Anda di halaman 1dari 9

Ir JEFRI SUSYAFIRMANTO,MM

Nip. 19680404 199603 1 004

SELAMET INDARJO, S.Hut, M.Si


Nip. 19801130 200912 1 001

KHAIRUR RASID DESKY, ST


DIREKTUR

SUDRAJAD, ST

MUNTAZERY MUSTAID, ST

PERSPEKTIF

1
NON SKALA

8
7.00
9.00
3.50

12.00

6.74 21.00

29.48
11.00 13.00

31.00

Ir JEFRI SUSYAFIRMANTO,MM
Nip. 19680404 199603 1 004

19.00

SELAMET INDARJO, S.Hut, M.Si


Nip. 19801130 200912 1 001

25.94

KHAIRUR RASID DESKY, ST


DIREKTUR

13.14

SUDRAJAD, ST

0.20
0.20
0.20 0.23
0.20 0.20
0.20 0.20
0.20

MUNTAZERY MUSTAID, ST

14.88
0.20
0.20
0.20 0.20
0.20
0.20

SITE PLANE
1.20

2
1 : 500

8
10

150

10

Ir JEFRI SUSYAFIRMANTO,MM
Nip. 19680404 199603 1 004

1
SELAMET INDARJO, S.Hut, M.Si
Nip. 19801130 200912 1 001

150

KHAIRUR RASID DESKY, ST


DIREKTUR
10

SUDRAJAD, ST

MUNTAZERY MUSTAID, ST

Pas. Batu Alam 5


Beton Cor 10 20
5 1.DETAIL JALAN
Pasir Urug 5 cm
2.POTONGAN 1
150

3
1 : 20

8
Ir JEFRI SUSYAFIRMANTO,MM
Nip. 19680404 199603 1 004

SELAMET INDARJO, S.Hut, M.Si


Nip. 19801130 200912 1 001

KHAIRUR RASID DESKY, ST


DIREKTUR

SUDRAJAD, ST

MUNTAZERY MUSTAID, ST

1. PERSPEKTIF

NON SKALA

8
Ir JEFRI SUSYAFIRMANTO,MM
Nip. 19680404 199603 1 004

SELAMET INDARJO, S.Hut, M.Si


2.50 Nip. 19801130 200912 1 001

1.50 1.50

KHAIRUR RASID DESKY, ST


DIREKTUR

2.50 SUDRAJAD, ST

MUNTAZERY MUSTAID, ST

1.DENAH
2. TAMPAK DEPAN
3. TAMPAK BELAKANG
4. TAMPAK SAMPING KANAN
5. TAMPAK SAMPING KIRI

5
1 : 50

8
264

Rabung Seng Nok


Kayu Reng 5/5 Penutup Atap Ijuk + Alumunium Foill + Triplek 6 mm
Kaki Kuda-Kuda 7/7 Gapit 2.3/7
9

60
146
60 53 53
Hanger

Ring Balok 13/15 15


Lisplank

37

Relif 5

93 200
Kolom Lapis Batu Alam Ir JEFRI SUSYAFIRMANTO,MM
Nip. 19680404 199603 1 004

Meja

Tempat Duduk 10 SELAMET INDARJO, S.Hut, M.Si


Nip. 19801130 200912 1 001
Lantai Lapis Batu Alam
20
Cor 1:3:5
Pasir Urug 20

Pas Batu Bata


Sloof 15/15 20 20

Cor 1:3:5 10
Pasir Alas 5
Besi Angker
Pondasi Menerus
35 65

KHAIRUR RASID DESKY, ST


Pas Batu Kosong 10 DIREKTUR
5

Pasir Alas
150
SUDRAJAD, ST

MUNTAZERY MUSTAID, ST

1.POTONGAN 1 - 1

6
1 : 25

8
264

Rabung Seng Nok


Kayu Reng 5/5 Penutup Atap Ijuk + Alumunium Foill + Triplek 6 mm
Kaki Kuda-Kuda 7/7 Gapit 2.3/7

69

146
60
Hanger

150

Ir JEFRI SUSYAFIRMANTO,MM
Nip. 19680404 199603 1 004

SELAMET INDARJO, S.Hut, M.Si


Nip. 19801130 200912 1 001

20

Lantai Lapis Batu Alam


Cor 1:3:5
Pasir Urug 20
2
Pas Batu Bata 5
Sloof 15/15 10
3
Cor 1:3:5
Pasir Alas 13
KHAIRUR RASID DESKY, ST
DIREKTUR
20
50
Besi Angker
Pondasi Menerus
SUDRAJAD, ST

Pas Batu Kosong 10


5

Pasir Alas
5 40 5 MUNTAZERY MUSTAID, ST

50

1. DETAIL PONDASI
2. DETAIL KAKI KUDA-KUDA

7
1 : 20

8
K1 BL5

20 13 13

20 15 15

TUMPUAN LAPANGAN
Kolom K Dimensi (cm) 13 x 15 13 x 15
Dimensi (cm) 20 x 20 Tul. Atas (mm)
Tul. Bagi (mm) - -
Tulangan (mm)
Tul. Bawah (mm)
Beugel L (mm) Beugel (mm)

Ir JEFRI SUSYAFIRMANTO,MM
Nip. 19680404 199603 1 004

SELAMET INDARJO, S.Hut, M.Si


Nip. 19801130 200912 1 001

SL1

15 15

15 15

KHAIRUR RASID DESKY, ST


DIREKTUR

TUMPUAN LAPANGAN
Dimensi (cm) 15 x 15 15 x 15 SUDRAJAD, ST

Tul. Atas (mm)


Tul. Bagi (mm) - - MUNTAZERY MUSTAID, ST

Tul. Bawah (mm)


1. DETAIL PEMBESIAN SLOOF
Beugel (mm) 2. DETAIL PEMBESIAN KOLOM
3. DETAIL PEMBESIAN BALOK

8
1 : 20

8
Gambar Bestek

KUTACANE. KAB. ACEH TENGGARA