NAMA PEKERJAAN : PEMBUATAN TUNGKU PENYULINGAN MINYAK
LOKASI PEKERJAAN : ANGGARAN : 2019
NO. NAMA PEKERJAAN VOLUME SAT HARGA SAT. JUMLAH
I. PEKERJAAN BETON 1 Pasir 2.50 m3 Rp 400,000.00 Rp 1,000,000.00 2 Koral 1.50 m3 Rp 500,000.00 Rp 750,000.00 3 Semen Api 10.00 sak Rp 300,000.00 Rp 3,000,000.00 5 Besi Ø 10 10.00 ljr Rp 70,000.00 Rp 700,000.00 6 Besi Ø 8 5.00 ljr Rp 50,000.00 Rp 250,000.00 7 Kawat Bendrat 3.00 kg Rp 18,000.00 Rp 54,000.00 8 Papan Bekisting 10.00 ljr Rp 25,000.00 Rp 250,000.00 9 Tukang 10.00 OH Rp 95,000.00 Rp 950,000.00 10 Pekerja 8.00 OH Rp 80,000.00 Rp 640,000.00 Sub Total Rp 7,594,000.00 II. PEKERJAAN PASANGAN 1 Bata Merah 2,500.00 bh Rp 1,000.00 Rp 2,500,000.00 2 Tanah liat 4.00 m3 Rp 80,000.00 Rp 320,000.00 3 Tukang 15.00 OH Rp 100,000.00 Rp 1,500,000.00 4 Pekerja 15.00 OH Rp 80,000.00 Rp 1,200,000.00 Sub Total Rp 5,520,000.00 III. PEKERJAAN LAIN-LAIN 1 Besi Plat (25x75) tebal 1 cm 30.00 kg Rp 20,000.00 Rp 600,000.00 2 Besi WF (150x100x5x7) 85cm 10.00 kg Rp 20,000.00 Rp 200,000.00 3 Plat Talang Galvalum (cerobong asap) 15.00 m' Rp 40,000.00 Rp 600,000.00 4 Tukang 5.00 OH Rp 100,000.00 Rp 500,000.00 Sub Total Rp 1,900,000.00
REKAPITULASI ANGGARAN BIAYA
NAMA PEKERJAAN : PEMBUATAN TUNGKU PENYULINGAN MINYAK
LOKASI PEKERJAAN ANGGARAN : 2019
NO. PEKERJAAN JUMLAH
I. PEKERJAAN BETON Rp 7,594,000.00 II. PEKERJAAN PASANGAN Rp 5,520,000.00 III. PEKERJAAN LAIN-LAIN Rp 1,900,000.00
JUMLAH Rp 15,014,000.00 PPN 10% Rp 1,501,400.00
JUMLAH TOTAL Rp 16,515,400.00
DIBULATKAN Rp 16,500,000.00 Terbilang ENAM BELAS JUTA LIMA RATUS RIBU RUPIAH