Date Accomplishment

November 23, 2010 Orientation of the company. The do’s


and don’ts while inside the office. Job
Description was introduced. Read the
Basic Training in Software training.

November 24, 2010 Continuation of reading about Basic


Training in Software training testing.
Introduced the validation guide of Facili
-works, while reading the validation,
A hand on in the system was made.

November 25, 2010 Exploring the whole system while


continuing reading the instruction
the validation guide.

November 30, 2010


Smoke testing was given. But I did the
Personal and Global Setting of the system.

Noted by:

Arvin Twaño Rosanna Esquivel


QA Supervisor In-charge in the Internship Program
ANGELES UNIVERSITY FOUNDATION
Angeles City
College of Computer Studies
AY 2009-2010

ACCOMPLISHMENT REPORT
December 01, 2010 to December 30, 2010

NAME: Labung, Martin Joseph T.

COMPANY NAME: Cybermetrics Corporation

Date Accomplishment

December 01, 2010 Continuation of finding issues of the


Personal and Global Setting and to
the smoke testing, after that,
continuation of the smoke testing.

December 02, 2010


Absent

December 06, 2010 No Electricity (No OJT)

December 07, 2010


Continuation of Smoke testing.

December 08, 2010 Continuation of the smoke testing. After


that the new release build 014 checklist
was being evaluated also.After the checklist
I did the test planning.

December 09, 2010 Continuation of the test planning, edit the


procedure text.

December 13, 2010 Rechecking of the Procedure text


then smoke testing on the build 014
ANGELES UNIVERSITY FOUNDATION
Angeles City
College of Computer Studies
AY 2009-2010

Date Accomplishment

December 14, 2010 Continuation of the smoke testing.


After checking of some issues on the
build 013

December 15, 2010 Smoke testing on build 014, after that


we verify the issues by using different
user and OS, checking issues on
report module on build 014 and the
advanced filter.

December 16, 2010 Rechecking of procedure text for some


concatenated words, extra periods and wrong
spelling.etc.

December 20, 2010 Install the 8.6 build 014 and did the checklist.

December 21, 2010 Continuation of build 014using different


Installing option and OS. Checking of CalPro
build 002.

December 22, 2010 Checking of CalPro build 002 verified if the


fixed issues doesn’t have any problem with
different user.

December 23, 2010 Checking of CalPro build 002 then checking


of the installer in windows 2008, 64 and 32 bit.

December 28, 2010 Rechecking of the issues fixed in build 015, did
the checklist for build 015.
ANGELES UNIVERSITY FOUNDATION
Angeles City
College of Computer Studies
AY 2009-2010

Date Accomplishment

December 29, 2010 Absent

December 30, 2010 Did the smoke testing for build 015.