TAHUN ANGGARAN : 2018 Harga Jumlah Harga No. Uraian pekerjaan Vol Sat. Satuan ( Rp. ) ( Rp. ) A PEKERJAAN PERSIAPAN 11,690,000 1 Papan Proyek 1 unt 500,000 500,000 2 Pek. Pengukuran dan Bowplank 52 m' 157,500 8,190,000 3 Pek. Listrik & Air Kerja 1 ls 2,500,000 2,500,000 4 Pek. Laporan & Dokumentasi 1 ls 1,000,000 1,000,000 B PEKERJAAN PONDASI & TANAH 74,489,747 1 Pek. Galian Tanah Pondasi 77.38 m3 36,740 2,842,941 2 Pek. Urug Tanah Kembali 25.79 m3 13,400 345,586 . = 3 19.55 m3 183,900 3,595,245 4 Pek. Pasir Urug - Bawah Pondasi 11.9 m3 11 110,000 1,309,000 Bawah Lantai 19.9 m3 110,000 2,189,000 5 Pek. Pondasi Tapak P1 (100x100x20- 40) - Beton K-225 3.92 m3 1,230,825 4,824,834 Bekisting 0.69 m2 295,290 203,750 6 Rek Kolom Sopi 60/60 - beton K-225 0.75 m3 1,230,825 923,119 Pembesian 84.12 kg 11,316 951,902 Bekisting 9.96 m2 295,290 2,941,088 7 Pek, Ring Balok Praktis Sopi-sopi - Beton K-175 0.96 m3 1,124,383 1,079,408 Pembesian 194.91 kg 11,316 2,205,602 Bekisting 12.81 m2 295,290 3,782,665 8 Pek. plat Beton Topi-topi - Beton K-225 0.86 m3 1,230,825 1,058,510 Pembesian 182.42 kg 11,316 2,064,265 Bekisting 12.24 m2 295,290 3,614,350 D PEKERJAAN ATAP & PLAFOND 83,777,760 D.1 PEKERJAAN ATAP 62,644,900 1 Rangka Atap baja Ringan 205.53 m2 165,000 33,912,450 2 Atap Spandek t=0,35 205.53 m2 65,000 13,359,450 3 Lisplank GRC 73.8 M' 85,000 6,273,000 4 Pasang Aluminium foil, Glaswool, Roofmesh 140 m2 65,000 9,100,000 D.2 PEKERJAAN PLAFOND 21,132,860 1 Plafond Gipsum +Rangka hollow 4/4; t= 136.49 m2 97,000 13,239,530 2 Plafond Calsiboard 4,5 mm + Rangka 53.31 m2 68,000 3,625,080 3 List Gipsum 5 cm 94.85 m2 45,000 4,268,250 E PEKERJAAN PASANGAN 110,064,060 1 P Di di B 250 73 2 66 440 16 658 501 3 Pek. Pengecatan Plafond 189.8 m2 21,360 4,054,128 4 Pek. Pengecatan Listplank 22.14 m2 21,360 472,910 H PEKERJAAN PLUMBING & SANITAIR 15,670,043 1 Instalasi Pipa PVC AW 4" 16 m' 180,519 2,888,304 2 Instalasi Pipa PVC AW 2" 12 m' 103,218 1,238,616 3 Instalasi Pipa PVC AW 3/4" 20 m' 98,180 1,963,600 4 Instalasi Pipa PVC AW 1/2" 15 m' 79,323 1,189,845 5 Septic Tank dan Rembesan 1 unt 4,407,413 4,407,413 6 Pemasangan Closed Jongkok 1 bh 627,947 627,947 7 Pemasangan Kran Air 2 bh 216,452 432,904 8 Pemasangan Wastafel + Kran 2 bh 875,074 1,750,148 9 Pemasangan Cermin Wastafel 100x200 1 unt 1,171,266 1,171,266 I PEKERJAAN LISTRIK 67,667,437 1 Penyambungan Daya Listrik 5.500 VA ## VA 1,000 5,500,000 . 2 ## VA 1,000 5,500,000 3 Panel Listrik 1 unt 467,280 467,280 4 Pek. Instalasi Kabel Feeder NYY 4x10 mm2 2 m' 1,506,600 3,013,200 . 5 66 ttk 241,760 15,956,160 6 Pek. Instalasi Power AC 2 ttk 1,800,000 3,600,000 7 Pemasangan Lampu TKI 2x36W 16 bh 317,400 5,078,400 8 Pemasangan Lampu Baret Kotak 22W 7 bh 95,274 666,918 9 Pemasangan Lampu E27ESS 8 Watt + Fitting 3 bh 2,908,080 8,724,240 10 Pemasangan Saklar Engkle 5 bh 105,360 526,800 11 Pemasangan Saklar Double 4 bh 118,440 473,760 12 P S K k Si l 9 bh 198 240 1 784 160 RENCANA ANGGARAN BIAYA PEMBANGUNAN GEDUNG WORKSHOP PEKERJAAN : KOMPUTER - BLK KOMUNITAS PEMBERI TUGAS : KEMENTERIAN KETENAGAKERJAAN RI TAHUN ANGGARAN : 2018
NO ITEM PEKERJAAN TOTAL
A PEKERJAAN PERSIAPAN 11,690,000
B PEKERJAAN PONDASI & TANAH 74,489,747 C PEKERJAAN STRUKTUR 120,307,947 D PEKERJAAN ATAP & PLAFOND 83,777,760 E PEKERJAAN PASANGAN 110,064,060 F PEKERJAAN KUSEN PINTU & JENDELA 64,473,180 G PEKERJAAN PENGECATAN 16,125,026 H PEKERJAAN PLUMBING & SANITAIR 15,670,043 I PEKERJAAN LISTRIK 67,667,437 J LAIN - LAIN 15,000,000 TOTAL 511,597,764 PEMBULATAN 500,000,000 TERBILANG : Lima Ratus Juta Rupiah
Sukabumi, 17 Juli 2018
Pimpinan Pondok Pesantren Ketua Unit Ketua Unit Nurul Hasanah Pengelola Kegiatan Pengelola Kuangan