LABORATORIUM TRANSPORTASI & JALAN RAYA

FAKULTAS TEKNIK UNIVERSITAS TADULAKO


Kampus Bumi Tadulako Tondo Palu Telp. 422611 Psw 157

PROYEK : PRAKTIKUM PERKERASAN JALAN DIKERJAKAN : KELOMPOK 36


PEKERJAAN : AC - WC DIHITUNG : KELOMPOK 36
SUMBER MAT. : Ex.S.C.Taipa DIPERIKSA : Dr.Ir Arief Setiawan ST,MT
NO. CONTOH : AGREGAT HALUS (ABU BATU) TANGGAL : 30 Desember 2019

ANALISA SARINGAN

Berat kering contoh sebelum disaring : 2685.70 gr


Berat Kumulatif
Sieve No. Bukaan (mm) % Tertahan % Lolos
Tertahan (gr) Tertahan (gr)
3/4 " 19.1 0.00 0.00 0.00 100.00
1/2 " 12.70 0.00 0.00 0.00 100.00
3/8 " 9.52 0.00 0.00 0.00 100.00
#4 4.760 17.20 17.20 0.58 99.42
#8 2.38 589.80 607.00 20.33 79.67
#16 1.160 743.30 1350.30 45.23 54.77
#30 0.590 600.00 1950.30 65.32 34.68
#50 0.279 182.30 2132.60 71.43 28.57
#100 0.150 260.20 2392.80 80.14 19.86
#200 0.075 153.00 2545.80 85.27 14.73
PAN 439.90 2985.70 100.00 0.00

100
90
80
% Lolos

70
60
50
40
30
20
10
0
0.01 0.10 1.00 10.00 100.00
Ukuran Butir (mm)

Palu, 2019
Disetujui Oleh

1.00 10.00 100.00


n Butir (mm) Dian Rifany K. S ST. MT

Gradasi Campuran yang digunakan Batas Bawah


Persiapan Mix Design Aspal Untuk Jenis Perkerasan HRS - WC
PROYEK : Praktikum DIKERJAKAN : Kelompok XXI
PEKERJAAN : Perc. Ekstraksi DIHITUNG : Kelompok XXI
LOKASI : Lab. Trans & Jln. Raya DIPERIKSA :
CONTOH :Aspal dan Agregat TANGGAL : 23 Nov 2010

Berat Tertahan (gram) Kumulatif Tertahan (gram) % Tertahan % Lolos


No.
Saringan Agg. Kasar Pasir Abu Batu Agg. Kasar Pasir Abu Batu Agg. Kasar Pasir Abu Batu Agg. Kasar Pasir Abu Batu

3/4" 0 0 0 0 0 0 0 0 0 100 100 100


1/2" 436.70 0 0 436.70 0 0 21.771 0 0 78.229 100 100
3/8" 933.15 1.90 0 1369.85 1.90 0 68.291 0.095 0 31.709 99.905 100
No. 8 616.35 365.20 292 1986.20 367.10 292 99.018 18.318 14.527 0.982 81.682 85.473
No. 30 1.15 1019.40 607.30 1987.35 1386.50 899.30 99.075 69.187 44.741 0.925 30.813 55.259
No. 200 2.30 564.70 825.50 1989.65 1951.20 1724.80 99.190 97.365 85.811 0.810 2.635 14.189
PAN 16.25 52.80 285.20 2005.90 2004 2010 100 100 100 0 0 0

Spesifikasi Jenis Perkerasan

% Lolos
No. Bukaan Spek % Jumlah Bahan
Saringan Lolos Agg. Kasar (28%) Pasir (12%) Abu Batu (60%) Campuran
(mm)
3/4" 19 100 28.427 11.996 59.579 100
1/2" 12.5 90 - 100 22.238 11.996 59.579 93.813
3/8" 9.5 75 - 85 9.014 11.985 59.579 80.578
No. 8 0 50 - 72 0.279 9.799 50.924 61.001
No. 30 0.6 35 - 60 0.263 3.696 32.923 36.882
No. 200 0.075 6 - 12 0.230 0.316 8.454 9.000
PAN 0 0 0 0 0 0
LABORATORIUM JALAN RAYA
FAKULTAS TEKNIK UNIVERSITAS TADULAKO
Kampus Bumi Tadulako Tondo Palu Telp. 422611 Psw 158

PROYEK : DIKERJAKAN :
PEKERJAAN : DIHITUNG :
LOKASI : DIPERIKSA :
CONTOH : TANGGAL :

PENGUJIAN KADAR AIR DAN FRAKSI ASPAL CAIR


DENGAN CARA PENYULINGAN
(SNI 06-2490-1991)

a. Kadar Air
No. Suhu (°C) ml
1
2
3

b. Fraksi Aspal
1. Volume benda uji pada awal percobaan (ml) (A)
2. Volume benda uji setelah percobaan (ml) (TD)
(A - TD)
3. Persentase residu aspal (%) R x 100
A
4. Persentase total fraksi (%) TD
T x 100
A

Persentase masing-masing fraksi hasil penyulingan


Terhadap volume
Pembacaan Suhu
No. Terhadap volume awal (%) total fraksi hasil
(°C)
penyulingan (%)
1
2
3

Catatan : .................................................................................................................................
.................................................................................................................................
.................................................................................................................................

Palu, 2017
Disetujui Oleh

.....................................
LABORATORIUM TRANSPORTASI & JALAN RAYA
FAKULTAS TEKNIK UNIVERSITAS TADULAKO
Kampus Bumi Tadulako Tondo Palu Telp. 422611 Psw 157

PROYEK : PRAKTIKUM JALAN RAYA DIKERJAKAN : KELOMPOK 21


PEKERJAAN : AC - W C DIHITUNG : KELOMPOK 21
LOKASI : LAB. TRANSPORTASI & JALAN RAYA UNTAD DIPERIKSA : Mashuri, ST.MT
CONTOH : ASPAL PEN 60/70 TANGGAL : 18 Desember 2019

PERCOBAAN MARSHALL
SNI - 06-2489-1991 (PC - 0201 - 76)

No Kadar Berat (gram) Isi BJ. Bulk BJ. Maks % Rongga % Rongga % Rongga Stabilitas Kelelehan Marshall
Benda Dalam Camp Teoritis diantr. Agr Udara trs Aspal dibaca disesuaikan Plastis Quention
Aspal di Udara SSD (gram)
Uji Air (Gmb) (Gmm) (VMA) (VIM) (VFB) KN Kg (mm) (Kg/mm)
%Total Data Data Data 100/((100−𝑏)/ data Terhadap data
(𝐵𝑗.𝐸𝑓𝑓)+𝑏/ 100−𝐺𝑚𝑏/𝐺𝑆𝑏 𝑥 100/(100+𝑏) x100 100𝑥 100𝑥 (𝑉𝑀𝐴−𝑉𝐼𝑀)/𝑉𝑀𝐴
d-e e/f (𝐵𝑗.𝐴𝑠𝑝)) (𝐺𝑚𝑚−𝐺𝑚𝑏)/𝐺𝑚𝑚 Pembacaan Faktor Pembacaan m/n
Campuran Timbangan Timbangan Timbangan
display Koreksi Tebal Kelelehan
a b c d e f g h i j k l m n o
1
4.5 1250.2 1256.2 708.4 547.8 1.293 2.427 52.386 46.721 10.8144043419288 11.2 1016.4531211 3.840 264.7013

2
5 1255.4 1261.6 718.6 543 1.323 2.409 51.506 45.075 12.4844590719149 11.1 1007.3776468 3.900 258.302

3
5.5 1261.8 1264.1 721 543.1 1.328 2.392 51.583 44.500 13.7309387449623 12.84 1165.29089954 3.920 297.2681

4
6 1268.7 1272.9 723.9 549 1.319 2.375 52.138 44.477 14.6934904087911 13.75 1247.87771563 3.160 394.898

5
6.5 1272.2 1275.9 721 554.9 1.299 2.358 53.058 44.894 15.3864922007082 11.96 1085.42672574 3.920 276.8946

6
7 1273.8 1278 723 555 1.303 2.341 53.156 44.357 16.5533886143461 10.35 939.311589585 4.010 234.2423

BJ. Bulk (Gsb) = 2.599 BJ. Aspal = 1.010 BJ. Eff Aggr (Gse) = 2.623
LABORATORIUM JALAN RAYA
FAKULTAS TEKNIK UNIVERSITAS TADULAKO
Kampus Bumi Tadulako Tondo Palu Telp. 422611 Psw 158

PROYEK ### DIKERJAKAN ###


PEKERJAAN : MIX DESIGN DIHITUNG ###
LOKASI : LAB. Transportasi, FAK. Teknik DIPERIKSA ###
CONTOH : Aspal Pen 60/70 & Mix Design AC - WC TANGGAL : 30 November 2019

MIX DESIGN

Keterangan Contoh
A Berat Talam Panas gram 291.80
B Berat Talam Panas + Agregat gram 1523.50
C Berat Agregat (B - A) gram 1200.00
D Persen Aspal Terhadap Campuran % 7.00
E Persen Aspal Terhadap Agragat (D/(100-D)) x 100 % 7.53
F Aspal yang ditambahkan (E /100) x C gram 90.32
G Bacaan Timbangan (F+B) gram 1613.82

Palu, Januari 2019


Disetujui Oleh

Dian Rifany K, ST, MT


LABORATORIUM TRANSPORTASI & JALAN RAYA
FAKULTAS TEKNIK UNIVERSITAS TADULAKO
Kampus Bumi Tadulako Tondo Palu Telp. 422611 Psw 157

Proyek : Praktikum Jalan Raya Dikerjakan #REF!


Pekerjaan : Percobaan Marshall Dihitung #REF!
Lokasi : LAB. Transportasi & Jalan Raya UNTAD Diperiksa : Mashuri, ST.MT
Contoh : Briket (Mix Design AC - WC) Tanggal : 18 Desember 2019

PERCOBAAN MARSHALL
SNI - 06-2489-1991 (PC - 0201 - 76)

No. a b c d e f g h i j k l m n o p q r s
1 4.71 4.5 1250.2 1256.2 708.4 547.8 2.28 2.45 10.17 83.09 6.74 16.91 60.14 6.74 11.20 1142.08 1016.45 3.84 264.70

2 5.26 5.0 1255.4 1261.6 718.6 543.0 2.31 2.43 11.45 83.74 4.82 16.26 70.37 4.82 11.10 1131.88 1007.38 3.90 258.30

3 5.82 5.5 1261.8 1264.1 721.0 543.1 2.32 2.41 12.65 83.70 3.64 16.30 77.64 3.64 12.84 1309.32 1165.29 3.92 297.27

4 6.38 6.0 1268.7 1272.9 723.9 549.0 2.31 2.39 13.73 82.82 3.46 17.18 79.89 3.46 13.75 1402.11 1247.88 3.16 394.90

5 6.95 6.5 1272.2 1275.9 721.0 554.9 2.29 2.38 14.75 81.72 3.52 18.28 80.74 3.52 11.96 1219.58 1085.43 3.92 276.89

6 7.53 7.0 1273.8 1278.0 723.0 555.0 2.30 2.36 15.91 81.38 2.72 18.62 85.41 2.72 10.35 1055.41 939.31 4.01 234.24

KETERANGAN
B.J. Aspal = 1.010 e = berat dalam air (gram) l = % rongga terhadap agregat = 100 - j
B.J. Agregat = 2.623 f = isi = d - e m = % rongga terisi aspal = 100 x i/l
Suhu Pencampuran g = berat isi benda uji n = % rongga terhadap campuran = 100 - 100 g/h
Suhu Pemadatan h = berat jenis maks teoritis o = pembacaan arloji stabilitas
a = % aspal terhadap Agregat = 100 / {(100-b)/B.J. Agg + b/B.J. Asp)} p = stabilitas (o x kalibrasi alat), kg
b = % aspal terhadap campuran i = (b x g) / B.J. Aspal q = stabilitas (p x koreksi benda uji), kg
c = berat (gram) j = (100 - b) g / B.J. Agg r = kelelehan, mm
d = berat jenuh (gram) k = jumlah kandungan rongga (%) = 100 - I - j s = quotient marshall = q/r, kg/mm

Palu, Desember 2019


Disetujui Oleh

#REF!
Mencari kadar aspal optimum dengan batas VIM minimum yaitu 3 dan batas maximum flow yaitu 4
Berdasarkan persamaan dari grafik hubungan antara VIM dan kadar aspal
y = 1,0529x2 - 14,468x + 51,611
Dengan cara coba coba :
Batas Maksimum = 5
x y
5 5.6
5.2 4.8
5.1 5.2
5.15 5.0

Berdasarkan persamaan dari grafik hubungan antara Flow dan kadar aspal
y = 0,294x2 - 2,808x + 10,473
Dengan cara coba coba :
Batas Maksimum = 5
x y
5 3.8
6 4.2
5.8 4.1
5.66 4.0