Anda di halaman 1dari 1

Skema teknis PETANGLONG

PELAYANAN KOTA PKL


(150 L/dt)
+ 10 Mdpl

RES. KARANGDADAP 4.000 M3


(TAHAP II)
+ 53 Mdpl
PELAYANAN RES. PEMBAGI - KOTA PKL
KAB PKL HDPE ND 500 mm
(170 L/dt) L = 12.000 m
+ 5 Mdpl
RES. KARANGDADAP 4.000 M3
(TAHAP I)
+ 53 Mdpl
RES. PEMBAGI - KAB PKL
HDPE ND 600 mm
L = 8.000 m RES. BATANG 1.000 M3
+ 53 Mdpl

IPA. KROMPENG - RES.


PEMBAGI
HDPE ND 600 mm IPA. KROMPENG - RES.
L = 4.000 m BATANG
HDPE ND 300 mm
IPA KROMPENG 200 L/dt L = 4.500 m
(TAHAP II)
IPA KROMPENG 200 L/dt (TAHAP I)
+ 150 Mdpl
+ 150 Mdpl
IPA KROMPENG – PLY TALUN DAM JAMBANGAN - IPA
GSP ND 150 mm KROMPENG
L = 100 m GSP ND 600 mm
L = 5.000 m
PELAYANAN TALUN
(30 L/dt) + 140 Mdpl DAM JAMBANGAN
+352 Mdpl

Anda mungkin juga menyukai