Ahsp - Sda - Keyhiran 210519
Ahsp - Sda - Keyhiran 210519
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT MIXING PLANT E01
2. Tenaga Pw 294.0 HP
3. Kapasitas Cp 60.0 T/Jam
4. Alat a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 3,600,000,000.0 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
8 Bahan bakar Batubara 0.00 Rp/kg
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT FINISHER E02
2. Tenaga Pw 72.4 HP
3. Kapasitas Cp 5.0 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,400.0 Jam
c. Harga Alat B 2,640,000,000 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT SPRAYER E03
2. Tenaga Pw 4.0 HP
3. Kapasitas Cp 850.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 126,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan BULLDOZER 100-150 HP E04
2. Tenaga Pw 155.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,663,200,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M E05
2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 5,000.0 CPM/(L/m)
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 183,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 0.3-0.6 M3 E06
2. Tenaga Pw 20.0 HP
3. Kapasitas Cp 500.0 Liter
4. Alat Baru : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 21,060,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE 10-15 TON E07
2. Tenaga Pw 138.0 HP
3. Kapasitas Cp 15.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,440,000,000 Rupiah
5.
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3.5 TON E08
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 3.5 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 300,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 10 TON E09
2. Tenaga Pw 90.0 HP
3. Kapasitas Cp 10.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 480,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir / Mekanik U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR 80-140 HP E10
2. Tenaga Pw 80.0 HP
3. Kapasitas Cp 0.93 M3
4. Alat Baru : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 5,000.0 Jam
c. Harga Alat B 1,800,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan FLAT BED TRUCK 3-4 M3 E11
2. Tenaga Pw 190.0 HP
3. Kapasitas Cp 10.0 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 300,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan GENERATOR SET E12
2. Tenaga Pw 180.0 HP
3. Kapasitas Cp 135.0 KVA
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 414,050,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan MOTOR GRADER >100 HP E13
2. Tenaga Pw 135.0 HP
3. Kapasitas Cp 10,800.0 -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 2,520,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan TRACK LOADER 75-100 HP E14
2. Tenaga Pw 70.0 HP
3. Kapasitas Cp 0.8 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 660,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3 E15
2. Tenaga Pw 96.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,722,866,500 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan THREE WHEEL ROLLER 6-8 T E16
2. Tenaga Pw 55.0 HP
3. Kapasitas Cp 8.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 600,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan TANDEM ROLLER 6-8 T. E17
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 8.1 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,843,200,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan TIRE ROLLER 8-10 T. E18
2. Tenaga Pw 100.5 HP
3. Kapasitas Cp 9.0 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 2,232,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan VIBRATORY ROLLER 5-8 T. E19
2. Tenaga Pw 82.0 HP
3. Kapasitas Cp 7.050 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,224,000,000 Rupiah
B. BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1. Nilai Sisa Alat = 10 % x B C 122,400,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE VIBRATOR E20
2. Tenaga Pw 5.5 HP
3. Kapasitas Cp 25.0 -
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 6,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan STONE CRUSHER E21
2. Tenaga Pw 220.0 HP
3. Kapasitas Cp 50.0 T/Jam
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,440,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WATER PUMP 70-100 mm E22
2. Tenaga Pw 6.0 HP
3. Kapasitas Cp - -
4. Alat Baru : a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 6,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WATER TANKER 3000-4500 L. E23
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 4,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 360,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan PEDESTRIAN ROLLER E24
2. Tenaga Pw 8.8 HP
3. Kapasitas Cp 835.000 Ton
4. Alat Baru : a. Umur Ekonomis A 3.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 180,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan TAMPER E25
2. Tenaga Pw 4.7 HP
3. Kapasitas Cp 121.000 Ton
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 24,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan JACK HAMMER E26
2. Tenaga Pw 0.0 HP
3. Kapasitas Cp 1,330.000 -
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 42,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan FULVI MIXER E27
2. Tenaga Pw 345.0 HP
3. Kapasitas Cp 2,005 -
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 1,080,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE PUMP E28
2. Tenaga Pw 100.0 HP
3. Kapasitas Cp 8.00 M3
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,200,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan TRAILER 20 TON E29
2. Tenaga Pw 175.0 HP
3. Kapasitas Cp 20.00 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 720,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan PILE DRIVER + HAMMER E30
2. Tenaga Pw 25.0 HP
3. Kapasitas Cp 2.50 Ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,200,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan CRANE ON TRACK 35 TON E31
2. Tenaga Pw 125.0 HP
3. Kapasitas Cp 35.00 Ton
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 3,000,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan WELDING SET E32
2. Tenaga Pw 40.0 HP
3. Kapasitas Cp 250.00 Amp
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 42,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan BORE PILE MACHINE E33
2. Tenaga Pw 150.0 HP
3. Kapasitas Cp 2,000.00 Meter
4. Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,500,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER E34
2. Tenaga Pw 5.0 HP
3. Kapasitas Cp 1,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 36,000,000 Rupiah
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
No. URAIAN KODE KOEF. SATUAN KET.
A. URAIAN PERALATAN
1. Jenis Peralatan ASPHALT LIQUID MIXER E34a
2. Tenaga Pw 40.0 HP Kapasitas 20.000
3. Kapasitas Cp 20,000.0 Liter
4. Alat Baru : a. Umur Ekonomis A 4.0 Tahun Khusus digunakan
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam untuk Asphalt
c. Harga Alat B 36,000,000 Rupiah Modifikasi
E. LAIN - LAIN
1. Tingkat Suku Bunga i 15.00 % / Tahun
2. Upah Operator / Sopir U1 20,674.60 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 14,674.60 Rp./Jam
4. Bahan Bakar Bensin Mb 10,200.00 Liter
5. Bahan Bakar Solar Ms 6,800.00 Liter
6. Minyak Pelumas Mp 35,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI
ALAT ALAT ALAT JAM
UMUR KERJA HARGA
ALAT 1 TAHUN ALAT
HP Cp B A W B
1 2 2a 3 4 5 6 7 8
1. ASPHALT MIXING PLANT E01 294.0 60.0 T/Jam 3,600,000,000 10.0 1,500.0 3,600,000,000
2. ASPHALT FINISHER E02 72.4 5.0 Ton 2,640,000,000 6.0 1,400.0 2,640,000,000
3. ASPHALT SPRAYER E03 4.0 850.0 Liter 126,000,000 5.0 2,000.0 126,000,000
4. BULLDOZER 100-150 HP E04 155.0 - - 1,663,200,000 5.0 2,000.0 1,663,200,000
5. COMPRESSOR 4000-6500 L\M E05 60.0 5,000.0 CPM/(L/m) 183,000,000 5.0 2,000.0 183,000,000
6. CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0 Liter 21,060,000 2.0 1,500.0 21,060,000
7. CRANE 10-15 TON E07 138.0 15.0 Ton 1,440,000,000 5.0 2,000.0 1,440,000,000
8. DUMP TRUCK 3.5 TON E08 100.0 3.5 Ton 300,000,000 5.0 2,000.0 300,000,000
9. DUMP TRUCK 10 TON E09 90.0 10.0 Ton 480,000,000 5.0 2,000.0 480,000,000
10. EXCAVATOR 80-140 HP E10 80.0 0.9 M3 1,800,000,000 2.0 5,000.0 1,800,000,000
11. FLAT BED TRUCK 3-4 M3 E11 190.0 10.0 ton 300,000,000 5.0 2,000.0 300,000,000
12. GENERATOR SET E12 180.0 135.0 KVA 414,050,000 5.0 2,000.0 414,050,000
13. MOTOR GRADER >100 HP E13 135.0 10,800.0 - 2,520,000,000 5.0 2,000.0 2,520,000,000
14. TRACK LOADER 75-100 HP E14 70.0 0.8 M3 660,000,000 5.0 2,000.0 660,000,000
15. WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5 M3 1,722,866,500 5.0 2,000.0 1,722,866,500
16. THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 600,000,000 5.0 2,000.0 600,000,000
17. TANDEM ROLLER 6-8 T. E17 82.0 8.1 Ton 1,843,200,000 5.0 2,000.0 1,843,200,000
18. TIRE ROLLER 8-10 T. E18 100.5 9.0 Ton 2,232,000,000 5.0 2,000.0 2,232,000,000
19. VIBRATORY ROLLER 5-8 T. E19 82.0 7.1 Ton 1,224,000,000 5.0 2,000.0 1,224,000,000
20. CONCRETE VIBRATOR E20 5.5 25.0 - 6,000,000 4.0 1,000.0 6,000,000
21. STONE CRUSHER E21 220.0 50.0 T/Jam 1,440,000,000 5.0 2,000.0 1,440,000,000
22. WATER PUMP 70-100 mm E22 6.0 - - 6,000,000 3.0 2,000.0 6,000,000
23. WATER TANKER 3000-4500 L. E23 100.0 4,000.0 Liter 360,000,000 5.0 2,000.0 360,000,000
24. PEDESTRIAN ROLLER E24 8.8 835.0 Ton 180,000,000 3.0 2,000.0 180,000,000
25. TAMPER E25 4.7 121.0 Ton 24,000,000 4.0 1,000.0 24,000,000
26. JACK HAMMER E26 0.0 1,330.0 - 42,000,000 5.0 2,000.0 42,000,000
27. FULVI MIXER E27 345.0 2,005.0 - 1,080,000,000 4.0 1,000.0 1,080,000,000
28. CONCRETE PUMP E28 100.0 8.00 M3 1,200,000,000 6.0 2,000.0 1,200,000,000
29. TRAILER 20 TON E29 175.0 20.00 Ton 720,000,000 6.0 2,000.0 720,000,000
30 PILE DRIVER + HAMMER E30 25.0 2.50 Ton 1,200,000,000 5.0 2,000.0 1,200,000,000
31. CRANE ON TRACK 35 TON E31 125.0 35.00 Ton 3,000,000,000 6.0 2,000.0 3,000,000,000
32. WELDING SET E32 40.0 250.00 Amp 42,000,000 5.0 2,000.0 42,000,000
33. BORE PILE MACHINE E33 150.0 2,000.0 Meter 1,500,000,000 6.0 2,000.0 1,500,000,000
34. ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 36,000,000 4.0 2,000.0 36,000,000
KETERANGAN : 1 Tingkat Suku Bunga = 15.00
2 Upah Operator / Sopir / Mekanik = 20,675
3 Upah Pembantu Operator/Sopir/Mekanik = 14,675
4 Harga Bahan Bakar Bensin = 10,200
5 Harga Bahan Bakar Solar = 6,800
6 Minyak Pelumas = 35,000
7 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
8 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasit
HP Cp B A W B
1 2 2a 3 4 5 6 7 8
35. TRONTON E35 150.0 15.0 Ton 600,000 10.0 1,500.0 600,000
36. COLD MILLING MACHINE E37 248.0 1,000.0 m 900,000,000 5.0 2,000.0 900,000,000
37. ROCK DRILL BREAKER E36 3.0 - - 1,800,000,000 10.0 1,500.0 1,800,000,000
38. COLD RECYCLER E38 900.0 2,200.0 M 610,800,000 5.0 2,000.0 610,800,000
39. HOT RECYCLER E39 400.0 3.0 M 612,000,000 5.0 2,000.0 612,000,000
40. AGGREGAT (CHIP) SPREADER E40 115.0 3.5 M 600,000,000 4.0 1,000.0 600,000,000
41. ASPHALT DISTRIBUTOR E41 115.0 4,000.0 Liter 600,000,000 5.0 2,000.0 600,000,000
42. SLIP FORM PAVER E42 105.0 2.5 M 600,000,000 6.0 2,000.0 600,000,000
43. CONCRETE PAN MIXER E43 134.0 600.0 Liter 600,000,000 10.0 1,500.0 600,000,000
44. CONCRETE BREAKER E44 290.0 20.0 m3/jam 600,000,000 5.0 2,000.0 600,000,000
45. ASPAHLT TANKER E45 190.0 4,000.0 liter 600,000,000 6.0 2,000.0 600,000,000
46. CEMENT TANKER E46 190.0 4,000.0 liter 600,000,000 6.0 2,000.0 600,000,000
47. CONCRETE MIXER (350) E47 20.0 350.0 liter 240,000,000 2.0 2,000.0 240,000,000
48. VIBRATING RAMMER E48 4.2 80.0 KG 480,000,000 4.0 1,000.0 480,000,000
49. TRUK MIXER (AGITATOR) E49 110.0 10.0 M3 1,500,000,000 5.0 1,000.0 1,500,000,000
50. BORE PILE MACHINE E50 125.0 60.0 CM 2,100,000,000 10.0 1,500.0 2,100,000,000
51. CRANE ON TRACK 75-100 TON E51 200.0 75.0 Ton 600,000,000 5.0 2,000.0 600,000,000
52. BLENDING EQUIPMENT E52 50.0 30.0 Ton 480,000,000 10.0 1,500.0 480,000,000
53. ASPHALT LIQUID MIXER E34a 40.0 20,000.0 Liter 36,000,000 4.0 2,000.0 36,000,000
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
KETERANGAN : 1 Tingkat Suku Bunga = 15.00
2 Upah Operator / Sopir / Mekanik = 20,675
3 Upah Pembantu Operator/Sopir/Mekanik = 14,675
4 Harga Bahan Bakar Bensin = 10,200
5 Harga Bahan Bakar Solar = 6,800
6 Minyak Pelumas = 35,000
7 Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
8 Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasit
9 AMP , Aspal Sprayer, Aspal Distribusi ditambah bahan bakar untuk pemanasan Aspal = 1/1000 x Ka
Kapasitas 20.000
Khusus digunakan
ANALISA BIAYA SEWA PERALATAN PER JAM KERJA (I)
360,000,000 0.19925 430,384.46 4,800.00 435,184.46 0.1500 0.0300 4,035,780.00 0.0875 210,000
264,000,000 0.26424 448,447.78 3,771.43 452,219.21 0.1500 0.0300 149,868.00 0.0625 117,857.14
12,600,000 0.29832 16,914.49 126.00 17,040.49 0.1200 0.0250 6,764.00 0.0875 5,512.50
166,320,000 0.29832 223,271.29 1,663.20 224,934.49 0.1200 0.0250 262,105.00 0.0875 72,765.00
18,300,000 0.29832 24,566.29 183.00 24,749.29 0.1200 0.0250 101,460.00 0.0875 8,006.25
2,106,000 0.61512 7,772.61 28.08 7,800.69 0.1500 0.0300 41,400.00 0.0875 1,228.50
144,000,000 0.29832 193,308.48 1,440.00 194,748.48 0.1200 0.0250 233,358.00 0.0875 63,000.00
30,000,000 0.29832 40,272.60 300.00 40,572.60 0.1200 0.0250 169,100.00 0.0875 13,125.00
48,000,000 0.29832 64,436.16 480.00 64,916.16 0.1200 0.0250 152,190.00 0.0875 21,000.00
180,000,000 0.61512 199,297.67 720.00 200,017.67 0.1200 0.0250 135,280.00 0.0875 31,500.00
30,000,000 0.29832 40,272.60 300.00 40,572.60 0.1200 0.0250 321,290.00 0.0875 13,125.00
41,405,000 0.29832 55,582.90 414.05 55,996.95 0.1200 0.0250 304,380.00 0.0875 18,114.69
252,000,000 0.29832 338,289.84 2,520.00 340,809.84 0.1200 0.0250 228,285.00 0.0875 110,250.00
66,000,000 0.29832 88,599.72 660.00 89,259.72 0.1200 0.0250 118,370.00 0.0875 28,875.00
172,286,650 0.29832 231,281.04 1,722.87 233,003.91 0.1200 0.0250 162,336.00 0.0875 75,375.41
60,000,000 0.29832 80,545.20 600.00 81,145.20 0.1200 0.0250 93,005.00 0.0875 26,250.00
184,320,000 0.29832 247,434.85 1,843.20 249,278.05 0.1200 0.0250 138,662.00 0.0875 80,640.00
223,200,000 0.29832 299,628.14 2,232.00 301,860.14 0.1200 0.0250 169,945.50 0.0875 97,650.00
122,400,000 0.29832 164,312.21 1,224.00 165,536.21 0.1200 0.0250 138,662.00 0.0875 53,550.00
600,000 0.35027 1,891.43 12.00 1,903.43 0.1500 0.0300 11,385.00 0.0625 375.00
144,000,000 0.29832 193,308.48 1,440.00 194,748.48 0.1200 0.0250 372,020.00 0.0875 63,000.00
600,000 0.43798 1,182.54 6.00 1,188.54 0.1200 0.0250 10,146.00 0.0875 262.50
36,000,000 0.29832 48,327.12 360.00 48,687.12 0.1200 0.0250 169,100.00 0.0875 15,750.00
18,000,000 0.43798 35,476.13 180.00 35,656.13 0.1200 0.0250 14,880.80 0.0875 7,875.00
2,400,000 0.35027 7,565.73 48.00 7,613.73 0.1500 0.0300 9,729.00 0.0625 1,500.00
4,200,000 0.29832 5,638.16 42.00 5,680.16 0.1200 0.0250 0.00 0.0875 1,837.50
108,000,000 0.35027 340,457.92 2,160.00 342,617.92 0.1500 0.0300 714,150.00 0.0625 67,500.00
120,000,000 0.26424 142,687.93 1,200.00 143,887.93 0.1200 0.0250 169,100.00 0.0875 52,500.00
72,000,000 0.26424 85,612.76 720.00 86,332.76 0.1200 0.0250 295,925.00 0.0875 31,500.00
120,000,000 0.29832 161,090.40 1,200.00 162,290.40 0.1200 0.0250 42,275.00 0.0875 52,500.00
300,000,000 0.26424 356,719.82 3,000.00 359,719.82 0.1200 0.0250 211,375.00 0.0875 131,250.00
4,200,000 0.29832 5,638.16 42.00 5,680.16 0.1200 0.0250 67,640.00 0.0875 1,837.50
150,000,000 0.26424 178,359.91 1,500.00 179,859.91 0.1200 0.0250 253,650.00 0.0875 65,625.00
3,600,000 0.35027 5,674.30 36.00 5,710.30 0.1200 0.0250 8,455.00 0.0875 1,575.00
% per-tahun
Rupiah per-orang/jam
Rupiah per-orang/jam
Rupiah per-liter
Rupiah per-liter
Rupiah per-liter
ekapitulasi Biaya Pekerjaan
material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
ANALISA BIAYA SEWA PERALATAN PER JAM KERJA (II)
60,000 0.19925 71.73 0.80 72.53 0.1500 0.0300 310,500.00 0.0875 35.00
90,000,000 0.29832 120,817.80 900.00 121,717.80 0.1200 0.0250 419,368.00 0.0875 39,375.00
180,000,000 0.19925 215,192.23 2,400.00 217,592.23 0.1500 0.0300 6,210.00 0.0875 105,000.00
61,080,000 0.29832 81,995.01 610.80 82,605.81 0.1200 0.0250 1,521,900.00 0.0875 26,722.50
61,200,000 0.29832 82,156.10 612.00 82,768.10 0.1200 0.0250 676,400.00 0.0875 26,775.00
60,000,000 0.35027 189,143.29 1,200.00 190,343.29 0.1500 0.0300 238,050.00 0.0625 37,500.00
60,000,000 0.29832 80,545.20 600.00 81,145.20 0.1200 0.0250 194,465.00 0.0875 26,250.00
60,000,000 0.26424 71,343.96 600.00 71,943.96 0.1200 0.0250 177,555.00 0.0875 26,250.00
60,000,000 0.19925 71,730.74 800.00 72,530.74 0.1500 0.0300 277,380.00 0.0875 35,000.00
60,000,000 0.29832 80,545.20 600.00 81,145.20 0.1200 0.0250 490,390.00 0.0875 26,250.00
60,000,000 0.26424 71,343.96 600.00 71,943.96 0.1200 0.0250 348,490.00 0.0875 26,250.00
60,000,000 0.26424 71,343.96 600.00 71,943.96 0.1200 0.0250 321,290.00 0.0875 26,250.00
24,000,000 0.61512 66,432.56 240.00 66,672.56 0.1200 0.0250 33,820.00 0.0875 10,500.00
48,000,000 0.35027 151,314.63 960.00 152,274.63 0.1500 0.0300 8,694.00 0.0625 30,000.00
150,000,000 0.29832 402,726.00 3,000.00 405,726.00 0.1500 0.0300 227,700.00 0.0625 93,750.00
210,000,000 0.19925 251,057.60 2,800.00 253,857.60 0.1500 0.0300 258,750.00 0.0875 122,500.00
60,000,000 0.29832 80,545.20 600.00 81,145.20 0.1200 0.0250 338,200.00 0.0875 26,250.00
48,000,000 0.19925 57,384.59 640.00 58,024.59 0.1500 0.0300 103,500.00 0.0875 28,000.00
3,600,000 0.35027 5,674.30 36.00 5,710.30 0.1200 0.0250 67,640.00 0.0875 1,575.00
% per-tahun
Rupiah per-orang/jam
Rupiah per-orang/jam
Rupiah per-liter
Rupiah per-liter
Rupiah per-liter
ekapitulasi Biaya Pekerjaan
material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
ntuk pemanasan Aspal = 1/1000 x Kapasitas tangki aspal x harga bahan bakar solar ( lihat E 01 , E 03, E 41)
BIAYA OPERASI PER JAM KERJA TOTAL No. URAIA
PERBAIKAN dan PERAWATAN UPAH TOTAL BIAYA
OPERATOR PEMBANTU BIAYA SEWA ALAT
KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
/ SOPIR / JAM JAM KERJA 1
- (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET. 2
1 Orang 1 Orang 3
0.125 (g1 x B') Per Per 4
s/d ----------- Jam Kerja Jam Kerja F+G+H+I E+J 5
0.175 W = = 6
Rp20,674.6 Rp14,674.6 7
g1 G H I J K L 8
17 18 19 20 21 22 23 9
10
0.1750 420,000.00 20,674.60 44,023.81 4,934,478.41 5,369,662.87 Pek. Ringan 11
0.1750 330,000.00 20,674.60 14,674.60 633,074.35 1,085,293.56 Pek. Ringan 12
0.1250 7,875.00 20,674.60 14,674.60 61,280.71 78,321.20 Pek. Berat 13
0.1250 103,950.00 20,674.60 14,674.60 474,169.21 699,103.70 Pek. Berat 14
0.1250 11,437.50 20,674.60 14,674.60 156,252.96 181,002.24 Pek. Berat 15
0.1750 2,457.00 20,674.60 14,674.60 80,434.71 88,235.40 Pek. Ringan 16
0.1250 90,000.00 20,674.60 14,674.60 421,707.21 616,455.68 Pek. Berat 17
0.1250 18,750.00 20,674.60 14,674.60 236,324.21 276,896.81 Pek. Berat 18
0.1250 30,000.00 20,674.60 14,674.60 238,539.21 303,455.37 Pek. Berat 19
0.1250 45,000.00 20,674.60 14,674.60 247,129.21 447,146.88 Pek. Berat 20
0.1250 18,750.00 20,674.60 14,674.60 388,514.21 429,086.81 Pek. Berat 21
0.1250 25,878.13 20,674.60 14,674.60 383,722.02 439,718.97 Pek. Berat 22
0.1250 157,500.00 20,674.60 14,674.60 531,384.21 872,194.04 Pek. Berat 23
0.1250 41,250.00 20,674.60 14,674.60 223,844.21 313,103.93 Pek. Berat 24
0.1250 107,679.16 20,674.60 14,674.60 380,739.77 613,743.68 Pek. Berat 25
0.1250 37,500.00 20,674.60 14,674.60 192,104.21 273,249.41 Pek. Berat 26
0.1250 115,200.00 20,674.60 14,674.60 369,851.21 619,129.26 Pek. Berat 27
0.1250 139,500.00 20,674.60 14,674.60 442,444.71 744,304.85 Pek. Berat 28
0.1250 76,500.00 20,674.60 14,674.60 304,061.21 469,597.41 Pek. Berat 29
0.1750 1,050.00 20,674.60 14,674.60 48,159.21 50,062.64 Pek. Ringan 30
0.1250 90,000.00 20,674.60 29,349.21 575,043.81 769,792.29 Pek. Berat 31
0.1250 375.00 20,674.60 14,674.60 46,132.71 47,321.24 Pek. Berat 32
0.1250 22,500.00 20,674.60 14,674.60 242,699.21 291,386.33 Pek. Berat 33
0.1250 11,250.00 20,674.60 14,674.60 69,355.01 105,011.14 Pek. Berat 34
0.1750 4,200.00 20,674.60 14,674.60 50,778.21 58,391.94 Pek. Ringan 35
0.1250 2,625.00 20,674.60 14,674.60 39,811.71 45,491.87 Pek. Berat 36
0.1750 189,000.00 20,674.60 14,674.60 1,005,999.21 1,348,617.13 Pek. Ringan 37
0.1250 75,000.00 20,674.60 14,674.60 331,949.21 475,837.14 Pek. Berat 38
0.1250 45,000.00 20,674.60 14,674.60 407,774.21 494,106.96 Pek. Berat 39
0.1250 75,000.00 20,674.60 14,674.60 205,124.21 367,414.60 Pek. Berat 40
0.1250 187,500.00 20,674.60 14,674.60 565,474.21 925,194.03 Pek. Berat 41
0.1250 2,625.00 20,674.60 14,674.60 107,451.71 113,131.87 Pek. Berat 42
0.1250 93,750.00 20,674.60 14,674.60 448,374.21 628,234.12 Pek. Berat 43
0.1250 2,250.00 20,674.60 14,674.60 47,629.21 53,339.51 Pek. Berat 44
45
46
47
48
49
50
51
52
53
BIAYA
URAIAN KO HP KAP. HARGA SEWA KET.
DE ALAT ALAT/JAM
(di luar PPN)
1,500,000,000.00
450,000,000.00
120,000,000.00
550,000,000.00
75,000,000.00
15,000,000.00
150,000,000.00
200,000,000.00
300,000,000.00
400,000,000.00
200,000,000.00
7,500,000.00
420,000,000.00
370,000,000.00
300,000,000.00
175,000,000.00
150,000,000.00
350,000,000.00
300,000,000.00
5,000,000.00
500,000,000.00
2,000,000.00
250,000,000.00
35,000,000.00
20,000,000.00
20,000,000.00
10,000,000.00
75,000,000.00
400,000,000.00
150,000,000.00
200,000,000.00
15,000,000.00
45,000,000.00
25,000,000.00
300,000,000.00
25,000,000.00
35,000,000.00
15,000,000.00
25,000,000.00
5,000,000.00
35,000,000.00
5,000,000.00
20,000,000.00
10,000,000.00
350,000,000.00
300,000,000.00
5,000,000.00
10,000,000.00
300,000,000.00
25,000,000.00
450,000,000.00
200,000,000.00
25,000,000.00
JANGKA WAKTU PELAKSANAAN 90.00 Hari Kalender Jam Kerja 7 Jam
I EXCAVATOR 1.71
b GALIAN TANAH DIANGKUT DAN DIBUANG 14.27 M3 99.89 M3 8,990.10 M3 2,925.00 M3 0.33
No. URAIAN
A. Sewa Tanah
B. PERALATAN
Periksa lembar 1.2-2
E. MOBILISASI PEKERJA
1 Pekerja
E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap
2 As Built Drawing
3 Dokumentasi dan Pelaporan
4 Survei,Pengukuran dan Pematokan
5 Papan Nama Proyek
6 Jasa Laboratorium
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk ove
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
KODE
No. JENIS ALAT ALAT
B. PERALATAN
M2
34,000,000.00
set
LS
LS 1.00 10,200,000.00 10,200,000.00
102,950,000.00 102,950,000
Lembar 1.2-2
HARGA JUMLAH
SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
Unit 1.00 - -
Unit 1.00 - -
Unit - -
Unit 1.00 - -
Unit - - -
Unit 1.00 - -
Unit 1.00 - -
Unit -
Unit 2.00 2,000,000.00 4,000,000.00
Unit - - -
Unit 2.00 15,000,000.00 30,000,000.00
Unit - - -
Unit 1.00 - -
Unit - - -
Unit - - -
Unit 1.00 - -
Unit - - -
Unit 1.00 - -
Unit 1.00 - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
Unit - - -
34,000,000.00
Analisa El - 181
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan
D. TENAGA / PERSONIL
Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
Analisa El - 119
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
HARGA & JARAK RATA-RATA
DARI SUMBER BAHAN (QUARRY)
HARGA JARAK
No. URAIAN SATUAN ROYALTY QUARRY
(Rp) ( Km )
UPAHPEKERJA
10 Pekerja OH 130,000.00
11 Tukang OH 170,000.00
12 Kepala Tukang OH 190,000.00
13 Mandor OH 210,000.00
14 Tukang LAS Konstruksi OH 170,000.00
Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3
KE DOYO BARU
km 000+000
2,5 km
2,5 km
Base Camp/
Lokasi Proyek
Lokasi Quarry
- Gravel
- Batu Kali/Gunung
- Batu Belah
- Tanam Timbunan
Catatan :
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 10.00 Km
4 Harga satuan pasir di Quarry RpM01 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume pasir Bil 1.40 ton/m3
II. URUTAN KERJA
1 Pasir digali dengan Excavator
2 Excavator sekaligus memuat pasir hasil
galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir ke lokasi
Base Camp
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 10.00 Km
4 Harga satuan batu kali di Quarry RpM02 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume batu kali Bil 1.44 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 16,091.13 Rupiah
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 10.00 Km
4 Harga satuan batu kali di Quarry RpM06 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Harga Satuan Dasar Wheel Loader RpE15 1.00 Jam
8 Harga Satuan Upah Pekerja RpL01 1.00 Jam
9 Berat volume batu belah Bil 1.60 ton/m3
3.d PEKERJA
Biaya Pekerja / M3 =
{ (7 Jam x P) : Qt } x RpL01 Rp4 10,079.82 Rupiah
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke Lokasi Pekerjaan L 5.00 Km
4 Harga satuan Gravel di Quarry RpM07 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume gravel Bil 2.20 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.75 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.75 menit
- Lain-lain T2 0.50 menit
Ts1 1.25 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 27.7884 M3 / Jam
Ts1
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi Base Camp L 10.00 Km
4 Harga satuan Sirtu di Quarry RpM16 1.00 M3
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam
6 Harga Satuan Dasar Dump Truck RpE09 1.00 Jam
7 Berat volume sirtu Bil 1.51 ton/m3
III. PERHITUNGAN
EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1
Jenis : Solar
Lokasi : Pertamina DOK.8
Tujuan : Base Camp
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
Jarak Terminal BBM Jayapura ke lokasi Base L 44.00 Km
3 Camp
4 Harga satuan solar di SPB RpM22 1.00 Ltr
5 Harga Satuan Dasar Dump Truck RpE01 1.00 Jam
6 Harga satuan dasar upah pekerja RpL.01 1.00 Jam
III. PERHITUNGAN
Jenis : Solar
Lokasi : Pertamina DOK.8
Tujuan : Base Camp
I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : sedang / baik
3 Jarak Jayapura ke Base Camp L 2.50 Km
4 Harga satuan bahan di Jayapura RpM09 1.00 Kg
5 Harga Satuan Dasar Dump Truck RpE01 1.00 Jam
6 Harga Satuan Dasar Upah Pekerja RpL01 1.00 Jam
III. PERHITUNGAN
KET.
Ke Lokasi pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Lokasi Pek.
Ke Base Camp
Ke Lokasi Pek.
Ke Lokasi Pek.
18,673.47
24,387.76
27,244.90
30,102.04
24,387.76
KE JAYAPURA
ENTROP
km
km
km
km
km
km
km
km
km
AN
HARGA
SATUAN
(Rp.)
600,000.00
447,146.88
276,896.81
Bersambung
AN
Lanjutan
HARGA
SATUAN
(Rp.)
AN
HARGA
SATUAN
(Rp.)
555,000.00
447,146.88
276,896.81
Bersambung
AN
Lanjutan
HARGA
SATUAN
(Rp.)
AN
HARGA
SATUAN
(Rp.)
450,000.00
447,146.88
276,896.81
0.00
18,673.47
Bersambung
AN
Lanjutan
HARGA
SATUAN
(Rp.)
AN
HARGA
SATUAN
(Rp.)
250,000.00
447,146.88
276,896.81
Bersambung
AN
Lanjutan
HARGA
SATUAN
(Rp.)
AN
HARGA
SATUAN
(Rp.)
550,000.00
447,146.88
276,896.81
Bersambung
AN
Lanjutan
HARGA
SATUAN
(Rp.)
AN
HARGA
SATUAN
(Rp.)
12,781.00
276,896.81
18,673.47
Bersambung
AN
Lanjutan
HARGA
SATUAN
(Rp.)
HARGA
SATUAN
(Rp.)
1,700.00
276,896.81
18,673.47
Bersambung
AN
Lanjutan
HARGA
SATUAN
(Rp.)
km
km
km
km
km
REKAPITULASI KUANTITAS DAN HARGA
Jumlah 3,635,979,729.06
Pajak Pertambahan Nilai (PPN) 10 % 363,597,972.91
JUMLAH TOTAL 3,999,577,701.97
Bronjong
Awal 1,392.00
Perubahan 1,812.00
RENCANA ANGGARAN BIAYA (RAB)
HARGA SATUAN
No. ITEM PEKERJAAN SAT. VOLUME KODE ANALISA JUMLAH (RP)
(RP)
I PEKERJAAN PERSIAPAN
1 Mobilisasi & Demobilisasi Ls 1.00 - 102,950,000.00 102,950,000.00
2 Pembersihan Lokasi m' 650.00 - 12,457.00 8,097,050.00
3 Keselamatan dan Kesehatan Kerja (K 3) Ls 1.00 22,550,000.00 22,550,000.00
T.01.b 1 m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/ tumbuhan ø < 15 cm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.0750 130,000 9,750.00
Mandor L.04 OH 0.0075 210,000 1,575.00
JUMLAH TENAGA KERJA 11,325.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 11,325.00
E Overhead & Profit 10% 10% 1,132.50
F Harga Satuan Pekerjaan (D+E) - 12,457.00
ITEM PEMBAYARAN NO. : 3.1.(1a) Analisa EI-311
JENIS PEKERJAAN : Galian Biasa
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.30 -
6 Berat volume tanah (lepas) D 1.40 ton/m3 1.40 - 1.80
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.95 -
Faktor Efisiensi alat Fa 0.70
Faktor konversi , kedalaman < 40 % Fv 0.95 Faktor konversi
Waktu siklus Ts1 menit dihapus, masuk
- Menggali , memuat T1 1.000 menit dalam waktu siklus
- Lain lain T2 1.000 menit disesuaikam
Waktu siklus = T1 x Fv Ts1 2.00 menit
3. TENAGA
Produksi menentukan : EXCAVATOR Q1 14.27 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 99.90 M3
Kebutuhan tenaga :
- Pekerja P 3.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.2102 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0701 Jam
Rp. 175,033.09 / M3
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET
A. TENAGA
B. BAHAN
C. PERALATAN
Lebar
50
Dalam 50
galian 50
50
50
50
50
50
50
50
50
50
50
650
Pasangan Batu 1 : 4 -
0.4 0.8 -
6,680.50