Anda di halaman 1dari 2

Kav 26 CONDO

Tanggal 21 mei 2020


Pek. Pasang lantai kamar mandi
Jaelani 1 x 165,000 = 165,000
Marno 1 x 165,000 = 165,000
Pek. Perapihan plafond rumah sebelah marketing bocor
Hasan 1 x 165,000 = 165,000
Udin 1 x 165,000 = 165,000
Tanggal 11 Juni 2020
Pasang papan GRC pos security
Hasan 1 x 165,000 = 165,000
Ipa 1 x 165,000 = 165,000
Bobok listplank beton + perapihan
Perman 1 x 165,000 = 165,000
Tanggal 12 Juni 2020
Jaelani 1 x 165,000 = 165,000
Tanggal 14 Juni 2020
Hasan 1 x 165,000 = 165,000
Perman 1 x 165,000 = 165,000
Sub total 1 1,650,000.00
Kav 26 CONDO Pak YUSMANA
Tanggal 18 Mei 2020
Pek. Bobok dinding tampak depan opening lantai III
Hasan 1 x 165,000 = 165,000
Ipa 1 x 165,000 = 165,000
Tanggal 19Mei 2020
Pek. Bongkar granit lt kamar mandi + pasang lantai II
Hasan 1 x 165,000 = 165,000
Hasan 1 x 165,000 = 165,000
Tanggal 20 mei 2020
Pek. Bongkar granit lt kamar mandi + pasang lantai III dua kamar mandi
Ipa 1 x 165,000 = 165,000
Deni 1 x 165,000 = 165,000
Sub total 2 990,000.00
JUMLAH 2,640,000.00
Kav 37 River 8 Ibu TRISULA
Tanggal 10 mei 2020 - 12 mei 2020
Pekerjaan Cat Railing Tangga
3 x 165,000 = 495,000
JUMLAH 495,000