Tabel 5 - 2.

PROYEKSI KEBUTUHAN AIR BERSIH


DESA BARATAN KEC BINAKAL
Tahun Proyeksi Ke n ANALISA PERHITUNGAN
No Uraian Satuan Tahun KETERANGAN
5th 10th 15th KODE CARA HITUNG
perenc.
1 Jumlah penduduk jiwa 483 533 589 650 1 rata2 kenaikan 2% pertahun
Pelayanan penduduk % 75 100 100 100 2 juklak 100% pelayanan
jiwa 362 533 589 650 3
2 Pelayanan SR % 100.00 100 100 100 4 juklak / survei
jiwa 362 533 589 650 5 (5)= ((4)*(3))/100
jiwa/sb 5 5 5 5 6 juklak
Jmlh. Sb 72 107 118 130 7 (7)= (5) / (6)
Pemakaian Air Lt/org/hr 90 90 90 90 8 juklak
Lt/sb/hr 450 450 450 450 9 (9)= (8) x (6)
Lt/det 0.38 0.56 0.61 0.68 10 (10)=(5)x(8)/86400
3 Pelayanan KU / HU % - - - - 11 (11)= 100 - (4)
jiwa - - - - 12 (12)=(11)/100*(3)
jiwa/HU 100 100 100 100 13 juklak
Jmlh. HU - - - - 14 (14)=(12)/(13)
Pemakaian Air Lt/org/hr 60 60 60 60 15 juklak
Lt/HU/hr 6,000 6,000 6,000 6,000 16 (16)=(13)*(15)
Lt/det - - - - 17 (17)=(12)*(15)/86400
4 Total Domestik Lt/det 0.38 0.56 0.61 0.68 18 (18)=(10)+(17)
5 Total Non Domestik % 10.00 10.00 10.00 10.00 19
Lt/det 0.04 0.06 0.06 0.07 20 (20)=(18) x (19)
6 Total Kebutuhan Air Lt/det 0.42 0.61 0.67 0.74 21 (21)=(18) + (20)
7 Kehilangan Air % 20 20 20 20 22 juklak
Lt/det 0.10 0.15 0.17 0.19 23 (23)=(21)*(22)/80
8 Kebutuhan Air
- Rata-rata Lt/det 0.52 0.76 0.84 0.93 24 (24)=(21)+ 23)
- Harian Puncak Faktor 1.1 1.1 1.1 1.1 25 juklak
Lt/det 0.57 0.84 0.93 1.02 26 (26)=(24)* (25)
M3/jam 2.05 3.02 3.34 3.69 27 (27)=(26)x3600/1000
M3/hari 49.31 72.59 80.15 88.49 28 (28)=(27)*24
- Jam Puncak Faktor 1.5 1.5 1.5 1.5 29 juklak (minimum)
Lt/det 0.78 1.15 1.26 1.40 30 (30)=(24)*(27)
9 Kebutuhan Air Baku Faktor 3.0 3.0 3.0 3.0 31 faktor keamanan
Lt/det 1.71 2.52 2.78 3.07 32 (32)=(26)*(33) Besarnya debit perencanaan
3X kebutuhan air baku
10 Volume Resevoir M 3
9.86 14.52 16.03 17.70 33 (30)=(0.2)*(28) Minimum 20% harian Maks
Kriteria perencanaan
Perhitungan Hydrolis Desa Baratan Kec. Binakal Kab. Bondowoso
Kriteria Desain :
Formula Hazen William :
Kebut. Air = 90 lt / org / hari S (slope) = ( ^H/L)*100
Pertumbuhan Pddk = 2 % / thn D (diam) teoritis = ((3.59*Q*10^6)/(S^0.54*C))^0.38
Periode Desain = 15 thn Hloss / 100 m = ((3.59*Q*10^6)/(D^2.63*C))^1.85
Faktor Jam Puncak, jp = 1.5 V = 4*Q/1000(3.14*(D/1000)^2)
Minor Loss = 5 %
Kebut air non domestik = 10 %

DATA BEBAN NODE BEBAN PIPA PERHITUNGAN HEAD LOSS


No Jalur Node Elevasi Beda Tinggi Pjg Pipa Slope Jmlh. Pddk Keb. Air Jmlh. Pddk Kebut. Air Kebut air Jmlh. Pddk Jmlh. Pddk Q non Flow Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL Sisa
Q domestik
Pipa h ^h L S yg dilayani Proy 15 thn Proy 15 thn jam puncak yg disuplai Proy 15 thn domestik Q tot (lt/dt) Kehilangan Jam Puncak C D teoritis D desain per 100 m (+10% minor) Tekan
(lt/dt)
(+ m) (m) (m) (%) (jiwa) (lt/d) (jiwa) (lt/dt) (l/dt) (jiwa) (jiwa) 10% air 20% (lt/dt) (lt/dt) (mm) (mm) (m) (m) (m) (m)

M2 480.00 480.00
M2-P1 P1 478.00 2.00 50.00 4.00 0.00 0 0.00 0.00 1,030 1,386 1.44 0.14 1.59 0.32 1.91 2.86 120 56.32 90.00 0.41 0.22 479.78 1.78
1 P1-P2 P2 464.00 14.00 640.00 2.19 0 0.00 0 0.00 0.00 1,030 1,386 1.44 0.14 1.59 0.32 1.91 2.86 120 63.75 90.00 0.41 2.78 477.22 13.22
2 P1-P2 P3 462.00 2.00 200.00 1.00 260 0.27 350 0.36 0.55 1,030 1,386 1.44 0.14 1.59 0.32 1.91 2.86 120 74.85 90.00 0.41 0.87 476.36 14.36
3 P2-P3 P4 443.00 19.00 250.00 7.60 265 0.28 357 0.37 0.56 770 1,036 1.08 0.11 1.19 0.24 1.42 2.14 120 44.20 63.00 1.37 3.59 472.77 29.77
4 P3-P4 P5 428.00 15.00 150.00 10.00 95 0.10 128 0.13 0.20 505 680 0.71 0.07 0.78 0.16 0.93 1.40 120 35.59 63.00 0.63 0.99 471.78 43.78
5 P4-P5 P6 424.00 4.00 50.00 8.00 95 0.10 128 0.13 0.20 410 552 0.57 0.06 0.63 0.13 0.76 1.14 120 34.43 63.00 0.43 0.22 471.55 47.55
6 P5-P6 P7 414.00 10.00 1,078.00 0.93 315 0.33 424 0.44 0.66 315 424 0.44 0.04 0.49 0.10 0.58 0.87 120 48.46 63.00 0.26 2.96 468.59 54.59
2,418 1,030 1.07 1,386 1.44 2.17 0.57 1.25 7.51 11.27

Note: Ukuran pipa desain:


Ø 110 mm 4" 1,528.00
Ø 90 mm 3"
Ø 75 mm 2.5 "
Ø 63 mm 2"
Ø 50 mm 1.5 "
Ø 40 mm 1.25 "
Ø 32 mm 1"
Ø 25 mm 3/4"
Ø 20 mm 1/2"
Kcptan
V
(m/dtk)

0.45
0.45
0.45
0.69
0.45
0.37
0.28
TABEL HASIL PENGUKURAN DESA TIRTOAGUNG
Keb Air Total Kebutuhan Air (Q)
Proyeksi Q Non Dom Kehilangan air
Elevasi Jarak Jumlah penduduk Keb. Air Domestik Kebutuhan
No Patok Node pddk 15 Th (10%Qdom) (20%)
(Qdom) Air Qrata2 Qhmax
(m) (m) KK ( Jiwa ) Jiwa lt/org/hr lt/dt lt/dt lt/dt lt/dt lt/dt lt/dt

M2 480.00
M2 - P1 P1 478.00 50.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 0.00 0.00 0.00
M2 - P2 P2 464.00 640.00 0.00 0.00 0.00 90.00 0.00 0.00 0.00 0.00 0.00 0.00
P2 - P3 P3 462.00 200.00 52.00 260.00 350.00 90.00 0.36 0.04 0.40 0.08 0.48 0.53
P3 - P4 P4 443.00 250.00 53.00 265.00 357.00 90.00 0.37 0.04 0.41 0.08 0.49 0.54
P4 - P5 P5 428.00 150.00 19.00 95.00 128.00 90.00 0.13 0.01 0.15 0.03 0.18 0.19
P5 - P6 P6 424.00 50.00 19.00 95.00 128.00 90.00 0.13 0.01 0.15 0.03 0.18 0.19
P6 - P7 P7 414.00 1,078.00 63.00 315.00 424.00 90.00 0.44 0.04 0.49 0.10 0.58 0.64
2,418.00 206.00 1,030.00

MA 1
482 m

19 KK + 1 KD + 1 Polindes + 1 M2 MA 2
PAUD 480 m
63 KK + 1 masjid + 1 unit
MCK 52 KK+2 unit MCK
50
P7 P6 P5 19 KK P4 53 KK + 1 SD P3 P2 P1
414 m 425 m 428 m 443 m 462 m 464 m 478m
1,078.00 50 150 250 200 640

Dusun Masjid RT I Dusun Krajan RT II


butuhan Air (Q)

Qjp
lt/dt

0.00
0.00
0.72
0.74
0.26
0.26
0.87

MA 1
482 m M1

17
MA 2
480 m

P1
478m