- Menghitung Faktor Tugas Penunjang (FTP) dan Standar Tugas Penunjang (STP)
Tugas Penunjang (Bidan - Ahli Pertama)
Standa
SBK
WKT (mnt/th)
(Standar Beban Kerja)
72,000 12500
72,000 4167
72,000 25000
72,000 3125
72,000 18750
72,000 25000
72,000 18750
72,000 15000
72,000 2500
72,000 12500
72,000 3125
72,000 15000
72,000 4167
72,000 3125
72,000 2083
72,000 4167
72,000 1250
72,000 6250
72,000 15000
72,000 15000
72,000 625
72,000 1042
72,000 250
njang (STP)
WKT FTP
Waktu Kegiatan (mnt/th)
(mnt/th) %
Kebutuhan SDMK
(2)/(3)
0.02
0.03
0.03
0.1
0.04
0.01
0.03
0.05
0.1
0.02
0.04
0.01
0.05
0.13
0.14
0.06
0.1
0.06
0.03
0.03
0.2
0.29
0.48
2.04
1.07
2.18
2