Anda di halaman 1dari 1

BON PESANAN PROYEK TANGGAL :

58/ASB_HARRIS/III/2020 HOTEL HARRIS - SOLO 30/03/2020


KETERANGAN/JENIS
NO NAMA BARANG VOLUME HAR SAT JUMLAH
PEKERJAAN

1 Bondex Kencana tebal 0,75 cm 5 m 2 lbr 104.000,00 1.040.000,00


3 m 6 lbr 104.000,00 1.872.000,00
7 m 1 lbr 104.000,00 728.000,00
2 Dynabolt M12 6cm 32 pcs 2.100,00 67.200,00
-
3 Resibon WD 4" 10 pcs 3.350,00 33.500,00
-
4 WF150 1 btg 2.100.000,00 2.100.000,00
-
5 Kawat las Nikko RD260 2,6 5 kg 25.000,00 125.000,00
-
-
GRAND TOTAL 5.965.700,00

MENGETAHUI YANG MENGELUARKAN

TRANSFER KE : SUMARNI

KALIS

Anda mungkin juga menyukai