URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT MIXING PLANT E01
2. Tenaga Pw 294.0 HP
3. Kapasitas Cp 60.0 T/Jam
4. Alat a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 3,600,000,000.0 Rupiah

5 Kapastas tangki aspal Ca 30,000.00 liter

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 360,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.19925 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 430,384.46 Rupiah
W

b. Asuransi, dll = 0.002 x B F 4,800.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 435,184.46 Rupiah

C. BIAYA OPERASI PER JAM KERJA


1. Bahan Bakar = (12%-15%) x Pw x Ms H1 299,880.00 Rupiah
Bahan Bakar Pemanasan Material = 12 ltr x Ms H2 3,427,200.00 Rupiah Khusus AMP
dan aspal (Oil Heater)
Bahan Bakar Pemanas Aspal =1/1000 *Ca*Ms H3 204,000.00

2. Pelumas = (2.5%-3%) x Pw x Mp I 308,700.00 Rupiah

3. Biaya bengkel (6.25% dan 8.75%) x B J 210,000


W
4. Biaya perbaikan (12,5 % - 17,5 %) x B K 420,000.00 Rupiah
W
5 Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah
6 Pembantu Operator = ( 3 Orang / Jam ) x U2 M 44,023.81 Rupiah

Biaya Operasi per Jam = (H+I+J+K+L+M) P 4,934,478.41 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 5,369,662.87 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
8 Bahan bakar Batubara 0.00 Rp/kg
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINISHER E02
2. Tenaga Pw 72.4 HP
3. Kapasitas Cp 5.0 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,400.0 Jam
c. Harga Alat B 2,640,000,000 Rupiah
5.

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 264,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26424 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 448,447.78 Rupiah
W

b. Asuransi, dll = 0.002 x B F 3,771.43 Rupiah


W

Biaya Pasti per Jam = (E+F) G 452,219.21 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 73,848.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 76,020.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 117,857


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 330,000.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 633,074.35 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 1,085,293.56 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER E03
2. Tenaga Pw 4.0 HP
3. Kapasitas Cp 850.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 126,000,000 Rupiah

5 Kapastas tangki aspal Ca 850 Liter

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 12,600,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 16,914.49 Rupiah
W

b. Asuransi, dll = 0.002 x B F 126.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 17,040.49 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 3,264.00 Rupiah


Bahan Bakar Pemanas Aspal = 1/1000 *Ca*Ms H3 5,780.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 3,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 5,513 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 7,875.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 61,280.71 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 78,321.20 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BULLDOZER 100-150 HP E04
2. Tenaga Pw 155.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,663,200,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 166,320,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 223,271.29 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,663.20 Rupiah


W

Biaya Pasti per Jam = (E+F) G 224,934.49 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 126,480.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 135,625.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 72,765


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 103,950.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 474,169.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 699,103.70 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M E05
2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 5,000.0 CPM/(L/m)
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 183,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 18,300,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 24,566.29 Rupiah
W

b. Asuransi, dll = 0.002 x B F 183.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 24,749.29 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 48,960.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 52,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 8,006


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 11,437.50 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 156,252.96 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 181,002.24 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 E06
2. Tenaga Pw 20.0 HP
3. Kapasitas Cp 500.0 Liter
4. Alat Baru : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 21,060,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 2,106,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.61512 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 7,772.61 Rupiah
W

b. Asuransi, dll = 0.002 x B F 28.08 Rupiah


W

Biaya Pasti per Jam = (E+F) G 7,800.69 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 20,400.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 21,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,229 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 2,457.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 80,434.71 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 88,235.40 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CRANE 10-15 TON E07
2. Tenaga Pw 138.0 HP
3. Kapasitas Cp 15.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,440,000,000 Rupiah
5.

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 144,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 193,308.48 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,440.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 194,748.48 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 112,608.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 120,750.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 63,000 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 90,000.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 421,707.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 616,455.68 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3.5 TON E08
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 3.5 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 300,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 30,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 40,272.60 Rupiah
W

b. Asuransi, dll = 0.002 x B F 300.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 40,572.60 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 81,600.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 87,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 13,125


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 18,750.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 236,324.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 276,896.81 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 10 TON E09
2. Tenaga Pw 90.0 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 480,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 48,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 64,436.16 Rupiah
W

b. Asuransi, dll = 0.002 x B F 480.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 64,916.16 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 73,440.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 78,750.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 21,000 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 30,000.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 238,539.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 303,455.37 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP E10
2. Tenaga Pw 80.0 HP
3. Kapasitas Cp 0.93 M3
4. Alat Baru : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 5,000.0 Jam
c. Harga Alat B 1,800,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 180,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.61512 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 199,297.67 Rupiah
W

b. Asuransi, dll = 0.002 x B F 720.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 200,017.67 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 65,280.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 70,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 31,500 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 45,000.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 247,129.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 447,146.88 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan FLAT BED TRUCK 3-4 M3 E11
2. Tenaga Pw 190.0 HP
3. Kapasitas Cp 10.0 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 300,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 30,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 40,272.60 Rupiah
W

b. Asuransi, dll = 0.002 x B F 300.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 40,572.60 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 155,040.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 166,250.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 13,125 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 18,750.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 388,514.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 429,086.81 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR SET E12
2. Tenaga Pw 180.0 HP
3. Kapasitas Cp 135.0 KVA
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 414,050,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 41,405,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 55,582.90 Rupiah
W

b. Asuransi, dll = 0.002 x B F 414.05 Rupiah


W

Biaya Pasti per Jam = (E+F) G 55,996.95 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 146,880.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 157,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 18,115 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 25,878.13 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 383,722.02 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 439,718.97 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan MOTOR GRADER >100 HP E13
2. Tenaga Pw 135.0 HP
3. Kapasitas Cp 10,800.0 -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 2,520,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 252,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 338,289.84 Rupiah
W

b. Asuransi, dll = 0.002 x B F 2,520.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 340,809.84 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 110,160.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 118,125.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 110,250 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 157,500.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 531,384.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 872,194.04 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TRACK LOADER 75-100 HP E14
2. Tenaga Pw 70.0 HP
3. Kapasitas Cp 0.8 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 660,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 66,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 88,599.72 Rupiah
W

b. Asuransi, dll = 0.002 x B F 660.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 89,259.72 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 57,120.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 61,250.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 28,875 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 41,250.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 223,844.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 313,103.93 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3 E15
2. Tenaga Pw 96.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,722,866,500 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 172,286,650 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 231,281.04 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,722.87 Rupiah


W

Biaya Pasti per Jam = (E+F) G 233,003.91 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 78,336.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 84,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 75,375 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 107,679.16 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 380,739.77 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 613,743.68 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan THREE WHEEL ROLLER 6-8 T E16
2. Tenaga Pw 55.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 600,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 60,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 80,545.20 Rupiah
W

b. Asuransi, dll = 0.002 x B F 600.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 81,145.20 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 44,880.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 48,125.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 26,250 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 37,500.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 192,104.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 273,249.41 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TANDEM ROLLER 6-8 T. E17
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 8.1 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,843,200,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 184,320,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 247,434.85 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,843.20 Rupiah


W

Biaya Pasti per Jam = (E+F) G 249,278.05 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 66,912.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 71,750.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 80,640 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 115,200.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 369,851.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 619,129.26 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TIRE ROLLER 8-10 T. E18
2. Tenaga Pw 100.5 HP
3. Kapasitas Cp 9.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 2,232,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 223,200,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 299,628.14 Rupiah
W

b. Asuransi, dll = 0.002 x B F 2,232.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 301,860.14 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 82,008.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 87,937.50 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 97,650 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 139,500.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 442,444.71 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 744,304.85 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. E19
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 7.050 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,224,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 122,400,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 164,312.21 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,224.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 165,536.21 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 66,912.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 71,750.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 53,550 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 76,500.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 304,061.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 469,597.41 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE VIBRATOR E20
2. Tenaga Pw 5.5 HP
3. Kapasitas Cp 25.0 -
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 6,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 600,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.35027 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 1,891.43 Rupiah
W

b. Asuransi, dll = 0.002 x B F 12.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 1,903.43 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 5,610.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 5,775.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 375 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 1,050.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 48,159.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 50,062.64 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan STONE CRUSHER E21
2. Tenaga Pw 220.0 HP
3. Kapasitas Cp 50.0 T/Jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,440,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 144,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 193,308.48 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,440.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 194,748.48 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 179,520.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 192,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 63,000 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 90,000.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 2 Orang / Jam ) x U2 M 29,349.21 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 575,043.81 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 769,792.29 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WATER PUMP 70-100 mm E22
2. Tenaga Pw 6.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 6,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 600,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.43798 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 1,182.54 Rupiah
W

b. Asuransi, dll = 0.002 x B F 6.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 1,188.54 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 4,896.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 5,250.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 263 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 375.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 46,132.71 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 47,321.24 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L. E23
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 360,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 36,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 48,327.12 Rupiah
W

b. Asuransi, dll = 0.002 x B F 360.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 48,687.12 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 81,600.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 87,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 15,750 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 22,500.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 242,699.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 291,386.33 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan PEDESTRIAN ROLLER E24
2. Tenaga Pw 8.8 HP
3. Kapasitas Cp 835.000 Ton
4. Alat Baru : a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 180,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 18,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.43798 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 35,476.13 Rupiah
W

b. Asuransi, dll = 0.002 x B F 180.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 35,656.13 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 7,180.80 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 7,700.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 7,875 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 11,250.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 69,355.01 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 105,011.14 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TAMPER E25
2. Tenaga Pw 4.7 HP
3. Kapasitas Cp 121.000 Ton
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 24,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 2,400,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.35027 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 7,565.73 Rupiah
W

b. Asuransi, dll = 0.002 x B F 48.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 7,613.73 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 4,794.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 4,935.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,500 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 4,200.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 50,778.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 58,391.94 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan JACK HAMMER E26
2. Tenaga Pw 0.0 HP
3. Kapasitas Cp 1,330.000 -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 42,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 4,200,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 5,638.16 Rupiah
W

b. Asuransi, dll = 0.002 x B F 42.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 5,680.16 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 0.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 0.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,838 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 2,625.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 39,811.71 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 45,491.87 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan FULVI MIXER E27
2. Tenaga Pw 345.0 HP
3. Kapasitas Cp 2,005 -
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 1,080,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 108,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.35027 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 340,457.92 Rupiah
W

b. Asuransi, dll = 0.002 x B F 2,160.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 342,617.92 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 351,900.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 362,250.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 67,500 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 189,000.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 1,005,999.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 1,348,617.13 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PUMP E28
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 8.00 M3
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,200,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 120,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26424 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 142,687.93 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,200.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 143,887.93 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 81,600.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 87,500.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 52,500 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 75,000.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 331,949.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 475,837.14 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan TRAILER 20 TON E29
2. Tenaga Pw 175.0 HP
3. Kapasitas Cp 20.00 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 720,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 72,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26424 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 85,612.76 Rupiah
W

b. Asuransi, dll = 0.002 x B F 720.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 86,332.76 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 142,800.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 153,125.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 31,500 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 45,000.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 407,774.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 494,106.96 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan PILE DRIVER + HAMMER E30
2. Tenaga Pw 25.0 HP
3. Kapasitas Cp 2.50 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,200,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 120,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 161,090.40 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,200.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 162,290.40 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 20,400.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 21,875.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 52,500 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 75,000.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 205,124.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 367,414.60 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 35 TON E31
2. Tenaga Pw 125.0 HP
3. Kapasitas Cp 35.00 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 3,000,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 300,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26424 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 356,719.82 Rupiah
W

b. Asuransi, dll = 0.002 x B F 3,000.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 359,719.82 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 102,000.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 109,375.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 131,250 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 187,500.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 565,474.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 925,194.03 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WELDING SET E32
2. Tenaga Pw 40.0 HP
3. Kapasitas Cp 250.00 Amp
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 42,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 4,200,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.29832 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 5,638.16 Rupiah
W

b. Asuransi, dll = 0.002 x B F 42.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 5,680.16 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 32,640.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 35,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,838 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 2,625.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 107,451.71 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 113,131.87 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE E33
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 2,000.00 Meter
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,500,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 150,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26424 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 178,359.91 Rupiah
W

b. Asuransi, dll = 0.002 x B F 1,500.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 179,859.91 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 122,400.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 131,250.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 65,625 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 93,750.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 448,374.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 628,234.12 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER E34
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp 1,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 36,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 3,600,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.35027 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 5,674.30 Rupiah
W

b. Asuransi, dll = 0.002 x B F 36.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 5,710.30 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 4,080.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 4,375.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,575 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 2,250.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 47,629.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 53,339.51 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER E34a
2. Tenaga Pw 40.0 HP Kapasitas 20.000
3. Kapasitas Cp 20,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun Khusus digunakan
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam untuk Asphalt
c. Harga Alat B 36,000,000 Rupiah Modifikasi

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 3,600,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.35027 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 5,674.30 Rupiah
W

b. Asuransi, dll = 0.002 x B F 36.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 5,710.30 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 32,640.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 35,000.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 1,575 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 2,250.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 20,674.60 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 14,674.60 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 106,814.21 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 112,524.51 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI
ALAT ALAT ALAT JAM
UMUR KERJA HARGA
ALAT 1 TAHUN ALAT

(HP) - (Tahun) (Tahun) (Jam) (Rp.)


No. JENIS PERALATAN KODE
ALAT

HP Cp B A W B
1 2 2a 3 4 5 6 7 8

1. ASPHALT MIXING PLANT E01 294.0 60.0 T/Jam 3,600,000,000 10.0 1,500.0 3,600,000,000
2. ASPHALT FINISHER E02 72.4 5.0 Ton 2,640,000,000 6.0 1,400.0 2,640,000,000
3. ASPHALT SPRAYER E03 4.0 850.0 Liter 126,000,000 5.0 2,000.0 126,000,000
4. BULLDOZER 100-150 HP E04 155.0 - - 1,663,200,000 5.0 2,000.0 1,663,200,000
5. COMPRESSOR 4000-6500 L\M E05 60.0 5,000.0 CPM/(L/m) 183,000,000 5.0 2,000.0 183,000,000
6. CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0 Liter 21,060,000 2.0 1,500.0 21,060,000
7. CRANE 10-15 TON E07 138.0 15.0 Ton 1,440,000,000 5.0 2,000.0 1,440,000,000
8. DUMP TRUCK 3.5 TON E08 100.0 3.5 Ton 300,000,000 5.0 2,000.0 300,000,000
9. DUMP TRUCK 10 TON E09 90.0 10.0 Ton 480,000,000 5.0 2,000.0 480,000,000
10. EXCAVATOR 80-140 HP E10 80.0 0.9 M3 1,800,000,000 2.0 5,000.0 1,800,000,000
11. FLAT BED TRUCK 3-4 M3 E11 190.0 10.0 ton 300,000,000 5.0 2,000.0 300,000,000
12. GENERATOR SET E12 180.0 135.0 KVA 414,050,000 5.0 2,000.0 414,050,000
13. MOTOR GRADER >100 HP E13 135.0 10,800.0 - 2,520,000,000 5.0 2,000.0 2,520,000,000
14. TRACK LOADER 75-100 HP E14 70.0 0.8 M3 660,000,000 5.0 2,000.0 660,000,000
15. WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5 M3 1,722,866,500 5.0 2,000.0 1,722,866,500
16. THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 600,000,000 5.0 2,000.0 600,000,000
17. TANDEM ROLLER 6-8 T. E17 82.0 8.1 Ton 1,843,200,000 5.0 2,000.0 1,843,200,000
18. TIRE ROLLER 8-10 T. E18 100.5 9.0 Ton 2,232,000,000 5.0 2,000.0 2,232,000,000
19. VIBRATORY ROLLER 5-8 T. E19 82.0 7.1 Ton 1,224,000,000 5.0 2,000.0 1,224,000,000
20. CONCRETE VIBRATOR E20 5.5 25.0 - 6,000,000 4.0 1,000.0 6,000,000
21. STONE CRUSHER E21 220.0 50.0 T/Jam 1,440,000,000 5.0 2,000.0 1,440,000,000
22. WATER PUMP 70-100 mm E22 6.0 - - 6,000,000 3.0 2,000.0 6,000,000
23. WATER TANKER 3000-4500 L. E23 100.0 4,000.0 Liter 360,000,000 5.0 2,000.0 360,000,000
24. PEDESTRIAN ROLLER E24 8.8 835.0 Ton 180,000,000 3.0 2,000.0 180,000,000
25. TAMPER E25 4.7 121.0 Ton 24,000,000 4.0 1,000.0 24,000,000
26. JACK HAMMER E26 0.0 1,330.0 - 42,000,000 5.0 2,000.0 42,000,000
27. FULVI MIXER E27 345.0 2,005.0 - 1,080,000,000 4.0 1,000.0 1,080,000,000
28. CONCRETE PUMP E28 100.0 8.00 M3 1,200,000,000 6.0 2,000.0 1,200,000,000
29. TRAILER 20 TON E29 175.0 20.00 Ton 720,000,000 6.0 2,000.0 720,000,000
30 PILE DRIVER + HAMMER E30 25.0 2.50 Ton 1,200,000,000 5.0 2,000.0 1,200,000,000
31. CRANE ON TRACK 35 TON E31 125.0 35.00 Ton 3,000,000,000 6.0 2,000.0 3,000,000,000
32. WELDING SET E32 40.0 250.00 Amp 42,000,000 5.0 2,000.0 42,000,000
33. BORE PILE MACHINE E33 150.0 2,000.0 Meter 1,500,000,000 6.0 2,000.0 1,500,000,000
34. ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 36,000,000 4.0 2,000.0 36,000,000
KETERANGAN : 1 Tingkat Suku Bunga = 15.00
2 Upah Operator / Sopir / Mekanik = 20,675
3 Upah Pembantu Operator/Sopir/Mekanik = 14,675
4 Harga Bahan Bakar Bensin = 10,200
5 Harga Bahan Bakar Solar = 6,800
6 Minyak Pelumas = 35,000
7 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
8 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasit

TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI


ALAT ALAT ALAT JAM

UMUR KERJA HARGA


ALAT 1 TAHUN ALAT

(HP) - (Tahun) (Tahun) (Jam) (Rp.)


No. JENIS PERALATAN KODE
ALAT

HP Cp B A W B
1 2 2a 3 4 5 6 7 8

35. TRONTON E35 150.0 15.0 Ton 600,000 10.0 1,500.0 600,000
36. COLD MILLING MACHINE E37 248.0 1,000.0 m 900,000,000 5.0 2,000.0 900,000,000
37. ROCK DRILL BREAKER E36 3.0 - - 1,800,000,000 10.0 1,500.0 1,800,000,000
38. COLD RECYCLER E38 900.0 2,200.0 M 610,800,000 5.0 2,000.0 610,800,000
39. HOT RECYCLER E39 400.0 3.0 M 612,000,000 5.0 2,000.0 612,000,000
40. AGGREGAT (CHIP) SPREADER E40 115.0 3.5 M 600,000,000 4.0 1,000.0 600,000,000
41. ASPHALT DISTRIBUTOR E41 115.0 4,000.0 Liter 600,000,000 5.0 2,000.0 600,000,000
42. SLIP FORM PAVER E42 105.0 2.5 M 600,000,000 6.0 2,000.0 600,000,000
43. CONCRETE PAN MIXER E43 134.0 600.0 Liter 600,000,000 10.0 1,500.0 600,000,000
44. CONCRETE BREAKER E44 290.0 20.0 m3/jam 600,000,000 5.0 2,000.0 600,000,000
45. ASPAHLT TANKER E45 190.0 4,000.0 liter 600,000,000 6.0 2,000.0 600,000,000
46. CEMENT TANKER E46 190.0 4,000.0 liter 600,000,000 6.0 2,000.0 600,000,000
47. CONCRETE MIXER (350) E47 20.0 350.0 liter 240,000,000 2.0 2,000.0 240,000,000
48. VIBRATING RAMMER E48 4.2 80.0 KG 480,000,000 4.0 1,000.0 480,000,000
49. TRUK MIXER (AGITATOR) E49 110.0 10.0 M3 1,500,000,000 5.0 1,000.0 1,500,000,000
50. BORE PILE MACHINE E50 125.0 60.0 CM 2,100,000,000 10.0 1,500.0 2,100,000,000
51. CRANE ON TRACK 75-100 TON E51 200.0 75.0 Ton 600,000,000 5.0 2,000.0 600,000,000
52. BLENDING EQUIPMENT E52 50.0 30.0 Ton 480,000,000 10.0 1,500.0 480,000,000
53. ASPHALT LIQUID MIXER E34a 40.0 20,000.0 Liter 36,000,000 4.0 2,000.0 36,000,000
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
KETERANGAN : 1 Tingkat Suku Bunga = 15.00
2 Upah Operator / Sopir / Mekanik = 20,675
3 Upah Pembantu Operator/Sopir/Mekanik = 14,675
4 Harga Bahan Bakar Bensin = 10,200
5 Harga Bahan Bakar Solar = 6,800
6 Minyak Pelumas = 35,000
7 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
8 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasit
9 AMP , Aspal Sprayer, Aspal Distribusi ditambah bahan bakar untuk pemanasan Aspal = 1/1000 x Ka
Kapasitas 20.000

Khusus digunakan
ANALISA BIAYA SEWA PERALATAN PER JAM KERJA (I)

NILAI FAKTOR BIAYA PASTI PER JAM BIAYA OPERASI PER JA


SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS WORKSHOP
ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK
MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA
MODAL
(Rp.) - (Rp.) (Rp.) (Rp.) % % (Rp.) - (Rp.)
f1 x HP x
i(1+i)^A (B - C) x D 0.002 x B 12 2.5 Harga BBM 0.0625 (g1 x B')
(10% X B) ----------- ----------- ----------- (e1 + e2) s/d s/d + s/d -----
(1+i)^A-1 W W 15 3 f2 x HP x 0.0875 W
Harga Olie
C D e1 e2 E f1 f2 F g1 G
9 10 11 12 13 14 15 16 17 18

360,000,000 0.19925 430,384.46 4,800.00 435,184.46 0.1500 0.0300 4,035,780.00 0.0875 210,000
264,000,000 0.26424 448,447.78 3,771.43 452,219.21 0.1500 0.0300 149,868.00 0.0625 117,857.14
12,600,000 0.29832 16,914.49 126.00 17,040.49 0.1200 0.0250 6,764.00 0.0875 5,512.50
166,320,000 0.29832 223,271.29 1,663.20 224,934.49 0.1200 0.0250 262,105.00 0.0875 72,765.00
18,300,000 0.29832 24,566.29 183.00 24,749.29 0.1200 0.0250 101,460.00 0.0875 8,006.25
2,106,000 0.61512 7,772.61 28.08 7,800.69 0.1500 0.0300 41,400.00 0.0875 1,228.50
144,000,000 0.29832 193,308.48 1,440.00 194,748.48 0.1200 0.0250 233,358.00 0.0875 63,000.00
30,000,000 0.29832 40,272.60 300.00 40,572.60 0.1200 0.0250 169,100.00 0.0875 13,125.00
48,000,000 0.29832 64,436.16 480.00 64,916.16 0.1200 0.0250 152,190.00 0.0875 21,000.00
180,000,000 0.61512 199,297.67 720.00 200,017.67 0.1200 0.0250 135,280.00 0.0875 31,500.00
30,000,000 0.29832 40,272.60 300.00 40,572.60 0.1200 0.0250 321,290.00 0.0875 13,125.00
41,405,000 0.29832 55,582.90 414.05 55,996.95 0.1200 0.0250 304,380.00 0.0875 18,114.69
252,000,000 0.29832 338,289.84 2,520.00 340,809.84 0.1200 0.0250 228,285.00 0.0875 110,250.00
66,000,000 0.29832 88,599.72 660.00 89,259.72 0.1200 0.0250 118,370.00 0.0875 28,875.00
172,286,650 0.29832 231,281.04 1,722.87 233,003.91 0.1200 0.0250 162,336.00 0.0875 75,375.41
60,000,000 0.29832 80,545.20 600.00 81,145.20 0.1200 0.0250 93,005.00 0.0875 26,250.00
184,320,000 0.29832 247,434.85 1,843.20 249,278.05 0.1200 0.0250 138,662.00 0.0875 80,640.00
223,200,000 0.29832 299,628.14 2,232.00 301,860.14 0.1200 0.0250 169,945.50 0.0875 97,650.00
122,400,000 0.29832 164,312.21 1,224.00 165,536.21 0.1200 0.0250 138,662.00 0.0875 53,550.00
600,000 0.35027 1,891.43 12.00 1,903.43 0.1500 0.0300 11,385.00 0.0625 375.00
144,000,000 0.29832 193,308.48 1,440.00 194,748.48 0.1200 0.0250 372,020.00 0.0875 63,000.00
600,000 0.43798 1,182.54 6.00 1,188.54 0.1200 0.0250 10,146.00 0.0875 262.50
36,000,000 0.29832 48,327.12 360.00 48,687.12 0.1200 0.0250 169,100.00 0.0875 15,750.00
18,000,000 0.43798 35,476.13 180.00 35,656.13 0.1200 0.0250 14,880.80 0.0875 7,875.00
2,400,000 0.35027 7,565.73 48.00 7,613.73 0.1500 0.0300 9,729.00 0.0625 1,500.00
4,200,000 0.29832 5,638.16 42.00 5,680.16 0.1200 0.0250 0.00 0.0875 1,837.50
108,000,000 0.35027 340,457.92 2,160.00 342,617.92 0.1500 0.0300 714,150.00 0.0625 67,500.00
120,000,000 0.26424 142,687.93 1,200.00 143,887.93 0.1200 0.0250 169,100.00 0.0875 52,500.00
72,000,000 0.26424 85,612.76 720.00 86,332.76 0.1200 0.0250 295,925.00 0.0875 31,500.00
120,000,000 0.29832 161,090.40 1,200.00 162,290.40 0.1200 0.0250 42,275.00 0.0875 52,500.00
300,000,000 0.26424 356,719.82 3,000.00 359,719.82 0.1200 0.0250 211,375.00 0.0875 131,250.00
4,200,000 0.29832 5,638.16 42.00 5,680.16 0.1200 0.0250 67,640.00 0.0875 1,837.50
150,000,000 0.26424 178,359.91 1,500.00 179,859.91 0.1200 0.0250 253,650.00 0.0875 65,625.00
3,600,000 0.35027 5,674.30 36.00 5,710.30 0.1200 0.0250 8,455.00 0.0875 1,575.00
% per-tahun
Rupiah per-orang/jam
Rupiah per-orang/jam
Rupiah per-liter
Rupiah per-liter
Rupiah per-liter
ekapitulasi Biaya Pekerjaan
material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
ANALISA BIAYA SEWA PERALATAN PER JAM KERJA (II)

NILAI FAKTOR BIAYA PASTI PER JAM BIAYA OPERASI PER JA


SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS WORKSHOP

ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK


MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA
MODAL
(Rp.) - (Rp.) (Rp.) (Rp.) Lt/HP/Jam Ltr/HP/Jam (Rp.) - (Rp.)
f1 x HP x
i(1+i)^A (B - C) x D 0.002 x B 0.125 0.01 Harga BBM 0.0625 (g1 x B')
(10% X B) ----------- ----------- ----------- (e1 + e2) s/d s/d + s/d -----
(1+i)^A-1 W W 0.175 0.02 f2 x HP x 0.0875 W
Harga Olie
C D e1 e2 E f1 f2 F g1 G
9 10 11 12 13 14 15 16 17 18

60,000 0.19925 71.73 0.80 72.53 0.1500 0.0300 310,500.00 0.0875 35.00
90,000,000 0.29832 120,817.80 900.00 121,717.80 0.1200 0.0250 419,368.00 0.0875 39,375.00
180,000,000 0.19925 215,192.23 2,400.00 217,592.23 0.1500 0.0300 6,210.00 0.0875 105,000.00
61,080,000 0.29832 81,995.01 610.80 82,605.81 0.1200 0.0250 1,521,900.00 0.0875 26,722.50
61,200,000 0.29832 82,156.10 612.00 82,768.10 0.1200 0.0250 676,400.00 0.0875 26,775.00
60,000,000 0.35027 189,143.29 1,200.00 190,343.29 0.1500 0.0300 238,050.00 0.0625 37,500.00
60,000,000 0.29832 80,545.20 600.00 81,145.20 0.1200 0.0250 194,465.00 0.0875 26,250.00
60,000,000 0.26424 71,343.96 600.00 71,943.96 0.1200 0.0250 177,555.00 0.0875 26,250.00
60,000,000 0.19925 71,730.74 800.00 72,530.74 0.1500 0.0300 277,380.00 0.0875 35,000.00
60,000,000 0.29832 80,545.20 600.00 81,145.20 0.1200 0.0250 490,390.00 0.0875 26,250.00
60,000,000 0.26424 71,343.96 600.00 71,943.96 0.1200 0.0250 348,490.00 0.0875 26,250.00
60,000,000 0.26424 71,343.96 600.00 71,943.96 0.1200 0.0250 321,290.00 0.0875 26,250.00
24,000,000 0.61512 66,432.56 240.00 66,672.56 0.1200 0.0250 33,820.00 0.0875 10,500.00
48,000,000 0.35027 151,314.63 960.00 152,274.63 0.1500 0.0300 8,694.00 0.0625 30,000.00
150,000,000 0.29832 402,726.00 3,000.00 405,726.00 0.1500 0.0300 227,700.00 0.0625 93,750.00
210,000,000 0.19925 251,057.60 2,800.00 253,857.60 0.1500 0.0300 258,750.00 0.0875 122,500.00
60,000,000 0.29832 80,545.20 600.00 81,145.20 0.1200 0.0250 338,200.00 0.0875 26,250.00
48,000,000 0.19925 57,384.59 640.00 58,024.59 0.1500 0.0300 103,500.00 0.0875 28,000.00
3,600,000 0.35027 5,674.30 36.00 5,710.30 0.1200 0.0250 67,640.00 0.0875 1,575.00

% per-tahun
Rupiah per-orang/jam
Rupiah per-orang/jam
Rupiah per-liter
Rupiah per-liter
Rupiah per-liter
ekapitulasi Biaya Pekerjaan
material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
ntuk pemanasan Aspal = 1/1000 x Kapasitas tangki aspal x harga bahan bakar solar ( lihat E 01 , E 03, E 41)
BIAYA OPERASI PER JAM KERJA TOTAL No. URAIA
PERBAIKAN dan PERAWATAN UPAH TOTAL BIAYA
OPERATOR PEMBANTU BIAYA SEWA ALAT
KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
/ SOPIR / JAM JAM KERJA 1
- (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET. 2
1 Orang 1 Orang 3
0.125 (g1 x B') Per Per 4
s/d ----------- Jam Kerja Jam Kerja F+G+H+I E+J 5
0.175 W = = 6
Rp20,674.6 Rp14,674.6 7
g1 G H I J K L 8
17 18 19 20 21 22 23 9
10
0.1750 420,000.00 20,674.60 44,023.81 4,934,478.41 5,369,662.87 Pek. Ringan 11
0.1750 330,000.00 20,674.60 14,674.60 633,074.35 1,085,293.56 Pek. Ringan 12
0.1250 7,875.00 20,674.60 14,674.60 61,280.71 78,321.20 Pek. Berat 13
0.1250 103,950.00 20,674.60 14,674.60 474,169.21 699,103.70 Pek. Berat 14
0.1250 11,437.50 20,674.60 14,674.60 156,252.96 181,002.24 Pek. Berat 15
0.1750 2,457.00 20,674.60 14,674.60 80,434.71 88,235.40 Pek. Ringan 16
0.1250 90,000.00 20,674.60 14,674.60 421,707.21 616,455.68 Pek. Berat 17
0.1250 18,750.00 20,674.60 14,674.60 236,324.21 276,896.81 Pek. Berat 18
0.1250 30,000.00 20,674.60 14,674.60 238,539.21 303,455.37 Pek. Berat 19
0.1250 45,000.00 20,674.60 14,674.60 247,129.21 447,146.88 Pek. Berat 20
0.1250 18,750.00 20,674.60 14,674.60 388,514.21 429,086.81 Pek. Berat 21
0.1250 25,878.13 20,674.60 14,674.60 383,722.02 439,718.97 Pek. Berat 22
0.1250 157,500.00 20,674.60 14,674.60 531,384.21 872,194.04 Pek. Berat 23
0.1250 41,250.00 20,674.60 14,674.60 223,844.21 313,103.93 Pek. Berat 24
0.1250 107,679.16 20,674.60 14,674.60 380,739.77 613,743.68 Pek. Berat 25
0.1250 37,500.00 20,674.60 14,674.60 192,104.21 273,249.41 Pek. Berat 26
0.1250 115,200.00 20,674.60 14,674.60 369,851.21 619,129.26 Pek. Berat 27
0.1250 139,500.00 20,674.60 14,674.60 442,444.71 744,304.85 Pek. Berat 28
0.1250 76,500.00 20,674.60 14,674.60 304,061.21 469,597.41 Pek. Berat 29
0.1750 1,050.00 20,674.60 14,674.60 48,159.21 50,062.64 Pek. Ringan 30
0.1250 90,000.00 20,674.60 29,349.21 575,043.81 769,792.29 Pek. Berat 31
0.1250 375.00 20,674.60 14,674.60 46,132.71 47,321.24 Pek. Berat 32
0.1250 22,500.00 20,674.60 14,674.60 242,699.21 291,386.33 Pek. Berat 33
0.1250 11,250.00 20,674.60 14,674.60 69,355.01 105,011.14 Pek. Berat 34
0.1750 4,200.00 20,674.60 14,674.60 50,778.21 58,391.94 Pek. Ringan 35
0.1250 2,625.00 20,674.60 14,674.60 39,811.71 45,491.87 Pek. Berat 36
0.1750 189,000.00 20,674.60 14,674.60 1,005,999.21 1,348,617.13 Pek. Ringan 37
0.1250 75,000.00 20,674.60 14,674.60 331,949.21 475,837.14 Pek. Berat 38
0.1250 45,000.00 20,674.60 14,674.60 407,774.21 494,106.96 Pek. Berat 39
0.1250 75,000.00 20,674.60 14,674.60 205,124.21 367,414.60 Pek. Berat 40
0.1250 187,500.00 20,674.60 14,674.60 565,474.21 925,194.03 Pek. Berat 41
0.1250 2,625.00 20,674.60 14,674.60 107,451.71 113,131.87 Pek. Berat 42
0.1250 93,750.00 20,674.60 14,674.60 448,374.21 628,234.12 Pek. Berat 43
0.1250 2,250.00 20,674.60 14,674.60 47,629.21 53,339.51 Pek. Berat 44
45
46
47
48
49
50
51
52
53

BIAYA OPERASI PER JAM KERJA TOTAL


PERBAIKAN & PERAWATAN UPAH TOTAL BIAYA

OPERATOR PEMBANTU BIAYA SEWA ALAT


KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
/ SOPIR / JAM JAM KERJA
- (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET.
1 Orang 1 Orang
0.125 (g1 x B') Per Per
s/d ----------- Jam Kerja Jam Kerja F+G+H+I E+J
0.175 W = =
Rp20,674.6 Rp14,674.6
g1 G H I J K L
17 18 19 20 21 22 23

0.1750 70.00 20,674.60 44,023.81 375,303.41 375,375.94 Pek. Ringan


0.1250 56,250.00 20,674.60 44,023.81 579,691.41 701,409.21 Pek. Berat
0.1750 210,000.00 20,674.60 44,023.81 385,908.41 603,500.64 Pek. Ringan
0.1250 38,175.00 20,674.60 44,023.81 1,651,495.91 1,734,101.73 Pek. Berat
0.1250 38,250.00 20,674.60 44,023.81 806,123.41 888,891.52 Pek. Berat
0.1750 105,000.00 20,674.60 44,023.81 445,248.41 635,591.70 Pek. Ringan
0.1250 37,500.00 20,674.60 44,023.81 322,913.41 404,058.61 Pek. Berat
0.1250 37,500.00 20,674.60 44,023.81 306,003.41 377,947.38 Pek. Berat
0.1750 70,000.00 20,674.60 44,023.81 447,078.41 519,609.16 Pek. Ringan
0.1250 37,500.00 20,674.60 44,023.81 618,838.41 699,983.61 Pek. Berat
0.1250 37,500.00 20,674.60 14,674.60 447,589.21 519,533.17 Pek. Berat
0.1250 37,500.00 20,674.60 14,674.60 420,389.21 492,333.17 Pek. Berat
0.1250 15,000.00 20,674.60 14,674.60 94,669.21 161,341.76 Pek. Berat
0.1750 84,000.00 20,674.60 14,674.60 158,043.21 310,317.84 Pek. Ringan
0.1750 262,500.00 20,674.60 14,674.60 619,299.21 1,025,025.20 Pek. Ringan
0.1750 245,000.00 20,674.60 14,674.60 661,599.21 915,456.81 Pek. Ringan
0.1250 37,500.00 20,674.60 14,674.60 437,299.21 518,444.41 Pek. Berat
0.1750 56,000.00 20,674.60 14,674.60 222,849.21 280,873.80 Pek. Ringan
0.1250 2,250.00 20,674.60 14,674.60 106,814.21 112,524.51 Pek. Berat
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

BIAYA
URAIAN KO HP KAP. HARGA SEWA KET.
DE ALAT ALAT/JAM
(di luar PPN)

ASPHALT MIXING PLANT E01 294.0 60.0 T/Jam 3,600,000,000 5,369,662.87


ASPHALT FINISHER E02 72.4 5.0 Ton 2,640,000,000 1,085,293.56
ASPHALT SPRAYER E03 4.0 850.0 Liter 126,000,000 78,321.20
BULLDOZER 100-150 HP E04 155.0 - - 1,663,200,000 699,103.70
COMPRESSOR 4000-6500 L\M E05 60.0 5,000.0 CPM/(L/m) 183,000,000 181,002.24
CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0 Liter 21,060,000 88,235.40
CRANE 10-15 TON E07 138.0 15.0 Ton 1,440,000,000 616,455.68
DUMP TRUCK 3.5 TON E08 100.0 3.5 Ton 300,000,000 276,896.81
DUMP TRUCK 10 TON E09 90.0 10.0 Ton 480,000,000 303,455.37
EXCAVATOR 80-140 HP E10 80.0 0.9 M3 1,800,000,000 447,146.88
FLAT BED TRUCK 3-4 M3 E11 190.0 10.0 ton 300,000,000 429,086.81
GENERATOR SET E12 180.0 135.0 KVA 414,050,000 439,718.97
MOTOR GRADER >100 HP E13 135.0 10,800.0 - 2,520,000,000 872,194.04
TRACK LOADER 75-100 HP E14 70.0 0.8 M3 660,000,000 313,103.93
WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5 M3 1,722,866,500 613,743.68
THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 600,000,000 273,249.41
TANDEM ROLLER 6-8 T. E17 82.0 8.1 Ton 1,843,200,000 619,129.26
TIRE ROLLER 8-10 T. E18 100.5 9.0 Ton 2,232,000,000 744,304.85
VIBRATORY ROLLER 5-8 T. E19 82.0 7.1 Ton 1,224,000,000 469,597.41
CONCRETE VIBRATOR E20 5.5 25.0 - 6,000,000 50,062.64
STONE CRUSHER E21 220.0 50.0 T/Jam 1,440,000,000 769,792.29
WATER PUMP 70-100 mm E22 6.0 - - 6,000,000 47,321.24
WATER TANKER 3000-4500 L. E23 100.0 4,000.0 Liter 360,000,000 291,386.33
PEDESTRIAN ROLLER E24 8.8 835.00 Ton 180,000,000 105,011.14
TAMPER E25 4.7 121.00 Ton 24,000,000 58,391.94
JACK HAMMER E26 0.0 1,330.00 - 42,000,000 45,491.87
FULVI MIXER E27 345.0 2,005.00 - 1,080,000,000 1,348,617.13
CONCRETE PUMP E28 100.0 8.00 M3 1,200,000,000 475,837.14
TRAILER 20 TON E29 175.0 20.00 Ton 720,000,000 494,106.96
PILE DRIVER + HAMMER E30 25.0 2.50 Ton 1,200,000,000 367,414.60
CRANE ON TRACK 35 TON E31 125.0 35.0 Ton 3,000,000,000 925,194.03
WELDING SET E32 40.0 250.0 Amp 42,000,000 113,131.87
BORE PILE MACHINE E33 150.0 2,000.0 Meter 1,500,000,000 628,234.12
ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 36,000,000 53,339.51
TRONTON E35 150.0 15.0 Ton 600,000 375,375.94
COLD MILLING E36 248.0 1,000.0 m 900,000,000 701,409.21
ROCK DRILL BREAKER E37 3.0 - - 1,800,000,000 603,500.64
COLD RECYCLER E38 900.0 2,200.0 M 610,800,000 1,734,101.73
HOT RECYCLER E39 400.0 3.0 M 612,000,000 888,891.52
AGGREGAT (CHIP) SPREADER E40 115.0 3.5 M 600,000,000 635,591.70
ASPHALT DISTRIBUTOR E41 115.0 4,000.0 Liter 600,000,000 404,058.61
SLIP FORM PAVER E42 105.0 2.5 M 600,000,000 377,947.38
CONCRETE PAN MIXER E43 134.0 600.0 Liter 600,000,000 519,609.16
CONCRETE BREAKER E44 290.0 20.0 m3/jam 600,000,000 699,983.61
ASPAHLT TANKER E45 190.0 4,000.0 liter 600,000,000 519,533.17
CEMENT TANKER E46 190.0 4,000.0 liter 600,000,000 492,333.17
CONCRETE MIXER (350) E47 20.0 350.0 liter 240,000,000 161,341.76 T x Te1 x Te2 x
VIBRATING RAMMER E48 4.2 80.0 KG 480,000,000 310,317.84
TRUK MIXER (AGITATOR) E49 110.0 10.0 M3 1,500,000,000 1,025,025.20
BORE PILE MACHINE E50 125.0 60.0 CM 2,100,000,000 915,456.81
CRANE ON TRACK 75-100 TON E51 200.0 75.0 Ton 600,000,000 518,444.41
BLENDING EQUIPMENT E52 50.0 30.0 Ton 480,000,000 224,873.80
ASPHALT LIQUID MIXER E34a 40.0 20,000.0 Liter 36,000,000 112,524.51
T x Te1 x Te2 x
10.36

1,500,000,000.00
450,000,000.00
120,000,000.00
550,000,000.00
75,000,000.00
15,000,000.00
150,000,000.00
200,000,000.00
300,000,000.00
400,000,000.00
200,000,000.00
7,500,000.00
420,000,000.00
370,000,000.00
300,000,000.00
175,000,000.00
150,000,000.00
350,000,000.00
300,000,000.00
5,000,000.00
500,000,000.00
2,000,000.00
250,000,000.00
35,000,000.00
20,000,000.00
20,000,000.00
10,000,000.00
75,000,000.00
400,000,000.00
150,000,000.00
200,000,000.00
15,000,000.00
45,000,000.00
25,000,000.00
300,000,000.00
25,000,000.00
35,000,000.00
15,000,000.00
25,000,000.00
5,000,000.00
35,000,000.00
5,000,000.00
20,000,000.00
10,000,000.00
350,000,000.00
300,000,000.00
5,000,000.00
10,000,000.00
300,000,000.00
25,000,000.00
450,000,000.00
200,000,000.00
25,000,000.00
JANGKA WAKTU PELAKSANAAN 90.00 Hari Kalender Jam Kerja 7 Jam

Produksi Produksi Produksi/unit Volume Kebutuhan Alat


NO JENIS ALAT , PEKERJAAN
/ Jam / Hari periode kons Pekerjaan Unit

I EXCAVATOR 1.71

a GALIAN TANAH DENGAN ALAT 14.27 M3 99.90 M3 8,991.31 M3 12,461.30 M3 1.39

b GALIAN TANAH DIANGKUT DAN DIBUANG 14.27 M3 99.89 M3 8,990.10 M3 2,925.00 M3 0.33

II DUMP TRUCK 1.44

a GALIAN TANAH DIANGKUT 3.23 M3 22.60 M3 2,034.35 M3 2,925.00 M3 1.44


ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK = 1.0955

No. URAIAN

A. Sewa Tanah

B. PERALATAN
Periksa lembar 1.2-2

C. MOBILISASI FASILITAS KONTRAKTOR


1 Base Camp
2 Kantor
3 Barak
4 Bengkel
5 Gudang, dan lain-lain

D. MOBILISASI FASILITAS LABORATORIUM


1 Ruang Laboratorium (sesuai Gambar)

E. MOBILISASI PEKERJA
1 Pekerja

E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap
2 As Built Drawing
3 Dokumentasi dan Pelaporan
4 Survei,Pengukuran dan Pematokan
5 Papan Nama Proyek
6 Jasa Laboratorium

F. Manajemen dan Keselamatan lalu lintas


G. DEMOBILISASI

Total Biaya Mobilisasi

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk ove
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

ITEM PEMBAYARAN NO. : 1.2


JENIS PEKERJAAN : MOBILISASI

KODE
No. JENIS ALAT ALAT

B. PERALATAN

1 ASPHALT MIXING PLANT E01


1 ASPHALT FINISHER E02
2 ASPHALT SPRAYER E03
3 ASPHALT DISTRIBUTOR E41
5 BULLDOZER 100-150 HP E04
4 COMPRESSOR 4000-6500 L\M E05
5 CONCRETE MIXER 0.3-0.6 M3 E06
8 CRANE 10-15 TON E07
6 DUMP TRUCK 3.5 TON E08
10 DUMP TRUCK 10 TON E09
7 EXCAVATOR 80-140 HP E10
12 FLAT BED TRUCK 3-4 M3 E11
13 GENERATOR SET E12
8 MOTOR GRADER >100 HP E13
15 TRACK LOADER 75-100 HP E14
9 WHEEL LOADER 1.0-1.6 M3 E15
17 THREE WHEEL ROLLER 6-8 T E16
10 TANDEM ROLLER 6-8 T. E17
11 TIRE ROLLER 8-10 T. E18
12 VIBRATORY ROLLER 5-8 T. E19
21 CONCRETE VIBRATOR E20
22 STONE CRUSHER E21
23 WATER PUMP 70-100 mm E22
13 WATER TANKER 3000-4500 L. E23
25 PEDESTRIAN ROLLER E24
25 TAMPER E25
26 JACK HAMMER E26
27 FULVI MIXER E27
28 CONCRETE PUMP E28
29 TRAILER 20 TON E29
30 PILE DRIVER + HAMMER E30
31 CRANE ON TRACK 35 TON E31
32 WELDING SET E32
33 BORE PILE MACHINE E33
34 ASPHALT LIQUID MIXER E34
35 TRONTON E35
36 COLD MILLING MACHINE E37
37 ROCK DRILL BREAKER E36
38 COLD RECYCLER E38
39 HOT RECYCLER E39
40 AGGREGAT (CHIP) SPREADER E40
41 ASPHALT DISTRIBUTOR E41
42 SLIP FORM PAVER E42
43 CONCRETE PAN MIXER E43
44 CONCRETE BREAKER E44
45 ASPAHLT TANKER E45
46 CEMENT TANKER E46
47 CONDRETE MIXER (350) E47
48 VIBRATING RAMMER E48
49 TRUK MIXER (AGITATOR) E49
50 BORE PILE MACHINE E50
51 CRANE ON TRACK 75-100 TON E51

Total untuk Item B pada Lembar 1


%
Lembar 1.2-1
HARGA JUMLAH
SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

M2

34,000,000.00

M2 18.00 250,000.00 4,500,000.00


M2 18.00 200,000.00 3,600,000.00
M2 45.00 250,000.00 11,250,000.00
M2 20.00 250,000.00 5,000,000.00
M2 24.00 250,000.00 6,000,000.00
....

set

LS 8.00 250,000.00 2,000,000.00

Set 1.00 3,000,000.00 3,000,000.00


Ls 1.00 5,000,000.00 5,000,000.00
Ls 1.00 11,400,000.00 11,400,000.00
Ls 1.00 5,000,000.00 5,000,000.00
Buah 2.00 1,000,000.00 2,000,000.00
Ls - - -

LS
LS 1.00 10,200,000.00 10,200,000.00

102,950,000.00 102,950,000

sasi di atas sudah termasuk over-head dan laba


aran lainnya.

Lembar 1.2-2
HARGA JUMLAH
SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)

Unit 1.00 - -
Unit 1.00 - -
Unit - -
Unit 1.00 - -
Unit - - -
Unit 1.00 - -
Unit 1.00 - -
Unit -
Unit 2.00 2,000,000.00 4,000,000.00
Unit - - -
Unit 2.00 15,000,000.00 30,000,000.00
Unit - - -
Unit 1.00 - -
Unit - - -
Unit - - -
Unit 1.00 - -
Unit - - -
Unit 1.00 - -
Unit 1.00 - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -

34,000,000.00
Analisa El - 181
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA PAKET PEKERJAAN : PEMBANGUNAN JALAN BURMESO - GESA - BARAPASI


ITEM PEMBAYARAN NO. : 1.8.(1)
JENIS PEKERJAAN : Manajemen dan Keselamatan Lalu Lintas
SATUAN PEMBAYARAN : Lump Sum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. DATA DAN ASUMSI


1 Panjang Lokasi Pekerjaan KM 10.00
2 Total Masa Pelaksanaan Kegiatan Bulan 5.00
3 Masa Mobilisasi Bulan 1.00
4 Periode Pekerjaan Perkerasan Jalan Bulan 4.00
5 Panjang zona kerja Perkerasan Jalan M 10,000.00

B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan

C. PERALATAN KESELAMATAN LALU LINTAS


PENYIAPAN RK3K terdiri atas :
1 Rambu panah berkedip Buah - 125,000.00 -
2 Rambu suar berkedip portabel M' - 125,000.00 -
3 Rambu tetap informasi pengalihan/pengaturan lalu lintas Buah 2.00 300,000.00 600,000.00
4 Rambu portabel informasi pengalihan/pengaturan lalu lintas Buah - 300,000.00 -
5 Rambu penghalang lalu-lintas jenis plastik Buah - 350,000.00 -
6 Rambu penghalang lalu-lintas jenis beton Buah - 450,000.00 -
7 Rambu Peringatan Buah 2.00 300,000.00 600,000.00
8 Rambu Petunjuk Buah 2.00 300,000.00 600,000.00
9 Pagar jaring pengaman termasuk perlengkapannya M' - 100,000.00 -
10 Marka jalan sementara (jika diperlukan) M2 - 30,000.00 -
11 Peralatan komunikasi dan Lainnya Set - 4,250,000.00 -
12 Alat Bantu Ls - - -

D. TENAGA / PERSONIL

1 Pekerja (Flagman) OB 8.00 2,600,000.00 20,800,000.00

2 Koordinator / Pengatur OB - 4,150,000.00 -

E TOTAL BIAYA MANAJEMEN KESELAMATAN LALU LINTAS 22,600,000.00

Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
Analisa El - 119
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA PAKET PEKERJAAN Pembangunan Pengendali Banjir Organda


ITEM PEMBAYARAN NO. :-
JENIS PEKERJAAN : Keselamatan dan Kesehatan Kerja
SATUAN PEMBAYARAN : Lumsum

PERKIRAAN HARGA JUMLAH


No. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. PENYIAPAN RK3K, terdiri atas :


1 Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja, Dll Set 1.00 2,000,000.00 2,000,000.00
2 Pembuatan Kartu Identitas Pekerja (KIP) Lb 1.00 - -

B. SOSIALISASI DAN PROMOSI K3, terdiri atas :


1 Induksi K3 (Safety Induktion) Org - - -
2 Pengarah K3 (Safety Briefing) : Org 1.00 150,000.00 150,000.00
Pertemuan Keselamatan (Safety Talk dan/atau Tool Box Meeting)
3 Pelatihan K3; Org 1.00 1,000,000.00 1,000,000.00
4 Simulasi K3; Org 1.00 50,000.00 50,000.00
5 Spanduk (bannner); Lb 1.00 500,000.00 500,000.00
6 Poster; Lb 1.00 400,000.00 400,000.00
7 Papan Informasi; Lb 1.00 1,000,000.00 1,000,000.00

C. ALAT PELINDUNG KERJA, terdiri atas :


1 Jaring Pengaman (Safety Net) ; Ls - - -
2 Tali Keselamatan (Life Line) Ls 1.00 1,000,000.00 1,000,000.00
3 Penahan Jatuh (Safety Deck) Ls - - -
4 Pagar Pengaman ( Guard Ralling) Ls 1.00 1,000,000.00 1,000,000.00
5 Pembatas Area (Restrited Area) Ls - - -

D. ALAT PELINDUNG DIRI, terdiri atas :


1 Topi Pelindung (Safety Helmet) Bh 15.00 100,000.00 1,500,000.00
2 Pelindung Mata (Goggles Spectacles) Psg - - -
3 Tameng Muka (Face Fhield) Bh - - -
4 Masker Selam (Breathing Apparatus) Bh - - -
5 Pelindung Telinga (Ear Plug, Ear Muff) Bh - - -
6 Pelindung Pernapasan dan Mulut (Masker) Bh 10.00 5,000.00 50,000.00
7 Sarung Tangan (Safety Gloves) Psg 10.00 10,000.00 100,000.00
8 Sepatu Keselamatan (Safety Shoes) Psg 10.00 150,000.00 1,500,000.00
9 Penunjang Seluruh Tubuh (Full Body Harness) Bh - - -
10 Jaket Pelampung (Life Vest) Bh - - -
11 Rompi Keselamatan (safety vest) Bh 10.00 200,000.00 2,000,000.00
12 Celemek (Apron/Coveralls) Bh - - -
13 Pelindung Jatuh (Fall Arrester) Bh - - -

E. ASURANSI DAN PERIZINAN, terdiri atas :


1 BPJS Ketenagakerjaan dan Kesehatan kerja Ls - - -
2 Surat ijin kelaikan Alat Alat/Kend - - -
3 Surat Ijin Oprator Lb/Alat - - -
4 Surat Ijin Pengesahan Panitia Pembina Keselamatan dan Ls - - -
Kesehatan Kerja

F. PERSONIL K3, terdiri atas :


1 Ahli K3 OB - - -
2 Petugas K3 OB 1.00 1,000,000.00 1,000,000.00
3 Petugas Tanggap Darurat OB - - -
4 Petugas P3K OB - - -
5 Petugas Pengatur lallu Lintas (Flagmen) OB - - -
6 Petugas Medis OB - - -
G. FASILITAS DAN SARANA KESEHATAN, terdiri atas :
1 Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen Ls 1.00 5,000,000.00 5,000,000.00
Obat Luka, Ferban Dll
2 Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Ls - - -
Berat Badan
3 Peralatan Pengasapan (Fogging) Bh - - -
4 Obat Pengasapan Ls - - -

H. RAMBU RAMBU, terdiri atas :


1 Rambu Petunjuk; Bh 2.00 300,000.00 600,000.00
2 Rambu Larangan; Bh 2.00 300,000.00 600,000.00
3 Rambu Peringantan; Bh 2.00 300,000.00 600,000.00
4 Rambu Kewajiban; Bh - - -
5 Rambu Informasi; Bh 2.00 300,000.00 600,000.00
6 Rambu Pekerjaan Sementara; Bh - - -
7 Tongkat Pengatur Lalu Lintas; (Warning Light Stick); Bh 2.00 300,000.00 600,000.00
8 Kerucut Lalu Lintas (Traffic Cane); Bh 2.00 300,000.00 600,000.00
9 Lampu Putar (Rotary Lamp); Bh - - -
10 Lampu Selang Lalu lintas Ls - - -

I. LAIN-LAIN TERKAIT PENGENDALIAN RESIKO, terdiri atas :


1 Alat Pemadam Api Ringan (APAR); Bh - - -
2 Sirine; Bh 1.00 700,000.00 700,000.00
3 Bendera K3; Bh - - -
4 Jalur Evakuasi (Escape Route) Ls - - -
5 Lampu Darurat (Emergency Lamp); Bh - - -
6 Program Inspeksi dan audit Internal Ls - - -
7 Pelaporan dan penyelidikan insiden; Ls - - -

J TOTAL BIAYA MANAJEMEN DAN KESEHATAN KERJA 22,550,000.00

Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
HARGA & JARAK RATA-RATA
DARI SUMBER BAHAN (QUARRY)

HARGA JARAK
No. URAIAN SATUAN ROYALTY QUARRY
(Rp) ( Km )

1. M01 - P a s i r Pasang M3 600,000.00 10.00


M01 - P a s i r Beton M3 600,000.00 10.00
2. M02 - Batu Kali M3 555,000.00 10.00

3. M06 - Batu Belah/Batu Quarry Besar M3 450,000.00 10.00

4. M07 - G r a v e l M3 250,000.00 5.00

5 M44 - Pasir Urug M3 550,000.00 10.00

6 M08 - Karang Timbun M3 450,000.00 10.00

7 M09 - Material Pilihan M3 450,000.00 10.00

8 Solar LITER 12,781.00 44.00

9 Semen KG 1,700.00 10.00

UPAHPEKERJA
10 Pekerja OH 130,000.00
11 Tukang OH 170,000.00
12 Kepala Tukang OH 190,000.00
13 Mandor OH 210,000.00
14 Tukang LAS Konstruksi OH 170,000.00

Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3

PETA LOKASI QUARRY


KE JAYAPURA

KE DOYO BARU
km 000+000

2,5 km
2,5 km

Base Camp/
Lokasi Proyek

Lokasi Quarry
- Gravel
- Batu Kali/Gunung
- Batu Belah
- Tanam Timbunan

Catatan :

Jayapura - Keihiran = 44.00


Sentani - Lokasi Proyek = 6.00
Total Sumber Quarry s/d Lokasi Proyek = 15.00

Lokasi Proyek - Base Camp = 0.20


Total Sumber Quarry s/d Lokasi Proyek = 15.20

Jarak Quarry Bt. Kali/Belah ke B. Camp diperkirakan = 15.00


Jarak Quarry Bt. Kali/Belah ke Lokasi Proyek diperkirakan = 15.00
Jarak Quarry Pasir ke Base Camp Proyek diperkirakan = 15.00
Jarak Quarry Pasir ke Lokasi Proyek diperkirakan = 15.00

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M01a - Pasir Pasang


Lokasi : Quarry
Tujuan : Base Camp

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 10.00 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume pasir Bil 1.40 ton/m3
II. URUTAN KERJA
1 Pasir digali dengan Excavator
2 Excavator sekaligus memuat pasir hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir ke lokasi
Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 10,727.42 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 3.50 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 KM/Jam
Kecepatan rata-rata kosong v2 35.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/Q1 x Bil) T1 3.60 menit
- Waktu tempuh isi = (L/v1) x 60 T2 24.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 17.14 menit
- Lain-lain T4 1.00 menit
Ts2 45.74 menit

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M01a - Pasir Pasang


Lokasi : Quarry
Tujuan : Base Camp
No. URAIAN KODE KOEF. SATUAN

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 2.72 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 101,732.29 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP

Harga Satuan Dasar Pasir =

( RpM01 + Rp1 + Rp2 ) M01 712,459.71 Rupiah

Dibulatkan : M01 712,500.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M02 - Batu Kali


Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 10.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume batu kali Bil 1.44 ton/m3

II. URUTAN KERJA


1 Batu kali digali dengan Excavator
2 Excavator sekaligus memuat batu kali
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut batu kali ke
lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 16,091.13 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 3.50 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 KM/Jam
Kecepatan rata-rata kosong v2 35.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 5.25 menit
- Waktu tempuh isi = (L/v1) x 60 T2 24.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 17.14 menit
- Lain-lain T4 1.00 menit
Ts2 47.39 menit

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M02 - Batu Kali


Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

No. URAIAN KODE KOEF. SATUAN

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 2.55 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 108,412.05 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Batu kali =

( RpM02 + Rp1 + Rp2 ) M02 679,503.18 Rupiah

Dibulatkan : M02 679,500.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M06 - Batu Belah


Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 10.00 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam
9 Berat volume batu belah Bil 1.60 ton/m3

II. URUTAN KERJA


1 Batu kali digali dengan Excavator
2 Batu kali dibelah oleh Pekerja
3 Dengan Wheel Loader batu belah dimuat
ke Dump Truck yang mengangkut batu
belah ke lokasi pekerjaan
III. PERHITUNGAN

3.a EXCAVATOR (E10)


Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 16,091.13 Rupiah

3.b WHEEL LOADER (E15)


Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi Alat Fa 0.83 -
Waktu sklus Ts1
- Muat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kapasitas Produksi / Jam =
V x Fb x Fa x 60 Q2 44.82 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q2) x RpE15 Rp2 0.00 Rupiah

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M06 - Batu Belah


Lokasi : Quarry
Tujuan : Lokasi Pekerjaan
No. URAIAN KODE KOEF. SATUAN

3.c DUMP TRUCK (E09)


Kapasitas bak V 3.50 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 KM/Jam
Kecepatan rata-rata kosong v2 35.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 4.72 menit
- Waktu tempuh isi = (L/v1) x 60 T2 24.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 17.14 menit
- Lain-lain T4 1.00 menit
Ts2 46.87 menit

Kapasitas Produksi / Jam =


V x Fa x 60 Q3 2.32 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q3) x RpE08 Rp3 119,123.90 Rupiah

3.d PEKERJA

Produksi menentukan : Excavator Q1 27.7884 M3 / Jam


Hasil galian batu / hari = Q1 x 7 Jam Qt 194.5188 M3 / 7 jam
Kebutuhan Pekerja P 15.00 Orang

Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 10,079.82 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Batu belah =

( RpM06 + Rp1 + Rp2 + Rp3 + Rp4 ) M06 595,294.85 Rupiah

Dibulatkan : M06 595,300.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M07 - Gravel


Lokasi : Quarry
Tujuan : Base Camp

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 5.00 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume gravel Bil 2.20 ton/m3

II. URUTAN KERJA


1 Gravel digali dengan Excavator
2 Excavator sekaligus memuat gravel
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut gravel ke
lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 16,091.13 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 3.50 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 24.00 KM/Jam
Kecepatan rata-rata kosong v2 35.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 3.44 menit
- Waktu tempuh isi = (L/v1) x 60 T2 12.50 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 8.57 menit
- Lain-lain T4 1.00 menit
Ts2 25.51 menit

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M07 - Gravel


Lokasi : Quarry
Tujuan : Base Camp

No. URAIAN KODE KOEF. SATUAN

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 3.11 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 89,144.33 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP

Harga Satuan Dasar Gravel =

( RpM07 + Rp1 + Rp2 ) M07 355,235.47 Rupiah

Dibulatkan : M07 355,200.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M16 - Sirtu


Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 10.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume sirtu Bil 1.51 ton/m3

II. URUTAN KERJA


1 Sirtu digali dengan Excavator
2 Excavator sekaligus memuat sirtu hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut sirtu ke lokasi
Base Camp

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 10,727.42 Rupiah

DUMP TRUCK (E09)


Kapasitas bak V 3.50 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 KM/Jam
Kecepatan rata-rata kosong v2 35.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 3.34 menit
- Waktu tempuh isi = (L/v1) x 60 T2 24.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 17.14 menit
- Lain-lain T4 1.00 menit
Ts2 45.48 menit

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : M16 - Sirtu


Lokasi : Quarry
Tujuan : Lokasi Pekerjaan

No. URAIAN KODE KOEF. SATUAN

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 2.54 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 109,096.69 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Sirtu =

( RpM16 + Rp1 + Rp2 ) M16 669,824.11 Rupiah

Dibulatkan : M16 669,800.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN

Jenis : Solar
Lokasi : Pertamina DOK.8
Tujuan : Base Camp

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
Jarak Terminal BBM Jayapura ke lokasi Base L 44.00 Km
3 Camp
4 Harga satuan solar di SPB RpM22 1.00 Ltr
5 Harga Satuan Dasar Dump Truck RpE01 1.00 Jam
6 Harga satuan dasar upah pekerja RpL.01 1.00 Jam

II. URUTAN KERJA


1 Drum Diisi Solar dan dinaikkan ke atas
Dump Truck dengan tenaga manusia.
2 Dump Truck mengangkut Solar
ke lokasi pekerjaan

III. PERHITUNGAN

3a. TENAGA BONGKAR MUAT


Pekerja p 3.00 orang
- Bongkar muat 1 drum 5.00 menit
Ts1 0.08 Jam
- Isi 1 drum solar B.As 200 Liter
Biaya pekerjaan/liter Solar Rp.1 22.41
22.41 rupiah

DUMP TRUCK (E09)


Kapasitas bak V 3.50 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 KM/Jam
Kecepatan rata-rata kosong v2 35.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/Q1 x Bil) T1 17.50 menit
- Waktu tempuh isi = (L/v1) x 60 T2 105.60 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 75.43 menit
- Lain-lain T4 1.00 menit
Ts2 199.53 menit

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : Solar
Lokasi : Pertamina DOK.8
Tujuan : Base Camp

No. URAIAN KODE KOEF. SATUAN

Kapasitas Produksi / Jam =


V x Fa x 60 x 200 Q2 174.71 Liter / Jam
Ts2

Biaya Dump Truck / Liter = (1 : Q2) x RpE01 Rp2 1,584.88 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI BASE CAMP

Harga Satuan Dasar Pasir =

( RpM01 + Rp1 + Rp2 ) M01 14,388.29 Rupiah

Dibulatkan : M01 14,400.00 Rupiah


Jenis : Angkutan Bahan (Semen)
Lokasi : Biak
Tujuan : Base Camp

No. URAIAN KODE KOEF. SATUAN

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Jayapura ke Base Camp L 2.50 Km
4 Harga satuan bahan di Jayapura RpM09 1.00 Kg
5 Harga Satuan Dasar Dump Truck RpE01 1.00 Jam
6 Harga Satuan Dasar Upah Pekerja RpL01 1.00 Jam

II. URUTAN KERJA


1 Bahan dinaikkan ke atas Dump Truck
dengan tenaga manusia.
2 Dump Truck mengangkut bahan
ke lokasi pekerjaan

III. PERHITUNGAN

TENAGA BONGKAR MUAT


Pekerja p 3.00 Orang

- Bongkar muat 1 zak semen 0.50 Menit


Ts1 0.01 Jam

- Rata-rata isi 1 zak B.As 50.00 Kg

Biaya pekerja/kg semen = Rp1 9.34 Rupiah


( p x Ts1 x Rp.L01 ) / B.As

DUMP TRUCK E01


Kapasitas bak V 3,500.00 Kg
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 30.00 Km/Jam
Kecepatan rata-rata kosong v2 40.00 Km/Jam
Waktu siklus Ts2
- Waktu tempuh isi = (L/v1) x 60 T1 5.00 Menit
- Waktu tempuh kosong = (L/v2) x 60 T2 3.75 Menit
- Muat T3 0.00 Menit
- Lain-lain T4 0.50 Menit
Ts2 9.25 Menit

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : Angkutan Bahan (Semen)


Lokasi : Biak
Tujuan : Base Camp

No. URAIAN KODE KOEF. SATUAN

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 18,843.24 Kg/Jam
Ts2

Biaya Dump Truck / Kg = (1 : Q2) x RpE01 Rp2 14.69 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar Angkutan Semen / Kg =

( RpM09 + Rp1 + Rp2 ) M09 1,724.03 Rupiah

Dibulatkan : M09 1,724.00 Rupiah


)

KET.

Ke Lokasi pek.
Ke Lokasi Pek.
Ke Lokasi Pek.

Ke Lokasi Pek.

Ke Base Camp

Ke Lokasi Pek.

Ke Lokasi Pek. Kota Jayapura - Pertigaan Kemiri Sentani 40.00


Pertigaan Pasar Lama - Lokasi Proyek 2.50
Ke Lokasi Pek. Kota Jayapura - Lokasi Proyek 42.50
Kota Jayapura - Pertigaan Pasar Lama 32.00
Ke Lokasi Pek. Lokasi Proyek - Lokasi Quarry 12.00

Ke Lokasi Pek.

18,673.47
24,387.76
27,244.90
30,102.04
24,387.76

KE JAYAPURA

ENTROP
km
km
km

km
km

km
km
km
km

AN

HARGA
SATUAN
(Rp.)

600,000.00
447,146.88
276,896.81
Bersambung
AN

Lanjutan
HARGA
SATUAN
(Rp.)
AN

HARGA
SATUAN
(Rp.)

555,000.00
447,146.88
276,896.81
Bersambung
AN

Lanjutan
HARGA
SATUAN
(Rp.)
AN

HARGA
SATUAN
(Rp.)

450,000.00
447,146.88
276,896.81
0.00
18,673.47

Bersambung
AN
Lanjutan
HARGA
SATUAN
(Rp.)
AN

HARGA
SATUAN
(Rp.)

250,000.00
447,146.88
276,896.81
Bersambung
AN

Lanjutan
HARGA
SATUAN
(Rp.)
AN

HARGA
SATUAN
(Rp.)

550,000.00
447,146.88
276,896.81

Bersambung
AN
Lanjutan
HARGA
SATUAN
(Rp.)
AN

HARGA
SATUAN
(Rp.)

12,781.00
276,896.81
18,673.47
Bersambung
AN

Lanjutan
HARGA
SATUAN
(Rp.)
HARGA
SATUAN
(Rp.)

1,700.00
276,896.81
18,673.47
Bersambung

AN

Lanjutan
HARGA
SATUAN
(Rp.)
km
km
km
km
km
REKAPITULASI KUANTITAS DAN HARGA

Kegiatan : Normalisasi Kali Doyo Kampung Keihiran Sentani


Pekerjaan : Normalisasi Kali Doyo Kampung Keihiran Sentani
Lokasi Pekerjaan : Kabupaten Jayapura
Tahun Anggaran : 2019

No. URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN 133,597,050.00

2 PEKERJAAN NORMALISASI SUNGAI 3,495,904,779.06

3 PEKERJAAN LAIN-LAIN 6,477,900.00

Jumlah 3,635,979,729.06
Pajak Pertambahan Nilai (PPN) 10 % 363,597,972.91
JUMLAH TOTAL 3,999,577,701.97

Tiga Milyar Sembilan Ratus Sembilan Puluh Sembilan Juta Lima


Terbilang : Ratus Tujuh Puluh Tujuh Ribu Tujuh Ratus Satu Koma Sembilan
Puluh Tujuh Rupiah.

Jayapura, April 2019

Kepala Dinas Pekerjaan Umum dan Penataan Ruang


Provinsi Papua
Selaku PENGGUNA ANGGARAN

GIRIUS ONE YOMAN, S.Pd., M.Si.


Pembina Tk. I
NIP. 19760314 200112 1 007

Pekerjaan Galian Dan Di Angkut


Awal 8,013.43
Perubahan 2,925.00

Bronjong
Awal 1,392.00
Perubahan 1,812.00
RENCANA ANGGARAN BIAYA (RAB)

TUGAS AKHIR : NORMALISASI SUNGAI HANYAAN, KOTA JAYAPURA


LOKASI : KOTA JAYAPURA
TAHUN ANGGARAN : 2019

HARGA SATUAN
No. ITEM PEKERJAAN SAT. VOLUME KODE ANALISA JUMLAH (RP)
(RP)

I PEKERJAAN PERSIAPAN
1 Mobilisasi & Demobilisasi Ls 1.00 - 102,950,000.00 102,950,000.00
2 Pembersihan Lokasi m' 650.00 - 12,457.00 8,097,050.00
3 Keselamatan dan Kesehatan Kerja (K 3) Ls 1.00 22,550,000.00 22,550,000.00

SUB TOTAL I 133,597,050.00

II PEKERJAAN NORMALISASI SUNGAI


1 Galian Tanah Secara Mekanis m³ 12,461.30 TM.04.a.1.c 69,500.78 866,070,069.81
2 Galian Tanah Secara Mekanis Diangkut dan Dibuang m³ 2,925.00 TM.04.c.1.a 126,837.93 371,000,945.25
3 Bronjong dengan kawat yang dilapisi galvanis m³ 1,812.00 P.06.a.4) a) 1,246,597.00 2,258,833,764.00

SUB TOTAL II 3,495,904,779.06

III PEKERJAAN LAIN-LAIN

1 Pembersihan Kembali m' 650.00 - 9,966.00 6,477,900.00

SUB TOTAL III 6,477,900.00


TM.04.a.1.1 m3 galian tanah biasa sedalam > 4 m atau Galian Tanah di sungai menggunakan exavator di darat
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.1633 130,000 21,229.00
Mandor L.04 OH 0.0163 210,000 3,423.00
JUMLAH TENAGA KERJA 24,652.00
B BAHAN
Solar M.137.b Liter 0.5000 14,400 7,200.00
JUMLAH HARGA BAHAN 7,200.00
C PERALATAN
Exavator E.11.c Sewa-Jam 0.0701 447,147 31,330.53
JUMLAH HARGA ALAT 31,330.53
D Jumlah (A+B+C) 63,182.53
E Overhead & Profit 10% 10% 6,318.25
F Harga Satuan Pekerjaan (D+E) - 69,500.78

TM.04.c. Angkutan material dan/atau hasil galian


TM.04.c.1 Mengangkut 1 m3 material atau hasil galian Menggunakan Dump Truck
TM.04.c.1.Jarak angkut < 1 Km
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Solar M.137.b Liter 0.5000 14,400 7,200.00
JUMLAH HARGA BAHAN 7,200.00
C PERALATAN
Exavator E.11.c Sewa-Jam 0.0500 447,147 22,357.34
Dump Truck E.11.b Sewa-Jam 0.3097 276,897 85,749.87
JUMLAH HARGA ALAT 108,107.22
D Jumlah (A+B+C) 115,307.22
E Overhead & Profit 10% 10% 11,530.72
F Harga Satuan Pekerjaan (D+E) - 126,837.93

P.06.a.4) Bentuk I, Tipe D bronjong kawat ukuran L=2,0 m x B=1,0 m x T= 0,5 m


P.06.a.4) aKawat bronjong galvanis kawat anyaman 3 lilitan ø 2,70 mm, kawat sisi ø 3,40 mm dan kawat pengikat ø 2,0 mm, lubang heksagonal 80 x 100 mm;
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.1400 130,000 148,200.00
Tukang L.02 OH 0.3800 170,000 64,600.00
Mandor L.04 OH 0.2980 210,000 62,580.00
JUMLAH TENAGA KERJA 275,380.00
B BAHAN
Batu/batu belah M.06.a M3 1.3000 595,300 773,890.00
Kawat Bronjong Ø 2,7 mm M.68 Kg 2.1000 40,000 84,000.00
Jumlah Harga 857,890.00
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,133,270.00
E Overhead & Profit 10% 10% 113,327.00
F Harga Satuan Pekerjaan (D+E) - 1,246,597.00
T.01.a 1 m2 pembersihan dan striping/kosrekan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.0600 130,000 7,800.00
Mandor L.04 OH 0.0060 210,000 1,260.00
JUMLAH TENAGA KERJA 9,060.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 9,060.00
E Overhead & Profit 10% 10% 906.00
F Harga Satuan Pekerjaan (D+E) - 9,966.00

T.01.b 1 m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/ tumbuhan ø < 15 cm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.0750 130,000 9,750.00
Mandor L.04 OH 0.0075 210,000 1,575.00
JUMLAH TENAGA KERJA 11,325.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 11,325.00
E Overhead & Profit 10% 10% 1,132.50
F Harga Satuan Pekerjaan (D+E) - 12,457.00
ITEM PEMBAYARAN NO. : 3.1.(1a) Analisa EI-311
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.30 -
6 Berat volume tanah (lepas) D 1.40 ton/m3 1.40 - 1.80

II. URUTAN KERJA


1 Tanah yang dipotong umumnya berada disisi jalan
2 Penggalian dilakukan dengan menggunakan Excavator
3 Selanjutnya Excavator menuangkan material hasil
galian kedalam Dump Truck
4 Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh L 5.00 Km

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.95 -
Faktor Efisiensi alat Fa 0.70
Faktor konversi , kedalaman < 40 % Fv 0.95 Faktor konversi
Waktu siklus Ts1 menit dihapus, masuk
- Menggali , memuat T1 1.000 menit dalam waktu siklus
- Lain lain T2 1.000 menit disesuaikam
Waktu siklus = T1 x Fv Ts1 2.00 menit

Kap. Prod. / jam V x Fb x Fa x 60 Q1 14.27 M3/Jam


Ts1 x Fk

Koefisien Alat / = 1 : Q1 (E10) 0.0701 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 3.50 ton 2.1875
Faktor efisiensi alat Fa 0.73 -
Kecepatan rata-rata bermuatan v1 30.00 KM/Jam
Kecepatan rata-rata kosong v2 50.00 KM/Jam
Waktu siklus Ts2 menit
- Muat = (V x 60)/(D x Q1 x Fk) T1 8.08 menit
- Waktu tempuh isi = (L : v1) x 60 T2 10.00 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 6.00 menit
- Lain-lain T4 2.00 menit
Ts2 26.08 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 3.23 M3/Jam


D x Fk x Ts2

Koefisien Alat / = 1 : Q2 (E08) 0.3097 Jam

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop
- Keranjang
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 3.1.(1a) Analisa EI-311
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 14.27 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 99.90 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2102 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0701 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 175,033.09 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan
............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan 0.00 M3
Analisa EI-311

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET

PROP / KAB / KODYA


ITEM PEMBAYARAN NO. : 3.1.(1a) PERKIRAAN VOL. PEK. : 0.00
JENIS PEKERJAAN : Galian Biasa TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2102 130,000.00 27,326.38


2. Mandor (L03) Jam 0.0701 210,000.00 14,714.20

JUMLAH HARGA TENAGA 42,040.59

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E10) Jam 0.0701 447,146.88 31,330.53


2. Dump Truck (E08) Jam 0.3097 276,896.81 85,749.87
3. Alat Bantu Ls 1.0000 0.00 0.00

MLAH HARGA PERALATAN 117,080.40

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 159,120.99


E. OVERHEAD & PROFIT 10.0 % x D 15,912.10
F. HARGA SATUAN PEKERJAAN ( D + E ) 175,033.09
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Galian Tanah Secara Mekanis
Normalisasi Sungai

Galian Tanah Secara Mekanis Diangkut dan Dibuang

Galian Tanah Secara Mekanis Diangkut dan Dibuang


GAMBAR Panjang Galian (M)

Lebar
50
Dalam 50
galian 50
50
50
50
50
50
50
50
50
50
50

650

Panjang Galian (M)

Pasangan Batu 1 : 4 -

Saluran Cor Beton 1


volume
saluran baru 0.30

Beton K - 225 2.45


volume
0.245
Lebar (M) Dalam (M) Volume Galian KETERANGAN

6.2 2.9 894.65


6.2 2.9 896.10
6.2 2.9 897.55 4,000,000,000.00
6.5 2.9 946.85 3,999,577,701.97
6.7 2.9 977.30 422,298.03
6.8 2.9 991.80 -
6.7 2.9 965.70
7.3 2.9 1,055.60
7.5 2.9 1,080.25
7.4 2.9 1,075.90
6.1 2.9 884.50
6.1 2.9 881.60
6.3 2.9 913.50
L. beronjong GALIAN TANAH
1.5 3 2925
GALIAN TANAH DI BUANG

Lebar (M) Tinggi m2

0.4 0.8 -

0.2 1.5 0.30


panjang
- 0.00

0.2 0.5 0.245


Panjang Dua Sisi
- 2 -
16,639.15
12,461.30
12461.30

6,680.50

Anda mungkin juga menyukai