PT.

SULTAN PROPERTINDO
RAB
Filter berdasarkan :No. Proyek
No. Proyek : 2. DAR 02-E10 PAK ABBAS Nama Manajer :
Nama Proyek : ORNANDO No. Kontrak :
Tipe Proyek : SPK No :
Propinsi : Tgl Mulai : 17 Apr 2020
Lokasi : Tgl Selesai : 17 Apr 2020
Nomor
Pekerja
an Keterangan Catatan Unit Volume Harga satuan Price
I PEK. PENDAHULUAN
1 Analisa 1 M2 150.00 0.00 0.00
Pembersihan Lokasi
3 Analisa 1 M Pengukuran 50.00 3,086.30 154,315.00
dan Pemasangan
Bowplank
154,315.00

II PEK. PONDASI
1 Analisa 1 M3 Galian 28.70 0.00 0.00
Tanah Pondasi
2 1 M3 Pasir Bawah 2.43 42,000.00 102,060.00
Pondasi/Lantai
3 Analisa 1 M3 LT. Kerja 2.43 123,228.97 299,446.40
Pondasi 1 PC : 3 PS : 5
KR
4 Analisa 1 M3 Beton Cor 2.07 1,102,707.81 2,282,605.16
Pondasi dan Mal 60x60
5 Analisa 1 M3 Beton Cor 0.50 2,703,934.07 1,351,967.04
Kolom pedestal 20x20
6 Pasang Batu 1 1/2 Bata 30.10 135,955.00 4,092,245.50
Rolag
7 1 M2 Plasteran 1 1/2 79.00 6,950.00 549,050.00
Bata Pondasi Rolag
8 Analisa 1 M3 Beton Cor 4.51 1,810,046.76 8,163,310.91
Balok sloof
16,840,685.00

III PEK. KOLOM DAN


BALOK RUMAH
1 Analisa 1 M3 Cor 3.22 2,703,934.07 8,706,667.71
Kolom LT. 1 3,5M
2 Analisa 1 M3 Cor Kolom 0.16 1,663,826.47 266,212.24
Peraktis LT.1 3,5M
3 Analisa 1 M3 Beton Cor 3.36 2,703,934.07 9,085,218.48
Kolom LT.2 20X20 4M
4 Analisa 1 M3 Cor Kolom 1.00 1,663,826.47 1,663,826.47
Peraktis 4M
5 Analisa 1 M3 Beton Cor 4.51 1,810,046.76 8,163,310.91
Balok Induk 30x20
6 Analisa 1 M3 Beton Cor 0.50 1,464,421.75 732,210.87
Balok Anak 20x15
7 Analisa 1 M3 Beton Cor 3.50 1,411,635.57 4,940,724.50
Ring Balok 20x20
33,558,171.18

IV PEK. DINDING RUMAH


1 1 M2 Pasang Batu Bata 315.73 35,015.00 11,055,287.10
1 : 2 LT.1 DAN LT.2
2 1 M2 Plesteran 1 : 4 721.50 8,436.00 6,086,574.00
Dinding dan Kolom
Rumah
3 1 M2 Acian 721.50 1,770.00 1,277,055.00
18,418,916.10

ACCURATE Accounting System Report


Cetak di 28 Apr 2020 - 13.46
(1)
PT. SULTAN PROPERTINDO
RAB
Filter berdasarkan :No. Proyek
No. Proyek : 2. DAR 02-E10 PAK ABBAS Nama Manajer :
Nama Proyek : ORNANDO No. Kontrak :
Tipe Proyek : SPK No :
Propinsi : Tgl Mulai : 17 Apr 2020
Lokasi : Tgl Selesai : 17 Apr 2020
Nomor
Pekerja
an Keterangan Catatan Unit Volume Harga satuan Price
V PEK. STRUKTUR
EKSTERIOR
1 Analisa 1 M3 Beton Cor 0.56 1,691,393.95 947,180.61
Kolom Teras 20x40
3,5m
2 Analisa 1 M3 Beton Cor 0.29 1,377,642.10 399,516.21
Balok Pinggang 20x15
3 Analisa 1 M3 Beton Cor 0.27 1,377,641.92 371,963.32
Balok Pinggang 15x15
4 Analisa 1 M3 Beton Cor 1.54 2,946,632.20 4,537,813.59
Plat Dak 20 cm
5 Analisa 1 M3 Beton Cor 1.12 2,946,632.20 3,300,228.06
Plat Dak 15 cm
6 Analisa 1 M3 Beton Cor 0.63 2,946,632.20 1,856,378.29
Plat Dak 10 cm
7 Analisa 1 M3 Beton Cor 0.17 2,946,632.20 500,927.47
Plat Dak 5 cm
8 Analisa 1 M3 Beton Cor 0.07 1,102,727.42 79,396.37
Pondasi Teras 60x60
9 Analisa 1 M3 Beton Cor 0.08 1,691,393.95 135,311.52
Kolom Pedestal teras
20x40
10 Analisa 1 M3 Beton Cor 0.18 1,691,401.73 304,452.31
Kolom Gudang 15x15
11 Analisa 1 M3 Beton Cor 0.19 1,377,645.70 256,242.10
ring Balok Gudang
15x20
12 Analisa 1 M3 Beton Cor 0.19 1,377,645.70 256,242.10
Balok Sloof Gudang
15x20
13 1 M2 Pasang Batu Bata 4.46 35,015.52 156,169.20
1 : 2 Dinding Gudang
14 Pasang Batu Bata 1.24 135,951.29 168,579.60
Rolag Gudang
13,270,400.76

VI PEK. PAGAR
1 1 M3 Pasir Bawah 0.53 42,000.00 22,260.00
Pondasi/Lantai
2 Analisa 1 M3 LT. kerja 0.53 123,238.68 65,316.50
Pondasi. 1 PC : 3 PS : 5
KR
3 Analisa 1 M3 Beton Cor 0.26 1,102,710.67 286,704.77
Pondasi 40x40
4 Analisa 1 M3 Beton Cor 0.53 1,699,391.08 905,775.45
Kolom 15x15
5 Analisa 1 M3 Beton Cor 1.33 1,385,645.04 1,842,907.90
Balok dan Slof
6 1 M2 Pasang Batu Bata 33.00 35,015.00 1,155,495.00
1:2
7 1 M2 Plesteran 1 : 4 122.00 8,436.00 1,029,192.00
8 1 M2 Acian 122.00 1,770.00 215,940.00
5,523,591.62

VII PEK. LANTAI DASAR


1 1 M3 Urug Tanah 22.00 45,000.00 990,000.00
Dipadatkan

ACCURATE Accounting System Report


Cetak di 28 Apr 2020 - 13.46
(2)
PT. SULTAN PROPERTINDO
RAB
Filter berdasarkan :No. Proyek
No. Proyek : 2. DAR 02-E10 PAK ABBAS Nama Manajer :
Nama Proyek : ORNANDO No. Kontrak :
Tipe Proyek : SPK No :
Propinsi : Tgl Mulai : 17 Apr 2020
Lokasi : Tgl Selesai : 17 Apr 2020
Nomor
Pekerja
an Keterangan Catatan Unit Volume Harga satuan Price
2 Lantai Kerja 1:3:5 4.00 313,000.00 1,252,000.00
3 1 M2 Pasang Keramik 40.00 130,980.00 5,239,200.00
ruangan 60 X 60
4 1 M2 Pasang Keramik 10.00 130,980.00 1,309,800.00
teras 60 X 60
5 1 M2 Pasang Keramik 32.00 79,890.00 2,556,480.00
KM/WC 25 X 25
6 1 M2 Pasang Keramik 5.00 130,980.00 654,900.00
Plint tepi dinding
GRANIT 10 X 60
7 1 M2 Pasang Keramik 18.50 145,510.00 2,691,935.00
Garasi 60 X 60
14,694,315.00

VIII PEK. LANTAI 2


1 Analisa 1 M3 Beton Cor 5.86 2,946,632.20 17,267,264.69
Plat Lantai 10cm
2 1 M2 Pasang Keramik 50.00 130,980.00 6,549,000.00
Ruangan Granit 60 X 60
3 1 M2 Pasang Keramik 6.80 130,980.00 890,664.00
Plint Granit 10 X 60
4 1 M2 Pasang Keramik 24.10 79,890.00 1,925,349.00
lantai dan dinding wc 25
X 25
26,632,277.69

IX PEK. PLAFOND
1 1 M2 Plafond Gypsum + 38.00 51,430.50 1,954,359.00
Rangka Rangan LT.1
2 1 M2 Plafond Gypsum + 6.90 51,430.50 354,870.45
Rangka wc LT.1
3 1 M2 Plafond Gypsum + 17.00 51,430.50 874,318.50
Rangka garasi LT.1
4 1 M2 Plafond Gypsum + 1.90 107,030.50 203,357.95
Rangka teras depan
LT.1
5 1 M2 Plafond Gypsum + 51.50 51,430.50 2,648,670.75
Rangka Ruanga LT.2
6 1 M2 Plafond Gypsum + 4.00 51,430.50 205,722.00
Rangka WC tmpt wudhu
LT.2
7 1 M2 Plafond Gypsum + 2.80 51,430.50 144,005.40
Rangka mushala LT.2
6,385,304.05

X PEK. Canopy Garasi


1 Analisa 1 M3 Beton Cor 0.53 2,946,632.20 1,561,715.07
Plat Dak Canopy Tebal
8 CM
2 Analisa 1 M3 Beton Cor 1.20 412,800.00 495,360.00
Lantai Canopy T=8CM
3 Analisa 1 M3 Beton Cor 0.26 1,691,395.32 431,305.81
Kolom 25X15
4 1 M3 Pasir Bawah 0.04 42,000.00 1,512.00
Pondasi/Lantai

ACCURATE Accounting System Report


Cetak di 28 Apr 2020 - 13.46
(3)
PT. SULTAN PROPERTINDO
RAB
Filter berdasarkan :No. Proyek
No. Proyek : 2. DAR 02-E10 PAK ABBAS Nama Manajer :
Nama Proyek : ORNANDO No. Kontrak :
Tipe Proyek : SPK No :
Propinsi : Tgl Mulai : 17 Apr 2020
Lokasi : Tgl Selesai : 17 Apr 2020
Nomor
Pekerja
an Keterangan Catatan Unit Volume Harga satuan Price
5 Analisa 1 M3 0.04 313,000.00 11,268.00
Pembuatan Lantai Kerja
1 PC : 3 PS : 5 KR
6 Analisa 1 M3 Beton Cor 0.06 1,102,697.04 70,572.61
Pondasi 40x40
2,571,733.48

XI PEK. TANGGA
1 Analisa 1 M3 Beton 1.38 2,946,632.20 4,066,352.44
Tangga
2 1 M2 Pasang Keramik 10.62 130,980.00 1,391,007.60
60 X 60
5,457,360.04

XII PEK. CAT AIR +


1 Analisa 1 M2 Cat Air 721.50 9,250.00 6,673,875.00
Dasar Dinding Rumah
(jotun)
2 Analisa 1 M2 Cat Air 721.50 14,925.00 10,768,387.50
Dinding Rumah (Jotun)
3 Analisa 1 M2 Cat Air 122.00 9,250.00 1,128,500.00
Dasar Pagar (jotun)
4 Analisa 1 M2 Cat Air 122.00 14,925.00 1,820,850.00
Pagar (Jotun)
5 1 M2 Plesteran 1 : 4 10.00 8,436.00 84,360.00
Gudang
6 1 M2 Acian Gudang 10.00 1,770.00 17,700.00
7 Analisa 1 M2 Cat Air 10.00 9,250.00 92,500.00
Dasar Gudang (Jotun)
8 Analisa 1 M2 Cat Air 10.00 14,925.00 149,250.00
Gudang (Jotun)
9 1 M2 Acian Canopy dan 19.60 1,770.00 34,692.00
Kolom Garasi
10 Analisa 1 M2 Cat Air 19.60 9,250.00 181,300.00
Dasar Canopy dan
Kolom Garasi (jotun)
11 Analisa 1 M2 Cat Air 19.60 14,925.00 292,530.00
Canopy dan Kolom
Garasi (jotun)
21,243,944.50

XIII PEK. ATAP


1 Analisa 1 M2 Pasang 83.04 120,408.16 9,998,693.61
Atap Genteng Metal
2 Analisa 1 M2 Pasang 83.04 250,000.00 20,760,000.00
BAJA RINGAN
3 Analisa 1 M3 Beton Cor 2.60 2,946,632.20 7,661,243.72
Plat Dak ATAP
4 Analisa 1 M1 Pasang 26.00 33,278.00 865,228.00
Perabung Genteng
Metal
5 Analisa 1 M1 Listplank 34.54 10,312.50 356,193.75
GRC
39,641,359.08

XIV PEK. PLUMBING

ACCURATE Accounting System Report


Cetak di 28 Apr 2020 - 13.46
(4)
PT. SULTAN PROPERTINDO
RAB
Filter berdasarkan :No. Proyek
No. Proyek : 2. DAR 02-E10 PAK ABBAS Nama Manajer :
Nama Proyek : ORNANDO No. Kontrak :
Tipe Proyek : SPK No :
Propinsi : Tgl Mulai : 17 Apr 2020
Lokasi : Tgl Selesai : 17 Apr 2020
Nomor
Pekerja
an Keterangan Catatan Unit Volume Harga satuan Price
1 TANKI AIR 1.00 0.00 0.00
2 MESIN AIR 1.00 0.00 0.00
3 Pekerjaan Sumur Bor 1.00 700,000.00 700,000.00
4 Analisa 1 Buah Septic 1.00 436,089.92 436,089.92
Tank
5 Analisa 1 M3 Galian 1.00 0.00 0.00
sumur resapan
6 Analisa 1 M Pasang 17.30 3,167.00 54,789.10
Pipa Air Bersih 3/4"
Sumur-tanki
7 Analisa 1 M Pasang 37.00 3,167.00 117,179.00
Pipa Air Bersih 3/4"
LT.1
8 Analisa 1 M Pasang 13.00 3,167.00 41,171.00
Pipa Air Bersih 3/4"
LT.2
9 Analisa Pemasangan 1 23.00 1,889.00 43,447.00
M Pipa Air Limbah 2,5"
LT.1
10 Analisa Pemasangan 1 13.50 1,889.00 25,501.50
M Pipa Air Limbah 2,5"
LT.2
11 Analisan Pemasangan 1 12.00 3,500.00 42,000.00
M Pipa Air Kotor 3" LT.1
12 Analisan Pemasangan 1 10.00 3,500.00 35,000.00
M Pipa Air Kotor 3"LT.2
13 Analisan Pemasangan 1 4.50 3,500.00 15,750.00
M Pipa Air Kotor 3"
PARIT
14 Analisa 1 Pasang 40.00 3,600.00 144,000.00
Penyambung Pipa Air
Bersih
15 Analisa 1 Pasang 15.00 10,700.00 160,500.00
Penyambung Pipa Air
Limbah 2,5"
16 Analisa 1 Pasang 6.00 10,700.00 64,200.00
Penyambung Pipa Air
Kotor 3"
17 CLOSET DUDUK 3.00 1,350,000.00 4,050,000.00
18 Analisa Pasang 1 Keran 7.00 15,350.00 107,450.00
Air
19 Analisa 1 Pasang Keran 1.00 50,000.00 50,000.00
Air Cuci Piring
20 Analisa 1 Pasang Floor 5.00 12,000.00 60,000.00
Drain
21 Analisa 1 Pasang Zinc 1.00 105,000.00 105,000.00
Meja Cuci Piring
6,252,077.52

XV PEK. INSTALASI
LISTRIK
1 Instalasi Titik Listrik 47.00 100,000.00 4,700,000.00
2 Analisa 1 Pasang Saklar 9.00 15,000.00 135,000.00
Tunggal
3 Analisa 1 Pasang Saklar 13.00 20,000.00 260,000.00
Ganda
4 Analisa 1 Pasang Stop 12.00 15,000.00 180,000.00
Kontak

ACCURATE Accounting System Report


Cetak di 28 Apr 2020 - 13.46
(5)
PT. SULTAN PROPERTINDO
RAB
Filter berdasarkan :No. Proyek
No. Proyek : 2. DAR 02-E10 PAK ABBAS Nama Manajer :
Nama Proyek : ORNANDO No. Kontrak :
Tipe Proyek : SPK No :
Propinsi : Tgl Mulai : 17 Apr 2020
Lokasi : Tgl Selesai : 17 Apr 2020
Nomor
Pekerja
an Keterangan Catatan Unit Volume Harga satuan Price
5 Analisa 1 Pasang MCB 1.00 38,000.00 38,000.00
5,313,000.00

XVI PEK. PINTU, KUSEN,


JENDELA, VENTILASI
1 Pintu Oven 4.00 750,000.00 3,000,000.00
2 1 Daun Pintu Utama 3.00 750,000.00 2,250,000.00
3 Pintu Geser Balkon 1.60 950,000.00 1,520,000.00
4 1 Daun Pintu KM/WC 3.00 210,000.00 630,000.00
5 Pintu Geser Wudhu 1.60 950,000.00 1,520,000.00
8 Kusen pintu 7.00 352,250.00 2,465,750.00
7 Jendela mati 23.53 700,000.00 16,471,000.00
8 Jendela sliding 8.61 950,000.00 8,179,500.00
9 Jendela engsel 15.38 750,000.00 11,535,000.00
10 ventilasi 1.00 0.00 0.00
47,571,250.00

XVII PEK. PENGGANTUNG


DAN KUNCI
1 Analisa 1 Engsel Pintu 21.00 11,250.00 236,250.00
4"
2 Analisa 1 Kunci Pintu 7.00 120,000.00 840,000.00
Biasa
1,076,250.00

XVIII PEK. CAT MINYAK


1 Analisa 1 M2 Cat 32.00 27,350.00 875,200.00
Minyak Pintu
2 Analisa 1 M2 Cat 11.00 27,350.00 300,850.00
Minyak Kusen
3 Analisa 1 M2 Cat 11.00 27,350.00 300,850.00
Minyak Listplank
1,476,900.00

XIX PEK. LAIN-LAIN


1 Analisa 1 M3 0.50 313,000.00 156,500.00
Pembuatan Beton Cor
Camp. 1 PC : 3 PS : 5
KR
2 Pintu Garasi 1.00 0.00 0.00
3 Analisa 1 M2 6.60 81,510.00 537,966.00
Pemasangan Keramik
Motif Batu Alam A
4 Analisa 1 M2 7.80 81,510.00 635,778.00
Pemasangan Keramik
Motif Batu Alam B
5 Analisa 1 M2 5.50 81,510.00 448,305.00
Pemasangan Keramik
Motif Batu Alam C
6 Papan Eksterior 1.00 0.00 0.00
7 Paving Block 4.00 80,000.00 320,000.00
8 Jalan Tapak 0.05 313,000.00 15,650.00
9 Akrilik Atap Canopy 1.00 0.00 0.00
2,114,199.00

ACCURATE Accounting System Report


Cetak di 28 Apr 2020 - 13.46
(6)
PT. SULTAN PROPERTINDO
RAB
Filter berdasarkan :No. Proyek
No. Proyek : 2. DAR 02-E10 PAK ABBAS Nama Manajer :
Nama Proyek : ORNANDO No. Kontrak :
Tipe Proyek : SPK No :
Propinsi : Tgl Mulai : 17 Apr 2020
Lokasi : Tgl Selesai : 17 Apr 2020
Nomor
Pekerja
an Keterangan Catatan Unit Volume Harga satuan Price
Total dari 2. DAR 02-E10 PAK ABBAS 268,196,050.02
Servis 0.00
% Total 268,196,050.02
Pembulatan 268,196,050.02
Jasa lain lain 0.00
Total Proyek 268,196,050.02

ACCURATE Accounting System Report


Cetak di 28 Apr 2020 - 13.46