THRESER
LAPORAN BUAH BALEN
10
11
12
13
14
15
16
17
18
19
20
PT.PALUTA INTI SAWIT
PMKS - SIANCIMUN
LAPORAN JAM OPERASI MESIN PRESS
PRESSAN NOMOR 2
PERIODE : …………………………
11/1/2018
11/2/2018
11/3/2018
11/4/2018
11/5/2018
11/6/2018
11/7/2018
11/8/2018
11/9/2018
11/10/2018
11/11/2018
11/12/2018
11/13/2018
11/14/2018
11/15/2018
11/16/2018
11/17/2018
11/18/2018
11/19/2018
11/20/2018
11/21/2018
11/22/2018
11/23/2018
11/24/2018
11/25/2018
11/26/2018
11/27/2018
11/28/2018
11/29/2018
11/30/2018
PT.PALUTA INTI SAWIT
PMKS - SIANCIMUN
LAPORAN JAM OPERASI MESIN PRESS
PRESSAN NOMOR 3
PERIODE : …………………………
11/1/2018
11/2/2018
11/3/2018
11/4/2018
11/5/2018
11/6/2018
11/7/2018
11/8/2018
11/9/2018
11/10/2018
11/11/2018
11/12/2018
11/13/2018
11/14/2018
11/15/2018
11/16/2018
11/17/2018
11/18/2018
11/19/2018
11/20/2018
11/21/2018
11/22/2018
11/23/2018
11/24/2018
11/25/2018
11/26/2018
11/27/2018
11/28/2018
11/29/2018
11/30/2018
PT.PALUTA INTI SAWIT
PMKS - SIANCIMUN
LAPORAN LOADING RAMP
HARI : …………………………
TGL : …………………………
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
CATATAN :
8.00
9.00
10.00
11.00
12.00
13.00
17.00
18.00
19.00
20.00
21.00
22.00
02.00
03.00
04.00
05.00
06.00
07,00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
01.00
02.00
03.00
04.00
05.00
06.00
Hari : Tanggal :
SLUDGE CENTRIFUGE VIBRATING SCREEN TEMPERATUR (°C ) Oil Transfer
Sand Cyclone
Jam NO 1 NO 2 NO 3 NO 1 NO 2 NO 3 Pump KETERANGAN
Sand trap
Sludge H.Water Oil
C.O.T C.S.T
Start Stop Start Stop Start Stop Start Stop Start Stop Start Stop Start Stop Tank
Tank Tank Tank Start Stop
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
1.00
2.00
3.00
4.00
5.00
6.00
Hari : Tanggal :
Cake Breaker Fan Kernel Silo V.Nut Silo Pengiriman Pemakaian
Ripple Mill 1 Ripple Mil 2 Vib Claybath Jam Operasi
Conveyor Pemanasan Temp °C % Ke Bunker CaCO3
Jam
Start Stop Start Stop Start Stop Start Stop Start Stop Atas Bwh No.1 No.2 Start Sop Zak Unit Mesin Awal Akhir
Operasi
7.00 C.B.C
8.00 Ripple Mill 1
9.00 Ripple Mill 2
10.00 Vib.Claybath
11.00 Fan Kernel silo
12.00
13.00
14.00 Laporan Kerusakan :
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
1.00
2.00
3.00
4.00
5.00
6.00
Akhir:
HM Operasi:
8.00 Awal :
9.00 Akhir:
10.00 HM Operasi:
11.00 P P
13.00 Awal :
14.00 Akhir:
15.00 HM Operasi:
16.00
18.00 Awal :
19.00 Akhir:
20.00 HM Operasi:
21.00
22.00
23.00
24.00
1.00
2.00
3.00
4.00
5.00
6.00
Tekanan
Tanggal Berlaku :
Divisi : Processing
Tanggal Kadaluarsa :
0 1 3 5 8 9
Hari : Tanggal :
W a k t u
Volume Sterilizer
Sterilizer No: Peak I
Peak II Peak III
Total Bongkar Total
JAM Buka
Tutup Waktu
Isi Tbs Total Pintu Total Catatan
Pintu 1 Siklus
Inlet Cond Press Inlet Cond/Exh Press Inlet Exh/Cond Press Waktu ( menit )
Start Stop
1 2 (bar) 3 4 (bar) 5 6 (bar) Rebus
Mentah
Masak
Mill Manager Asst Prosess 1 & 2 Op.Shif 1 Op. Shif 2 L.ramp : Rebusan
PT.PALUTA INTI SAWIT
PKS - DESA SIANCIMUN GENSET 2 (450 kva)
Tanggal Berlaku :
Divisi : Processing Tanggal Kadaluarsa :
7.00 0
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
01.00
02.00
03.00
04.00
05.00
06.00