Anda di halaman 1dari 62

DAFTAR GAMBAR

( ARSITEKTUR )

NO G A M B A R KODE/HALAMAN NO G A M B A R KODE/HALAMAN
01 DAFTAR ISI LM.A.00.00
01 DENAH MATERIAL DINDING LANTAI 01 LM.A.06.01
01 DENAH LANTAI 01 LM.A.01.01 02 DENAH MATERIAL DINDING LANTAI 02 LM.A.06.02
02 DENAH LANTAI 02 LM.A.01.02 03 DENAH MATERIAL DINDING LANTAI TOP ROOF LM.A.06.03
03 DENAH LANTAI TOP ROOF LM.A.01.03
04 DENAH SITUASI ATAP LM.A.01.04 01 MATERIAL TAMPAK DEPAN & TAMPAK SAMPING KANAN LM.A.07.01
05 TAMPAK DEPAN & TAMPAK SAMPING KANAN LM.A.01.05 02 MATERIAL TAMPAK BELAKANG & TAMPAK SAMPING KIRI LM.A.07.02
06 TAMPAK BELAKANG & TAMPAK SAMPING KIRI LM.A.01.06
07 POTONGAN A - A & POTONGAN B - B LM.A.01.07 01 DENAH LAYOUT LAVATORY, PANTRY, T. WUDHU & EMERGENCY SHOWER LT. 01 LM.A.08.01
08 POTONGAN C - C LM.A.01.08 02 DENAH LAYOUT LAVATORY, PANTRY, T. WUDHU & EMERGENCY SHOWER LT. 02 LM.A.08.02
09 POTONGAN PRINSIP LM.A.01.09 s/d 11 03 DETAIL LAVATORY, PANTRY, T. WUDHU & EMERGENCY SHOWER LM.A.08.03 s/d 10

01 DENAH POLA LANTAI LT. 01 LM.A.02.01 01 DENAH LAYOUT TANGGA LANTAI 01 LM.A.09.01
02 DENAH POLA LANTAI LT. 02 LM.A.02.02 02 DENAH LAYOUT TANGGA LANTAI 02 LM.A.09.02
03 DENAH POLA LANTAI LT. TOP ROOF LM.A.02.03 03 DETAIL TANGGA LM.A.09.03 s/d 07
04 DENAH POLA LANTAI LT. ATAP LM.A.02.04
01 DETAI LIFT LM.A.10.01 s/d 02
01 DENAH WALL PLINT LANTAI 01 LM.A.03.01
02 DENAH WALL PLINT LANTAI 02 LM.A.03.02 01 DENAH LAYOUT RAILING LANTAI 02 LM.A.11.01
03 DENAH WALL PLINT LANTAI TOP ROOF LM.A.03.03 02 DETAIL RAILING LM.A.11.02

01 DENAH KUSEN LANTAI 01 LM.A.04.01 01 DENAH PENEBALAN KOLOM LANTAI 01 LM.A.12.01


02 DENAH KUSEN LANTAI 02 LM.A.04.02 02 DENAH PENEBALAN KOLOM LANTAI 02 LM.A.12.02
03 DENAH KUSEN LANTAI TOP ROOF LM.A.04.03 03 DETAIL PENEBALAN KOLOM LM.A.12.03
04 DETAIL KUSEN LM.A.04.04 s/d 08
01 DETAIL FASADE LM.A.13.01
01 DENAH PLAFOND LANTAI 01 LM.A.05.01
02 DENAH PLAFOND LANTAI 02 LM.A.05.02
03 DENAH PLAFOND LANTAI TOP ROOF LM.A.05.03
04 DETAIL PLAFOND LM.A.05.04 s/d 05
A PEKERJAAN :

LOKASI :
-0.250
-0.020 -0.250
R. Operator
D TAHUN ANGGARAN
2020

B R. TIMBANGAN
B MENGETAHUI :
Pejabat Pembuat Komitmen

R. KALIBRASI
-0.250 GETARAN R. KORIDOR R. AKUSTIK
STAGE R. MEETING AUDIO VISUAL R. PENYIMPANAN R. KALIBRASI UDARA R. KALIBRASI ALIRAN (OPERATOR) ANECHOIC
CHAMBER
Erni Arsih Yulianti
-0.750 -1.200 ALAT NIP. 19750709 199703 2 001
(Desain Khusus)
-0.250 DISETUJUI :
-0.800 +0.400 Penanggungjawab User
-0.400 +0.800
C Lab. Metrologi Lingkungan

C PANTRY C Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
R. PANEL -0.020 Penanggungjawab User
Lab. Merkuri
B
Lav. R. CCTV
Ernawita Nazir
Difable
NIP. 19720504 199803 2 001
R. STAFF
DIKOREKSI OLEH :
Toilet -0.250 Konsultan Managemen Kontruksi
-0.020 Wanita Resepsionis
R. PENYIMPANAN
R. SPECTRO R. AAS CONTOH UJI GUDANG
R. TIMBANG
R. LOBBY (R.TUNGGU) R. BAHAN
KIMIA
R. KABID R. PREPARASI CONTOH UJI Darwin
Direktur
Toilet
Pria SC FH KONSULTAN PERENCANA
A
-0.020 -0.020 -0.020

1 2 3 4 5 6 7 8 9 DANANG RUJITO WIBOWO


KEPALA

DENAH LANTAI 01
A
01
SKALA = 1 : 175 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DENAH
1 : 175
LANTAI 01
KODE NO.LEMBAR JML.LEMBAR

LM A.01.01 11
A PEKERJAAN :

LOKASI :
Jalur Darurat / Maintenance Jalur Darurat / Maintenance
Gudang +4.280 +4.280

R. MUSHOLLA
SC
D TAHUN ANGGARAN
+4.350 SC FH FH FH 2020

B R. MEETING
+4.300 R. PREPARASI
R. ALAT AFS
DAN GC ECD
B MENGETAHUI :
Pejabat Pembuat Komitmen
T. Wudhu
R. ALAT MERCURY R. MAINTENANCE
+4.300 ANECHOIC
+4.300
Erni Arsih Yulianti

Jalur Darurat / Maintenance


NIP. 19750709 199703 2 001
DISETUJUI :

+4.280
Penanggungjawab User

R. LOKER
R. GANTI
SANDAL
R. CUCI R. PREPARASI
MERCURY UNTUK PADATAN & AIR
+4.300
C Lab. Metrologi Lingkungan

+4.300

C C Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
VOID VOID
R. PANEL Penanggungjawab User
Lab. Merkuri
B
Lav. Pantry & R. Istirahat Ernawita Nazir
Difable +4.300 NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Toilet Konsultan Managemen Kontruksi
Wanita
VOID R. PENYIMPANAN
+4.300
R. STAFF R. PERALATAN SAMPING
+4.300 +4.300
R. PREPARASI BIOTA
+4.300 Darwin
R. PIMPINAN R. Simpan
+4.300 +4.300 Direktur
Toilet
Pria KONSULTAN PERENCANA

R. Mandi Jalur Darurat / Maintenance Jalur Darurat / Maintenance


A
+4.280 +4.280

1 2 3 4 5 6 7 8 9 DANANG RUJITO WIBOWO


KEPALA

DENAH LANTAI 02
A
01
SKALA = 1 : 175 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DENAH
1 : 175
LANTAI 02
KODE NO.LEMBAR JML.LEMBAR

LM A.01.02 11
A PEKERJAAN :

LOKASI :

D TAHUN ANGGARAN
2020

B DAK BETON
+8.500
DAK BETON
+8.500
B MENGETAHUI :
Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
C Lab. Metrologi Lingkungan

C C Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
DAK BETON
+8.500 Penanggungjawab User
R. PANTAU Lab. Merkuri
+8.600
B
R. MESIN LIFT Ernawita Nazir
+8.700
NIP. 19720504 199803 2 001
+8.600 DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

DAK BETON DAK BETON


+8.500 +8.500 Darwin
Direktur
KONSULTAN PERENCANA
A

1 2 3 4 5 6 7 8 9 DANANG RUJITO WIBOWO


KEPALA

DENAH LANTAI TOP ROOF


A
01
SKALA = 1 : 175 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DENAH
1 : 175
LANTAI TOP ROOF
KODE NO.LEMBAR JML.LEMBAR

LM A.01.03 11
PEKERJAAN :

LOKASI :

D TAHUN ANGGARAN
2020
MENGETAHUI :
DAK BETON DAK BETON
+8.500 +8.500 Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

C Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
DAK BETON DAK BETON
+8.500 +11.600 Penanggungjawab User
Lab. Merkuri
B
DAK BETON
+12.600 Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

DAK BETON
+11.600

DAK BETON DAK BETON


+8.500 +8.500 Darwin
Direktur
KONSULTAN PERENCANA
A

1 2 3 4 5 6 7 8 9 DANANG RUJITO WIBOWO


KEPALA

01 DENAH SITUASI ATAP


SKALA = 1 : 175 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DENAH
1 : 175
SITUASI ATAP
KODE NO.LEMBAR JML.LEMBAR

LM A.01.04 11
PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

1 2 3 4 5 6 7 8 9 Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
01 TAMPAK DEPAN Lab. Merkuri
SKALA = 1 : 175
Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

Darwin
Direktur
KONSULTAN PERENCANA

DANANG RUJITO WIBOWO


KEPALA

D C B A
BAMBANG RIYANTO
TEAM LEADER
01 TAMPAK SAMPING KANAN JUDUL GAMBAR SKALA
SKALA = 1 : 175 TAMPAK DEPAN &
TAMPAK SAMPING KANAN
1 : 175

KODE NO.LEMBAR JML.LEMBAR

LM A.01.05 11
PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

9 8 7 6 5 4 3 2 1 Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
01 TAMPAK BELAKANG Lab. Merkuri
SKALA = 1 : 175
Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

Darwin
Direktur
KONSULTAN PERENCANA

DANANG RUJITO WIBOWO


KEPALA

A B C D
BAMBANG RIYANTO
TEAM LEADER
01 TAMPAK SAMPING KIRI JUDUL GAMBAR SKALA
SKALA = 1 : 175 TAMPAK BELAKANG &
TAMPAK SAMPING KIRI
1 : 175

KODE NO.LEMBAR JML.LEMBAR

LM A.01.06 11
DAK BETON
(F.F.L)+12.600
(S.F.L)+12.600

DAK BETON LANTAI TOP ROOF


+8.500 (F.F.L)+8.600
(S.F.L)+8.500 PEKERJAAN :

PLAFOND
+7.500
R. ALAT MERCURY LANTAI 02 LOKASI :
+4.300 (F.F.L)+4.300
(S.F.L)+4.200

TAHUN ANGGARAN
PLAFOND 2020
+3.200 MENGETAHUI :
R. PREPARASI CONTOH UJI LANTAI 01 Pejabat Pembuat Komitmen

(S.F.L)-0.100
Erni Arsih Yulianti
NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


A B C D NIP. 19670706 199303 1 001
Penanggungjawab User
01 POTONGAN A - A Lab. Merkuri
SKALA = 1 : 175
Ernawita Nazir
NIP. 19720504 199803 2 001
DAK BETON DAK BETON DAK BETON
+8.500 +8.500 +8.500 DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

PLAFOND PLAFOND
+7.500 +7.500
R. MEETING R. CUCI
+4.300 +4.300 +4.300 +4.300 +4.300 Darwin
Direktur
KONSULTAN PERENCANA
PLAFOND PLAFOND PLAFOND
+3.200 +3.200 +3.200
R. KALIBRASI ALIRAN R. AKUSTIK ANECHOIC CHAMBER

-1.200

DANANG RUJITO WIBOWO


KEPALA

BAMBANG RIYANTO
TEAM LEADER
1 2 3 4 5 6 7 8 9 JUDUL GAMBAR SKALA
POTONGAN A - A
01 POTONGAN B - B &
POTONGAN B - B
1 : 175
SKALA = 1 : 175 KODE NO.LEMBAR JML.LEMBAR

LM A.01.07 11
PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
DAK BETON 2020
(F.F.L)+12.600
(S.F.L)+12.600 MENGETAHUI :
Pejabat Pembuat Komitmen

DAK BETON DAK BETON LANTAI TOP ROOF


Erni Arsih Yulianti
+8.500 +8.500 (F.F.L)+8.600
NIP. 19750709 199703 2 001
(S.F.L)+8.500 DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan
PLAFOND PLAFOND PLAFOND
+7.300 +7.500 +7.500
Lav. Difable LANTAI 02
+4.250 +4.300 +4.300 +4.300 (F.F.L)+4.300
Wisnu Eka Yulyanto
NIP. 19670706 199303 1 001
(S.F.L)+4.200
Penanggungjawab User
Lab. Merkuri
PLAFOND PLAFOND PLAFOND PLAFOND
+3.000 +3.200 +3.200 +3.200
Lav. Difable LANTAI 01 Ernawita Nazir
-0.050 NIP. 19720504 199803 2 001
(S.F.L)-0.100 DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

Darwin
Direktur
KONSULTAN PERENCANA

1 2 3 4 5 6 7 8 9

01 POTONGAN C - C
SKALA = 1 : 175

DANANG RUJITO WIBOWO


KEPALA

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

POTONGAN C - C 1 : 175

KODE NO.LEMBAR JML.LEMBAR

LM A.01.08 11
DAK BETON
+12.600

PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
R. KONTROL 2020
DAK BETON +8.500 DAK BETON MENGETAHUI :
+8.500 +8.500
Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
PLAFOND PLAFOND PLAFOND PLAFOND DISETUJUI :
PLAFOND +7.500 +7.500 +7.500 +7.500 Penanggungjawab User
+7.300
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
LAV. DIFABLE LANTAI 2 Lantai 2 Lab. Merkuri
+4.250 +4.300 +4.300 +4.300

Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi
PLAFOND PLAFOND PLAFOND PLAFOND
PLAFOND +3.200 +3.200 +3.200 +3.200
+3.000

Darwin
Direktur
KONSULTAN PERENCANA
CD
LAV. DIFABLE R. CCTV LANTAI 1 Lantai 1
-0.050 Selasar
-0.200

Pit Lift
-1.600

DANANG RUJITO WIBOWO


KEPALA

01 POTONGAN PRINSIP 1 01 POTONGAN PRINSIP 2


SKALA = 1 : 75 SKALA = 1 : 75 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

POTONGAN PRINSIP 1
9 POTONGAN PRINSIP 2
1 : 75

1 2 3 KODE NO.LEMBAR JML.LEMBAR

LM A.01.09 11
PEKERJAAN :

LOKASI :

DAK BETON DAK BETON


+8.500 +8.500 TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

PLAFOND PLAFOND Erni Arsih Yulianti


+7.500 +7.500 NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


Lantai 2 Lantai 2 NIP. 19670706 199303 1 001
+4.300 +4.300
Penanggungjawab User
Lab. Merkuri

Ernawita Nazir
NIP. 19720504 199803 2 001
PLAFOND PLAFOND DIKOREKSI OLEH :
+3.200 +3.200
Konsultan Managemen Kontruksi

Darwin
Direktur
Lantai 1 Lantai 1
Halaman Selasar KONSULTAN PERENCANA
-0.300 -0.200

DANANG RUJITO WIBOWO


KEPALA

01 POTONGAN PRINSIP 3 01 POTONGAN PRINSIP 4


SKALA = 1 : 75 A SKALA = 1 : 75 D BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

POTONGAN PRINSIP 3
POTONGAN PRINSIP 4
1 : 75

KODE NO.LEMBAR JML.LEMBAR

LM A.01.10 11
DAK BETON PEKERJAAN :
DAK BETON
+8.500 +8.500

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
+4.300 DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
Lab. Merkuri

Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
R. AKUSTIK ANECHOIC CHAMBER Konsultan Managemen Kontruksi

Darwin
Direktur
KONSULTAN PERENCANA

DANANG RUJITO WIBOWO


KEPALA

01 POTONGAN PRINSIP 5
SKALA = 1 : 75 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA
7 8 9
POTONGAN PRINSIP 5 1 : 75

KODE NO.LEMBAR JML.LEMBAR

LM A.01.11 11
PEKERJAAN :

HT2 HT2
HT2 -0.250
HT2 -0.020 HT2 -0.250
HT1R. Operator LOKASI :
D
VN1
HT2 TAHUN ANGGARAN
R. TIMBANGAN 2020
VN1 VN1 VN2 MENGETAHUI :
CP VN1 R. KALIBRASI
R. AKUSTIK
-0.250 GETARAN R. KORIDOR Pejabat Pembuat Komitmen
STAGE R. MEETING AUDIO VISUAL R. PENYIMPANAN VN1 R. KALIBRASI UDARA R. KALIBRASI ALIRAN (OPERATOR) ANECHOIC
CHAMBER HT2
-0.750 -1.200 ALAT
(Desain Khusus)
CP -0.250
-0.800 +0.400
Erni Arsih Yulianti
NIP. 19750709 199703 2 001
-0.400 +0.800
VN1 DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan
PANTRY C
HT1 VN1 VN1 -0.020
R. PANEL Wisnu Eka Yulyanto
HT1 NIP. 19670706 199303 1 001
B Penanggungjawab User
R. CCTV
Lab. Merkuri
Lav.
Difable VN1 VN1
HT2 HT1
R. STAFF
HT1 Ernawita Nazir
Toilet -0.250 NIP. 19720504 199803 2 001
-0.020 Wanita VN1
Resepsionis VN1 R. PENYIMPANAN DIKOREKSI OLEH :
R. SPECTRO R. AAS CONTOH UJI GUDANG HT2 Konsultan Managemen Kontruksi
R. TIMBANG
R. LOBBY (R.TUNGGU) VN1 VN1 R. BAHAN
VN1 KIMIA
HT1
R. KABID VN1 R. PREPARASI CONTOH UJI
HT1 VN1
Toilet
Pria Darwin
A Direktur

HT2 -0.020 HT2 -0.020 HT2 -0.020 KONSULTAN PERENCANA

HT2 HT2

1 2 3 4 5 6 7 8 9
NOTASI KETERANGAN LANTAI DANANG RUJITO WIBOWO
HT1 HOMOGENOUS TILE 60x60 Cm POLISHED KEPALA

02 DENAH POLA LANTAI LT. 01 HT2 HOMOGENOUS TILE 60x60 Cm UNPOLISHED


SKALA = 1 : 175 VN1 VINYL ANTI KIMIA
BAMBANG RIYANTO
VN2 VINYL KEDAP SUARA TEAM LEADER
CP CARPET JUDUL GAMBAR SKALA
GL FRAMELESS TEMPERED LAMINATED
GLASS 12 mm DENAH POLA LANTAI
1 : 175
FH FLOOR HARDENER
LT. 01

WP WATER PROOFING + SCREED KODE NO.LEMBAR JML.LEMBAR

LIHAT DETAIL LM A.02.01 04


PEKERJAAN :

Jalur Darurat / Maintenance Jalur Darurat / Maintenance


Gudang HT2 +4.280 HT2 +4.280 HT2
HT1 LOKASI :
R. MUSHOLLA D
+4.350
VN1 TAHUN ANGGARAN
R. MEETING R. ALAT AFS
DAN GC ECD 2020
+4.300 R. PREPARASI
T. Wudhu VN1 MENGETAHUI :
HT1 VN1 R. MAINTENANCE
R. ALAT MERCURY Pejabat Pembuat Komitmen
VN1 +4.300 ANECHOIC
+4.300

Jalur Darurat / Maintenance


VN2 Erni Arsih Yulianti

+4.280
R. CUCI
NIP. 19750709 199703 2 001
HT1 HT1 R. PREPARASI
R. GANTI MERCURY UNTUK PADATAN & AIR DISETUJUI :
R. LOKER
HT1 VN1 VN1
SANDAL +4.300 Penanggungjawab User
+4.300 Lab. Metrologi Lingkungan
C
VOID VOID
R. PANEL VN1 Wisnu Eka Yulyanto
HT1 NIP. 19670706 199303 1 001
VN1
HT1 VN1 VN1 B Penanggungjawab User
Lab. Merkuri
Lav. Pantry & R. Istirahat
Difable HT1 VN1 VN1 +4.300 HT2
VN1 Ernawita Nazir
Toilet NIP. 19720504 199803 2 001
Wanita
VOID R. PENYIMPANAN
DIKOREKSI OLEH :
+4.300 Konsultan Managemen Kontruksi
R. STAFF VN1 R. PERALATAN SAMPING VN1
HT1 +4.300 R. PREPARASI BIOTA
+4.300
HT1 VN1
+4.300 VN1
R. PIMPINAN R. Simpan
Toilet GL +4.300 +4.300
Pria Darwin

R. Mandi Jalur Darurat / Maintenance Jalur Darurat / Maintenance


A Direktur
HT2 +4.280 HT2 +4.280 HT2 KONSULTAN PERENCANA

WP
GL

1 2 3 4 5 6 7 8 9
NOTASI KETERANGAN LANTAI DANANG RUJITO WIBOWO
HT1 HOMOGENOUS TILE 60x60 Cm POLISHED KEPALA

02 DENAH POLA LANTAI LT. 02 HT2 HOMOGENOUS TILE 60x60 Cm UNPOLISHED


SKALA = 1 : 175 VN1 VINYL ANTI KIMIA
BAMBANG RIYANTO
VN2 VINYL KEDAP SUARA TEAM LEADER
CP CARPET JUDUL GAMBAR SKALA
GL FRAMELESS TEMPERED LAMINATED
GLASS 12 mm DENAH POLA LANTAI
1 : 175
FH FLOOR HARDENER
LT. 02

WP WATER PROOFING + SCREED KODE NO.LEMBAR JML.LEMBAR

LIHAT DETAIL LM A.02.02 04


PEKERJAAN :

WP WP WP WP WP WP WP WP
LOKASI :
D
DAK BETON DAK BETON TAHUN ANGGARAN
+8.500 +8.500 2020
MENGETAHUI :
Pejabat Pembuat Komitmen
WP WP WP WP WP WP WP WP

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan
C
DAK BETON
WP
+8.500
WP WP VN1 Wisnu Eka Yulyanto
R. PANTAU NIP. 19670706 199303 1 001
+8.600
B Penanggungjawab User
Lab. Merkuri
FH R. MESIN LIFT
+8.700

+8.600 Ernawita Nazir


VN1
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
WP WP WP WP WP WP Konsultan Managemen Kontruksi

WP
DAK BETON DAK BETON
+8.500 +8.500

Darwin
A Direktur
WP WP WP WP WP WP KONSULTAN PERENCANA
WP

1 2 3 4 5 6 7 8 9
NOTASI KETERANGAN LANTAI DANANG RUJITO WIBOWO
HT1 HOMOGENOUS TILE 60x60 Cm POLISHED KEPALA

02 DENAH POLA LANTAI LT. TOP ROOF HT2 HOMOGENOUS TILE 60x60 Cm UNPOLISHED
SKALA = 1 : 175 VN1 VINYL ANTI KIMIA
BAMBANG RIYANTO
VN2 VINYL KEDAP SUARA TEAM LEADER
CP CARPET JUDUL GAMBAR SKALA
GL FRAMELESS TEMPERED LAMINATED
GLASS 12 mm DENAH POLA LANTAI
1 : 175
FH FLOOR HARDENER
LT. TOP ROOF

WP WATER PROOFING + SCREED KODE NO.LEMBAR JML.LEMBAR

LIHAT DETAIL LM A.02.03 04


PEKERJAAN :

LOKASI :
D
DAK BETON DAK BETON TAHUN ANGGARAN
+8.500 +8.500 2020
MENGETAHUI :
Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan
C
DAK BETON DAK BETON
+8.500
GL +11.600 Wisnu Eka Yulyanto
NIP. 19670706 199303 1 001

WP B Penanggungjawab User
Lab. Merkuri
DAK BETON
+12.600 WP

Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
DAK BETON
Konsultan Managemen Kontruksi
+11.600

DAK BETON DAK BETON WP


+8.500 +8.500

Darwin
A Direktur
KONSULTAN PERENCANA

1 2 3 4 5 6 7 8 9
NOTASI KETERANGAN LANTAI DANANG RUJITO WIBOWO
HT1 HOMOGENOUS TILE 60x60 Cm POLISHED KEPALA

02 DENAH POLA LANTAI LT. ATAP HT2 HOMOGENOUS TILE 60x60 Cm UNPOLISHED
SKALA = 1 : 175 VN1 VINYL ANTI KIMIA
BAMBANG RIYANTO
VN2 VINYL KEDAP SUARA TEAM LEADER
CP CARPET JUDUL GAMBAR SKALA
GL FRAMELESS TEMPERED LAMINATED
GLASS 12 mm DENAH POLA LANTAI
1 : 175
FH FLOOR HARDENER
LT. ATAP

WP WATER PROOFING + SCREED KODE NO.LEMBAR JML.LEMBAR

LIHAT DETAIL LM A.02.04 04


-0.250
A A -0.020 -0.250 PEKERJAAN :
R. Operator
B B D

A
A A B B B B B B
B B

R. TIMBANGAN LOKASI :
B B B
R. KALIBRASI
-0.250 GETARAN R. KORIDOR R. AKUSTIK
STAGE R. MEETING AUDIO VISUAL R. R. KALIBRASI UDARA R. KALIBRASI ALIRAN (OPERATOR) ANECHOIC
B PENYIMPANAN B B B B B B B CHAMBER TAHUN ANGGARAN
-0.750 -1.200 ALAT 2020
(Desain Khusus)
B -0.250 MENGETAHUI :
-0.800 +0.400 Pejabat Pembuat Komitmen
B
-0.400 +0.800
B B
B B
B B B B B BB Erni Arsih Yulianti
PANTRY
A B
C NIP. 19750709 199703 2 001
A A B B B B B B B DISETUJUI :
A A -0.020 Penanggungjawab User
R. PANEL Lab. Metrologi Lingkungan
A A
A B B B B B B B B
A
A A A B B B B B B B B B B
B B
B
Lav. R. CCTV B
A Wisnu Eka Yulyanto
Difable A A B B A A
A B B NIP. 19670706 199303 1 001
A
B B A A
A R. STAFF Penanggungjawab User
Toilet -0.250 Lab. Merkuri
-0.020 Wanita A A B B B
Resepsionis
R. PENYIMPANAN
A BR. SPECTROB B R. AAS B B B B CONTOH UJI GUDANG
A
R. TIMBANG
R. LOBBY (R.TUNGGU) R. BAHAN Ernawita Nazir
B B B KIMIA B A A A NIP. 19720504 199803 2 001
R. KABID A R. PREPARASI CONTOH UJI DIKOREKSI OLEH :
Konsultan Managemen Kontruksi
Toilet
Pria A A A B B B B SC FH B B B B B A A
A
-0.020 -0.020 -0.020

Darwin
Direktur
KONSULTAN PERENCANA

1 2 3 4 5 6 7 8 9

03 DENAH WALL PLINT LT. 01


SKALA = 1 : 175 DANANG RUJITO WIBOWO
KEPALA

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

NOTASI KETERANGAN WALL PLINT DENAH WALL PLINT


LT. 01
1 : 175
A HOMOGENOUS TILE 10x60 Cm POLISHED

B PLINT VINYL LEBAR 10 Cm + KODE NO.LEMBAR JML.LEMBAR


CAPPING & COVE ALUMUNIUM
LIHAT DETAIL LM A.03.01 03
Jalur Darurat / Maintenance Jalur Darurat / Maintenance
A A A
Gudang A
+4.280 +4.280 PEKERJAAN :
A
A A
R. MUSHOLLA B B B B B B
SC B B D
A A A +4.350 A SC FH B FH B FH

A
R. MEETING B B B R. ALAT AFS LOKASI :
+4.300 DAN GC ECD
A A T. Wudhu R. PREPARASI
A R. ALAT MERCURY R. MAINTENANCE
+4.300 ANECHOIC
A B B B B B B +4.300 TAHUN ANGGARAN

Jalur Darurat / Maintenance


2020
B
A MENGETAHUI :

+4.280
B Pejabat Pembuat Komitmen
A A A A R. CUCI R. PREPARASI
R. GANTI MERCURY UNTUK PADATAN & AIR
AR. LOKER SANDALA A +4.300
+4.300 B B
A Erni Arsih Yulianti
B B B B B B B B
A
A A
A
C NIP. 19750709 199703 2 001
B B B B B B B B B DISETUJUI :
A VOID VOID Penanggungjawab User
R. PANEL Lab. Metrologi Lingkungan
A A
A B B B B B B
A B B B B B B B B B B
B B B
B
B B B B B
Lav. A B Pantry & R. Istirahat
Difable A Wisnu Eka Yulyanto
+4.300
NIP. 19670706 199303 1 001
B B B B B A A
A Penanggungjawab User
Toilet Lab. Merkuri
Wanita A A A A B B B B B B
VOID B
A R. PENYIMPANAN B
+4.300
R. STAFF R. PERALATAN SAMPING B Ernawita Nazir
+4.300 B B B +4.300 B B A A NIP. 19720504 199803 2 001
R. PREPARASI BIOTA B
+4.300
DIKOREKSI OLEH :
R. PIMPINAN R. Simpan Konsultan Managemen Kontruksi
A B B +4.300 B
Toilet +4.300
Pria A A B B B B B B B B A

R. Mandi Jalur Darurat / Maintenance Jalur Darurat / Maintenance


A
+4.280 +4.280

Darwin
Direktur
KONSULTAN PERENCANA

1 2 3 4 5 6 7 8 9

03 DENAH WALL PLINT LT. 02


SKALA = 1 : 175 DANANG RUJITO WIBOWO
KEPALA

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

NOTASI KETERANGAN WALL PLINT DENAH WALL PLINT


LT. 02
1 : 175
A HOMOGENOUS TILE 10x60 Cm POLISHED

B PLINT VINYL LEBAR 10 Cm + KODE NO.LEMBAR JML.LEMBAR


CAPPING & COVE ALUMUNIUM
LIHAT DETAIL LM A.03.02 03
PEKERJAAN :
D
DAK BETON DAK BETON
+8.500 +8.500 LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

Erni Arsih Yulianti


B C NIP. 19750709 199703 2 001
DISETUJUI :
DAK BETON B B Penanggungjawab User
+8.500 Lab. Metrologi Lingkungan
R. PANTAU
+8.600
B
B B B
R. MESIN LIFT
+8.700
Wisnu Eka Yulyanto
B NIP. 19670706 199303 1 001
B
+8.600 Penanggungjawab User
B Lab. Merkuri

Ernawita Nazir
NIP. 19720504 199803 2 001
DAK BETON DAK BETON DIKOREKSI OLEH :
+8.500 +8.500
Konsultan Managemen Kontruksi

Darwin
Direktur
KONSULTAN PERENCANA

1 2 3 4 5 6 7 8 9

03 DENAH WALL PLINT LT.TOP ROOF


SKALA = 1 : 175 DANANG RUJITO WIBOWO
KEPALA

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

NOTASI KETERANGAN WALL PLINT DENAH WALL PLINT


LT. TOP ROOF
1 : 175
A HOMOGENOUS TILE 10x60 Cm POLISHED

B PLINT VINYL LEBAR 10 Cm + KODE NO.LEMBAR JML.LEMBAR


CAPPING & COVE ALUMUNIUM
LIHAT DETAIL LM A.03.03 03
PEKERJAAN :

LOKASI :
-0.250
-0.020 -0.250
R. Operator
D TAHUN ANGGARAN
2020
MENGETAHUI :
R. TIMBANGAN Pejabat Pembuat Komitmen

R. KALIBRASI
-0.250 GETARAN R. KORIDOR R. AKUSTIK
STAGE R. MEETING AUDIO VISUAL R. PENYIMPANAN R. KALIBRASI UDARA R. KALIBRASI ALIRAN (OPERATOR) ANECHOIC
CHAMBER
Erni Arsih Yulianti
-0.750 -1.200 ALAT NIP. 19750709 199703 2 001
(Desain Khusus)
-0.250 DISETUJUI :
-0.800 +0.400 Penanggungjawab User
-0.400 +0.800 Lab. Metrologi Lingkungan

PANTRY C Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
R. PANEL -0.020 Penanggungjawab User
Lab. Merkuri
B
Lav. R. CCTV
Ernawita Nazir
Difable
NIP. 19720504 199803 2 001
R. STAFF
DIKOREKSI OLEH :
Toilet -0.250 Konsultan Managemen Kontruksi
-0.020 Wanita Resepsionis
PTS R. PENYIMPANAN
R. SPECTRO R. AAS CONTOH UJI GUDANG
R. TIMBANG
R. LOBBY (R.TUNGGU) R. BAHAN
KIMIA
R. KABID R. PREPARASI CONTOH UJI Darwin
Direktur
Toilet
Pria SC FH KONSULTAN PERENCANA
A
-0.020 -0.020 -0.020

1 2 3 4 5 6 7 8 9 DANANG RUJITO WIBOWO


KEPALA

04 DENAH KUSEN LANTAI 01


SKALA = 1 : 175 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DENAH KUSEN
1 : 175
LANTAI 01
KODE NO.LEMBAR JML.LEMBAR

LM A.04.01 08
PEKERJAAN :

LOKASI :
Jalur Darurat / Maintenance Jalur Darurat / Maintenance
Gudang +4.280 +4.280

R. MUSHOLLA
SC
D TAHUN ANGGARAN
+4.350 SC FH FH FH 2020
MENGETAHUI :
R. MEETING R. ALAT AFS Pejabat Pembuat Komitmen
+4.300 DAN GC ECD
T. Wudhu R. PREPARASI
R. ALAT MERCURY R. MAINTENANCE
+4.300 ANECHOIC
+4.300
Erni Arsih Yulianti

Jalur Darurat / Maintenance


NIP. 19750709 199703 2 001
DISETUJUI :

+4.280
Penanggungjawab User
R. CUCI R. PREPARASI Lab. Metrologi Lingkungan
R. GANTI MERCURY UNTUK PADATAN & AIR
R. LOKER SANDAL +4.300
+4.300

C Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
VOID VOID
R. PANEL Penanggungjawab User
Lab. Merkuri
B
Lav. Pantry & R. Istirahat Ernawita Nazir
Difable +4.300 NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Toilet Konsultan Managemen Kontruksi
Wanita
VOID R. PENYIMPANAN
+4.300
PTS
R. STAFF R. PERALATAN SAMPING
+4.300 +4.300
R. PREPARASI BIOTA
+4.300 Darwin
R. PIMPINAN R. Simpan
+4.300 +4.300 Direktur
Toilet
Pria KONSULTAN PERENCANA

R. Mandi Jalur Darurat / Maintenance Jalur Darurat / Maintenance


A
+4.280 +4.280

1 2 3 4 5 6 7 8 9 DANANG RUJITO WIBOWO


KEPALA

04 DENAH KUSEN LANTAI 02


SKALA = 1 : 175 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DENAH KUSEN
1 : 175
LANTAI 02
KODE NO.LEMBAR JML.LEMBAR

LM A.04.02 08
PEKERJAAN :

LOKASI :

D TAHUN ANGGARAN
2020
MENGETAHUI :
DAK BETON DAK BETON
+8.500 +8.500 Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

C Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
DAK BETON
+8.500 Penanggungjawab User
R. PANTAU Lab. Merkuri
+8.600
B
R. MESIN LIFT Ernawita Nazir
+8.700
NIP. 19720504 199803 2 001
+8.600 DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

DAK BETON DAK BETON


+8.500 +8.500 Darwin
Direktur
KONSULTAN PERENCANA
A

1 2 3 4 5 6 7 8 9 DANANG RUJITO WIBOWO


KEPALA

04 DENAH KUSEN LANTAI TOP ROOF


SKALA = 1 : 175 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DENAH KUSEN
1 : 175
LANTAI TOP ROOF
KODE NO.LEMBAR JML.LEMBAR

LM A.04.03 08
PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
Lab. Merkuri

Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

Darwin
Direktur
KONSULTAN PERENCANA

F.F.L F.F.L

DANANG RUJITO WIBOWO


KEPALA

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DETAIL KUSEN 1 : 30

KODE NO.LEMBAR JML.LEMBAR

LM A.04.04 08
PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
Lab. Merkuri

Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

Darwin
Direktur
KONSULTAN PERENCANA

DANANG RUJITO WIBOWO


KEPALA

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DETAIL KUSEN 1 : 30

KODE NO.LEMBAR JML.LEMBAR

LM A.04.05 08
PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
Lab. Merkuri

Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

Darwin
Direktur
KONSULTAN PERENCANA

F.F.L

F.F.L

DANANG RUJITO WIBOWO


KEPALA

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DETAIL KUSEN 1 : 30

KODE NO.LEMBAR JML.LEMBAR

LM A.04.06 08
PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
Lab. Merkuri

Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

Darwin
Direktur
KONSULTAN PERENCANA

DANANG RUJITO WIBOWO


KEPALA

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DETAIL KUSEN 1 : 30

KODE NO.LEMBAR JML.LEMBAR

LM A.04.07 08
PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
Lab. Merkuri

Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

Darwin
Direktur
KONSULTAN PERENCANA

DANANG RUJITO WIBOWO


KEPALA

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DETAIL KUSEN 1 : 30

KODE NO.LEMBAR JML.LEMBAR

LM A.04.08 08
PEKERJAAN :

GB -0.020 -0.020
GB +3.200 GB +3.200 LOKASI :
+3.200
D
TAHUN ANGGARAN
GB 2020
GB MENGETAHUI :
GP +3.200 GB GB GB GP Pejabat Pembuat Komitmen
VAR +3.200
+3.200 +3.200 +3.200 +3.200 +3.200
Erni Arsih Yulianti
GB NIP. 19750709 199703 2 001
DISETUJUI :
+3.200 Penanggungjawab User
Lab. Metrologi Lingkungan
GB
+3.200 GB C
GB GB

+3.200
GB
GB
Wisnu Eka Yulyanto
-0.020 +3.200 +3.200 NIP. 19670706 199303 1 001
+3.200 +3.200

GB
B Penanggungjawab User
GB GB Lab. Merkuri
GW
GB +3.200 GB GB
GB +3.200 +3.200
Ernawita Nazir

+3.200

+3.200
GW NIP. 19720504 199803 2 001
+3.200 GB
-0.020 GB GB GB DIKOREKSI OLEH :
+3.000 VOID Konsultan Managemen Kontruksi
+3.200
+3.200 GB +3.200 +3.200 GB
GB
GW GB +3.200 +3.200
-0.020 BE BE
+3.000 +3.200
Darwin

-0.020
A Direktur
GB GB GB -0.020 KONSULTAN PERENCANA
+3.200 +3.200

TR

1 2 3 4 5 6 7 8 9
DANANG RUJITO WIBOWO
KEPALA

05 DENAH PLAFOND LT. 01 NOTASI KETERANGAN PLAFOND


SKALA = 1 : 175 GB GYPSUMP BOARD 9 mm + LIST GYPSUMP 10 cm
RANGKA METAL FURING BAMBANG RIYANTO
GW GYPSUMP WET AREA 9 mm + LIST GYPSUMP 10 cm TEAM LEADER
RANGKA METAL FURING
JUDUL GAMBAR SKALA
GP GYPSUMP PANEL AKUSTIK + LIST GYPSUMP 10 cm
RANGKA CROSS TEE MAIN TEE
DENAH PLAFOND
SHADING ALUMUNIUM Uk. 70x200 mm, 1 : 175
SG
FINISHING POWDER COATING
LT. 01
TR TEMPERED LAMINATED SUNENERGY CLEAR KODE NO.LEMBAR JML.LEMBAR
SNFL LOW-E t=12 mm GLASS

BE BETON EXPOSE, FINISHING CAT LM A.05.01 05


PEKERJAAN :

GB GB
GB
GB LOKASI :
+4.300
D
+7.600
GB TAHUN ANGGARAN
GB GB
+4.300 2020
+4.300 +7.600 +4.300 GB MENGETAHUI :
+7.600 GW GB
+7.600 Pejabat Pembuat Komitmen
+4.300 +4.300 BE
+7.600 +7.600

GB Erni Arsih Yulianti


GB
+4.300 NIP. 19750709 199703 2 001
GB +4.300 GB
+7.600 DISETUJUI :
+7.600
+4.300 +4.300 Penanggungjawab User
GB +7.600 +7.600 Lab. Metrologi Lingkungan
C
GB
SG SG SG SG +4.300 GB
GB Wisnu Eka Yulyanto
+7.600

+4.280
NIP. 19670706 199303 1 001

+7.600
B Penanggungjawab User
GB GB Lab. Merkuri
GW
+4.300 +4.300 GB
GB +7.600 +7.600
+4.300 Ernawita Nazir
GW +7.600
NIP. 19720504 199803 2 001
+4.300 GB DIKOREKSI OLEH :
+7.600 GB +4.300 Konsultan Managemen Kontruksi
+4.300 GB GB GB +7.600
+7.600 +4.300 +4.300 +4.300
GW +7.600 GB +7.600 +7.600 GB
+4.300 +4.300 +4.300
+7.600 +7.600 +7.600 Darwin
A Direktur
GB GB KONSULTAN PERENCANA
GB

1 2 3 4 5 6 7 8 9
DANANG RUJITO WIBOWO
KEPALA

05 DENAH PLAFOND LT. 02 NOTASI KETERANGAN PLAFOND


SKALA = 1 : 175 GB GYPSUMP BOARD 9 mm + LIST GYPSUMP 10 cm
RANGKA METAL FURING BAMBANG RIYANTO
GW GYPSUMP WET AREA 9 mm + LIST GYPSUMP 10 cm TEAM LEADER
RANGKA METAL FURING
JUDUL GAMBAR SKALA
GP GYPSUMP PANEL AKUSTIK + LIST GYPSUMP 10 cm
RANGKA CROSS TEE MAIN TEE
DENAH PLAFOND
SHADING ALUMUNIUM Uk. 70x200 mm, 1 : 175
SG
FINISHING POWDER COATING
LT. 02
TR TEMPERED LAMINATED SUNENERGY CLEAR KODE NO.LEMBAR JML.LEMBAR
SNFL LOW-E t=12 mm GLASS

BE BETON EXPOSE, FINISHING CAT LM A.05.02 05


PEKERJAAN :

LOKASI :
D
TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan
C
TR TR TR TR BE
Wisnu Eka Yulyanto
BE NIP. 19670706 199303 1 001
B Penanggungjawab User
BE BE Lab. Merkuri
BE BE

BE BE Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

BE

Darwin
A Direktur
KONSULTAN PERENCANA

1 2 3 4 5 6 7 8 9
DANANG RUJITO WIBOWO
KEPALA

05 DENAH PLAFOND LT. TOP ROOF NOTASI KETERANGAN PLAFOND


SKALA = 1 : 175 GB GYPSUMP BOARD 9 mm + LIST GYPSUMP 10 cm
RANGKA METAL FURING BAMBANG RIYANTO
GW GYPSUMP WET AREA 9 mm + LIST GYPSUMP 10 cm TEAM LEADER
RANGKA METAL FURING
JUDUL GAMBAR SKALA
GP GYPSUMP PANEL AKUSTIK + LIST GYPSUMP 10 cm
RANGKA CROSS TEE MAIN TEE
DENAH PLAFOND
SHADING ALUMUNIUM Uk. 70x200 mm, 1 : 175
SG
FINISHING POWDER COATING
LT. TOP ROOF
TR TEMPERED LAMINATED SUNENERGY CLEAR KODE NO.LEMBAR JML.LEMBAR
SNFL LOW-E t=12 mm GLASS

BE BETON EXPOSE, FINISHING CAT LM A.05.03 05


PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
Lab. Merkuri

Ernawita Nazir
05 DETAIL PLAFOND (RANGKA METAL FURING) NIP. 19720504 199803 2 001
SKALA = 1 : 20 DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

Darwin
Direktur
KONSULTAN PERENCANA

DANANG RUJITO WIBOWO


KEPALA

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DETAIL PLAFOND 1 : 20

KODE NO.LEMBAR JML.LEMBAR

LM A.05.04 05
PEKERJAAN :

Plafond Angle bracket & 2mm dia


Angle bracket & galvanished wire
adjustable hanger LOKASI :
Cross - tee

TAHUN ANGGARAN
2020
MENGETAHUI :
Cross - tee Pejabat Pembuat Komitmen

Cross - tee Main - tee


Erni Arsih Yulianti
NIP. 19750709 199703 2 001
DISETUJUI :
Main - tee Penanggungjawab User
Cross - tee Lab. Metrologi Lingkungan

Cross - tee
Wisnu Eka Yulyanto
Main - tee NIP. 19670706 199303 1 001
Cross - tee
Penanggungjawab User
Lab. Merkuri

Cross - tee Main - tee


Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

Darwin
Direktur
KONSULTAN PERENCANA

DANANG RUJITO WIBOWO


KEPALA

05 DETAIL PLAFOND (RANGKA CROSS TEE MAIN TEE)


SKALA = 1 : 20 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DETAIL PLAFOND 1 : 20

KODE NO.LEMBAR JML.LEMBAR

LM A.05.05 05
CE
-0.250
CI CI CE CE -0.020 CE CE -0.250 CE CE CE CE PEKERJAAN :
CE CE CE CE CE CE
R. Operator
CE
EP EP EP EP EP EP
CE D

CI
CI CI PA PA EP EP EP EP EP EP EP
EP EP

PA
PA
R. TIMBANGAN LOKASI :
EP EP EP
R. KALIBRASI
-0.250 GETARAN R. KORIDOR R. AKUSTIK
R. KALIBRASI UDARA R. KALIBRASI ALIRAN (OPERATOR) ANECHOIC
CE PASTAGE R. MEETING AUDIO VISUAL PA R. PENYIMPANAN
EP EP EP EP EP EP EP EP CHAMBER EP CE TAHUN ANGGARAN
-0.750 -1.200 ALAT 2020
(Desain Khusus)
EP -0.250 MENGETAHUI :
-0.800 +0.400 Pejabat Pembuat Komitmen
EP
-0.400 +0.800
PA EP EP
PA
EP EP EP
PA PA EP EP EP EP EP EPEP EP EP EP EP Erni Arsih Yulianti
PANTRY
CI EP
C NIP. 19750709 199703 2 001
CI CI EP EP EP EP EP EP EP DISETUJUI :
CI CI -0.020 Penanggungjawab User
R. PANEL Lab. Metrologi Lingkungan
CI CI
CI GR EP EP EP EP EP EP EP EP
CE CI
CI
GR CI CI EP EP EP EP EP EP EP EP EP EP
EP EP
CE B
Lav. R. CCTV EP
CI Wisnu Eka Yulyanto
Difable CI CI EP EP CI CI
CI GR EP EP NIP. 19670706 199303 1 001
CI
EP EP CI CI
CI GR R. STAFF Penanggungjawab User
Toilet -0.250 Lab. Merkuri
-0.020 Wanita CI CI EP EP EP
Resepsionis
R. PENYIMPANAN
GR GR CI CI EPR. SPECTROEP EP R. AAS EP EP EP EPCONTOH UJI GUDANG
CI CE
R. TIMBANG
R. LOBBY (R.TUNGGU) CI R. BAHAN Ernawita Nazir
CE GR NIP. 19720504 199803 2 001
EP EP EPKIMIA EP CI CI CI
GR
R. R. PREPARASI CONTOH UJI DIKOREKSI OLEH :
CI CI KABID CI
Konsultan Managemen Kontruksi
Toilet AC
Pria CI CI CI EP EP EP EP SC FH EP EP EP EP EP CI CI
GR
AC AC AC AC CE CE CE CE CE CE CE A
BA AC BA AC -0.020 AC AL2 CE
AL2
CE -0.020 CE CE CE -0.020 CE AC
AL1 AL1 AL2 CE
AC AC AC AL1 AL2
AL1 AC
BA BA BA AC BA AC Darwin
BA Direktur
AC AC
BA BA BA BA BA
KONSULTAN PERENCANA
BA BA

1 2 3 4 5 6 7 8 9
NOTASI KETERANGAN MATERIAL DINDING
FINISHING CAT
CI WATHERSHIELD DOFF (INTERIOR)
06 DENAH MATERIAL DINDING LT. 01 CE
FINISHING CAT
WATHERSHIELD DOFF (EXTERIOR)
SKALA = 1 : 175 FINISHING GRANITE TILE MOTIF
DANANG RUJITO WIBOWO
GR
KEPALA
EP FINISHING CAT EPOXY

PA LAPIS PANEL AKUSTIK

BA LAPIS BATU ALAM FIN. COATING


BAMBANG RIYANTO
ALUMUNIUM COMPOSITE PANEL (ACP)
AC
MOTIF KAYU TEAM LEADER
AL1 PROFIL ALUMINIUM Uk. 50x150mm JUDUL GAMBAR SKALA
AL2 ACP Uk. 100x300mm
DENAH MATERIAL DINDING
LT. 01
1 : 175
DINDING BATA RINGAN + PLESTER + ACI
PARTISI DOUBLE GYPSUMPBOARD 12 mm,
KODE NO.LEMBAR JML.LEMBAR
RANGKA METAL STUD
LIHAT DETAIL LM A.06.01 03
AL1 AL2 AL1 AL2 AL1 AL2 AL1 AL2
CE CE BA BA

CE CE Jalur Darurat / Maintenance CE CE CE CE Jalur Darurat / Maintenance


CI CI CI
Gudang CI CE
CE CE+4.280 CE CE CE CE CE
+4.280
CE PEKERJAAN :
CI
CE CI CI
R. MUSHOLLA EP EP EP EP EP EP
SC EP EP EP EP EP
CE D
CI CI CI +4.350 CI SC FH EP FH EP FH EP
CE BA
CI
R. MEETING EP EP EP R. ALAT AFS LOKASI :
+4.300 DAN GC ECD
CE CI CI T. Wudhu R. PREPARASI
CI R. ALAT MERCURY R. MAINTENANCE
+4.300 ANECHOIC
EP EP EP EP EP EP +4.300 EP CE TAHUN ANGGARAN
CI

Jalur Darurat / Maintenance


2020
EP
CI MENGETAHUI :

+4.280
EP Pejabat Pembuat Komitmen
CI CI CI CI R. CUCI R. PREPARASI
R. GANTI MERCURY UNTUK PADATAN & AIR
CIR. LOKER SANDALCI CI +4.300
+4.300 CE BA
CI EP EP EP
EP EP EP EP EP EP EP EP EP EP EP Erni Arsih Yulianti
CI
CI CI
CI
C NIP. 19750709 199703 2 001
CE
CI EP EP EP EP EP EP EP EP DISETUJUI :
CI VOID VOID Penanggungjawab User
R. PANEL Lab. Metrologi Lingkungan
CI CI
CI CI EP EP EP EP EP EP
CE CI
GR
EP EP EP EP EP EP EP EP EP EP
EP EP EP
CE B
EP EP EP EP EP
Lav. CI CI CI EP Pantry & R. Istirahat
Difable CI Wisnu Eka Yulyanto
+4.300
GR AL2 NIP. 19670706 199303 1 001
EP EP EP EP EP CI CI CE
CI Penanggungjawab User
Toilet
CI AL1
CI CI CI CI CI EP EP EP EP EP EP Lab. Merkuri
Wanita
VOID EP
CI R. PENYIMPANAN EP CE
CE +4.300
CI R. STAFF CI R. PERALATAN SAMPING EP Ernawita Nazir
+4.300 EP EP EP +4.300 EP EP CI CI CE NIP. 19720504 199803 2 001
CI R. PREPARASI BIOTA EP
+4.300
DIKOREKSI OLEH :
R. PIMPINAN R. Simpan Konsultan Managemen Kontruksi
CI EP EP+4.300 EP
Toilet CI CI +4.300
EP EP AC
Pria CI CI EP EP EP EP EP EP CI

R. Mandi
AC
CE Jalur DaruratCE
/ Maintenance CE CE Jalur DaruratCE
/ Maintenance CE CE A
AC AC CE CE CE CE CE CE
AL1 AL2 +4.280 AL1 AL2 +4.280 AL1 AL2 CE AC
AC
AC AC
AC AC Darwin
Direktur
AC
KONSULTAN PERENCANA

1 2 3 4 5 6 7 8 9
NOTASI KETERANGAN MATERIAL DINDING
FINISHING CAT
CI WATHERSHIELD DOFF (INTERIOR)
06 DENAH MATERIAL DINDING LT. 02 CE
FINISHING CAT
WATHERSHIELD DOFF (EXTERIOR)
SKALA = 1 : 175 FINISHING GRANITE TILE MOTIF
DANANG RUJITO WIBOWO
GR
KEPALA
EP FINISHING CAT EPOXY

PA LAPIS PANEL AKUSTIK

BA LAPIS BATU ALAM FIN. COATING


BAMBANG RIYANTO
ALUMUNIUM COMPOSITE PANEL (ACP)
AC
MOTIF KAYU TEAM LEADER
AL1 PROFIL ALUMINIUM Uk. 50x150mm JUDUL GAMBAR SKALA
AL2 ACP Uk. 100x300mm
DENAH MATERIAL DINDING
LT. 02
1 : 175
DINDING BATA RINGAN + PLESTER + ACI
PARTISI DOUBLE GYPSUMPBOARD 12 mm,
KODE NO.LEMBAR JML.LEMBAR
RANGKA METAL STUD
LIHAT DETAIL LM A.06.02 03
CE CE CE CE

CE CE CE CE
PEKERJAAN :
D
DAK BETON DAK BETON
+8.500 +8.500 LOKASI :

CE CE CE CE

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

CE CE
CE CE CE CE Erni Arsih Yulianti
CE CE C NIP. 19750709 199703 2 001
CI CI CI CI DISETUJUI :
DAK BETON CE CI CI CE Penanggungjawab User
+8.500 Lab. Metrologi Lingkungan
CE CI CI CI CI R. PANTAU
CI +8.600 CI B
CI CI CI CE CE CE CE
CE CI
CI R. MESIN LIFT
CI CI CI
CE CE Wisnu Eka Yulyanto
+8.700
CI CI CI CI CI NIP. 19670706 199303 1 001
CI
CE CI +8.600 Penanggungjawab User
Lab. Merkuri
CE CI CI CE

CE CE Ernawita Nazir
CI CI NIP. 19720504 199803 2 001
DAK BETON DAK BETON CE CE
DIKOREKSI OLEH :
+8.500 +8.500
Konsultan Managemen Kontruksi

CI
A
CE
CE CE CE
CE Darwin
CE CE CE
Direktur
CE
KONSULTAN PERENCANA

1 2 3 4 5 6 7 8 9
NOTASI KETERANGAN MATERIAL DINDING
FINISHING CAT
CI WATHERSHIELD DOFF (INTERIOR)
06 DENAH MATERIAL DINDING LT. TOP ROOF CE
FINISHING CAT
WATHERSHIELD DOFF (EXTERIOR)
SKALA = 1 : 175 FINISHING GRANITE TILE MOTIF
DANANG RUJITO WIBOWO
GR
KEPALA
EP FINISHING CAT EPOXY

PA LAPIS PANEL AKUSTIK

BA LAPIS BATU ALAM FIN. COATING


BAMBANG RIYANTO
ALUMUNIUM COMPOSITE PANEL (ACP)
AC
MOTIF KAYU TEAM LEADER
AL1 PROFIL ALUMINIUM Uk. 50x150mm JUDUL GAMBAR SKALA
AL2 ACP Uk. 100x300mm
DENAH MATERIAL DINDING
LT. TOP ROOF
1 : 175
DINDING BATA RINGAN + PLESTER + ACI
PARTISI DOUBLE GYPSUMPBOARD 12 mm,
KODE NO.LEMBAR JML.LEMBAR
RANGKA METAL STUD
LIHAT DETAIL LM A.06.03 03
CE
CE
CE
CE
PEKERJAAN :

CE CE CE CE CE CE CE CE

AL1 AL1 AL1 AL1 AL1 AL1 LOKASI :


AC TR AC AC
AL2 AL2 AL2 AL2 AL2 AL2
TAHUN ANGGARAN
2020
AL1 AL1 AL1 AL1 AL1 MENGETAHUI :
Pejabat Pembuat Komitmen
AC TR AC CE AC
BA AL2 AL2 AL2 AL2 AL2
BA Erni Arsih Yulianti
BA BA NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
07 MATERIAL TAMPAK DEPAN Lab. Merkuri
SKALA = 1 : 175

CE Ernawita Nazir
NIP. 19720504 199803 2 001
CE DIKOREKSI OLEH :
CE Konsultan Managemen Kontruksi
CE

CE CE
CE Darwin
Direktur
CE CE CE CE AC KONSULTAN PERENCANA

CE CE

CE CE CE CE AC
CE

DANANG RUJITO WIBOWO


KEPALA
NOTASI KETERANGAN MATERIAL

CE FINISHING CAT
WATHERSHIELD DOFF (EXTERIOR)
BAMBANG RIYANTO
BA LAPIS BATU ALAM FIN. COATING TEAM LEADER
07 MATERIAL TAMPAK SAMPING KANAN AC ALUMUNIUM COMPOSITE PANEL (ACP)
MOTIF KAYU
JUDUL GAMBAR SKALA
SKALA = 1 : 175 MATERIAL TAMPAK DEPAN
AL1 PROFIL ALUMINIUM Uk. 50x150mm & 1 : 175
TAMPAK SAMPING KANAN
AL2 ACP Uk. 100x300mm
KODE NO.LEMBAR JML.LEMBAR
TR TEMPERED LAMINATED GLASS t = 12mm LM A.07.01 02
CE
CE
CE
PEKERJAAN :

CE CE CE CE CE CE CE CE

CE CE CE AL1 AL1 AL1 AL1 AL1 AC LOKASI :

AL2 AL2 AL2 AL2 AL2


BA BA TAHUN ANGGARAN
2020
AL1 AL1 AL1 AL1 AL1 MENGETAHUI :
Pejabat Pembuat Komitmen
CE CE CE AL2 AL2 AL2 AL2 AL2 CE AC
Erni Arsih Yulianti
NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
07 MATERIAL TAMPAK BELAKANG Lab. Merkuri
SKALA = 1 : 175

CE Ernawita Nazir
NIP. 19720504 199803 2 001
CE DIKOREKSI OLEH :
CE Konsultan Managemen Kontruksi
CE

CE CE

AL1 AL1 Darwin


AC AC CE Direktur
KONSULTAN PERENCANA
AL2 AL2
BA
CE

AC AC CE CE

DANANG RUJITO WIBOWO


KEPALA
NOTASI KETERANGAN MATERIAL

CE FINISHING CAT
WATHERSHIELD DOFF (EXTERIOR)
BAMBANG RIYANTO
BA LAPIS BATU ALAM FIN. COATING TEAM LEADER
07 MATERIAL TAMPAK SAMPING KIRI AC ALUMUNIUM COMPOSITE PANEL (ACP)
MOTIF KAYU
JUDUL GAMBAR SKALA
SKALA = 1 : 175 MATERIAL TAMPAK BELAKANG
AL1 PROFIL ALUMINIUM Uk. 50x150mm & 1 : 175
TAMPAK SAMPING KIRI
AL2 ACP Uk. 100x300mm
KODE NO.LEMBAR JML.LEMBAR
TR TEMPERED LAMINATED GLASS t = 12mm LM A.07.02 02
PEKERJAAN :

-0.250
-0.020 -0.250
R. Operator LOKASI :
D
TAHUN ANGGARAN
R. TIMBANGAN 2020
MENGETAHUI :
R. KALIBRASI
-0.250 GETARAN R. KORIDOR R. AKUSTIK Pejabat Pembuat Komitmen
STAGE R. MEETING AUDIO VISUAL R. PENYIMPANAN R. KALIBRASI UDARA R. KALIBRASI ALIRAN (OPERATOR) ANECHOIC
-0.750 -1.200 ALAT CHAMBER
(Desain Khusus)
-0.250
-0.800 +0.400
Erni Arsih Yulianti
NIP. 19750709 199703 2 001
-0.400 +0.800
DISETUJUI :
PANTRY LT.01.1
Penanggungjawab User
Lab. Metrologi Lingkungan
PANTRY C
-0.020
R. PANEL
EMERGENCY SHOWER LT.01.1
Wisnu Eka Yulyanto
NIP. 19670706 199303 1 001
B Penanggungjawab User
R. CCTV
Lab. Merkuri
Lav.
Difable

R. STAFF Ernawita Nazir


Toilet -0.250 NIP. 19720504 199803 2 001
-0.020 Wanita Resepsionis
R. PENYIMPANAN DIKOREKSI OLEH :
R. SPECTRO R. AAS CONTOH UJI GUDANG
Konsultan Managemen Kontruksi
R. TIMBANG
R. LOBBY (R.TUNGGU) R. BAHAN
KIMIA
R. KABID R. PREPARASI CONTOH UJI

Toilet
Pria Darwin
A Direktur

LAVATORY LT.01.1
-0.020 -0.020 -0.020 KONSULTAN PERENCANA

1 2 3 4 5 6 7 8 9
DANANG RUJITO WIBOWO
KEPALA

08 DENAH LAYOUT LAVATORY, PANTRY, T.WUDHU & EMERGENCY SHOWER LT. 01


SKALA = 1 : 175
BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA
DENAH LAYOUT LAVATORY,
PANTRY, T.WUDHU &
EMERGENCY SHOWER 1 : 175
LANTAI 01
KODE NO.LEMBAR JML.LEMBAR

LM A.08.01 10
PEKERJAAN :

Jalur Darurat / Maintenance Jalur Darurat / Maintenance


Gudang +4.280 +4.280
LOKASI :
R. MUSHOLLA D
+4.350

T. WUDHU LT.02.1 R. ALAT AFS TAHUN ANGGARAN


R. MEETING 2020
+4.300 DAN GC ECD
T. Wudhu R. PREPARASI MENGETAHUI :
R. ALAT MERCURY R. MAINTENANCE Pejabat Pembuat Komitmen
+4.300 ANECHOIC
+4.300

Jalur Darurat / Maintenance


Erni Arsih Yulianti

+4.280
R. CUCI
NIP. 19750709 199703 2 001
R. PREPARASI
R. GANTI MERCURY UNTUK PADATAN & AIR DISETUJUI :
R. LOKER SANDAL +4.300 Penanggungjawab User
+4.300 Lab. Metrologi Lingkungan
C
VOID VOID
R. PANEL Wisnu Eka Yulyanto
PANTRY LT.02.1 NIP. 19670706 199303 1 001
B Penanggungjawab User
Lab. Merkuri
Lav. Pantry & R. Istirahat
Difable +4.300
EMERGENCY SHOWER LT.02.1
Ernawita Nazir
Toilet NIP. 19720504 199803 2 001
Wanita LAVATORY LT.02.1
VOID R. PENYIMPANAN
DIKOREKSI OLEH :
+4.300 Konsultan Managemen Kontruksi
R. STAFF R. PERALATAN SAMPING
+4.300 +4.300
R. PREPARASI BIOTA
+4.300
R. PIMPINAN R. Simpan
Toilet +4.300 +4.300
Pria Darwin

R. Mandi Jalur Darurat / Maintenance Jalur Darurat / Maintenance


A Direktur
+4.280 +4.280 KONSULTAN PERENCANA

1 2 3 4 5 6 7 8 9
DANANG RUJITO WIBOWO
KEPALA

08 DENAH LAYOUT LAVATORY, PANTRY, T.WUDHU & EMERGENCY SHOWER LT. 02


SKALA = 1 : 175
BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA
DENAH LAYOUT LAVATORY,
PANTRY, T.WUDHU &
EMERGENCY SHOWER 1 : 175
LANTAI 02
KODE NO.LEMBAR JML.LEMBAR

LM A.08.02 10
1
PEKERJAAN :
B HT2 KC
KW

HT2 WW HT2
LOKASI :
HR
HT2 HT2 HT2 HT2 HT2
HR
LAVATORY DIFABLE HT2 CP HT2 HT2 CP HT2 HT2 HT2
HT. 60x60 cm CERMIN CERMIN
CF
UNPOLISHED KC KC TAHUN ANGGARAN
-0.020 20 KC
2020
KC
WS MENGETAHUI :
KW WT WT WT WT
SH
PH PH HR KW Pejabat Pembuat Komitmen
FD HR WW
HT2 WW
WT WT WT WT CD
CD CD
LT. 01 WS WS

HT2 HT2
-0.050 -0.020 -0.050 -0.020 -0.020 Erni Arsih Yulianti
WT 20 HT1 HT1 HT1 HT1 HT1 NIP. 19750709 199703 2 001
DISETUJUI :
KT Penanggungjawab User
Lab. Metrologi Lingkungan
KC LAVATORY WANITA
HT. 60x60 cm
KT UNPOLISHED HT2
WT -0.020 Wisnu Eka Yulyanto
NIP. 19670706 199303 1 001
CP
30 30
CP
A 08 POTONGAN 01 - 01 B Penanggungjawab User
20 Lab. Merkuri
HT. 60x60 cm HT. 60x60 cm SKALA = 1 : 50
HT2 UNPOLISHED UNPOLISHED HT2
-0.050 -0.050
PH PH Ernawita Nazir
NIP. 19720504 199803 2 001
CD CD
DIKOREKSI OLEH :
FD HT2
FD
WS
HT2
WS
HT2
HT2 Konsultan Managemen Kontruksi
KODE KETERANGAN

HT2
CA DINDING BATA RINGAN FIN. CAT INTERIOR
HT2
HT1 HOMOGENEOUS TILE 60x60 cm UNPOLISHED
WT

LAVATORY PRIA HT2 HOMOGENEOUS TILE 60x60 cm POLISHED


KT HT. 60x60 cm KT1 KERAMIK TILE 30x60 cm POLISHED Darwin
KC
UNPOLISHED HT2
HT2 Direktur
-0.020 HT2 CP HT2 CP CUBICAL TOILET PHANEL PHENOLIC
HT2
KONSULTAN PERENCANA
HT2
UR PG PLAFON GRC FIN. CAT WATHERSHIELD DOF
KT
WT
UP
CP UP
KODE KETERANGAN
PH
CD CLOSED DUDUK
2 FD
HT. 60x60 cm
PH
30
UR
2 UR

CF CLOSED DIFABEL
CD
HT2 UNPOLISHED
-0.050 WS WASHLET SHOWER SPRAY
HT2 -0.050 -0.020
CD HT1
FD HT1 WF WATER FAUCET / KRAN
HT2
WS CP PH PAPER TOILET HOLDER
A HT2
PH
FD FLOOR DRAIN DANANG RUJITO WIBOWO
KEPALA
WT WASHTAFEL UNDERCOUNTER
KC
KW KW
SELASAR WW WASHTAFEL WALLHUNG
-0.020
WW
WW KT KRAN WASTAFEL UNDERCOUNTER
BAMBANG RIYANTO
KW KRAN WASTAFEL WALLHUNG TEAM LEADER
1 KC KACA CERMIN t = 8 Mm JUDUL GAMBAR SKALA
1 2 1 2 HR HAND RAIL
UR URINOIR DETAIL LAVATORY 1 : 50

08 DETAIL LAVATORY LT. 01.1 08 POTONGAN 02 - 02 UP URINOIR PARTITION


KODE NO.LEMBAR JML.LEMBAR
SH SHOWER
SKALA = 1 : 50 SKALA = 1 : 50
SE SHOWER EMERGENCY LM A.08.03 10
CI CI CI

PEKERJAAN :

CI HT2 HT2 HT2 CI

LOKASI :
KR
+0.780
SI HT2

TAHUN ANGGARAN
2020
-0.020 MENGETAHUI :
HT1 Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
2 Penanggungjawab User
Lab. Metrologi Lingkungan

1 2
Wisnu Eka Yulyanto

HT2
KR HT2
+0.800
08 POTONGAN 01 - 01 NIP. 19670706 199303 1 001

SI HT2
Penanggungjawab User
SKALA = 1 : 50 Lab. Merkuri

C CI PANTRY
HT. 60x60 cm
CI
Ernawita Nazir
1 POLISHED 1 NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
CI CI
Konsultan Managemen Kontruksi
CI KODE KETERANGAN
CA DINDING BATA RINGAN FIN. CAT INTERIOR
HT1 HOMOGENEOUS TILE 60x60 cm UNPOLISHED
2 CI CI CI
HT2 HOMOGENEOUS TILE 60x60 cm POLISHED
1 2 KT1 KERAMIK TILE 30x60 cm POLISHED Darwin
KT1
Direktur
CI KT1 CP CUBICAL TOILET PHANEL PHENOLIC
KONSULTAN PERENCANA
08 DETAIL PANTRY LT. 01.1 PG PLAFON GRC FIN. CAT WATHERSHIELD DOF

SKALA = 1 : 50
KODE KETERANGAN
HT
CD CLOSED DUDUK
CF CLOSED DIFABEL
WS WASHLET SHOWER SPRAY
HT1
WF WATER FAUCET / KRAN
PH PAPER TOILET HOLDER
FD FLOOR DRAIN DANANG RUJITO WIBOWO
KEPALA
WT WASHTAFEL UNDERCOUNTER
WW WASHTAFEL WALLHUNG
KT KRAN WASTAFEL UNDERCOUNTER
BAMBANG RIYANTO
KW KRAN WASTAFEL WALLHUNG TEAM LEADER
C KC KACA CERMIN t = 8 Mm JUDUL GAMBAR SKALA
HR HAND RAIL
UR URINOIR DETAIL PANTRY 1 : 50
08 POTONGAN 02 - 02 UP URINOIR PARTITION
KODE NO.LEMBAR JML.LEMBAR
SKALA = 1 : 50 SH SHOWER

SE SHOWER EMERGENCY LM A.08.04 10


PEKERJAAN :
KT1
KT1 KT1

LOKASI :

TAHUN ANGGARAN
SE
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

-0.050
KR
Erni Arsih Yulianti
NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan
2
6
Wisnu Eka Yulyanto
NIP. 19670706 199303 1 001
08 POTONGAN 01 - 01 Penanggungjawab User
50
SE EMERGENCY SKALA = 1 : 50 Lab. Merkuri
SHOWER
KERAMIK 30x30 cm
1B KT1

FD
UNPOLISHED
-0.050 KT1 1 Ernawita Nazir
KT1 NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi
KODE KETERANGAN
CA DINDING BATA RINGAN FIN. CAT INTERIOR
6 2 HT1 HOMOGENEOUS TILE 60x60 cm UNPOLISHED
CI KT1
KT1
HT2 HOMOGENEOUS TILE 60x60 cm POLISHED
KT1 KERAMIK TILE 30x60 cm POLISHED Darwin
Direktur
08 DETAIL EMERGENCY SHOWER LT. 01.1 CP CUBICAL TOILET PHANEL PHENOLIC
KONSULTAN PERENCANA
PG PLAFON GRC FIN. CAT WATHERSHIELD DOF
SKALA = 1 : 50
KODE KETERANGAN
SE
CD CLOSED DUDUK
CF CLOSED DIFABEL
WS WASHLET SHOWER SPRAY
-0.050
KR WF WATER FAUCET / KRAN
PH PAPER TOILET HOLDER
FD FLOOR DRAIN DANANG RUJITO WIBOWO
KEPALA
WT WASHTAFEL UNDERCOUNTER
WW WASHTAFEL WALLHUNG
KT KRAN WASTAFEL UNDERCOUNTER
BAMBANG RIYANTO
B KW KRAN WASTAFEL WALLHUNG TEAM LEADER
KC KACA CERMIN t = 8 Mm JUDUL GAMBAR SKALA
HR HAND RAIL
08 POTONGAN 02 - 02 UR URINOIR
DETAIL EMERGENCY
1 : 50
SHOWER
SKALA = 1 : 50 UP URINOIR PARTITION
KODE NO.LEMBAR JML.LEMBAR
SH SHOWER

SE SHOWER EMERGENCY LM A.08.05 10


1

B HT2 KC
KW

HT2 WW HT2 PEKERJAAN :


HR
HR
LAVATORY DIFABLE
HT. 60x60 cm
CF
UNPOLISHED
+4.280 20
LOKASI :
WS

FD SH HR
HT2
TAHUN ANGGARAN
2020
HT2 HT2 LT. 02 MENGETAHUI :
+4.300
WT 20 Pejabat Pembuat Komitmen

KW

+5.100 Erni Arsih Yulianti


KC LAVATORY WANITA
HT. 60x60 cm NIP. 19750709 199703 2 001
KW POLISHED HT2 DISETUJUI :
WT +4.280 Penanggungjawab User
Lab. Metrologi Lingkungan
CP CP
30 30
20

HT. 60x60 cm HT. 60x60 cm Wisnu Eka Yulyanto


HT2 UNPOLISHED UNPOLISHED NIP. 19670706 199303 1 001
+4.250 +4.250
PH PH
HT2 Penanggungjawab User
CD CD
Lab. Merkuri

WS FD WS HT2
HT1
FD HT2 HT2
Ernawita Nazir
HT2 HT2 NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
WT Konsultan Managemen Kontruksi
LAVATORY PRIA KODE KETERANGAN
KW HT. 60x60 cm
POLISHED HT2 CA DINDING BATA RINGAN FIN. CAT INTERIOR
KC
+4.280 HT1 HOMOGENEOUS TILE 60x60 cm UNPOLISHED
HT2 HT2
UR HT2 HOMOGENEOUS TILE 60x60 cm POLISHED
KW WT
KT1 KERAMIK TILE 30x60 cm POLISHED Darwin
+5.100 Direktur
CP UP CP CUBICAL TOILET PHANEL PHENOLIC
KONSULTAN PERENCANA
2 FD HT. 60x60 cm 30 UR
2 PG PLAFON GRC FIN. CAT WATHERSHIELD DOF
HT2 UNPOLISHED
+4.250
KODE KETERANGAN
CD
HT2
CD CLOSED DUDUK
CP
WS PH HT2 HT2
CF CLOSED DIFABEL
A HT2
WS WASHLET SHOWER SPRAY
FD
30 WF WATER FAUCET / KRAN
SH
R. MANDI PH PAPER TOILET HOLDER
HT. 60x60 cm DANANG RUJITO WIBOWO
UNPOLISHED FD FLOOR DRAIN
+4.250 CP KEPALA
WT WASHTAFEL UNDERCOUNTER
HT
2

HT
2 WW WASHTAFEL WALLHUNG
KT KRAN WASTAFEL UNDERCOUNTER
BAMBANG RIYANTO
KW KRAN WASTAFEL WALLHUNG TEAM LEADER
KC KACA CERMIN t = 8 Mm JUDUL GAMBAR SKALA
HR HAND RAIL
UR URINOIR DETAIL LAVATORY 1 : 50
1
1 2 08 DETAIL LAVATORY LT. 02.1 UP URINOIR PARTITION
KODE NO.LEMBAR JML.LEMBAR
SH SHOWER
SKALA = 1 : 50
SE SHOWER EMERGENCY LM A.08.06 10
PLAFOND PLAFOND PLAFOND PEKERJAAN :
+7.300 +7.300 +7.300

HT2 HT2 HT2 HT2 HT2 LOKASI :


HT2 HT2 HT2 CP HT2 HT2 CP HT2 HT2 HT2 HT2

CERMIN CERMIN
KC KC
TAHUN ANGGARAN
SH KC 2020
PH
WT WT PH WT WT HR KW MENGETAHUI :
WW Pejabat Pembuat Komitmen
WT WT WT WT CD
CD CD SH
WS WS

+4.300 +4.300 +4.250 +4.280 +4.250 +4.280 +4.280 +4.300


HT1 HT1 HT1 HT1 HT1 HT1 Erni Arsih Yulianti
NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


A B NIP. 19670706 199303 1 001

08 POTONGAN 01 - 01 Penanggungjawab User


Lab. Merkuri
SKALA = 1 : 50

Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi
KODE KETERANGAN
PLAFOND CA DINDING BATA RINGAN FIN. CAT INTERIOR
HT1 HOMOGENEOUS TILE 60x60 cm UNPOLISHED
HT2 HOMOGENEOUS TILE 60x60 cm POLISHED
KT1 KERAMIK TILE 30x60 cm POLISHED Darwin
HT2 HT2 Direktur
HT2 CP HT2 CP CUBICAL TOILET PHANEL PHENOLIC
KONSULTAN PERENCANA
PG PLAFON GRC FIN. CAT WATHERSHIELD DOF

UP
KODE KETERANGAN
UR CD CLOSED DUDUK
CD
CF CLOSED DIFABEL

+4.250 +4.280 +4.300 WS WASHLET SHOWER SPRAY


HT1
WF WATER FAUCET / KRAN
PH PAPER TOILET HOLDER
FD FLOOR DRAIN DANANG RUJITO WIBOWO
KEPALA
WT WASHTAFEL UNDERCOUNTER
WW WASHTAFEL WALLHUNG
KT KRAN WASTAFEL UNDERCOUNTER
BAMBANG RIYANTO
KW KRAN WASTAFEL WALLHUNG TEAM LEADER
1 2 KC KACA CERMIN t = 8 Mm JUDUL GAMBAR SKALA
HR HAND RAIL
UR URINOIR DETAIL LAVATORY 1 : 50
08 POTONGAN 02 - 02 UP URINOIR PARTITION
KODE NO.LEMBAR JML.LEMBAR
SKALA = 1 : 50 SH SHOWER

SE SHOWER EMERGENCY LM A.08.07 10


PLAFOND PEKERJAAN :

LOKASI :

CI HT2 HT2
HT2 TAHUN ANGGARAN
2020
MENGETAHUI :
WF WF WF
Pejabat Pembuat Komitmen

+4.300 +4.250 +4.280 +4.300 Erni Arsih Yulianti


HT1 NIP. 19750709 199703 2 001
1 DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan
MUSHOLA
+4.350
50
CI
Wisnu Eka Yulyanto
T. WUDHU
HT. 60x60 cm
20
08 POTONGAN 01 - 01 NIP. 19670706 199303 1 001

POLISHED Penanggungjawab User


CI SKALA = 1 : 50 Lab. Merkuri
+4.280
+4.300
2 HT2
30 +4.250
HT2
2
FD +4.250 Ernawita Nazir
WF HT2 WF WF NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi
KODE KETERANGAN
PLAFOND
CA DINDING BATA RINGAN FIN. CAT INTERIOR

1 HT1 HOMOGENEOUS TILE 60x60 cm UNPOLISHED


HT2 HOMOGENEOUS TILE 60x60 cm POLISHED
KT1 KERAMIK TILE 30x60 cm POLISHED Darwin
Direktur
CP CUBICAL TOILET PHANEL PHENOLIC
KONSULTAN PERENCANA
08 DETAIL T.WUDHU LT. 02.1 HT2
HT2 CI
CI PG PLAFON GRC FIN. CAT WATHERSHIELD DOF

SKALA = 1 : 50
KODE KETERANGAN

WF CD CLOSED DUDUK
CF CLOSED DIFABEL
WS WASHLET SHOWER SPRAY
+4.300 +4.250 +4.280 +4.300
HT1 WF WATER FAUCET / KRAN
PH PAPER TOILET HOLDER
FD FLOOR DRAIN DANANG RUJITO WIBOWO
KEPALA
WT WASHTAFEL UNDERCOUNTER
WW WASHTAFEL WALLHUNG
KT KRAN WASTAFEL UNDERCOUNTER
BAMBANG RIYANTO
KW KRAN WASTAFEL WALLHUNG TEAM LEADER
KC KACA CERMIN t = 8 Mm
08 POTONGAN 02 - 02 HR HAND RAIL
JUDUL GAMBAR SKALA

SKALA = 1 : 50 UR URINOIR DETAIL T. WUDHU 1 : 50


UP URINOIR PARTITION
KODE NO.LEMBAR JML.LEMBAR
SH SHOWER

SE SHOWER EMERGENCY LM A.08.08 10


PEKERJAAN :

CI HT2
CI HT2
LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
+4.300 +4.300 +4.300 Pejabat Pembuat Komitmen
HT

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
2 DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

CI
B
C Wisnu Eka Yulyanto
NIP. 19670706 199303 1 001
Penanggungjawab User

1
+5.100
1 08 POTONGAN 01 - 01 Lab. Merkuri
HT2
PANTRY SKALA = 1 : 50
HT. 60x60 cm Ernawita Nazir
POLISHED NIP. 19720504 199803 2 001
+4.300
DIKOREKSI OLEH :
CI Konsultan Managemen Kontruksi
KODE KETERANGAN
CA DINDING BATA RINGAN FIN. CAT INTERIOR
HT1 HOMOGENEOUS TILE 60x60 cm UNPOLISHED
SI
KR
CI CI
HT2 HOMOGENEOUS TILE 60x60 cm POLISHED
CI
CI Darwin
KT1 KERAMIK TILE 30x60 cm POLISHED
Direktur
CP CUBICAL TOILET PHANEL PHENOLIC
KONSULTAN PERENCANA
HT2 HT2 CI PG PLAFON GRC FIN. CAT WATHERSHIELD DOF
8 2 HT2

KODE KETERANGAN
KR CD CLOSED DUDUK
+5.100
SI
CF CLOSED DIFABEL
WS WASHLET SHOWER SPRAY
08 DETAIL PANTRY LT. 02.1 WF WATER FAUCET / KRAN
SKALA = 1 : 50 +4.300 +4.300 +4.300
HT PH PAPER TOILET HOLDER
FD FLOOR DRAIN DANANG RUJITO WIBOWO
KEPALA
WT WASHTAFEL UNDERCOUNTER
WW WASHTAFEL WALLHUNG
KT KRAN WASTAFEL UNDERCOUNTER
BAMBANG RIYANTO
KW KRAN WASTAFEL WALLHUNG TEAM LEADER
KC KACA CERMIN t = 8 Mm JUDUL GAMBAR SKALA
B HR HAND RAIL
UR URINOIR DETAIL PANTRY 1 : 50
08 POTONGAN 02 - 02 UP URINOIR PARTITION
KODE NO.LEMBAR JML.LEMBAR
SKALA = 1 : 50 SH SHOWER

SE SHOWER EMERGENCY LM A.08.09 10


KT1
KT1 KT1

PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
2020
+4.300 +4.250 +4.300 MENGETAHUI :
KR Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan
2
5
Wisnu Eka Yulyanto
NIP. 19670706 199303 1 001
08 POTONGAN 01 - 01 Penanggungjawab User
SE EMERGENCY
50 SKALA = 1 : 50 Lab. Merkuri
SHOWER
KERAMIK 30x30 cm
1 KT1 UNPOLISHED 1 Ernawita Nazir
-0.050 KT1
FD
KT1
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi
KODE KETERANGAN

5 2
CA DINDING BATA RINGAN FIN. CAT INTERIOR
HT1 HOMOGENEOUS TILE 60x60 cm UNPOLISHED
HT2 HOMOGENEOUS TILE 60x60 cm POLISHED
CI KT1
KT1 Darwin
KT1 KERAMIK TILE 30x60 cm POLISHED
Direktur
08 DETAIL EMERGENCY SHOWER LT. 02.1 CP CUBICAL TOILET PHANEL PHENOLIC
KONSULTAN PERENCANA
PG PLAFON GRC FIN. CAT WATHERSHIELD DOF
SKALA = 1 : 50
KODE KETERANGAN
CD CLOSED DUDUK
SE
CF CLOSED DIFABEL
WS WASHLET SHOWER SPRAY
WF WATER FAUCET / KRAN
+4.300 +4.250 +4.300
KR PH PAPER TOILET HOLDER
FD FLOOR DRAIN DANANG RUJITO WIBOWO
KEPALA
WT WASHTAFEL UNDERCOUNTER
WW WASHTAFEL WALLHUNG
KT KRAN WASTAFEL UNDERCOUNTER
BAMBANG RIYANTO
KW KRAN WASTAFEL WALLHUNG TEAM LEADER
KC KACA CERMIN t = 8 Mm JUDUL GAMBAR SKALA
HR HAND RAIL
08 POTONGAN 02 - 02 UR URINOIR
DETAIL EMERGENCY
1 : 50
SHOWER
SKALA = 1 : 50 UP URINOIR PARTITION
KODE NO.LEMBAR JML.LEMBAR
SH SHOWER

SE SHOWER EMERGENCY LM A.08.10 10


PEKERJAAN :

LOKASI :
-0.250
-0.020 -0.250
R. Operator
D TAHUN ANGGARAN
2020
MENGETAHUI :
R. TIMBANGAN Pejabat Pembuat Komitmen

R. KALIBRASI
-0.250 GETARAN R. KORIDOR R. AKUSTIK
STAGE R. MEETING AUDIO VISUAL R. PENYIMPANAN R. KALIBRASI UDARA R. KALIBRASI ALIRAN (OPERATOR) ANECHOIC
CHAMBER
Erni Arsih Yulianti
-0.750 -1.200 ALAT NIP. 19750709 199703 2 001
(Desain Khusus)
-0.250 DISETUJUI :
-0.800 +0.400 Penanggungjawab User
-0.400 +0.800 Lab. Metrologi Lingkungan

PANTRY C Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
R. PANEL -0.020 Penanggungjawab User
Lab. Merkuri
B
Lav. R. CCTV
Ernawita Nazir
Difable
NIP. 19720504 199803 2 001
R. STAFF
DIKOREKSI OLEH :
Toilet -0.250 Konsultan Managemen Kontruksi
-0.020 Wanita Resepsionis
R. PENYIMPANAN
R. SPECTRO R. AAS CONTOH UJI GUDANG
R. TIMBANG
R. LOBBY (R.TUNGGU) R. BAHAN
KIMIA
R. KABID R. PREPARASI CONTOH UJI Darwin
Direktur
Toilet
Pria SC FH KONSULTAN PERENCANA
A
-0.020 -0.020 -0.020

1 2 3 4 5 6 7 8 9 DANANG RUJITO WIBOWO


KEPALA

09 DENAH LAYOUT TANGGA LANTAI 01


SKALA = 1 : 175 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DENAH LAYOUT TANGGA


LANTAI 01
1 : 175

KODE NO.LEMBAR JML.LEMBAR

LM A.09.01 07
PEKERJAAN :

LOKASI :
Jalur Darurat / Maintenance Jalur Darurat / Maintenance
Gudang +4.280 +4.280

R. MUSHOLLA
SC
D TAHUN ANGGARAN
+4.350 SC FH FH FH 2020
MENGETAHUI :
R. MEETING R. ALAT AFS Pejabat Pembuat Komitmen
+4.300 DAN GC ECD
T. Wudhu R. PREPARASI
R. ALAT MERCURY R. MAINTENANCE
+4.300 ANECHOIC
+4.300
Erni Arsih Yulianti

Jalur Darurat / Maintenance


NIP. 19750709 199703 2 001
DISETUJUI :

+4.280
Penanggungjawab User
R. CUCI R. PREPARASI Lab. Metrologi Lingkungan
R. GANTI MERCURY UNTUK PADATAN & AIR
R. LOKER SANDAL +4.300
+4.300

C Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
VOID VOID
R. PANEL Penanggungjawab User
Lab. Merkuri
B
Lav. Pantry & R. Istirahat Ernawita Nazir
Difable +4.300 NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Toilet Konsultan Managemen Kontruksi
Wanita
VOID R. PENYIMPANAN
+4.300
R. STAFF R. PERALATAN SAMPING
+4.300 +4.300
R. PREPARASI BIOTA
+4.300 Darwin
R. PIMPINAN R. Simpan
+4.300 +4.300 Direktur
Toilet
Pria KONSULTAN PERENCANA

R. Mandi Jalur Darurat / Maintenance Jalur Darurat / Maintenance


A
+4.280 +4.280

1 2 3 4 5 6 7 8 9 DANANG RUJITO WIBOWO


KEPALA

09 DENAH LAYOUT TANGGA LANTAI 02


SKALA = 1 : 175 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DENAH LAYOUT TANGGA


LANTAI 02
1 : 175

KODE NO.LEMBAR JML.LEMBAR

LM A.09.02 07
PEKERJAAN :

LOKASI :

D TAHUN ANGGARAN
2020
MENGETAHUI :
DAK BETON DAK BETON
+8.500 +8.500 Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

C Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
DAK BETON
+8.500 Penanggungjawab User
R. PANTAU Lab. Merkuri
+8.600
B
R. MESIN LIFT Ernawita Nazir
+8.700
NIP. 19720504 199803 2 001
+8.600 DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

DAK BETON DAK BETON


+8.500 +8.500 Darwin
Direktur
KONSULTAN PERENCANA
A

1 2 3 4 5 6 7 8 9 DANANG RUJITO WIBOWO


KEPALA

09 DENAH LAYOUT TANGGA LANTAI TOP ROOF


SKALA = 1 : 175 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DENAH LAYOUT TANGGA


LANTAI TOP ROOF
1 : 175

KODE NO.LEMBAR JML.LEMBAR

LM A.09.03 07
LANTAI 02
+4.300 02 PEKERJAAN :

B 24 LOKASI :
23
22
TAHUN ANGGARAN
2020
R. CCTV 21
20
LANTAI 02
MENGETAHUI :
Pejabat Pembuat Komitmen

19
18 Erni Arsih Yulianti
NIP. 19750709 199703 2 001
17
DISETUJUI :
16 Penanggungjawab User
Lab. Metrologi Lingkungan
15
14
Wisnu Eka Yulyanto
BORDES NIP. 19670706 199303 1 001
+2.329
FIN.VINLY ANTI SLIP Penanggungjawab User

Resepsionis MOTIF + KEDAP SUARA Lab. Merkuri

13
Ernawita Nazir
12 NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
11 11 Konsultan Managemen Kontruksi
10 10
09 09
08 R. LOBBY (R.TUNGGU) 08
LANTAI 01

07 07 Darwin
Direktur
06 06 KONSULTAN PERENCANA
PIPA STAINLESS LANTAI 01 PIPA STAINLESS

01
BORDES 01 BORDES
+0.896 +0.896
FIN.VINLY ANTI SLIP FIN.VINLY ANTI SLIP 2
MOTIF + KEDAP SUARA MOTIF + KEDAP SUARA

09 POTONGAN 01 - 01 DANANG RUJITO WIBOWO


02 02 SKALA = 1 : 50 KEPALA

A
BAMBANG RIYANTO
TEAM LEADER
2 2 JUDUL GAMBAR SKALA

09 DENAH TANGGA TYPE A LT.01 09 DENAH TANGGA TYPE A LT.02 DETAIL TANGGA
(TYPE A)
1 : 50
SKALA = 1 : 50 SKALA = 1 : 50
KODE NO.LEMBAR JML.LEMBAR

LM A.09.04 07
PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen
LANTAI 02
+3.400
Erni Arsih Yulianti
NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
Lab. Merkuri

Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

R.CCTV LANTAI 01
Darwin
Direktur
KONSULTAN PERENCANA

DANANG RUJITO WIBOWO


09 POTONGAN 02 - 02 09 DETAIL 01 KEPALA
SKALA = 1 : 50 SKALA = 1 : 20

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA
DETAIL TANGGA 1 : 20
(TYPE A) 1 : 50
KODE NO.LEMBAR JML.LEMBAR

LM A.09.05 07
R. PANTAU
+8.600
PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

LANTAI 01 LANTAI 02
+4.300 +8.600 Erni Arsih Yulianti
01 01 LANTAI 03 01
+8.600 NIP. 19750709 199703 2 001
-0.250 PIPA STAINLESS
PIPA STAINLESS
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan
24 48
01 23 25 47

GUDANG 02
03
22
21
26
27
46
45
Wisnu Eka Yulyanto
NIP. 19670706 199303 1 001
Penanggungjawab User
04 20 28 44 Lab. Merkuri

05 19 29 43
42 Ernawita Nazir
06 18 NIP. 19720504 199803 2 001
07 17 07 41 31 DIKOREKSI OLEH :
Konsultan Managemen Kontruksi
08 16 08 40 32
09 15 09 39 33
10 14 10 38 34
PIPA STAINLESS
11 13 11 37 35 Darwin
Direktur
12 12 36
KONSULTAN PERENCANA
BORDES +2.150
FIN.VINLY ANTI SLIP
MOTIF + KEDAP SUARA BORDES +2.150 BORDES +6.450
FIN.VINLY ANTI SLIP FIN.VINLY ANTI SLIP
MOTIF + KEDAP SUARA MOTIF + KEDAP SUARA
PIPA STAINLESS
PIPA STAINLESS
PIPA STAINLESS
A A A

DANANG RUJITO WIBOWO


KEPALA

9 9 9

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA
09 DENAH TANGGA TYPE A LT.01 09 DENAH TANGGA TYPE A LT.02 09 DENAH TANGGA TYPE A LT.03
SKALA = 1 : 50 SKALA = 1 : 50 SKALA = 1 : 50 DETAIL TANGGA
(TYPE B)
1 : 50

KODE NO.LEMBAR JML.LEMBAR

LM A.09.06 07
PEKERJAAN :
LANTAI 03
+8.600

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

BORDES
+6.450
Erni Arsih Yulianti
NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
LANTAI 02
+4.300 Penanggungjawab User
Lab. Merkuri

Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

BORDES
+2.150
Darwin
Direktur
KONSULTAN PERENCANA

09 DETAIL 01
SKALA = 1 : 20
LANTAI 01

DANANG RUJITO WIBOWO


KEPALA

BAMBANG RIYANTO
TEAM LEADER
A
JUDUL GAMBAR SKALA
09 POTONGAN 01 - 01 DETAIL TANGGA 1 : 20
SKALA = 1 : 50 (TYPE B) 1 : 50
KODE NO.LEMBAR JML.LEMBAR

LM A.09.07 07
B B C

PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen
B

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
10 DENAH LIFT LT.01 10 DENAH LIFT LT.02 Lab. Metrologi Lingkungan

SKALA = 1 : 50 SKALA = 1 : 50

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
Lab. Merkuri

Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi
10 DENAH R. MESIN LIFT
SKALA = 1 : 50

HOMOGENOUS HOMOGENOUS Darwin


TILE Uk. 60x120cm TILE Uk. 60x120cm Direktur
KONSULTAN PERENCANA

HOMOGENOUS
TILE Uk. 60x120cm

HOMOGENOUS HOMOGENOUS
TILE Uk. 60x120cm PINTU LIFT HOMOGENOUS TILE Uk. 60x120cm PINTU LIFT HOMOGENOUS
TILE Uk. 60x120cm TILE Uk. 60x120cm

DANANG RUJITO WIBOWO


KEPALA

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA
10 TAMPAK DEPAN LIFT LT. 01 10 TAMPAK DEPAN LIFT LT. 02 DETAIL LIFT 1 : 50
SKALA = 1 : 50 SKALA = 1 : 50
KODE NO.LEMBAR JML.LEMBAR

LM A.10.01 02
LANTAI ATAP LANTAI ATAP
(F.F.L)+12.600 (F.F.L)+12.600
(S.F.L)+12.600 (S.F.L)+12.600

PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
LANTAI TOP ROOF LANTAI TOP ROOF 2020
(F.F.L)+8.600 (F.F.L)+8.600 MENGETAHUI :
(S.F.L)+8.500 (S.F.L)+8.500 Pejabat Pembuat Komitmen

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
Lab. Merkuri

LANTAI 02 LANTAI 02 Ernawita Nazir


(F.F.L)+4.300 (F.F.L)+4.300 NIP. 19720504 199803 2 001
(S.F.L)+4.200 (S.F.L)+4.200 DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

Darwin
Direktur
KONSULTAN PERENCANA

LANTAI 01 LANTAI 01

(S.F.L)-0.100 (S.F.L)-0.100 DANANG RUJITO WIBOWO


KEPALA

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

10 POTONGAN MEMANJANG LIFT 10 POTONGAN MELINTANG LIFT DETAIL LIFT 1 : 60

SKALA = 1 : 50 SKALA = 1 : 50 KODE NO.LEMBAR JML.LEMBAR

LM A.10.02 02
D
PEKERJAAN :

R3 LOKASI :
Jalur Darurat / Maintenance Jalur Darurat / Maintenance
Gudang +4.280 R1 +4.280

R. MUSHOLLA
SC
TAHUN ANGGARAN
+4.350 SC FH FH FH 2020
MENGETAHUI :
R. MEETING R. ALAT AFS Pejabat Pembuat Komitmen
+4.300 DAN GC ECD
T. Wudhu R. PREPARASI
R. ALAT MERCURY R. MAINTENANCE
+4.300 ANECHOIC
+4.300
Erni Arsih Yulianti

Jalur Darurat / Maintenance


NIP. 19750709 199703 2 001
DISETUJUI :

+4.280
Penanggungjawab User
R. CUCI R. PREPARASI
R3 Lab. Metrologi Lingkungan
R. GANTI MERCURY UNTUK PADATAN & AIR
R. LOKER SANDAL +4.300
+4.300

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
R. PANEL R2 VOID R2 R2 VOID R2 Penanggungjawab User
R2 R2 Lab. Merkuri

Lav. Pantry & R. Istirahat Ernawita Nazir


Difable +4.300 NIP. 19720504 199803 2 001
R1 DIKOREKSI OLEH :
Toilet Konsultan Managemen Kontruksi
Wanita
VOID R. PENYIMPANAN
+4.300
R. STAFF R. PERALATAN SAMPING
+4.300 +4.300
R. PREPARASI BIOTA
+4.300 Darwin
R. PIMPINAN R. Simpan
+4.300 +4.300 Direktur
Toilet
Pria KONSULTAN PERENCANA

R. Mandi Jalur Darurat / Maintenance


+4.280
R1 Jalur Darurat / Maintenance
+4.280

DANANG RUJITO WIBOWO


KEPALA

01 DENAH LAYOUT RAILING LANTAI 02


SKALA = 1 : 175 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DENAH LAYOUT RAILING


LANTAI 02
1 : 175

KODE NO.LEMBAR JML.LEMBAR

LM A.11.01 02
PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen

ELEVASI Erni Arsih Yulianti


LANTAI NIP. 19750709 199703 2 001
DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

11 DETAIL RAILING R1
SKALA 1 : 50 Wisnu Eka Yulyanto
NIP. 19670706 199303 1 001
Penanggungjawab User
Lab. Merkuri

Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

11 DETAIL RAILING R3 Darwin


Direktur
ELEVASI SKALA 1 : 15
LANTAI KONSULTAN PERENCANA

11 DETAIL RAILING R2
SKALA 1 : 50

DANANG RUJITO WIBOWO


KEPALA

BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DETAIL RAILING 1 : 15
1 : 50
KODE NO.LEMBAR JML.LEMBAR

LM A.11.02 02
PEKERJAAN :

LOKASI :
-0.250

R. Operator
PK.1e -0.020 -0.250

D TAHUN ANGGARAN
2020
PK.1c PK.1e PK.1e PK.1e PK.1e PK.1e PK.1e PK.1d MENGETAHUI :
R. TIMBANGAN Pejabat Pembuat Komitmen

R. KALIBRASI
-0.250 GETARAN R. KORIDOR R. AKUSTIK
STAGE R. MEETING AUDIO VISUAL R. PENYIMPANAN R. KALIBRASI UDARA R. KALIBRASI ALIRAN (OPERATOR) ANECHOIC
CHAMBER
Erni Arsih Yulianti
-0.750 -1.200 ALAT NIP. 19750709 199703 2 001
(Desain Khusus)
-0.250 DISETUJUI :
-0.800 +0.400 Penanggungjawab User
-0.400 +0.800 Lab. Metrologi Lingkungan

PANTRY C Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
PK.1c R. PANEL PK.1d -0.020 Penanggungjawab User
Lab. Merkuri
B
Lav. R. CCTV
Ernawita Nazir
Difable
NIP. 19720504 199803 2 001
R. STAFF
DIKOREKSI OLEH :
Toilet -0.250 Konsultan Managemen Kontruksi
-0.020 Wanita Resepsionis
R. PENYIMPANAN
R. SPECTRO R. AAS CONTOH UJI GUDANG
R. TIMBANG
R. LOBBY (R.TUNGGU) R. BAHAN
KIMIA
R. KABID R. PREPARASI CONTOH UJI Darwin
Direktur
Toilet
Pria SC FH KONSULTAN PERENCANA
A
-0.020 -0.020 -0.020
PK.1a PK.1a PK.1a PK.1a PK.1a PK.1a PK.1a PK.1a
PK.1b

1 2 3 4 5 6 7 8 9 DANANG RUJITO WIBOWO


KEPALA

12 DENAH PENEBALAN KOLOM LANTAI 01


SKALA = 1 : 175 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DENAH PENEBALAN KOLOM


LANTAI 01
1 : 175

KODE NO.LEMBAR JML.LEMBAR

LM A.12.01 03
PEKERJAAN :

LOKASI :
Gudang PK.2f Jalur Darurat / Maintenance
+4.280
Jalur Darurat / Maintenance
+4.280

R. MUSHOLLA
SC
D TAHUN ANGGARAN
+4.350 SC FH FH FH 2020
PK.2d PK.2f PK.2f
R. ALAT AFS
PK.2f PK.2f PK.2f PK.2f PK.2e MENGETAHUI :
R. MEETING Pejabat Pembuat Komitmen
+4.300 DAN GC ECD
T. Wudhu R. PREPARASI
R. ALAT MERCURY R. MAINTENANCE
+4.300 ANECHOIC
+4.300
Erni Arsih Yulianti

Jalur Darurat / Maintenance


NIP. 19750709 199703 2 001
DISETUJUI :

+4.280
Penanggungjawab User
R. CUCI R. PREPARASI Lab. Metrologi Lingkungan
R. GANTI MERCURY UNTUK PADATAN & AIR
R. LOKER SANDAL +4.300
+4.300

C Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
PK.2d R. PANEL VOID VOID
PK.2e Penanggungjawab User
Lab. Merkuri
B
Lav. Pantry & R. Istirahat Ernawita Nazir
Difable +4.300 NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Toilet Konsultan Managemen Kontruksi
Wanita
VOID R. PENYIMPANAN
+4.300
R. STAFF R. PERALATAN SAMPING
+4.300 +4.300
R. PREPARASI BIOTA
+4.300 Darwin
R. PIMPINAN R. Simpan
+4.300 +4.300 Direktur
Toilet
Pria KONSULTAN PERENCANA

R. Mandi Jalur Darurat / Maintenance Jalur Darurat / Maintenance


A
+4.280 +4.280
PK.2a PK.2c PK.2c PK.2c PK.2c PK.2c PK.2c PK.2c
PK.2b

1 2 3 4 5 6 7 8 9 DANANG RUJITO WIBOWO


KEPALA

12 DENAH PENEBALAN KOLOM LANTAI 02


SKALA = 1 : 175 BAMBANG RIYANTO
TEAM LEADER
JUDUL GAMBAR SKALA

DENAH PENEBALAN KOLOM


LANTAI 02
1 : 175

KODE NO.LEMBAR JML.LEMBAR

LM A.12.02 03
DETAIL PENEBALAN KOLOM LT. 01 DETAIL PENEBALAN KOLOM LT. 02

PEKERJAAN :

LOKASI :

TAHUN ANGGARAN
2020
MENGETAHUI :
Pejabat Pembuat Komitmen
12 DETAIL PK.1a 12 DETAIL PK.1b 12 DETAIL PK.2b
SKALA = 1 : 20 SKALA = 1 : 20 SKALA = 1 : 20
Erni Arsih Yulianti
12 DETAIL PK.2a NIP. 19750709 199703 2 001
DISETUJUI :
SKALA = 1 : 20 Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001
Penanggungjawab User
Lab. Merkuri

Ernawita Nazir
NIP. 19720504 199803 2 001
DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

12 DETAIL PK.1c 12 DETAIL PK.1d


SKALA = 1 : 20 SKALA = 1 : 20
12 DETAIL PK.2c 12 DETAIL PK.2d Darwin
Direktur
SKALA = 1 : 20 SKALA = 1 : 20
KONSULTAN PERENCANA

DANANG RUJITO WIBOWO


KEPALA

BAMBANG RIYANTO
TEAM LEADER

12 DETAIL PK.1e 12 DETAIL PK.2e 12 DETAIL PK.2f JUDUL GAMBAR SKALA

SKALA = 1 : 20 SKALA = 1 : 20 SKALA = 1 : 20 DETAIL PENEBALAN


KOLOM
1 : 20

KODE NO.LEMBAR JML.LEMBAR

LM A.12.03 03
FINISHING CAT
WATHERSHIELD DOFF (EXTERIOR)

ALUMUNIUM COMPOSITE PANEL


PROFIL ALUMUNIUM Uk. 50X150mm
FINISHING CAT
WATHERSHIELD DOFF (EXTERIOR) PEKERJAAN :

ACP MOTIF KAYU


LOKASI :
BRACKET BESI SIKU
40.40.2,8mm + Zinchromate
TAHUN ANGGARAN
2020
FINISHING CAT MENGETAHUI :
WATHERSHIELD DOFF (EXTERIOR) RANGKA HOLLOW
ALUMUNIUM 40.40.1,2mm Pejabat Pembuat Komitmen
ACP 4mm - PVDF

Erni Arsih Yulianti


NIP. 19750709 199703 2 001
LIHAT DETAIL KANOPI
+4.300 DISETUJUI :
Penanggungjawab User
Lab. Metrologi Lingkungan

Wisnu Eka Yulyanto


NIP. 19670706 199303 1 001

BRACKET BESI SIKU Penanggungjawab User


40.40.2,8mm + Zinchromate
Lab. Merkuri

HALAMAN SELASAR
-0.200
-0.300 RANGKA HOLLOW Ernawita Nazir
ALUMUNIUM 40.40.1,2mm NIP. 19720504 199803 2 001
TANAMAN ACP 4mm - PVDF
LAPIS BATU ALAM FIN. COATING DIKOREKSI OLEH :
Konsultan Managemen Kontruksi

HALAMAN SELASAR
-0.200
-0.300
6 7
LAPIS BATU ALAM FIN. COATING
Darwin
Direktur
13 TAMPAK DETAIL FASADE 13 POTONGAN DETAIL FASADE KONSULTAN PERENCANA
SKALA = 1 : 50 SKALA = 1 : 50

-0.250
-0.020 -0.250
R. Operator
D

B R. TIMBANGAN
B
R. KALIBRASI
-0.250 GETARAN R. KORIDOR R. AKUSTIK
STAGE R. MEETING AUDIO VISUAL R. PENYIMPANAN R. KALIBRASI UDARA R. KALIBRASI ALIRAN (OPERATOR) ANECHOIC
-0.750 -1.200 ALAT CHAMBER
(Desain Khusus)
-0.250
-0.800 +0.400
-0.400 +0.800
C
C PANTRY C Danang Rujito Wibowo
R. PANEL -0.020
Kepala
B
Lav. R. CCTV
Difable

R. STAFF
Toilet -0.250
-0.020 Wanita Resepsionis
R. PENYIMPANAN
R. SPECTRO R. AAS CONTOH UJI GUDANG
R. TIMBANG
R. LOBBY (R.TUNGGU) R. BAHAN
KIMIA
R. KABID R. PREPARASI CONTOH UJI

Toilet
Pria SC FH Bambang Riyanto
A
-0.020 -0.020 -0.020 Team Leader

6 7
JUDUL GAMBAR SKALA
1 2 3 4 5 6 7 8 9
6 7 A DETAIL FASADE 1 : 50
KEY PLAN 1 : 400
KODE NO.LEMBAR JML.LEMBAR
13 DENAH DETAIL FASADE 13 KEY PLAN
SKALA = 1 : 50 SKALA = 1 : 400 LM A.13.01 01

Anda mungkin juga menyukai