PERHITUNGAN
a. Sudut Superelevsi
1432.4 1432.4
D = = = 8.953
Rrencana 160
Dari Tabel AASTHO, buku Silvia Sukirman dengan e max = 0.1 (jalan arteri), untuk:
D = 8.953
e = 0.091
Ls = 60
Keterangan:
Rren = 160 m
β = 34.0 o
V = 60.0 Km/Jam
Tc = 48.917 m
Lc = 94.928 m
e = 9.100 %
Ec = 7.311 m
Ls = 94.928 m
2) Tikungan 2
Dik: R = 80 m
β = 31.0 o
V = 50 Km/Jam
a. Sudut Superelevsi
1432.4 1432.4
D = = = 17.905
Rrencana 80
Dari Tabel AASTHO, buku Silvia Sukirman dengan e max = 0.099 (jalan arteri), untuk:
D = 17.905
e = 0.095
Ls = 50
Keterangan:
Rren = 80 m
β = 31.0 o
V = 50.0 Km/Jam
Tc = 22.186 m
Lc = 43.276 m
e = 9.500 %
Ec = 3.019 m
Ls = 43.276 m
3) Tikungan 3
Dik: R = 150 m
β = 27.0 o
V = 60 Km/Jam
a. Sudut Superelevsi
1432.4 1432.4
D = = = 9.549
Rrencana 150
Dari Tabel AASTHO, buku Silvia Sukirman dengan e max = 0.1 (jalan arteri), untuk:
D = 9.549
e = 0.095
Ls = 60
Keterangan:
Rren = 150 m
β = 27.0 o
V = 60.0 Km/Jam
Tc = 36.012 m
Lc = 70.6725 m
e = 9.500 %
Ec = 4.262 m
Ls = 70.6725 m
4) Tikungan 6
Dik: R = 170 m
β = 29.0 o
V = 60 Km/Jam
a. Sudut Superelevsi
1432.4 1432.4
D = = = 8.426
Rrencana 170
Dari Tabel AASTHO, buku Silvia Sukirman dengan e max = 0.1 (jalan arteri), untuk:
D = 8.426
e = 0.095
Ls = 60
Keterangan:
Rren = 170 m
β = 29.0 o
V = 60.0 Km/Jam
Tc = 43.965 m
Lc = 86.0285 m
e = 9.500 %
Ec = 5.593 m
Ls = 86.0285 m
5) Tikungan 4 (S-C-S)
Diketahui:
VR = 50 km/jam
β = 64.00 ˚
e max = 10 %
R = 95 m
a. sudut superelevasi
1432.4 1432.4
D = = = 15.078
Rrencana 95
V²
Rmin =
127 . (emaks + fmaks)
2500
=
127 . ( 0.10 + 0.153 )
= 77.806 m
181913.530 . (e max + fmax)
Dmax =
V²
181913.530 . ( 0.10 + 0.153 )
=
2500
= 18.410
K Ls3
= Ls - - R sin ϴs
40 . R2
125000
= 50 - - 95 . 0.26
40 . 9025
= 24.92905 m
Kontrol L < 2 Ts
156.0622 < 169.973
a. sudut superelevasi
1432.4 1432.4
D = = = 11.018
Rrencana 130
V²
Rmin =
127 . (emaks + fmaks)
3600
=
127 . ( 0.10 + 0.153 )
= 112.041 m
181913.530 . (e max + fmax)
Dmax =
V²
181913.530 . ( 0.10 + 0.153 )
=
3600
= 12.784
K Ls3
= Ls - - R sin ϴs
40 . R2
216000
= 60 - - 130 . 0.229
40 . ###
= 29.93122 m
Kontrol L < 2 Ts
150.7111 < 155.343
9 (4)+ 10
1 2 3 (3)+(2) 4 5 6 7 8 11 ((10)/(2))×100% 12
((5)/(7))×(8) (p1-A dst..)
1.750 7.000
P13 525.000 380.000 1.400 0.200 1.600 10.000 388.750
50.000 1.250 2.500
P14 575.000 390.000 0.000 0.100 0.100 10.000 390.000
50.000 -2.222 -4.444
P15 625.000 380.000 0.700 0.200 0.900 10.000 387.778
50.000 2.222 4.444
B 675.000 390.000 0.000 0.100 0.100 10.000 390.000
50.000 2.857 5.714
P16 725.000 390.000 0.200 0.500 0.700 10.000 392.857
25.000 2.143 8.571
P17 750.000 390.000 0.300 0.300 0.600 10.000 395.000
25.000 3.333 13.333
T3 775.000 390.000 0.500 0.100 0.600 10.000 398.333
25.000 0.000 0.000
P18 800.000 390.000 0.500 0.100 0.600 10.000 398.333
25.000 0.000 0.000
P19 825.000 390.000 0.500 0.100 0.600 10.000 398.333
50.000 3.333 6.667
P20 875.000 400.000 0.100 0.500 0.600 10.000 401.667
50.000 4.048 8.095
P21 925.000 400.000 0.400 0.300 0.700 10.000 405.714
25.000 1.429 5.714
P22 950.000 400.000 0.500 0.200 0.700 10.000 407.143
25.000 1.429 5.714
T4 975.000 400.000 0.600 0.100 0.700 10.000 408.571
25.000 -6.571 -26.286
P23 1000.000 400.000 0.300 1.200 1.500 10.000 402.000
25.000 -7.000 -28.000
P24 1025.000 390.000 0.400 0.400 0.800 10.000 395.000
50.000 -3.571 -7.143
P25 1075.000 390.000 0.100 0.600 0.700 10.000 391.429
50.000 11.429
5.714
INTERPOLASI ELEVASI TANAH ASLI
JARAK ANTAR JARAK ELEVASI TANAH
TITIK PATOK TINGGI jarak antar kotur BEDA TINGGI (m) KELANDAIAN (%) KETERANGAN
PATOK (m) LNGSUNG (m) a (mm) b (mm) (a+b) (mm) ASLI (m)
AWAL (m)
9 (4)- 10
1 2 3 (3)+(2) 4 5 6 7 8 11 ((10)/(2))×100% 12
((5)/(7))×(8) (p1-A dst..)
A 370.00
0.00 25 25 0.00 Datar
P1 370.00
0.00 50 75 0.00 Datar
P2 370.00
0.00 50 125 0.00 Datar
P3 370.00
4.50 50 175 9.00 Tanjakan
P4 374.50
4.00 50 225 8.00 Tanjakan
P5 378.50
0.00 25 250 0.00 Datar
P6 378.50
0.00 25 275 0.00 Datar
T1 378.50
0.00 25 300 0.00 Datar
P7 378.50
0.00 25 325 0.00 Datar
P8 378.50
3.78 50 375 7.56 Tanjakan
P9 382.28
3.28 50 425 6.56 Tanjakan
P10 385.56
0.00 25 450 0.00 Datar
P11 385.56
0.00 25 475 0.00 Datar
T2 385.56
1.11 25 500 4.44 Tanjakan
P12 386.67
1.11 25 525 4.44 Tanjakan
P13 387.78
2.22 50 575 4.44 Tanjakan
P14 390.00
0.00 50 625 0.00 Datar
P15 390.00
P15 390.00
0.00 50 675 0.00 Datar
B 390.00
4.17 50 725 8.33 Tanjakan
P16 394.17
2.08 25 750 8.33 Tanjakan
P17 396.25
2.08 25 775 8.33 Tanjakan
T3 398.33
0.00 25 800 0.00 datar
P18 398.33
0.00 25 825 0.00 Datar
P19 398.33
0.00 50 875 0.00 Datar
P20 398.33
1.47 50 925 2.93 Tanjakan
P21 399.80
0.73 25 950 2.93 Tanjakan
P22 400.53
0.73 25 975 2.93 Tanjakan
T4 401.27
0.73 25 1000 2.94 Tanjakan
P23 402.00
0.00 25 1025 0.00 Datar
P24 402.00
0.00 50 1075 0.00 Datar
P25 402.00
-2.50 50 1125 -5.00 Turunan
P26 399.50
-2.38 25 1150 -9.52 Turunan
T5 397.12
-2.41 25 1175 -9.62 Turunan
P27 394.71
-2.41 25 1200 -9.62 Turunan
P28 392.31
-3.65 50 1250 -7.31 Turunan
P29 388.65
-3.65 50 1300 -7.31 Turunan
-3.65 50 1300 -7.31 Turunan
P30 385.00
0.00 50 1350 0.00 Datar
P31 385.00
0.00 50 1400 0.00 Datar
P32 385.00
0.50 25 1425 2.00 Tanjakan
P33 385.50
0.50 25 1450 2.00 Tanjakan
T6 386.00
0.50 25 1475 2.00 Tanjakan
P34 386.50
0.00 25 1500 0.00 Datar
P35 386.50
0.00 50 1550 0.00 Datar
C 386.50
Tinggi Kontur A Tinggi Kontur B Jarak a Jarak b Tinggi titik
NO Nama Patok
H1 H2 B1 B2 x
1 A 370 370 1 1 370.00
2 P1 360 370 0.5 0.7 367.14
3 P2 370 370 1 1 370.00
4 P3 370 380 0.25 0.5 375.00
5 P4 370 380 0.6 0.7 378.57
6 P5 370 380 0.5 0.7 377.14
7 T1 370 380 0.4 0.8 375.00
8 P6 370 380 0.5 0.8 376.25
9 P7 370 380 0.7 0.8 378.75
10 P8 380 390 0.3 1.5 382.00
11 P9 380 390 1 1.8 385.56
12 P10 380 390 1.2 1.9 386.32
13 T2 380 390 1.3 2 386.50
14 P11 380 390 1.4 2 387.00
15 P12 380 390 1.4 1.6 388.75
16 P13 390 390 1 1 390.00
17 P14 380 390 0.6 0.9 386.67
18 B 390 390 1 1 390.00
19 P15 390 400 0.2 0.7 392.86
20 P16 390 400 0.3 0.6 395.00
21 T3 390 400 0.5 0.6 398.33
22 P17 390 400 0.4 0.6 396.67
23 P18 390 400 0.3 0.6 395.00
24 P19 390 400 0.4 0.6 396.67
25 P20 390 400 0.4 0.5 398.00
26 T4 390 400 0.4 0.5 398.00
27 P21 380 390 0.5 0.6 388.33
28 P22 380 390 0.2 0.7 382.86
29 P23 380 390 0.3 0.7 384.29
30 T5 380 390 0.5 0.7 387.14
31 P24 380 390 0.5 0.7 387.14
32 P25 380 390 0.55 1 385.50
33 P26 380 390 0.2 1.1 381.82
34 P27 370 380 0.4 0.6 376.67
35 P28 370 380 0.2 0.5 374.00
36 P29 370 380 0.2 0.4 375.00
37 P30 370 380 0.2 0.3 376.67
38 T6 370 380 0.2 0.3 376.67
39 P31 380 390 0.1 0.5 382.00
40 P32 380 390 0.2 0.5 384.00
41 C 380 380 1 1 380.00