q1 = 20 kN/m
q2 = 10 kN/m
L1 = 8.5 m
L2 = 5.5 m
MP = 90 kN.m
q1
MP = 0.086 × q1 × Load Factor × L²
90 = 0.086 × 20 × Lf × 72.25
Lf = 90
124.27
Lf = 0.72
q2
MP = 0.086 × q2 × Load Factor × L²
90 = 0.086 × 10 × Lf × 30.25
Lf = 90
26.015
Lf = 3.46
UAS BAJA PLASTIS 2017
MUTHIA SETYARINY 13110028
2)
P = 1.1 ton/m
Load factor= 1.85
q = 2.3 ton/m
Load factor = 1.4
h = 6m
L = 7m
Mutu baja = A-36
Fy = 36 ksi
Diminta :
a) Hitung Momen Plastis menggunakan static method.
b) Periksa pertanyaan di atas menggunakan metode kerja virtual.
c) Hitung reaksi-reaksi kedua peletakkan dan gambarkan diagram momen portal ini pada
keadaan yang menentukan.
d) Tentukan profil yang diperlukan. Gunakan profil Amerika (W)
UAS BAJA PLASTIS 2017
MUTHIA SETYARINY 13110028
∑ MB = 0
VA = VB
= ½ qu1 × L
UAS BAJA PLASTIS 2017
MUTHIA SETYARINY 13110028
= ½ × 2.04 ton/m × 7 m
= 7.12 ton
2 MP = ⅛ qu1 × L²
MP = ⅛ qu1 × L²
2
= ⅛ × 2.04 ton/m × 49 m
2
= 6.23 ton.m
∑H = 0
HA = HB
= MP
h
= 6.23 ton.m
6 m
= 1.04 ton
Transfer merata horizontal menjadi beban terpusat horizontal di puncak kolom (titik C)
HC = ½ qu2 × h
= ½ × qu2 × h
= ½ × 3.22 ton/m × 6 m
= 9.66 ton
UAS BAJA PLASTIS 2017
MUTHIA SETYARINY 13110028
∑ MB = 0
VA = (½ × qu1 × L²) - (HC × h)
L
= ½ × 2.04 × 49 -
7
9.66 × 6
ton
7
= -1.16 ton
∑ MA = 0
VB = (½ × qu1 × L²) + (HC × h)
L
= ½ × 2.04 × 49 +
7
9.66 × 6
ton
7
= 15.40 ton
Cek = Oke
VA + VB = qu1 × L
-1.16 + 15.40 = 2.04 × 7
14.25 ton = 14.245 ton
HB = MP
h
Mx = (VB . x) - (HB . h) - ½ . qu1 . x²
dMx = 0
dx
VB - qu1 . x = 0
x= VB
qu1
= 15.40 ton
2.04 ton/m
= 7.57 m
Maka
Mx = MP
= (VB . x) - (HB . h) - ½ . qu1 . x²
UAS BAJA PLASTIS 2017
MUTHIA SETYARINY 13110028
= (VB . x) - MP - ½ . qu1 . x²
= 15.40 × 7.57 - MP -
½ × 2.04 × 57.29
2MP = 58.29 ton.m
MP = 29.14 ton.m
Maka :
Sx = MP
2 Fy
= 29.14 ton.m
72 ksi
= 29.14 × 2,2 × 3,28 × 12 kips.in
72 ksi
= 35.05 in³
Dari tabel profil baja AISC diperoleh = W8×40 Sx→ 35.5 in³
Berat profil = 40 lb/ft
Dari tabel profil baja AISC diperoleh = W10×60 Zx→ 74.6 in³
Berat profil = 60 lb/ft
Diambil yang teringan = W10x40
Kerja dalam = MP . Θ + MP . 2Θ + MP . Θ
= 4 . MP . Θ
Kerja luar = qu1 × L × 4Θ
2
= 2.04 × 7 × 4Θ
2
= 7.12 . 4Θ
*) Mekanisme Panel
Kerja dalam = MP . Θ + MP . Θ = 2 . MP . Θ
Kerja luar = HC . δ. = HC. 6Θ
= 9.66 × 6Θ
= 57.96 Θ
*) Mekanisme Kombinasi
UAS BAJA PLASTIS 2017
MUTHIA SETYARINY 13110028
Kerja dalam = MP . Θ + MP . 2Θ + MP . Θ
= 4 . MP . Θ
Sx perlu = MP = 28.98
2 Fy 72