DAFTAR ISI

Halaman
DIVISI I – UMUM

SEKSI 1.2 MOBILISASI DAN DEMOBILISASI


Pasal 1.2.1 Umum .............................................................................................. DIV.1 / 1
1.2.2 Program Mobilisasi ............................................................................ DIV.1 / 3
1.2.3 Pengukuran dan Pembayaran ............................................................. DIV.1 / 4

DIVISI 2 – DRAINASE

PASAL 2.1 SELOKAN DAN SALURAN AIR


Pasal 2.1.1 Umum .............................................................................................. DIV.2 /1
2.1.2 Bahan dan Jaminan Mutu .................................................................. DIV.2 /3
2.1.3 Pelaksanaan ...................................................................................... DIV.2 /4
2.1.4 Pengukuran dan Pembayaran ............................................................ DIV.2 /5

SEKSI 2.2 PASANGAN BATU DENGAN MORTAR


Pasal 2.2.1 Umum ............................................................................................. DIV.2 /6
2.2.2 Bahan dan Jaminan Mutu .................................................................. DIV.2 /8
2.2.3 Pelaksanaan ...................................................................................... DIV.2 /9
2.2.4 Pengukuran dan Pembayaran ............................................................. DIV.2 / 10

DIVISI 3 – PEKERJAAN TANAH

SEKSI 3.1 GALIAN


Pasal 3.1.1 Umum .............................................................................................. DIV.3 / 1
3.1.2 Prosedur Penggalian ......................................................................... DIV.3 / 7
3.1.3 Pengukuran dan Pembayaran ............................................................ DIV.3 / 10

SEKSI 3.2 TIMBUNAN


Pasal 3.2.1 Umum .............................................................................................. DIV.3 / 14
3.2.2 Bahan .............................................................................................. DIV.3 / 18
3,2,3 Penghamparan dan Pemadatan Timbunan DIV.3 / 20
..........................................
3.2.4 Jaminan Mutu DIV.3 / 22
…….................................................................................
3.2.5 Pengukuran dan Pembayaran ............................................................ DIV.3 / 24

SEKSI 3.3 PENYIAPAN BADAN JALAN


Pasal 3.3.1 Umum .............................................................................................. DIV.3 / 27
3.3.2 Bahan .............................................................................................. DIV.3 / 29
3.3.3 Pelaksanaan dari Penyiapan Badan Jalan ........................................... DIV.3 / 30
3.3.4 Pengukuran dan Pembayaran ............................................................ DIV.3 / 30

DIVISI 4 – PELEBARAN PERKERASAN DAN BAHU JALAN

SEKSI 4.2 BAHU JALAN


Pasal 4.2.1 Umum .............................................................................................. DIV.4 /1
4.2.2 Bahan ............................................................................................... DIV.4 /3
4.2.3 Pelaksanaan dan Pemadatan ............................................................ DIV.4 /3
4.2.4 Pengukuran dan Pembayaran ............................................................ DIV.4 /3
DIVISI 5 – PERKERASAN BERBUTIR

SEKSI 5.1 LAPIS PONDASI AGREGAT


Pasal 5.1.1 Umum ............................................................................................. DIV.5 / 1
5.1.2 Bahan .............................................................................................. DIV.5 / 4
5.1.3 Penghamparan dan Pemadatan Lapis Pondasi Agregat DIV.5 / 6
........................
5.1.4 Pengukuran dan Pembayaran ............................................................. DIV.5 / 8

DIVISI 6 PERKERASAN ASPAL

SEKSI 6.1 LAPIS RESAP PENGIKAT DAN LAPIS PEREKAT


Pasal 6.1.1 Umum .............................................................................................. DIV.6 /1
6.1.2 Bahan .............................................................................................. DIV.6 /4
6.1.3 Peralatan ......................................................................................... DIV.6 /5
6.1.4 Pelaksanaan Pekerjaan ..................................................................... DIV.6 /8
6.1.5 Pemeliharaan dan Pembukaan bagi Lalu-Lintas DIV.6 / 12
...................................
6.1.6 Pengendalian Mutu dan Pengujian di Lapangan DIV.6 / 13
...................................
6.1.7 Pengukuran dan Pembayaran ............................................................. DIV.6 / 13

SEKSI 6.3 CAMPURAN ASPAL PANAS


Pasal 6.3.1 Umum .............................................................................................. DIV.6 / 15
6.3.2 Bahan ............................................................................................... DIV.6 / 22
6.3.3 Campuran ………………………. DIV.6 / 23
........................................................
6.3.4 Ketentuan Instalasi Pencampur Aspal ............................................... DIV.6 / 30
6.3.5 Pembuatan dan Produksi Campuran Aspal DIV.6 / 47
...........................................
6.3.6 Penghamparan Campuran .................................................................. DIV.6 / 50
6.3.7 Pengendalian Mutu dan Pemeriksaan di Lapangan DIV.6 / 54
..............................
6.3.8 Pengukuran dan Pembayaran ............................................................ DIV.6 / 58

SEKSI 6.6 LAPIS PERATA PENETRASI MACADAM


Pasal 6.6.1 Umum .............................................................................................. DIV.6 / 62
6.6.2 Bahan ............................................................................................... DIV.6 / 63
6.6.3 Kuantitas Agregat dan Aspal ............................................................. DIV.6 / 64
6.6.4 Peralatan .......................................................................................... DIV.6 / 65
6.6.5 Pelaksanaan ...................................................................................... DIV.6 / 65
6.6.6 Pengendalian Mutu dan Pengujian di Lapangan DIV.6 / 68
............................................................................
6.6.7 Pengukuran dan Pembayaran ............................................................ DIV.6 / 69

DIVISI 7 STRUKTUR

SEKSI 7.1 BETON


Pasal 7.1.1 Umum .............................................................................................. DIV.7 /1
7.1.2 Bahan .............................................................................................. DIV.7 /5
7.1.3 Pencampuran dan Penakaran ............................................................ DIV.7 /7
7.1.4 Pelaksanaan Pengecoran ................................................................... DIV.7 / 11
7.1.5 Pekerjaan Akhir ................................................................................ DIV.7 / 16
7.1.6 Pengendalian Mutu di Lapangan ........................................................ DIV.7 / 19
7.1.7 Pengukuran dan Pembayaran ............................................................. DIV.7 / 20
SEKSI 7.3 BAJA TULANGAN
Pasal 7.3.1 Umum .............................................................................................. DIV.7 / 22
7.3.2 Bahan .............................................................................................. DIV.7 / 24
7.3.3 Pembuatan dan Penempatan ............................................................. DIV.7 / 25
7.3.4 Pengukuran dan Pembayaran ............................................................ DIV.7 / 26

SEKSI 7.4 BAJA STRUKTUR


Pasal 7.4.1 Umum .............................................................................................. DIV.7 / 28
7.4.2 Bahan .............................................................................................. DIV.7 / 31
7.4.3 Kecakapan Kerja .............................................................................. DIV.7 / 32
7.4.4 Pelaksanaan ..................................................................................... DIV.7 / 34
7.4.5 Pengukuran dan Pembayaran ............................................................ DIV.7 / 38

SEKSI 7.9 PASANGAN BATU


Pasal 7.9.1 Umum ............................................................................................. DIV.7 / 40
7.9.2 Bahan .............................................................................................. DIV.7 / 41
7.9.3 Pelaksanaan Pasangan Batu .............................................................. DIV.7 / 41
7.9.4 Pengukuran dan Pembayaran ............................................................ DIV.7 / 44

SEKSI 7.10 PASANGAN BATU KOSONG DAN BRONJONG


Pasal 7.10.1 Umum ............................................................................................. DIV.7 / 45
7.10.2 Bahan .............................................................................................. DIV.7 / 47
7.10.3 Pelaksanaan ..................................................................................... DIV.7 / 47
7.10.4 Pengukuran dan Pembayaran ............................................................ DIV.7 / 48

SEKSI 7.11 EXPANSION JOINT


Pasal 7.11.1 Umum ............................................................................................. DIV.7 / 50
7.11.2 Bahan .............................................................................................. DIV.7 / 51
7.11.3 Pelaksanaan ..................................................................................... DIV.7 / 52
7.11.4 Pengukuran dan Pembayaran ............................................................ DIV.7 / 53

DIVISI 8 PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR

SEKSI 8.4 PERLENGKAPAN JALAN DAN PENGATUR LALU LINTAS


Pasal 8.4.1 Umum .............................................................................................. DIV.8 /1
8.4.2 Bahan ............................................................................................... DIV.8 /3
8.4.3 Pelaksanaan ..................................................................................... DIV.8 /6
8.4.4 Pengukuran dan Pembayaran ............................................................ DIV.8 / 11

LAMPIRAN - LAMPIRAN
DAFTAR LAMPIRAN

1.4.A DAFTAR PERALATAN LABORATORIUM UNTUK PENGUJIAN TANAH DAN


ASPAL

1.10.A EKUIVALENSI AASHTO TERHADAP SPESIFIKASI STANDAR INDONESIA

5.4.A PROSEDUR LAPANGAN UNTUK PENGGUNAAN SCALA DCP UNTUK


PENGENDALIAN KONSTRUKSI LAPIS PONDASI TANAH SEMEN

6.2.A CARA MENENTUKAN UKURAN, BENTUK DAN GRADASI BATUAN


LABURAN UKURAN NOMINAL 9 SAMPAI 20 MM

6.2.B PROSEDUR STANDAR PENGUJIAN UNTUK PENGUKURAN TEKSTUR


DENGAN CARA LINGKARAN PASIR

6.2.C METODE RANCANGAN UNTUK TAKARAN PEMAKAIAN BAHAN BITUMEN

6.3.A METODE PEMBAYARAN CAMPURAN ASPAL PANAS

6.3.B MODIFIKASI MARSHALL UNTUK AGREGAT BESAR (> 1” & < 2”)

6.3.C PROSEDUR PENGUJIAN ANGULARITITAS AGREGAT KASAR

6.3.D PROSEDUR PENGUJIAN ANGULARITAS AGREGAT HALUS

6.3.E CONTOH GRAFIK-GRAFIK DATA MARSHALL

6.3.F CONTOH GRAFIK BALOK (BAR CHART) UNTUK MENUNJUKKAN DATA


RANCANGAN CAMPURAN DAN PEMILIHAN KADAR ASPAL RANCANGAN
(CONTOH AC-WC)

6.3.G RINGKASAN AASHTO T283 – 89


RESISTANCE OF COMPACTED BITUMINOUS MIXTURE TO MOISTURE
INDUCED DAMAGE

6.3.H GRADASI CAMPURAN AC-WC & CONTOH TITIK KONTROL

6.4.A PROSEDUR RANCANGAN BAHAN PEREMAJA

6.4.B PROSEDUR UNTUK OPTIMASI VISKOSITAS BAHAN PEREMAJA

6.4.C PROSEDUR PENGAMBILAN CONTOH UNTUK ASBUTON DAN CAMPURAN


ASBUTON

6.4.D FORMULIR STANDAR RANCANGAN CAMPURAN ASBUTON

6.4.E METODE SEDERHANA UNTUK MENENTUKAN RANCANGAN CAMPURAN


NOMINAL LASBUTAG

6.4.F METODE SEDERHANA UNTUK MENENTUKAN RANCANGAN CAMPURAN


NOMINAL LATASBUSIR

6.5.A METODE PENGUJIAN UNTUK OPTIMASI KADAR BITUMEN RESIDUAL


CAMPURAN DINGIN KELAS E