RINCIAN ANGGARAN BELANJA

A. BIAYA LANGSUNG PERSONIL


No. Tenaga Ahli Jumlah Total Jumlah Biaya
Satuan Bulan Harga Satuan
Personil OB (Rp)
1 2 2 3 4 6 7

I. BIAYA TENAGA AHLI


1 Ketua Tim/Team Leader 1 OB 5.00 5.00 10,890,000.00 54,450,000.00
2 Ahli Teknik Lingkungan 1 OB 5.00 5.00 7,260,000.00 36,300,000.00
3 Ahli Sipil 1 OB 5.00 5.00 7,260,000.00 36,300,000.00
4 Ahli Hidrologi 1 OB 2.00 2.00 7,260,000.00 14,520,000.00
5 Ahli Geodesi 1 OB 2.00 2.00 7,260,000.00 14,520,000.00

JUMLAH I 156,090,000.00

II. BIAYA TENAGA LAINNYA


1 Surveyor 2 OB 1.50 3.00 3,630,000.00 10,890,000.00
2 Sekretaris 1 OB 5.00 5.00 2,420,000.00 12,100,000.00
3 Operator Komputer 1 OB 5.00 5.00 2,420,000.00 12,100,000.00
4 Operator CAD 2 OB 5.00 10.00 2,420,000.00 24,200,000.00
5 Pesuruh 1 OB 5.00 5.00 1,210,000.00 6,050,000.00

JUMLAH II 65,340,000.00
JUMLAH TOTAL I + II 221,430,000.00
B. BIAYA LANGSUNG NON PERSONIL

I. PERJALANAN DINAS

No. Uraian Jumlah Durasi/ Harga Satuan Jumlah Biaya


Satuan
Kunjungan Orang Rp. (Rp)
1 2 3 4 5 6 7(4*5*6)

A. Perjalanan Dinas ke Jakarta dalam rangka koordinasi


1 Tiket Pesawat ( 2 orang x 1 kali ) Orang.Trip 1 2.00 2,250,000.00 4,500,000.00
2 Lumpsum ( 2 orang x 1 kali x 2 hari ) Orang/Hari 1 4.00 450,000.00 1,800,000.00
3 Penginapan ( 2 orang x 1 kali x 1 hari ) Orang/Hari 1 2.00 400,000.00 800,000.00

B. Perjalanan Dinas ke Jakarta dalam rangka konsinyasi


1 Tiket Pesawat ( 5 orang x 1 kali ) Orang.Trip 1 5.00 2,250,000.00 11,250,000.00
2 Lumpsum ( 5 orang x 1 kali x 2 hari ) Orang/Hari 1 10.00 450,000.00 4,500,000.00
3 Penginapan ( 5 orang x 1 kali x 1 hari ) Orang/Hari 1 5.00 400,000.00 2,000,000.00
4 Work Shop LS 1 - - -

Jumlah I 24,850,000.00

II. BIAYA PERLENGKAPAN KANTOR

No. Uraian Volume Jumlah Biaya Jumlah Biaya


Satuan
Bulan Sewa (Rp)
1 2 3 4 5 6 7(4*5*6)

1 Sewa Komputer + Printer Unit 2 5.00 350,000.00 3,500,000.00


2 Sewa Plotter LS 1 1.00 3,500,000.00 3,500,000.00
3 Sewa Kendaraan Roda 4 Unit 1 5.00 4,500,000.00 22,500,000.00
4 Sewa Alat Servey Pengukuran Unit 2 1.50 2,000,000.00 6,000,000.00
5 Biaya Sondir dan Analisis Labor Titik 7 - -

Jumlah II 35,500,000.00

III. BIAYA OPERASIONAL KANTOR

No. Uraian Jumlah Harga Jumlah Biaya


Satuan Volume
Bulan Satuan (Rp)
1 2 3 4 5 6 7(4*5*6)

1 Bahan Komputer Bulan 1 5.00 350,000.00 1,750,000.00


2 Biaya Komunikasi Bulan 1 5.00 700,000.00 3,500,000.00
3 Alat Tulis Kantor, Surat menyurat, dll Bulan 1 5.00 300,000.00 1,500,000.00
4 Dokumentasi LS 1 1.00 300,000.00 300,000.00

Jumlah III 7,050,000.00

IV. BIAYA PELAPORAN

No. Uraian Volume Satuan Harga Jumlah Biaya


Satuan (Rp)
1 2 3 4 5 6(3*4*5)

1 Laporan Pendahuluan 10 Buku 100,000.00 1,000,000.00


2 Laporan Antara 10 Buku 100,000.00 1,000,000.00
3 Draf Laporan Akhir 10 Buku 100,000.00 1,000,000.00
4 Laporan Akhir 10 Buku 150,000.00 1,500,000.00
5 Eksekutif Summary 10 Buku 125,000.00 1,250,000.00
6 Dokumen Leleng 5 Buku 125,000.00 625,000.00
7 Gambar Rencana Detail dan pelayanan (A3) 10 Buku 300,000.00 3,000,000.00
8 Gambar Rencana Detail dan pelayanan (A1) 5 Buku 1,500,000.00 7,500,000.00
9 Eksternal Disk Kap. 750GB 2 Buku 1,500,000.00 3,000,000.00
10 Soft Copy (lengkap) dalam Bentuk CD 10 Keping 10,000.00 100,000.00

Jumlah VI 19,975,000.00
RINCIAN ANGGARAN BELANJA
REVIEW DED PEMBANGUNAN TPA KOTA PADANG TA. 2014
Kementerian : Kementerian Pekerjaan Umum
Satker : Pengembangan Penyehatan Lingkungan Permukiman
Kegiatan : REVIEW DED PEMBANGUNAN TPA KOTA PADANG
Keluaran : Laporan REVIEW DED PEMBANGUNAN TPA KOTA PADANG
Volume : 1 (satu)
Satuan Ukur : Laporan
Alokasi Dana : Rp. 350.000.000
Paket : 10 (Sepuluh)

A. BIAYA LANGSUNG PERSONIL Rp. 221,430,000.00

I. BIAYA TENAGA AHLI Rp. 156,090,000.00


II. BIAYA TENAGA LAINNYA Rp. 65,340,000.00

B. BIAYA TIDAK LANGSUNG NON PERSONIL 87,375,000.00

I. PERJALANAN DINAS Rp. 24,850,000.00


II. BIAYA PERLENGKAPAN KANTOR Rp. 35,500,000.00
III. BIAYA OPERASIONAL KANTOR Rp. 7,050,000.00
V. BIAYA PELAPORAN Rp. 19,975,000.00

JUMLAH Rp. 308,805,000.00


PPN 10% Rp. 30,880,500.00

TOTAL 339,685,500.00
DIBULATKAN 339,685,000.00

Terbilang : …………………………………………………………………………………………

……….., …………………….. 20...


Penawar,

…………………….
DAFTAR ANALISA HARGA SATUAN TENAGA

Personil : Tim Leader


Pengalaman : 7 Tahun
No. Komponen BLP Koefesien Nasional K. Diambil Billing Rate Harga Satuan
1. Gaji Dasar (GD) 1 x GD 1.00 4,500,000.00 4,500,000.00
2. Beban Biaya Sosial (BBS) (0,3 - 0,4) x GD 0.30 4,500,000.00 1,350,000.00
3. Beban Biaya Umum (BBU) (0,5 - 1,3) x GD 0.70 4,500,000.00 3,150,000.00
4. Tunjang Penugasan (0,1 - 0,3) x GD 0.20 4,500,000.00 900,000.00
5. Keuntungan 0,1 x (GD + BBS + BBU) 0.10 9,900,000.00 990,000.00
Jumlah 10,890,000.00

Personil : Tenaga Ahli


Pengalaman : 5 Tahun
No. Komponen BLP Koefesien Nasional K. Diambil Billing Rate Harga Satuan
1. Gaji Dasar (GD) 1 x GD 1.00 3,000,000.00 3,000,000.00
2. Beban Biaya Sosial (BBS) (0,3 - 0,4) x GD 0.30 3,000,000.00 900,000.00
3. Beban Biaya Umum (BBU) (0,5 - 1,3) x GD 0.70 3,000,000.00 2,100,000.00
4. Tunjang Penugasan (0,1 - 0,3) x GD 0.20 3,000,000.00 600,000.00
5. Keuntungan 0,1 x (GD + BBS + BBU) 0.10 6,600,000.00 660,000.00
Jumlah 7,260,000.00

Personil : Operator CAD / MAP


Pengalaman : 2 Tahun
No. Komponen BLP Koefesien Nasional K. Diambil Billing Rate Harga Satuan
1. Gaji Dasar (GD) 1 x GD 1.00 1,000,000.00 1,000,000.00
2. Beban Biaya Sosial (BBS) (0,3 - 0,4) x GD 0.30 1,000,000.00 300,000.00
3. Beban Biaya Umum (BBU) (0,5 - 1,3) x GD 0.70 1,000,000.00 700,000.00
4. Tunjang Penugasan (0,1 - 0,3) x GD 0.20 1,000,000.00 200,000.00
5. Keuntungan 0,1 x (GD + BBS + BBU) 0.10 2,200,000.00 220,000.00
Jumlah 2,420,000.00

Personil : Operator Komputer


Pengalaman : 2 Tahun
No. Komponen BLP Koefesien Nasional K. Diambil Billing Rate Harga Satuan
1. Gaji Dasar (GD) 1 x GD 1.00 1,000,000.00 1,000,000.00
2. Beban Biaya Sosial (BBS) (0,3 - 0,4) x GD 0.30 1,000,000.00 300,000.00
3. Beban Biaya Umum (BBU) (0,5 - 1,3) x GD 0.70 1,000,000.00 700,000.00
4. Tunjang Penugasan (0,1 - 0,3) x GD 0.20 1,000,000.00 200,000.00
5. Keuntungan 0,1 x (GD + BBS + BBU) 0.10 2,200,000.00 220,000.00
Jumlah 2,420,000.00

Personil : Surveyor
Pengalaman : 3 Tahun
No. Komponen BLP Koefesien Nasional K. Diambil Billing Rate Harga Satuan
1. Gaji Dasar (GD) 1 x GD 1.00 1,500,000.00 1,500,000.00
2. Beban Biaya Sosial (BBS) (0,3 - 0,4) x GD 0.30 1,500,000.00 450,000.00
3. Beban Biaya Umum (BBU) (0,5 - 1,3) x GD 0.70 1,500,000.00 1,050,000.00
4. Tunjang Penugasan (0,1 - 0,3) x GD 0.20 1,500,000.00 300,000.00
5. Keuntungan 0,1 x (GD + BBS + BBU) 0.10 3,300,000.00 330,000.00
Jumlah 3,630,000.00

Personil : Sekretaris
Pengalaman : 2 Tahun
No. Komponen BLP Koefesien Nasional K. Diambil Billing Rate Harga Satuan
1. Gaji Dasar (GD) 1 x GD 1.00 1,000,000.00 1,000,000.00
2. Beban Biaya Sosial (BBS) (0,3 - 0,4) x GD 0.30 1,000,000.00 300,000.00
3. Beban Biaya Umum (BBU) (0,5 - 1,3) x GD 0.70 1,000,000.00 700,000.00
4. Tunjang Penugasan (0,1 - 0,3) x GD 0.20 1,000,000.00 200,000.00
5. Keuntungan 0,1 x (GD + BBS + BBU) 0.10 2,200,000.00 220,000.00
Jumlah 2,420,000.00

Personil : Pesuruh
Pengalaman :
No. Komponen BLP Koefesien Nasional K. Diambil Billing Rate Harga Satuan
1. Gaji Dasar (GD) 1 x GD 1.00 500,000.00 500,000.00
2. Beban Biaya Sosial (BBS) (0,3 - 0,4) x GD 0.30 500,000.00 150,000.00
3. Beban Biaya Umum (BBU) (0,5 - 1,3) x GD 0.70 500,000.00 350,000.00
4. Tunjang Penugasan (0,1 - 0,3) x GD 0.20 500,000.00 100,000.00
5. Keuntungan 0,1 x (GD + BBS + BBU) 0.10 1,100,000.00 110,000.00
Jumlah 1,210,000.00