SULTAN PROPERTINDO
RAB
Filter berdasarkan :No. Proyek
No. Proyek : 2. DAR 02-E10 PAK ABBAS Nama Manajer :
Nama Proyek : ORNANDO No. Kontrak :
Tipe Proyek : SPK No :
Propinsi : Tgl Mulai : 17 Apr 2020
Lokasi : Tgl Selesai : 17 Apr 2020
Nomor
Pekerja
an Keterangan Catatan Unit Volume Harga satuan Price
I PEK. PENDAHULUAN
1 Analisa 1 M2 150.00 0.00 0.00
Pembersihan Lokasi
3 Analisa 1 M Pengukuran 50.00 3,086.30 154,315.00
dan Pemasangan
Bowplank
154,315.00
II PEK. PONDASI
1 Analisa 1 M3 Galian 28.70 0.00 0.00
Tanah Pondasi
2 1 M3 Pasir Bawah 2.43 42,000.00 102,060.00
Pondasi/Lantai
3 Analisa 1 M3 LT. Kerja 2.43 123,228.97 299,446.40
Pondasi 1 PC : 3 PS : 5
KR
4 Analisa 1 M3 Beton Cor 2.07 1,102,707.81 2,282,605.16
Pondasi dan Mal 60x60
5 Analisa 1 M3 Beton Cor 0.50 2,703,934.07 1,351,967.04
Kolom pedestal 20x20
6 Pasang Batu 1 1/2 Bata 30.10 135,955.00 4,092,245.50
Rolag
7 1 M2 Plasteran 1 1/2 79.00 6,950.00 549,050.00
Bata Pondasi Rolag
8 Analisa 1 M3 Beton Cor 4.51 1,810,046.76 8,163,310.91
Balok sloof
16,840,685.00
VI PEK. PAGAR
1 1 M3 Pasir Bawah 0.53 42,000.00 22,260.00
Pondasi/Lantai
2 Analisa 1 M3 LT. kerja 0.53 123,238.68 65,316.50
Pondasi. 1 PC : 3 PS : 5
KR
3 Analisa 1 M3 Beton Cor 0.26 1,102,710.67 286,704.77
Pondasi 40x40
4 Analisa 1 M3 Beton Cor 0.53 1,699,391.08 905,775.45
Kolom 15x15
5 Analisa 1 M3 Beton Cor 1.33 1,385,645.04 1,842,907.90
Balok dan Slof
6 1 M2 Pasang Batu Bata 33.00 35,015.00 1,155,495.00
1:2
7 1 M2 Plesteran 1 : 4 122.00 8,436.00 1,029,192.00
8 1 M2 Acian 122.00 1,770.00 215,940.00
5,523,591.62
IX PEK. PLAFOND
1 1 M2 Plafond Gypsum + 38.00 51,430.50 1,954,359.00
Rangka Rangan LT.1
2 1 M2 Plafond Gypsum + 6.90 51,430.50 354,870.45
Rangka wc LT.1
3 1 M2 Plafond Gypsum + 17.00 51,430.50 874,318.50
Rangka garasi LT.1
4 1 M2 Plafond Gypsum + 1.90 107,030.50 203,357.95
Rangka teras depan
LT.1
5 1 M2 Plafond Gypsum + 51.50 51,430.50 2,648,670.75
Rangka Ruanga LT.2
6 1 M2 Plafond Gypsum + 4.00 51,430.50 205,722.00
Rangka WC tmpt wudhu
LT.2
7 1 M2 Plafond Gypsum + 2.80 51,430.50 144,005.40
Rangka mushala LT.2
6,385,304.05
XI PEK. TANGGA
1 Analisa 1 M3 Beton 1.38 2,946,632.20 4,066,352.44
Tangga
2 1 M2 Pasang Keramik 10.62 130,980.00 1,391,007.60
60 X 60
5,457,360.04
XV PEK. INSTALASI
LISTRIK
1 Instalasi Titik Listrik 47.00 100,000.00 4,700,000.00
2 Analisa 1 Pasang Saklar 9.00 15,000.00 135,000.00
Tunggal
3 Analisa 1 Pasang Saklar 13.00 20,000.00 260,000.00
Ganda
4 Analisa 1 Pasang Stop 12.00 15,000.00 180,000.00
Kontak