Construction elements –
naturally made of timber
Construction Contens
ETICS timber construction
Timber frame construction
CLT wall
ETICS masonry wall
Masonry wall with timber
Date 05 / 2017. Subject to errors and technical changes. The current version applies.
engineered by nature
STEICO Detail catalog - Contents
Basic structure
1. Level
Element
AW External wall
DA Roof
DE Ceiling
2. Level
Typ
WDVS ETICS
VHF External cladding system
SD Pitched roof
FD Flat roof
HB Timber beam
MH Solid wood
BE Concrete
3. Level
Construction
HRB Timber frame construction
MH CLT wall
MWHU Masonry wall with timber
MWG Masonry wall glued and plugged
MW Masonry wall
nsi Invisible
si Visible
Be Concrete
STEICO Detail catalog - Contents
4. Level
Area
1 DPC
2 External wall / System transitions
3 Window / Door
Wall
4 Rollo
5 Raffstore & window blind
6 Roof / System transitions
7 Ceiling / System transitions
1 Ridge
2 Eaves
3 Verge
Roof
4 Rooflight
5 Element joint
6 Collar tie connection
7 Connections
STEICO Detail catalog ‐ Contents
External wall (AW)
ETICS (WDVS)
Timber frame construction (HRB)
DPC
AW‐WDVS‐HRB‐1‐10 DPC ‐ Level threshold ‐ Continuous render layer, Page 12
Variation for pre‐assemble elements
AW‐WDVS‐HRB‐1‐20 DPC ‐ Elevated threshold ‐ Splashback free Page 13
AW‐WDVS‐HRB‐1‐30 DPC ‐ Level threshold, reduced splashback zone Page 14
AW‐WDVS‐HRB‐1‐40 DPC ‐ Level threshold, grating (terrace) Page 15
AW‐WDVS‐HRB‐1‐50 DPC ‐ Basement ceiling in timber construction Page 16
AW‐WDVS‐HRB‐1‐60 DPC ‐ Wood fibre in splash zone (tanking slurry) Page 17
AW‐WDVS‐HRB‐1‐70 DPC ‐ lower edge threshold min. 15 cm over terrain Page 18
top edge (gravel bed)
AW‐WDVS‐HRB‐1‐80 DPC ‐ Solid wood wall min. 15 cm over terrain Page 19
top edge (min. 2% fall)
External wall / System transitions
External wall ‐ Transitions ‐ Outside corner with Page 20
AW‐WDVS‐HRB‐2‐10 STEICO LVL R edge beam
AW‐WDVS‐HRB‐2‐20 External wall ‐ Transitions ‐ Outside corner Page 21
STEICOwall edge beam
AW‐WDVS‐HRB‐2‐30 External wall ‐ Transitions ‐ Inside corner with Page 22
STEICO LVL R edge beam
AW‐WDVS‐HRB‐2‐40 External wall ‐ Transitions ‐ Inside corner with Page 23
STEICOwall edge beam
AW‐WDVS‐HRB‐2‐50 External wall ‐ Transitions ‐ Internal wall connection Page 24
AW‐WDVS‐HRB‐2‐60 External wall ‐ Transitions ‐ Building party wall Page 25
flash over zone
AW‐WDVS‐HRB‐2‐90 External wall ‐ Transitions ‐ Element joint vertical Page 26
AW‐WDVS‐HRB‐2‐100 External wall ‐ Transitions ‐ Expansion joint Page 27
AW‐WDVS‐HRB‐2‐110 External wall ‐ Transitions ‐ Balcony, integrated Page 28
balcony in ETICS
Window / Door
AW‐WDVS‐HRB‐3‐10 Window ‐ Side connection with reveal board, Page 29
horizontal section
AW‐WDVS‐HRB‐3‐20 Window ‐ Upper connection with reveal board, Page 30
vertical section
AW‐WDVS‐HRB‐3‐30 Window ‐ Bottom connection with reveal board, Page 31
vertical section
AW‐WDVS‐HRB‐3‐40 Doors ‐ Vertical section with reveal board ‐ Level threshold Page 32
STEICO Detail catalog ‐ Contents
Roller blind
AW‐WDVS‐HRB‐4‐10 Roller blind ‐ Window ‐ Horizontal section with reveal board Page 33
AW‐WDVS‐HRB‐4‐20 Roller blind ‐ Window ‐ Upper connection, vertical section Page 34
AW‐WDVS‐HRB‐4‐30 Roller blind ‐ Doors ‐ Vertical section with reveal board ‐ Page 35
Level threshold
Raffstore & window blind
Page 36
AW‐WDVS‐HRB‐5‐10 Raffstore ‐ Window ‐ Horizontal section with reveal board
AW‐WDVS‐HRB‐5‐20 Raffstore ‐ Window ‐ Upper connection with reveal board, Page 37
vertical section
AW‐WDVS‐HRB‐5‐30 Raffstore ‐ Doors ‐ Vertical section with reveal board ‐ Level Page 38
threshold (balcony)
Roof / System transitions
AW‐WDVS‐HRB‐6‐10 Roof ‐ Transitions ‐ Eaves, STEICO LVL projecting roof board Page 39
(without rafter doubling)
AW‐WDVS‐HRB‐6‐20 Roof ‐ Transitions ‐ Eaves, above rafter insulation, ETICS on Page 40
blocking panels
AW‐WDVS‐HRB‐6‐30 Roof ‐ Transitions ‐ Eaves, solid wood rafter, ETICS between Page 41
the rafter
AW‐WDVS‐HRB‐6‐40 Roof ‐ Transitions ‐ Eaves, solid wood rafter with blocking Page 42
panels
AW‐WDVS‐HRB‐6‐50 Roof ‐ Transitions ‐ Eaves, with end timber (element Page 43
assembly)
AW‐WDVS‐HRB‐6‐60 Roof ‐ Transitions ‐ Eaves, STEICO LVL projecting roof board Page 44
(without rafter doubling)
AW‐WDVS‐HRB‐6‐70 Roof ‐ Transitions ‐ Verge, visible projecting roof rafter, Page 45
above rafter insulation
AW‐WDVS‐HRB‐6‐80 Roof ‐ Transitions ‐ Verge, with end timber (element Page 46
assembly)
AW‐WDVS‐HRB‐6‐90 Roof ‐ Transitions ‐ Gable cheek, continuous wall Page 47
AW‐WDVS‐HRB‐6‐100 Roof ‐ Transitions ‐ Connection to single pitch roof without Page 48
rear ventilation
Ceiling / System transitions
AW‐WDVS‐HRB‐7‐10 Ceiling ‐ Transitions ‐ Continuous render layer ‐ Fiber belt Page 49
AW‐WDVS‐HRB‐7‐20 Ceiling ‐ Transitions ‐ Transition to rear ventilated facade Page 50
STEICO Detail catalog ‐ Contents
External wall (AW)
ETICS (WDVS)
CLT wall (MH)
DPC
AW‐WDVS‐MH‐1‐10 DPC ‐ New build ‐ Heated basement ‐ Ground level below top Page 52
edge of concrete ceiling
AW‐WDVS‐MH‐1‐20 DPC ‐ CLT wall min. 15 cm over terrain top edge (min. 2% fall) Page 53
Window / Door
AW‐WDVS‐MH‐3‐10 Window ‐ Side connection with reveal board, horizontal Page 55
section
AW‐WDVS‐MH‐3‐20 Window ‐ Upper connection with reveal board, vertical Page 56
section
AW‐WDVS‐MH‐3‐30 Window ‐ Bottom connection with reveal board, vertical Page 57
section
Roof / System transitions
AW‐WDVS‐MH‐6‐10 Roof ‐ Transitions ‐ Eaves, above rafter insulation, ETICS on Page 58
blocking panels
AW‐WDVS‐MH‐6‐20 Roof ‐ Transitions ‐ Eaves, solid wood rafter, ETICS between Page 59
the rafter
AW‐WDVS‐MH‐6‐30 Roof ‐ Transitions ‐ Eaves, solid wood rafter with blocking Page 60
panels
AW‐WDVS‐MH‐6‐40 Roof ‐ Transitions ‐ Eaves, CLT element, ETICS on blocking Page 61
panels
AW‐WDVS‐MH‐6‐50 Roof ‐ Transitions ‐ Verge, visible projecting roof rafter Page 62
STEICO Detail catalog ‐ Contents
External wall (AW)
ETICS (WDVS)
Masonry wall with timber (MWHU)
DPC
AW‐WDVS‐MWHU‐1‐10 DPC ‐ Level threshold, continuous render layer Page 64
AW‐WDVS‐MWHU‐1‐20 DPC ‐ Elevated threshold (splashback free) Page 65
AW‐WDVS‐MWHU‐1‐30 DPC ‐ Level threshold, grating (terrace) Page 66
AW‐WDVS‐MWHU‐1‐40 DPC ‐ Lower edge threshold min. 15 cm over terrain top edge
(gravel bed) Page 67
External wall / System transitions
AW‐WDVS‐MWHU‐2‐10 External wall ‐ Transitions ‐ Outside corner with STEICOwall
edge beam Page 68
AW‐WDVS‐MWHU‐2‐20 External wall ‐ Transitions ‐ Inside corner with STEICOwall
edge beam Page 69
AW‐WDVS‐MWHU‐2‐30 External wall ‐ Transitions ‐ Expansion joint Page 70
Window / Door
AW‐WDVS‐MWHU‐3‐10 Window ‐ Side connection with reveal board, horizontal Page 71
section
AW‐WDVS‐MWHU‐3‐20 Window ‐ Bottom connection with reveal board, vertical Page 72
section
Raffstore & window blind
AW‐WDVS‐MWHU‐5‐10 Raffstore ‐ Window ‐ Upper connection with reveal board, Page 73
vertical section
Roof / System transitions
AW‐WDVS‐MWHU‐6‐10 Roof ‐ Transitions ‐ Eaves, solid wood rafter with blocking Page 74
panels
AW‐WDVS‐MWHU‐6‐20 Roof ‐ Transitions ‐ Verge, visible projecting roof rafter Page 75
Ceiling / System transitions
AW‐WDVS‐MWHU‐7‐10 Ceiling ‐ Transitions ‐ I‐Joist joint horizontal Seite 76
STEICO Detail catalog ‐ Contents
External wall (AW)
ETICS (WDVS)
Masonry wall glued and plugged (MWG)
DPC
AW‐WDVS‐MWG‐1‐10 DPC ‐ New build ‐ Heated basement ‐ Ground level below top Page 78
edge of concrete ceiling
AW‐WDVS‐MWG‐1‐20 DPC ‐ New build ‐ Heated basement ‐ Ground level on top Page 79
edge of concrete ceiling
AW‐WDVS‐MWG‐1‐30 DPC ‐ Existing ‐ Un‐heated basement ‐ Ground level below Page 80
top edge of concrete ceiling
Window / Door
AW‐WDVS‐MWG‐3‐10 Window ‐ New build ‐ Side connection with reveal board, Page 81
horizontal section
AW‐WDVS‐MWG‐3‐20 Window ‐ New build ‐ Upper connection with reveal board, Page 82
vertical section
AW‐WDVS‐MWG‐3‐30 Window ‐ New building ‐ Bottom connection with reveal Page 83
board, vertical section
STEICO Detail catalog ‐ Contents
Roof (DA)
Pitched roof (SD)
Between rafter insulation (ZSD)
First
DA‐SD‐ZSD‐1‐10 Ridge ‐ Sloped purlin ‐ Element assembly with fixing point Page 85
DA‐SD‐ZSD‐1‐20 Ridge ‐ Rectangular purlin ‐ Element assembly Page 86
DA‐SD‐ZSD‐1‐30 Ridge ‐ Side connection with metal sheet Page 87
Eaves
AW‐WDVS‐HRB‐6‐10 Roof ‐ Transitions ‐ Eaves, STEICO LVL projecting roof board Page 88
(without rafter doubling)
AW‐WDVS‐HRB‐6‐30 Roof ‐ Transitions ‐ Eaves, solid wood rafter, ETICS between Page 89
the rafter
AW‐WDVS‐HRB‐6‐40 Roof ‐ Transitions ‐ Eaves, solid wood rafter with blocking Page 90
panels
AW‐WDVS‐HRB‐6‐50 Roof ‐ Transitions ‐ Eaves, with end timber (element Page 91
assembly)
AW‐WDVS‐MH‐6‐20 Roof ‐ Transitions ‐ Eaves, solid wood rafter, ETICS between Page 92
the rafter
AW‐WDVS‐MH‐6‐30 Roof ‐ Transitions ‐ Eaves, solid wood rafter with blocking Page 93
panels
AW‐WDVS‐MWHU‐6‐10 Roof ‐ Transitions ‐ Eaves, solid wood rafter with blocking Page 94
panels
Verge
AW‐WDVS‐HRB‐6‐60 Roof ‐ Transitions ‐ Eaves, STEICO LVL projecting roof board Page 95
(without rafter doubling)
AW‐WDVS‐HRB‐6‐80 Roof ‐ Transitions ‐ Verge, with end timber (element Page 96
assembly)
AW‐WDVS‐MH‐6‐50 Roof ‐ Transitions ‐ Verge, visible projecting roof rafter Page 97
AW‐WDVS‐MWHU‐6‐20 Roof ‐ Transitions ‐ Verge, visible projecting roof rafter Page 98
DFF
DA‐SD‐ZSD‐4‐10 Rooflight ‐ Trimmer connection with metalwork Page 99
DA‐SD‐ZSD‐4‐20 Rooflight ‐ Trimmer connection without metalwork Page 100
Element joint
DA‐SD‐ZSD‐5‐10 Element joint ‐ Roof element joint Page 101
Kehlbalkenanschluss
DA‐SD‐ZSD‐6‐10 Collar tie connection Page 102
Connections
AW‐WDVS‐HRB‐6‐90 Roof ‐ Transitions ‐ Gable cheek, continuous wall Page 103
AW‐WDVS‐HRB‐6‐100 Roof ‐ Transitions ‐ Connection to single pitch roof without Page 104
rear ventilation
STEICO Detail catalog ‐ Contents
Roof (DA)
Pitched roof (SD)
Above rafter insulation (AD)
First
DA‐SD‐ADD‐1‐10 Ridge ‐ Purlin roof truss Page 106
Eaves
AW‐WDVS‐MH‐6‐10 Roof ‐ Transitions ‐ Eaves, above rafter insulation, ETICS on Page 107
blocking panels
AW‐WDVS‐MH‐6‐40 Roof ‐ Transitions ‐ Eaves, CLT element, ETICS on blocking Page 108
panels
AW‐WDVS‐HRB‐6‐20 Roof ‐ Transitions ‐ Eaves, above rafter insulation, ETICS on Page 109
blocking panels
Verge
AW‐WDVS‐HRB‐6‐70 Roof ‐ Transitions ‐ Verge, visible projecting roof rafter, Page 110
above rafter insulation
DFF
DA‐SD‐ADD‐4‐10 Rooflight Page 111
Connections
DA‐SD‐ADD‐7‐10 Fixed with dual threaded screws, v‐screwing, above rafter Page 112
insulation
DA‐SD‐ADD‐7‐20 Fixed with single thread screw, above rafter insulation Page 113
DA‐SD‐ADD‐7‐30 Rafter doubling with STEICO joist, above rafter insulation Page 114
DA‐SD‐ADD‐7‐40 Valley ‐ Purlin roof truss Page 115
Legend of hatching Page 116
Legend of profile Page 117
External wall - ETICS -
Timber frame construction
Wall construction
(from inside to outside)
Outside Inside
10 cm
3
> 0.100
17
30 cm
0.300
min.
4 16 14 15
11
5
≥ 150cm
6
≥ 50cm
12 13
Sufficient drainage
8
≥0.292
30 cm
10
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 STEICOmulti fill
- OSB, airtight tape 2 Additional mesh tape with sufficient coverage
- STEICOflex/ zell/ floc to ensure surface re-inforcement
STEICOwall 3 Cement bonded board
- STEICOprotect/ STEICOprotect dry 4 EPS insulation with textured surface
- Approved plaster system 5 Sealing in accordance with DIN 18195-4, taken to the inside
6 DPC edge profile
7 Below DPC render in accordance with render recommendation,
in ground environment with flexible, mineral render sealing
8 Gravel bed, grain size min. 16/32
9 Perimeter insulation
10 Building weathering protection, min. 15 cm above ground level
11 STEICO LVL Laminated Veneer Lumber
12 Swelling mortar
13 Bituminous sheeting
14 STEICOtherm/ STEICObase
15 Wet screed
16 STEICOsoundstrip
17 Airtight tape
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
DPC - Level threshold, continuous render layer, variation for pre-assemble elements
Datum: 12.03.2015 Detailnummer: AW-WDVS-HRB-1-10
Änderung: 22.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 5.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
Outside Inside
13
12 11
7
1 2 10
3 9
zone min. 30 cm
8
≤ 40 mm0
(DIN 4108 Bbl. 2)
Splash water 0.309
Legend:
1 DPC edge profile
2 Joint sealing tape
3 Trowelled joist
4 Below DPC render in accordance
Sufficient drainage with render recommendation,
in ground environment with flexible,
mineral render sealing
5 Building weathering protection
min. 15 cm above ground level
Wall construction 6 Perimeter insulation
(from inside to outside) 7 STEICO LVL Laminated Veneer
- Plasterboard Lumber
- OSB, airtight tape 8 Swelling mortar
- STEICOflex/ zell/ floc 9 Bituminous sheeting
STEICOwall 10 STEICOtherm/ STEICObase
- STEICOprotect/ STEICOprotect dry 11 Wet screed
- Approved plaster system 12 STEICOsoundstrip
13 Airtight tape
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside Inside
10 cm
3
> 0.100
17
30 cm
0.300
min.
4 16 14 15
11
5
≥ 150cm
6
≥ 50cm
12 13
Sufficient drainage
8
≥0.292
30 cm
10
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 STEICOmulti fill
- OSB, airtight tape 2 Additional mesh tape with sufficient coverage
- STEICOflex/ zell/ floc to ensure surface re-inforcement
STEICOwall 3 Cement bonded board
- STEICOprotect/ STEICOprotect dry 4 EPS insulation with textured surface
- Approved plaster system 5 Sealing in accordance with DIN 18195-4
6 DPC edge profile
7 Below DPC render in accordance with render recommendation,
in ground environment with flexible, mineral render sealing
8 Gravel bed, grain size min. 16/32
9 Perimeter insulation
10 Building weathering protection, min.15 cm above ground level
11 STEICO LVL Laminated Veneer Lumber
12 Swelling mortar
13 Bituminous sheeting
14 STEICOtherm/ STEICObase
15 Wet screed
16 STEICOsoundstrip
17 Airtight tape
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
0 cm
14
≥ 10
1 2
0 cm
≤ 40 mm
≥ 15
0
(DIN 4108 Bbl. 2)
6
4
5 13
11
≥ 300cm
15 cm
≥ 0.114
10 12
8
Sufficient drainage
≥ 300 cm 9
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 DPC edge profile
- OSB, airtight tape 2 Joint sealing tape
- STEICOflex/ zell/ floc 3 Cement bonded board
STEICOwall 4 Perimeter insulation
- STEICOprotect/ STEICOprotect dry 5 Sealing in accordance with DIN 18195-4
- Approved plaster system 6 Grating
7 Below DPC render in accordance with render recommendation in
ground enviroment with flexible, mineral render sealing
8 Gravel bed, grain size min. 16/32 mm
9 Building weathering protection, min. 15 cm above ground level
10 Swelling mortar
11 STEICO LVL Laminated Veneer Lumber
12 Bituminous sheeting
13 STEICOsoundstrip
14 Airtight tape
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside Inside
12
11
2 10
≤ 40 mm 0
(DIN 4108 Bbl. 2)
30 cm
min.0.300
9 9
4
8
7
Sufficient drainage
Outside Inside
10 cm
> 0.100
17
30 cm
3
0.300
min.
16 14 15
11
4
≥ 150cm
5
6
12 13
7
Sufficient drainage
8
≥0.292
30 cm
10
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 STEICOprotect/ STEICOprotect dry
- OSB, airtight tape 2 Re-inforced render including mesh with water repellent highly cured,
- STEICOflex/ zell/ floc cementitious tanking membrane
STEICOwall 3 Cement bonded board
- STEICOprotect/ STEICOprotect dry 4 Sealing in accordance with DIN 18195-4, taken to the inside
- Approved plaster system 5 DPC edge profile
6 Trowelled joist
7 Below DPC render in accordance with render recommendation
in ground enviroment with flexible, mineral render sealing
8 Gravel bed, grain size min. 16/32
9 Perimeter insulation
10 Building weathering protection, min. 15 cm above ground level
11 STEICO LVL Laminated Veneer Lumber
12 Swelling mortar
13 Bituminous sheeting
14 STEICOtherm/ STEICObase
15 Wet screed
16 STEICOsoundstrip
17 Airtight tape
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside Inside
16
≥0.300
30 cm
15 14 13
11
2 3
15 cm
4
≥ 0.150
12
≤ 40 mm0 10
(DIN 4108 Bbl. 2)
6
5
Sufficient drainage 7
8
≥0.252
15 cm 9
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 In splash water zone (up to min. 30 cm over ground level)
- OSB, airtight tape apply cementitious tanking slurry as moisture protection layer
- STEICOflex/ zell/ floc between upper and lower render
STEICOwall 2 DPC edge profile
- STEICOprotect/ STEICOprotect dry 3 Joint sealing tape
- Approved plaster system 4 Trowelled joist
5 Below DPC render in accordance with render recommendation
in ground enviroment with flexible, mineral render sealing
6 Garden edging
7 Gravel bed, grain size min. 16/32
8 Perimeter insulation
9 Building weathering protection, min. 15 cm above ground level
10 Swelling mortar
11 STEICO LVL Laminated Veneer Lumber
12 Bituminous sheeting
13 STEICOtherm/ STEICObase
14 Wet screed
15 STEICOsoundstrip
16 Airtight tape
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
DPC - Lower edge threshold min. 15 cm over terrain top edge (gravel bed)
Datum: 12.03.2015 Detailnummer: AW-WDVS-HRB-1-70
Änderung: 22.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 5.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
Outside Inside
16
1
15 14 13
11
2 3
4
15 cm
12
≥0.151
≤ 40 mm
0
(DIN 4108 Bbl. 2) 10
5
7
6
Fall min. 2%
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 In splash water zone (up to min. 30 cm over ground level)
- OSB, airtight tape apply cementitious tanking slurry as moisture protection layer
- STEICOflex/ zell/ floc upper and lower render
STEICOwall 2 DPC edge profile
- STEICOprotect/ STEICOprotect dry 3 Joint sealing tape
- Approved plaster system 4 Trowelled joist
5 Below DPC render in accordance with render recommendation,
in ground enviroment with flexible, mineral render sealing
6 Terrain top edge
7 Finished floor covering (= water-carrying layer) min. 2% fall
8 Perimeter insulation
9 Building weathering protection, min. 15 cm above ground level
10 Swelling mortar
11 STEICO LVL Laminated Veneer Lumber
12 Bituminous sheeting
13 STEICOtherm/ STEICObase
14 Wet screed
15 STEICOsoundstrip
16 Airtight tape
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
DPC - Lower edge threshold min. 15 cm over terrain top edge (min. 2% fall)
Datum: 12.03.2015 Detailnummer: AW-WDVS-HRB-1-80
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 5.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
Outside
3 2 1
Inside
5
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 Mesh corner angle
- OSB, airtight tape 2 STEICOmulti fill glueing optional
- STEICOflex/ zell/ floc 3 Square cut joint
STEICOwall 4 STEICO LVL R Laminated Veneer Lumber
- STEICOprotect/ STEICOprotect dry 5 Pre designed fixing point. Site filled with STEICOflex.
- Approved plaster system Opening should be made airtight with vapour control layer
6 STEICOmulti tape
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
External wall - Transitions - Outside corner with STEICO LVL R edge beam
Datum: 20.03.2015 Detailnummer: AW-WDVS-HRB-2-10
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 5.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
Outside
3 2 1
Inside
5
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 Mesh corner angle
- OSB, airtight tape 2 STEICOmulti fill glueing optional
- STEICOflex/ zell/ floc 3 Square cut joint
STEICOwall 4 STEICOwall I-Joist
- STEICOprotect/ STEICOprotect dry 5 Pre designed fixing point. Site filled with STEICOflex.
- Approved plaster system Opening should be made airtight with vapour control layer
6 STEICOmulti tape
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Inside
1 2
Detail A
5
4
Outside
Legend:
1 STEICOmulti tape
5 2 Corner angle
3 STEICO LVL R Laminated Veneer Lumber
4 STEICOflex
5 Expansion joint profile
4 Wall construction
(from inside to outside)
- Plasterboard
- OSB, airtight tape
- STEICOflex/ zell/ floc
STEICOwall
- STEICOprotect/ STEICOprotect dry
- Approved plaster system
Detail A, M 1:2,5
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
External wall -Transitions - Inside corner with STEICO LVL R edge beam
Datum: 20.03.2015 Detailnummer: AW-WDVS-HRB-2-30
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 5.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
Inside
1 2
Detail A
5
4
Outside
Legend:
1 STEICOmulti tape
5 2 Corner angle
3 STEICOwall I-Joist
4 STEICOflex
5 Expansion joint profile
4 Wall construction
(from inside to outside)
- Plasterboard
- OSB, airtight tape
- STEICOflex/ zell/ floc
STEICOwall
- STEICOprotect/ STEICOprotect dry
- Approved plaster system
Detail A, M 1:2,5
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside Inside
2
1
Detail A
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside Inside
Outside Inside
3 4 5
1 2
Detail A
Outside
1
3
Inside
External wall construction
(from inside to outside) Legend:
- Plasterboard 1 STEICOsecure joint profile,
- OSB, airtight tape up to 12 mm flexible
- STEICOflex/ zell/ floc 2 Web insulation
STEICOwall 3 STEICOmulti tape
- STEICOprotect/ STEICOprotect dry
- Approved plaster system
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside Inside
1
1 2
5 cm
0.050
3 4
Fall min. 2%
≥
14
16
13
15
12
5 6
9 10
8
11
Balcony construction
(from top to bottom) Legend:
- Wooden flooring 30 mm 1 Joint sealing tape
- Support batten 40 mm 2 Metal sheet upstand
- Drainage mat 3 Drainage channel cover, height adjustable
- EPDM- Sealing membrane 4 Protective plate in front of seal
- Timber based panel product Ceiling construction 5 Coated aluminium dovetail connector
visible 6 Glulam rimboard
(from top to bottom) 7 STEICOtherm as core insulation
- Joist location
- Floor covering 8 Anchorage above angle connector
Wall construction - Dry screed 25 mm 9 Drip edge
(from inside to outside) - STEICOtherm/ 10 Joint sealing tape
- Plasterboard STEICObase 40 mm 11 Trowelled joist
- OSB, airtight tape - Timber based panel 12 Vapour barrier in connection areas
- STEICOflex/ zell/ floc product (OSB) 13 STEICO LVL Laminated Veneer Lumber
STEICOwall - STEICOjoist 14 Airtight window installation (DIN 4108-7)
- STEICOprotect/ + STEICOflex 120 mm 15 STEICOflex 240 mm in connection area
STEICOprotect dry - Trickle protection 16 Insulation wedge
- Approved plaster system - Batten
- Plasterboard
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
0.022mm
ca. 18-22 Outside
6
8
Recommendation
0
7 30-50 mm
1
9
2
1
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 STEICOmulti tape
- OSB, airtight tape 2 STEICObase
- STEICOflex/ zell/ floc
STEICOwall
- STEICOprotect/ STEICOprotect dry
3
4
5
Seprerating strips
AN 100 mesh profile for plastering over
STEICOprotect H reveal board 20 mm
Inside
- Approved plaster system 6 End profile for ETICS suitable
7 Surface mesh
8 Aluminium window sill
9 Window sill inside
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Inside Outside
5 6
1
4
2 3
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 STEICOmulti tape
- OSB, airtight tape 2 STEICObase
- STEICOflex/ zell/ floc 3 Seprerating strips
STEICOwall 4 AN 100 mesh profile for plastering over
- STEICOprotect/ STEICOprotect dry 5 STEICOprotect H reveal board 20 mm
- Approved plaster system 6 Drip edge profile
7 Surface mesh
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Inside Outside
1 5 6 8 8
2 7
1
4
10
9
1
Recommendation
0.046
30-50 mm
3
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 STEICOmulti tape
- OSB, airtight tape 2 Window sill inside
- STEICOflex/ zell/ floc 3 Web insulation
STEICOwall 4 STEICOmulti UDB
- STEICOprotect/ STEICOprotect dry 5 STEICOfix wood fibre insulation fillet
- Approved plaster system 6 Bonded membrane on insulation fillet
7 Aluminium window sill
8 Joint sealing tape
9 Parapet profile
10 STEICOmulti fill glueing
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside Inside
1
Recommendation
0
30-50 mm
1 2 1 3 4 5
5
6
5 cm
≥0.061
Juliet balcony
8
10
14 15
11
12
13
10
Legend:
Note:
1 Joint sealing tape
To position 11: 2 Aluminium window sill
The so-called "fiber" belt is inserted exact on site. 3 STEICOfix wood fibre insulation fillet
The board joint should be sanded after installation. 4 Bonded membrane on insulation fillet
5 STEICOmulti tape
Airtight window installation (DIN 4108-7)
Wall construction Ceiling construction 6 STEICOmulti UDB
(from inside to outside) (from top to bottom) 7 Parapet profile
- Plasterboard - Floor covering 8 STEICOtherm as edge side
- OSB, airtight tape - Dry screed 25 mm insolation
- STEICOflex/ zell/ floc - STEICOtherm/ 9 Vapour barrier in connection areas
STEICOwall STEICObase 40 mm 10 STEICO LVL Laminated Veneer Lumber
- STEICOprotect/ - Timber based panel 11 STEICOprotect/ STEICOprotect dry fitting piece,
STEICOprotect dry product (OSB) adjusted on site
- Approved plaster system - STEICOjoist 12 Additional mesh tape with sufficient coverage
+ STEICOflex 120 mm to ensure surface re-inforcement
- Trickle protection 13 STEICOmulti fill
- Batten 14 Tension and compression resistant connection
- Plasterboard (to structural requirements)
15 STEICOflex 240 mm in connection area
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
ca. 18-22
0.027 mm Outside
8
Recommendation
0
9 30-50 mm
7 10
13
12
6 5
11
3
2
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 Airtight window installation (DIN 4108-7)
- OSB, airtight tape 2 Corner angle
3 STEICObase
- STEICOflex/ zell/ floc
STEICOwall
- STEICOprotect/ STEICOprotect dry
4
5
Seprerating strips
Clean finish render stop bead
Inside
- Approved plaster system 6 Joint sealing tape
7 STEICOprotect H reveal board
8 End profile for ETICS suitable
9 Surface mesh
10 Aluminium window sill
11 Window sill inside
12 Roller blind guide rail
13 Reinforced rollerblind
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Inside
10
2 4 5 6
Wall construction 8 9
(from inside to outside)
- Plasterboard
- OSB, airtight tape 7
- STEICOflex/ zell/ floc
STEICOwall
- STEICOprotect/ STEICOprotect dry
- Approved plaster system
Legend:
1 Airtight window installation (DIN 4108-7)
2 Corner angle
3 STEICObase
4 Seprerating strips
5 Joint sealing tape
6 Access panel
7 Guide rail
8 Galvanised steel, powder coated
9 DPC level mounting profile
10 STEICOmulti fill glueing
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside 1
15 cm
≥0.150
4
3
Fall min. 2%
4 4 5 16
6
7
8
30 cm
≥0.300
Recommendation
0
30-50 mm 13 14 15
15 cm
≥ 0.149
9
10
11
12
Sufficient drainage
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 Roller blind guide rail
- OSB, airtight tape 2 DPC edge profile, change of material
- STEICOflex/ zell/ floc see Detail AW-WDVS-HRB-1-40
STEICOwall 3 Grating
- STEICOprotect/ STEICOprotect dry 4 Joint sealing tape
- Approved plaster system 5 Sealing in accordance with DIN 18195
Building weathering protection
6 STEICOfix insulation fillet
7 Aluminium window sill
8 Parapet profile
9 Below DPC render in accordance with render recommendation
in ground enviroment with flexible, mineral render sealing
10 Gravel bed, grain size min. 16/32 mm
11 Perimeter insulation
12 Building weathering protection, min. 15 cm above ground level
13 Cement bounded board
14 Swelling mortar
15 STEICOsoundstrip
Important Note: 16 Airtight window installation (DIN 4108-7)
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Roller blind - Doors - Vertical section with reveal board - Level threshold
Datum: 12.03.2015 Detailnummer: AW-WDVS-HRB-4-30
Änderung: 11.06.2019 Bearbeiter: A. Luz Maßstab: 1 : 5.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
ca. 18-22
0.027 mm Outside
8
Recommendation
0
9 30-50 mm
10
7
13
12
6 5
11
1
3
2
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 Airtight window installation (DIN 4108-7)
- OSB, airtight tape 2 Corner angle
- STEICOflex/ zell/ floc
STEICOwall
- STEICOprotect/ STEICOprotect dry
3
4
5
STEICObase
Seprerating strips
Clean finish render stop bead
Inside
- Approved plaster system 6 Joint sealing tape
7 STEICOprotect H reveal board
8 End profile for ETICS suitable
9 Surface mesh
10 Aluminium window sill
11 Window sill inside
12 Raffstore- guide rail
13 Raffstore- lamella
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Inside Outside
10
7 7
1
9
3
2
6
3 4 8
5
11
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 Airtight window installation (DIN 4108-7)
- OSB, airtight tape 2 Corner angle
- STEICOflex/ zell/ floc 3 STEICObase
STEICOwall 4 Seprerating strips
- STEICOprotect/ STEICOprotect dry 5 Joint sealing tape
- Approved plaster system 6 Raffstore
7 STEICOprotect H reveal board
8 DPC edge profile
9 STEICOmulti fill glueing
10 Surface mesh
11 Raffstore-guide rail
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside Inside
17
1
1 2
5 cm
0.050
Fall min. 2% 3 4
≥
14
16
13
15
12
5 6
9 10
8
11
Balcony construction
(from top to bottom) Legend:
- Wooden flooring 30 mm 1 Joint sealing tape
- Support batten 40 mm 2 Metal sheet upstand
- Drainage mat 3 Drainage channel cover, height adjustable
- EPDM membrane 4 Protective plate in front of seal
- Timber based panel product 5 Coated aluminium dovetail connector
Ceiling construction 6 Glulam rimboard
visible (from top to bottom)
- Joist location 7 STEICOtherm as core insulation
- Floor covering 8 Anchorage above angle connector
Wall construction - Dry screed 25 mm 9 Drip edge
(from inside to outside) - STEICOtherm/ 10 Joint sealing tape
- Plasterboard STEICObase 40 mm 11 Trowelled joist
- OSB, airtight tape - Timber based panel product 12 Vapour barrier in connection areas
- STEICOflex/ zell/ floc (OSB) 13 STEICO LVL Laminated Veneer Lumber
STEICOwall - STEICOjoist 14 Airtight window installation (DIN 4108-7)
- STEICOprotect/ + STEICOflex 120 mm 15 STEICOflex 240 mm in connection area
STEICOprotect dry - Trickle protection 16 Insulation wedge
- Approved plaster system - Batten 17 Raffstore- guide rail
- Plasterboard
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Raffstore - Doors - Vertical section with reveal board - Level threshold (balcony)
Datum: 02.04.2015 Detailnummer: AW-WDVS-HRB-5-30
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 5.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
12
11
10
Outside
2
1
4 5
7
Inside
8
3
6
Roof - Transitions - Eaves, STEICO LVL projecting roof board (without rafter doubling)
Datum: 02.04.2015 Detailnummer: AW-WDVS-HRB-6-10
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 7.5
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
7 8
3 4
5
1
2 9
11
10
6
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
3
4
5
1
2 6
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Roof - Transitions - Eaves, solid wood rafter, ETICS between the rafter
Datum: 02.04.2015 Detailnummer: AW-WDVS-HRB-6-30
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 7.5
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
7
3
4
1
2 6
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
8
3
4
1
2 7
6
5
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Detail A 4
1 2
5
3 9
10 7
4 5
1
Detail A, M 1:2,5
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Roof - Transitions - Eaves, STEICO LVL projecting roof board (without rafter doubling)
Datum: 02.04.2015 Detailnummer: AW-WDVS-HRB-6-60
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 7.5
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
1
2
3
4
5 8
9
6
10
7
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Roof - Transitions - Verge, visible projecting roof rafter, above rafter insulation
Datum: 02.04.2015 Detailnummer: AW-WDVS-HRB-6-70
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 7.5
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
1 8
2
3
4 6
7
5
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
4
Detail A
5
15 cm
0.185
min.
6
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Inside Outside
1
15 cm
0.162
2
min.
3
5
4
9
10
Outside Inside
6 8
1
5
9
6
3
Note:
To position 2:
The so-called "fiber belt" is inserted exact on site.
The board joint should be sanded after installation.
Legend:
1 STEICOmulti fill
2 STEICOprotect/ STEICOprotect dry fitting piece,
adjusted on site
Wall construction Ceiling construction 3 STEICOtherm as edge side insulation
(from inside to outside) (from top to bottom) 4 Additional mesh tape with sufficient coverage
- Plasterboard - Floor covering to ensure surface re-inforcement
- OSB, airtight tape - Dry screed 25 mm 5 Vapour barrier in connection areas
- STEICOflex/ zell/ floc - STEICOtherm/ 6 STEICO LVL Laminated Veneer Lumber
STEICOwall STEICObase 40 mm 7 Tension and compression resistant connection
- STEICOprotect/ - timber based panel product (to structural requirements)
STEICOprotect dry (OSB) 8 Taping, airtight connection
- Approved plaster system - STEICOjoist + STEICOflex 9 STEICOflex 120 mm
- Trickle protection
- Batten
- Plasterboard
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside Inside
6 9
7 8
10
6
1
2
3
5
4
Wall construction
(from inside to outside)
Outside Inside
16
15
14
13
1 2
3 11 12
zone min. 30 cm
10
≤ 40 mm0
(DIN 4108 Bbl. 2)
0.309
Splash water
5
5 cm
≥0.050
7 6 9
Sufficient drainage
8
≥ 0.308
30 cm
min. 50 mm taken on
0
Legend:
Wall construction
(from inside to outside) 1 DPC edge profile
2 Joint sealing tape
- Plasterboard 3 Trowelled joist
- CLT wall, 4 Below DPC render in accordance with render recommendation
in connection area airtight tape in ground enviroment with flexible, mineral render sealing
- STEICOprotect/ STEICOprotect dry, 5 Perimeter insulation
fixed with plate washers 6 Flexible, mineral render sealing
- Approved plaster system 7 Gravel bed, grain size min. 16/32
8 Protective layer, e.g. dimpled drainage layer
9 Mortar resin suitable for weathering protection
10 Building weathering protection in accordance with DIN 18195
min. 15 cm above ground level
11 Swelling mortar/ mortar bed
12 Bituminous sheeting
13 STEICOtherm/ STEICObase
14 Wet screed
15 STEICOsoundstrip
Important Note:
16 Airtight tape
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
DPC - New build - Heated basement - Ground level below top edge of concrete ceiling
Datum: 12.03.2015 Detailnummer: AW-WDVS-MH-1-10
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 5.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
Outside Inside
1
17 15
16 14
2 3
4 12 13
15 cm
≥0.151
≤ 40 mm
0
(DIN 4108 Bbl. 2)
5 cm
≥0.050
5
6
Ground level
Fall min. 2%
7
11
10
8
9
min. 50 mm taken on
0
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 In splash water zone (up to min. 30 cm over ground level)
- CLT wall, apply cementitious tanking slurry as moisture protection layer
in connection area airtight tape between upper and lower render
- STEICOprotect/ STEICOprotect dry, 2 DPC edge profile
fixed with plate washers 3 Joint sealing tape
- Approved plaster system 4 Trowelled joist
5 Below DPC render in accordance with render recommendation
in ground enviroment with flexible, mineral render sealing
6 Flexible, mineral render sealing
7 Finished floor covering (= water-carrying layer) min. 2% fall
8 Protective layer, e.g. dimpled drainage layer
9 Perimeter insulation
10 Mortar resin suitable for weathering protection
11 Building weathering protection in accordance with DIN 18195
min. 15 cm above ground level
12 Swelling mortar/ mortar bed
13 Bituminous sheeting
14 STEICOtherm/ STEICObase
15 Wet screed
16 STEICOsoundstrip
17 Airtight tape
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
DPC - CLT wall min. 15 cm over terrain top edge (min. 2% fall)
Datum: 12.03.2015 Detailnummer: AW-WDVS-MH-1-20
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 5.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
Outside 16 Inside
15 14 13
1 2
11 12
3
zone min. 30 cm
500 mm (DIN 4108 Bbl. 2)
≤ 40 mm0
(DIN 4108 Bbl. 2)
Splash water 0.309
5
≥0.500
5 cm
≥0.050
7 6
10
17
Sufficient drainage
8
≥ 0.308
30 cm
9
min. 50 mm taken on
0
Legend:
Wall construction 1 DPC edge profile
(from inside to outside) 2 Joint sealing tape
3 Trowelled joist
- Plasterboard 4 Below DPC render in accordance with render recommendation
- CLT wall, in ground enviroment with flexible, mineral render sealing
in connection area airtight tape 5 Perimeter insulation
- STEICOprotect/ STEICOprotect dry, 6 Flexible, mineral render sealing
fixed with plate washers 7 Gravel bed, grain size min. 16/32
- Approved plaster system 8 Protective layer, e.g. dimpled drainage layer
9 Building weathering protection in accordance with DIN 18195
min. 15 cm above ground level
10 Mortar resin suitable for weathering protection
11 Swelling mortar/ mortar bed
12 Bituminous sheeting
13 STEICOtherm/ STEICObase
14 Wet screed
15 STEICOsoundstrip
16 Airtight tape
17 Basement ceiling insulation in accordance with requirements
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
DPC - Un-heated basement - Ground level below top edge of concrete ceiling
Datum: 12.03.2015 Detailnummer: AW-WDVS-MH-1-30
Änderung: 04.06.2019 Bearbeiter: A. Luz Maßstab: 1 : 5.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
ca. 18-22
0.027 mm
0
10 9
7
12
5
11
1
2
Wall construction
(from inside to outside) Legend:
Inside
- Plasterboard 1 Window sill inside
- CLT wall, 2 STEICObase
in connection area airtight tape 3 Airtight window installation (DIN 4108-7)
- STEICOprotect/ STEICOprotect dry, 4 Seprerating strips
fixed with plate washers 5 AN 100 mesh profile for plastering over
- Approved plaster system 6 STEICOprotect H reveal board
7 Mesh corner angle
8 End profile for ETICS suitable
9 STEICOmulti fill
10 Surface mesh
11 Mounted frame for window connection,
also possible with i-joist
12 Aluminium window sill
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Inside Outside
10
1
4
3
2
5 6 7
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 Corner angle
- CLT wall, 2 STEICObase
in connection area airtight tape 3 Seprerating strips
- STEICOprotect/ STEICOprotect dry, 4 Airtight window installation (DIN 4108-7)
fixed with plate washers 5 AN 100 mesh profile for plastering over
- Approved plaster system 6 STEICOprotect H reveal board
7 Drip edge profile
8 STEICOmulti fill
9 Surface mesh
10 Mounted frame for window connection,
also possible with i-joist
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Inside Outside
1 5 6 7
3 7
8
2 4
Recommendation
0.048
30-50 mm
10
Wall construction
(from inside to outside) Legend:
- Plasterboard 1 Window sill inside
- CLT wall, 2 Airtight window installation (DIN 4108-7)
in connection area airtight tape 3 STEICOmulti tape
- STEICOprotect/ STEICOprotect dry, 4 STEICOmulti UDB
fixed with plate washers 5 STEICOfix wood fibre insulation fillet
- Approved plaster system 6 Bonded membrane on insulation fillet
7 Joint sealing tape
8 Aluminium window sill
9 Parapet profile
10 Mounted frame for window connection,
also possible with i-joist
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
11
3 4
5 10
1
2
6
9
8
4
5
3 7
6
1
2
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Roof - Transitions - Eaves, solid wood rafter, ETICS between the rafter
Datum: 02.04.2015 Detailnummer: AW-WDVS-MH-6-20
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 7.5
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
7
3
4 6
1
2
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
3 4
5 8
1
2 7
6
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
1 2
3 5 6
9
7 8
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Wall construction
(from inside to outside)
Outside
3
16
30 cm
15
0.300
12
14
min.
5
≥ 150cm
11
17
6
≥ 50cm
13
Sufficient drainage
8
≥0.292
30 cm
9 10
Wall construction
(from inside to outside) Legend:
- Render layer 1 STEICOmulti fill
- Masonry wall 2 Additional mesh tape with sufficient coverage
- Render layer to ensure surface re-inforcement
- STEICOwall optional 3 Cement bonded board
solid timber 4 EPS insulation with textured surface
STEICOflex/ zell/ floc 5 Sealing in accordance with DIN 18195-4
- STEICOprotect/ STEICOprotect dry 6 DPC edge profile
- Approved plaster system 7 Below DPC render in accordance with render recommendation
in ground enviroment with flexible, mineral render sealing
8 Gravel bed, grain size min. 16/32
9 Perimeter insulation
10 Building weathering protection, min. 15 cm above ground level
11 Timber based panel product
12 Laminated Veneer Lumber STEICO LVL
for vertical transfer loads
13 Bituminous sheeting
14 STEICOtherm/ STEICObase
15 Wet screed
16 STEICOsoundstrip
17 Mortar levelling layer
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside Inside
8
12 11
1 2 7
13 10
9
3
zone min. 30 cm
≤ 40 mm
0
(DIN 4108 Bbl. 2)
Splash water 0.309
5
6
Sufficient drainage
1 2
0 cm
≤ 40 mm 0
≥ 15
(DIN 4108 Bbl. 2)
4 11 13
5
≥ 300cm
7 10
14
15 cm
12
≥ 0.100
Sufficient drainage
≥ 300 cm
9
Wall construction
(from inside to outside) Legend:
- Render layer 1 DPC edge profile
- Masonry wall 2 Joint sealing tape
- Render layer 3 Cement bonded board
- STEICOwall optional 4 Perimeter insulation
solid timber 5 Sealing in accordance with DIN 18195-4
STEICOflex/ zell/ floc 6 Grating
- STEICOprotect/ STEICOprotect dry 7 Below DPC render in accordance with render recommendation
- Approved plaster system in ground enviroment with flexible, mineral render sealing
8 Gravel bed, grain size min. 16/32 mm
9 Building weathering protection, min. 15 cm above ground level
10 Timber based panel product
11 Laminated Veneer Lumber STEICO LVL
for vertical transfer loads
12 Bituminous sheeting
13 STEICOsoundstrip
Important Note: 14 Mortar levelling layer
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside
1 15
14
≥ 0.300
30 cm 11
13
2 10
3 16
15 cm
12
≥ 0.150
≤ 40 mm
0
6 (DIN 4108 Bbl. 2)
5
Sufficient drainage 7
8
≥ 0.252
15 cm 9
Wall construction
(from inside to outside) Legend:
- Render layer 1 In splash water zone (up to min. 30 cm over ground level)
- Masonry wall apply cementitious tanking slurry as moisture protection layer
- Render layer between upper and lower render
- STEICOwall optional 2 DPC edge profile
solid timber 3 Joint sealing tape
STEICOflex/ zell/ floc 4 Trowelled joist
- STEICOprotect/ STEICOprotect dry 5 Below DPC render in accordance with render recommendation
- Approved plaster system in ground enviroment with flexible, mineral render sealing
6 Garden edging
7 Gravel bed, grain size min. 16/32
8 Perimeter insulation
9 Building weathering protection, min. 15 cm above ground level
10 Timber based panel product
11 Laminated Veneer Lumber STEICO LVL
for vertical transfer loads
12 Bituminous sheeting
13 STEICOtherm/ STEICObase
14 Wet screed
15 STEICOsoundstrip
Important Note:
16 Mortar levelling layer
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
DPC - Lower edge threshold min. 15 cm over terrain top edge (gravel bed)
Datum: 12.03.2015 Detailnummer: AW-WDVS-MWHU-1-40
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 5.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
Outside
1
2
3
Edge distance
0.103
Inside
Wall construction
(from inside to outside) Legend:
- Render layer 1 Mesh corner angle
- Masonry wall 2 STEICOmulti fill glueing
- Render layer 3 Square timber
- STEICOwall optional Broad back staples: min. 6 x 6 cm
solid timber Fixed with plate washers: min. 8 x 8 cm
STEICOflex/ zell/ floc 4 STEICOwall with web insulation
- STEICOprotect/ STEICOprotect dry optional solid timber possible
- Approved plaster system
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Inside
2 1
Detail A 3
Outside
Detail A, M 1:2,5
Wall construction
(from inside to outside) Legend:
- Render layer 1 STEICOflex installed in advance
- Masonry wall 2 STEICOwall with web insulation
- Render layer optional solid timber possible
- STEICOwall optional 3 Expansion joint profile
solid timber 4 STEICOflex
STEICOflex/ zell/ floc
- STEICOprotect/ STEICOprotect dry
- Approved plaster system
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
2 1
Variation 2: with expansion joint in masonry wall
2 1
Wall construction
(from inside to outside) Legend:
- Render layer 1 Expansion joint profile
- Masonry wall up to 12 mm flexible
- Render layer 2 STEICOflex
- STEICOwall optional 3 STEICOwall
solid timber 4 Web insulation
STEICOflex/ zell/ floc
- STEICOprotect/ STEICOprotect dry
- Approved plaster system
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
0
7 30-50 mm
6
9
3
5
2
1
Wall construction
(from inside to outside) Legend:
- Render layer 1 Airtight window installation (DIN 4108-7)
- Masonry wall 2 Window sill inside
- Render layer 3 Fix at the side due to edge distance
- STEICOwall optional
solid timber
STEICOflex/ zell/ floc
4
5
6
AN 100 mesh profile for plastering over
STEICOmulti fill
STEICOprotect H reveal board
Inside
- STEICOprotect/ STEICOprotect dry 7 Mesh corner angle
- Approved plaster system 8 End profile for ETICS suitable
9 Aluminium window sill
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Inside Outside
3 5 6 7 7
1 8
2
4
Wall construction
(from inside to outside) Legend:
- Render layer 1 Window sill inside
- Masonry wall 2 Airtight window installation (DIN 4108-7)
- Render layer 3 STEICOmulti tape
- STEICOwall optional 4 STEICOmulti UDB
solid timber 5 STEICOfix wood fibre insulation fillet
STEICOflex/ zell/ floc 6 Bonded membrane on insulation fillet
- STEICOprotect/ STEICOprotect dry 7 Joint sealing tape
- Approved plaster system 8 Aluminium window sill
9 Render stop profile
10 Timber connected with frame plugs (pre drilled)
and fixed according to masonry construction
(follow manufacturers guidance)
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Inside Outside
10
1
4
5
7 8
3
9
Wall construction
(from inside to outside) Legend:
- Render layer 1 Airtight window installation (DIN 4108-7)
- Masonry wall 2 Window lintel
- Render layer 3 Joint sealing tape
- STEICOwall optional 4 STEICOprotect H reveal board
solid timber 5 Raffstore
STEICOflex/ zell/ floc 6 Raffstore- guide rail
- STEICOprotect/ STEICOprotect dry 7 STEICOmulti fill
- Approved plaster system 8 STEICOprotect H reveal board
9 Drip edge profile
10 Surface mesh
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
10
5
3 4
6 7
1
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
1 2
3 5 6
7 9
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside Inside
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside 11
15
14
13
1 2 16
3 12
zone min. 30 cm
10
≤ 40 mm0
(DIN 4108 Bbl. 2)
0.309
Splash water
5
5 cm
≥0.050
7 6 9
Fall min. 2%
min. 50 mm taken on
0
Legend:
Wall construction 1 DPC edge profile
(from inside to outside) 2 Joint sealing tape
- Render layer 3 Trowelled joist
- Masonry wall 4 Below DPC render in accordance with render recommendation
- Mortar resin in ground enviroment with flexible, mineral render sealing
- STEICOprotect L dry 5 Perimeter insulation
- Approved plaster system 6 Flexible, mineral render sealing
7 Finished floor covering (= water-carrying layer) min. 2% fall
8 Protective layer, e.g. dimpled drainage layer
9 Mortar resin suitable for weathering protection
10 Building weathering protection in accordance with
DIN 18195 min. 15 cm above ground level
11 Mortar resin
12 Bituminous sheeting
13 STEICOtherm/ STEICObase
14 Wet screed
15 STEICOsoundstrip
Important Note:
16 Mortar levelling layer
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
DPC - New build - Heated basement - Ground level below top edge of concrete ceiling
Datum: 12.03.2015 Detailnummer: AW-WDVS-MWG-1-10
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 5.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
Outside
1 2
11
zone min. 30 cm 3
≤ 40 mm0
(DIN 4108 Bbl. 2)
0.309
15
Splash water
4 14
10
15 cm
13
≥ 0.147
5
5 cm
16
≥0.050
7 6
12
Sufficient drainage
8
≥ 0.308
30 cm
min. 50 mm taken on
0
DPC - New build - Heated basement - Ground level on top edge of concrete ceiling
Datum: 12.03.2015 Detailnummer: AW-WDVS-MWG-1-20
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 5.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
Outside 15
14
16
1 2
3 13
12
zone min. 30 cm
500 mm (DIN 4108 Bbl. 2)
≤ 40 mm0
(DIN 4108 Bbl. 2)
Splash water 0.309
5
≥0.500
5 cm
≥0.050
7 6
11 17
Sufficient drainage
8 10
≥ 0.308
30 cm
min. 50 mm taken on
0
Legend:
Wall construction 1 DPC edge profile
(from inside to outside) 2 Joint sealing tape
3 Trowelled joist
- Render layer 4 Below DPC render in accordance with render recommendation
- Masonry wall in ground enviroment with flexible, mineral render sealing
- Mortar resin 5 Perimeter insulation
- STEICOprotect L dry 6 Flexible, mineral render sealing
- Approved plaster system 7 Gravel bed, grain size min. 16/32
8 Protective layer, e.g. dimpled drainage layer
9 Capillary breaking seperation approx. 20mm wide,
sealed with a flexible mineral sealant
10 Building weathering protection in accordance
with DIN 18195 min. 15 cm above ground level
11 Mortar resin suitable for old render
12 Bituminous sheeting
13 STEICOtherm/ STEICObase
14 Wet screed
15 STEICOsoundstrip
16 Mortar levelling layer
Important Note: 17 Basement ceiling insulation in accordance with requirements
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
DPC - Existing - Un-heated basement - Ground level below top edge of concrete ceiling
Datum: 12.03.2015 Detailnummer: AW-WDVS-MWG-1-30
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 5.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
0
30-50 mm
7
3 4
Wall construction
(from inside to outside) Legend:
- Render layer 1 Airtight window installation (DIN 4108-7)
- Masonry wall 2 Window sill inside
- Mortar resin 3 Mortar resin
- STEICOprotect L dry 4 AN 100 mesh profile for plastering over
- Approved plaster system 5 STEICOmulti fill glueing
6 STEICOprotect reveal board 40 mm
7 Mesh corner angle
8 End profile for ETICS suitable
9 Aluminium window sill
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Window - New build - Side connection with reveal board, horizontal section
Datum: 06.03.2015 Detailnummer: AW-WDVS-MWG-3-10
Änderung: 28.05.2019 Bearbeiter: A. Luz Maßstab: 1 : 2.5
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
Inside Outside
4 4
2 5
3
Wall construction
(from inside to outside) Legend:
- Render layer 1 Airtight window installation (DIN 4108-7)
- Masonry wall 2 AN 100 mesh profile for plastering over
- Mortar resin 3 STEICOprotect reveal board 40 mm
- STEICOprotect L dry 4 Mortar resin
- Approved plaster system 5 Drip edge profile
6 STEICOmulti fill glueing
7 Surface mesh
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Window - New build - Upper connection with reveal board, vertical section
Datum: 11.03.2015 Detailnummer: AW-WDVS-MWG-3-20
Änderung: 28.05.2019 Bearbeiter: A. Luz Maßstab: 1 : 3.0
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
Inside Outside
7
1 3 5 6 7 8
2
10
9
Recommendation
0
30-50 mm
11
Wall construction
(from inside to outside) Legend:
- Render layer 1 Window sill inside
- Masonry wall 2 Airtight window installation (DIN 4108-7)
- Mortar resin 3 STEICOmulti tape
- STEICOprotect L dry 4 STEICOmulti UDB
- Approved plaster system 5 STEICOfix wood fibre insulation fillet
6 Bonded membrane on wood fibre insulation fillet
7 Joint sealing tape
8 Aluminium window sill
9 Parapet profile
10 STEICOmulti fill glueing
11 Mortar resin
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Window - New building - Bottom connection with reveal board, vertical section
Datum: 12.03.2015 Detailnummer: AW-WDVS-MWG-3-30
Änderung: 04.04.2017 Bearbeiter: A. Luz Maßstab: 1 : 3.0
Roof - Pitched roof - Between rafter
insulation
Roof construction
(from inside to outside)
9
5
7 8
Roof construction
(from inside to outside) Legend:
- Plasterboard 1 Mounting cover fixed after screwing of the STEICO joist
- Batten on the ridge purlin and filling of the insulation zone
- Vapour barrier 2 STEICOmulti UDB
- STEICOflex/ zell/ floc 3 Possibly tension strap (DN > 30°)
STEICOjoist 4 Ridge area after element assembly filled with STEICOflex
- STEICOuniversal 5 Fully threaded screws max. t = 6 mm (pre-drilled).
- Counter batten 6 Place sheeting strips (vapour barrier) above ridge purlin
- Support batten before assembly of the roof elements and then connect together
- Roof covering 7 Pasterboard mounting cover
8 Filling with seprerating strips on the ridge purlin
9 Web insulation
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
2
1
4
5
Roof construction
(from inside to outside) Legend:
- Plasterboard 1 Last support batten, on-site assembled
- Batten 2 Ridge batten holder, on-site assembled
- Vapour barrier 3 Roofing felt taped on the ridge
- STEICOflex/ zell/ floc 4 STEICOmulti UDB, only in ridge area
STEICOjoist 5 Part thread screw (mushroom top), (pre-drilled)
- STEICOuniversal 6 Element end e.g. 15 mm OSB,
- Counter batten if required consider insulating between elements
- Support batten 7 Support fillet, Laminated Veneer Lumber STEICO LVL R
- Roof covering 8 Pre-compressed sealing tape connected to element
9 Filling with seprerating strips on the ridge purlin
(seprerating strips cut off after filling)
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
5
4
Roof construction
(from inside to outside) Legend:
- Plasterboard 1 STEICOmulti tape + STEICOmulti primer
- Batten 2 Possibly tension strap (DN > 30°)
- Vapour barrier 3 Steel sheet e.g. LSSUI 35 "Simpson Strong- Tie"
- STEICOflex/ zell/ floc 4 Taping (vapour barrier stripe), airtight tape
STEICOjoist 5 Paper joint re-inforcement band filled
- STEICOuniversal
- Counter batten
- Support batten
- Roof covering
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
12
11
10
Outside
2
1
4 5
7
Inside
8
3
6
Roof - Transitions - Eaves, STEICO LVL projecting roof board (without rafter doubling)
Datum: 02.04.2015 Detailnummer: AW-WDVS-HRB-6-10
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 7.5
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
3
4
5
1
2 6
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Roof - Transitions - Eaves, solid wood rafter, ETICS between the rafter
Datum: 02.04.2015 Detailnummer: AW-WDVS-HRB-6-30
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 7.5
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
7
3
4
1
2 6
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
8
3
4
1
2 7
6
5
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
8
4
5
3 7
6
1
2
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Roof - Transitions - Eaves, solid wood rafter, ETICS between the rafter
Datum: 02.04.2015 Detailnummer: AW-WDVS-MH-6-20
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 7.5
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
7
3
4 6
1
2
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
10
5
3 4
6 7
1
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Detail A 4
1 2
5
3 9
10 7
4 5
1
Detail A, M 1:2,5
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Roof - Transitions - Eaves, STEICO LVL projecting roof board (without rafter doubling)
Datum: 02.04.2015 Detailnummer: AW-WDVS-HRB-6-60
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 7.5
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
1 8
2
3
4 6
7
5
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
1 2
3 5 6
9
7 8
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
1 2
3 5 6
7 9
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
5 1 ITSE
Connection
trimmer on rafter Bottom view M 1:10
1
2
Trimmer
4 2 3 4
4
IUSE
2 2
Roof construction
(from inside to outside) Legend:
- Plasterboard 1 Timmer I-Joist STEICOjoist
- Batten 2 Filling timber
- Vapour barrier 3 Metal sheet Simpson Strong-Tie ITSE
- STEICOflex/ zell/ floc 4 Metal sheet Simpson Strong-Tie IUSE
STEICOjoist 5 Flashing and water drainage channel
- STEICOuniversal 6 Interior lining rooflight
- Counter batten 7 STEICOmulti tape + STEICOmulti primer
- Support batten
- Roof covering
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
7 1
Connection
trimmer on rafter Bottom view M 1:10
4
3
2
Trimmer
3
5 6
6 5 3
5 4
Roof construction
(from inside to outside) Legend:
- Plasterboard 1 Trimmer I-Joist STEICOjoist
- Batten 2 Laminated Veneer Lumber plate STEICO LVL X
- Vapour barrier 3 Fully threaded screws, 2 piece per connection
- STEICOflex/ zell/ floc 4 Part trhreade screw, only structural, 2 piece per connection
STEICOjoist 5 Notch on rafter
- STEICOuniversal 6 Staples only structual
- Counter batten 7 Flashing and water drainage channel
- Support batten 8 Interior lining rooflight
- Roof covering 9 STEICOmulti tape + STEICOmulti primer
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Detail A, M 1:5 ≥ 30
0 mm
3 2
Detail A
3 2
Detail B 6 5
Datail B, M 1:5
Roof construction
(from inside to outside) Legend:
- Plasterboard 1 Nail tight tape
- Batten 2 Web insulation
- Vapour barrier 3 Compressable insulation at connection
- STEICOflex/ zell/ floc 4 STEICOmulti tape
STEICOjoist 5 Connection plate STEICO LVL X Laminated Veneer Lumber
- STEICOuniversal 6 Plasterboard mounting cover
- Counter batten
- Support batten
- Roof covering
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Viewing direction
5 6
1 1
2
3
1
2 2
4
Detail A
5
15 cm
0.185
min.
6
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Inside Outside
1
15 cm
0.162
2
min.
3
5
4
9
10
Roof construction
(from inside to outside)
1
Outside
2
3
Inside
Roof construction
(from inside to outside) Legend:
- Visible rafter 1 Ridge batten support
- Timber cladding 2 STEICOmulti UDB, only in ridge zone
- Vapour barrier if required STEICOmulti tape + STEICOmulti primer
- STEICOtherm 3 Single thread screw to secure for wind suction loads
- STEICOuniversal 4 Single thread screw to secure against shear loads
- Counter batten
- Support batten
- Roof covering
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
11
3 4
5 10
1
2
6
9
3 4
5 8
1
2 7
6
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
7 8
3 4
5
1
2 9
11
10
6
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
1
2
3
4
5 8
9
6
10
7
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Roof - Transitions - Verge, visible projecting roof rafter, above rafter insulation
Datum: 02.04.2015 Detailnummer: AW-WDVS-HRB-6-70
Änderung: 23.08.2017 Bearbeiter: A. Luz Maßstab: 1 : 7.5
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
Outside
Inside
3
Roof construction
(from inside to outside) Legend:
- Visible rafter 1 Trimmer
- Timber cladding 2 Cover strip interior lining
- Vapour barrier 3 Interior lining
- STEICOtherm 4 Airtight tape
- STEICOuniversal 5 Flashing and water drainage channel
- Counter batten 6 STEICOmulti tape + STEICOmulti primer
- Support batten 7 STEICOflex
- Roof covering
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Rooflight
Datum: 23.03.2015 Detailnummer: DA-SD-ADD-4-10
Änderung: 04.04.2017 Bearbeiter: A. Luz Maßstab: 1 : 7.5
STEICO SE * Otto-Lilienthal-Ring 30 * D-85622 Feldkirchen * TEL 0 89 - 99 15 51 0 FAX: 0 89 - 99 15 51 26 www.steico.com
Outside
cm
a.10
c
2
Inside
Roof construction
(from inside to outside) Legend:
- Visible rafter 1 Dual threaded screw to secure for wind suction
- Timber cladding loads in 90° angle to rafter axis
- Vapour barrier (spacing based on structural requirements)
- STEICOtherm 2 Dual threaded screw
- STEICOuniversal (v-screwing) in default angle to rafter axis to secure
- Counter batten against shear loads
- Support batten (spacing based on structural requirements)
- Roof covering 3 Details in accordance with screw manufacturer
Note:
The safe long term load transfer and connection for Wind and Suction loads must be in line with
requirements of the STEICO woodfibre insulation. Structurally approved fastners, which specifically
make reference to the compressive strength of the insulation material allow the creation of a
structural recommendation.
Data entry sheets for the creation of a structural recommendation are available on our homepage at:
www.steico.com under Download / Technik-Verarbeitung/Eingabeblaetter
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Außen
Inside
Roof construction
(from inside to outside) Legend:
- Visible rafter 1 Single threaded screw to secure for wind suction
- Timber cladding loads in 90° angle to rafter axis
- Vapour barrier (spacing based on structural requirements)
- STEICOtherm 2 Single threaded screw in default angle
- STEICOuniversal to rafter axis to secure against shear loads
- Counter batten (spacing based on structural requirements)
- Support batten 3 Details in accordance with screw manufacturer
- Roof covering
Note:
The safe long term load transfer and connection for Wind and Suction loads must be in line with
requirements of the STEICO woodfibre insulation. Structurally approved fastners, which specifically
make reference to the compressive strength of the insulation material allow the creation of a
structural recommendation.
Data entry sheets for the creation of a structural recommendation are available on our homepage at:
www.steico.com under Download / Technik-Verarbeitung/Eingabeblaetter
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside
Inside
Roof construction
(from inside to outside) Legend:
- Visible rafter 1 Single thread screw
- Timber cladding (Spacing based on structural requirements)
- Vapour barrier
- STEICOflex/ zell/ floc
- STEICOuniversal
- Counter batten
- Support batten
- Roof covering
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Outside
3
4
6 5
Inside
Roof construction
(from inside to outside) Legend:
- Visible rafter 1 Single threaded screw to secure against shear loads
- Timber cladding 2 Single threaded screw to secure for wind suction loads
- Vapour barrier 3 Foam wedge to secure against water pressure
- STEICOtherm 4 Valley plate on timber cladding
- STEICOuniversal 5 STEICOmulti tape + STEICOmulti primer
- Counter batten 6 STEICOmulti UDB, only in valley zone
- Support batten
- Roof covering
Important Note:
The preceding details should only be used for planning purposes. Their accuracy, completeness and suitability should be checked
by the installer / designer independently to ensure compliance with the relevant regulatory requirements. They should not be used to replace
individual project detailing but to assist the project designer in the detailing process.
Masonry wall
Concrete re-inforced
Insulation materials
STEICOmulti fill
Insect screen
Thin full line - dimension line, reference line, light edges, hatching, projected line
Legend hatching
Datum: 10-03-2015 Detailnummer: -
Änderung: 07-04-2017 Bearbeiter: A. Luz Maßstab: 1 : 2.5
End profile
(End of render layer on mesh component)
Screws plug
Metal connection profile
Legend profiles
Datum: 10-03-2015 Detailnummer: -
Änderung: 04-04-2017 Bearbeiter: A. Luz Maßstab: 1 : 5.0