” 10 00 00 (100 tablets) 10 02 15
Elysator T 25 (complete) 10 00 01 Indicator 10 00 78 Aluminium No.1. (100 tablets) 10 01 98
Flowmeter 10 00 77 Anodes hot water 1 set 10 01 61 Aluminium No.2. (100 tablets) 10 01 99
Airvent 10 00 00 Anodes chilled water 1 set 10 01 62 Ph 5,2-6,8 bromocresol purple
Indicator (analog) 10 00 78 Ballvalves (inlet / outlet) 10 01 24 (100 tablets) 10 00 28
Anodes set 10 01 75 Regulating valve 10 01 25 pH 6,8-8,4 phenol red
Ballvalves (inlet / outlet) 10 00 71 (100 tablets) 10 00 29
Regulating valve R15 ¾” 10 00 74 Type 1000 pH 8,0-9,6 thymol blue
Elysator T 1000 (complete) (100 tablets) 10 00 30
Type 50 Hot water (rockwool insulation) 10 02 04 Iron LR (100 tablets) 10 00 98
Elysator T 50 (complete) 10 00 02 Elysator T 1000 (complete) Coppere zinc / declor
Flowmeter 10 00 77 Chilled water (armaflex insulation) 10 02 05 (100 tablets) 10 01 83
Airvent 10 00 00 Elysator T 1000 boiler with pump etc. 10 00 19 Copper LR (100 tablets) 10 00 32
Indicator 10 00 78 Flowmeter 1 ½” 10 01 09 Copper no. 1 (100 tablets) 10 02 38
Anodes set 10 01 60 Airvent 3/8” 10 00 00 Copper no. 2 (100 tablets) 10 02 39
Ballvalves (inlet / outlet) 10 00 71 Indicator 10 00 78 Sulphate (100 tablets) 10 00 31
Regulating valve 10 00 74 Anodes hot water 1 set 10 02 25 Sulfite (100 tablets) 10 00 36
Anodes chilled water 1 set 10 02 26 Hardcheck P (100 tablets) 10 01 44
Type 75 –100 Ballvalves (inlet / outlet) 10 01 24 Chlorides T1 (100 tablets) 10 00 34
Elysator T 75 (complete) 10 00 03 Regulating valve 10 01 25 Chlorides T2 (100 tablets) 10 00 35
Elysator T 75 Boiler with pump etc. 10 02 32 EDTA (100 tablets) 10 00 33
Elysator T 100 (complete) 10 00 05 Spare parts for boiler systems Sulphate (100 tablets) 10 00 31
Elysator t100 boiler , with pum etc. 10 01 52 Elysator type 75-100 Oxygen set of vials inc. accessories 10 00 26
Flowmeter 10 00 77 Pump 340V - 60 Hz 10 00 49 Oxygen adapter for ampoules 10 00 27
Airvent 10 00 00 Start panel 10 01 15 Watertest bottles 1pc 10 01 67
Indicator 10 00 78 Gasket for pump 10 01 36
Anodes set typ 75 10 01 76 Mechanical seal 10 02 27 Micro checkit series handheld
Anodes set typ 100 10 01 57 series
Ballvalves (inlet /outlet) 10 01 71 Elysator type 260 Micro checkit pH ++ 10 00 45
Regulating valve 10 00 74 Pump 340V - 60 Hz 10 01 37 Micro checkit LR 0-1990 S/cm 10 00 46
Start panel 10 01 15 Micro checkit HR 0-19,9 mS 10 00 47
Type 260 Gasket for pump 10 01 36 ET260 Oxygen meter 10 01 93
Elysator T 260 (complete) Mechanical seal 10 02 28 Batteries for micro checkit 10 01 78
Hot water – rockwool insulation 10 00 04 Elysator type 500 Buffer solution 100 ml pH 4 10 01 29
Elysator T 260 (complete) Pump 340V - 60 Hz 10 02 36 Buffer solution 100 ml pH 7 10 01 30
Chilled water- armaflex insulation 10 00 12 Start panel 10 00 68 Buffer solution 100 ml pH 10 10 01 31
Elysator T 260 Boiler with pump etc. 10 00 14 Gasket for pump 10 01 38 Buffer pH 10 tablets 10 00 94
Flowmeter 1 ½” 10 01 09 Mechanical seal 10 02 30 Buffer pH 4 tablets 10 00 95
Airvent 10 00 00 Elysator type 800 Buffer pH 7 tablets 10 00 96
Indicator 10 00 78 Pump 340V - 60 Hz 10 02 37 Calibration solution 1442 S/cm 10 00 97
Anodes 10 01 78 Start panel 10 00 68
Ballvalves 10 01 03 Gasket for pump 10 01 39 Optionals
Regulating valve 10 01 18 Mechanical seal 10 02 31 Digital indicator 10 00 80
Elysator type 1000 Transmitter 10 01 80
Type 500 Pump 340V - 60 Hz 10 02 37 Filter for Elysator outlet 1” 10 01 13
Elysator T 500 (complete) Start panel 10 00 68 Filter for Elysator outlet 2” 10 01 14
Hot water (rockwool insulation) 10 01 54 Gasket for pump 10 01 39 Timer & automatic drain for filter 10 02 08
Mechanical seal 10 02 31 Timer & aut. drain for elysator 1” 10 02 29
19 - Running & Maintenance - Elysator

Carnival Conquest

Norwegian sky

Radiance of The Seas2

Explorer of the seas

Adventure of the seas

Nord Jahre Target

Asir
20 - Running & Maintenance - Elysator

Laboratories

All rights for world-wide maritime distribution


International Water Treatment Maritime AS
Eternittveien 1, N-3470 Slemmestad, NORWAY
Phone:+47 31 28 71 71, Telefax: +47 31 28 91 30
E-mail: iwtm@iwtm.no • Homepage: http//:www.iwtm.no

Asia office Your partner for Safe maintenance


IWTM PTE.LTD
101 B, Telok Ayer Street
068574 Singapore
Tel.: +65 6535 6804 - Fax: +65 6535 6804
E-mail: iwtm@iwtm.sg.com

North America office


International Water Treatment NA
7406 27th St. W., Ste 207
University Place, WA 98466
USA
Tel.: +001 253-566-1438
Fax: +001 253-566-1512
www.iwtna.com
Grafisk form/Produksjon

Manufacturer: Elysator Engineering AG, Wollerau, Switzerland

Anda mungkin juga menyukai