Anda di halaman 1dari 2

Form for cooling load calculations

Project Afmi Plaza (22°21' N, 91°50'E)


Building Commercial Location Chittagong
Zone/Room
Month Day Time

1. Psychrometric analysis
Item Tdb Twb *RH Entalphy(h) Specific humidity( )
Outside 37 30 62
Inside 22.5 16 51
Difference 14.5
Daily range= 11
*5% basis

2. Transmission load
Item Description Area(m²) U factor CLTDC (°C) Qtransmission(W)
Walls North
South
East
West

Partition North
South
East
West

Roof
Floor

Glass North
South
East
West
Total transmission cooling load (W)

3. Solar radiation
Description Area(m²) SC SHGF CLF QSHG

North

South

East

West
Total solar radiation gain cooling (W)

4. Internal loads
Form for cooling load calculations
Item Input(W) CLF Qappliance
Lights
Appliances

Total internal gain cooling(W)

5. Occupancy
Number CLF Q1 Q2
Lights
Appliances
Total occupancy gains, Qoccupncy (W)

6. Vertilation/ Infiltration
L/s CFM Q1 Q2
Sensible
Latent
Total ventilation / infiltration load(W)

7. Miscellaneous heat gains:


Supply air duct heat gain (W)
Return air duct heat gain (W)
Supply air duct leakage (W)
Supply air fan heat gain (W)
Return air fan heat gain (W)
Pump heat gain (W)
Total miscellaneous heat gain (W)

8. Grand total cooling loads


Total latent load (W)
Total sensible load (W)
Total load (W)
Tons of refrigeration*

* 1 ton = 3.5 KW = 12,000 Btu/h

Anda mungkin juga menyukai