Anda di halaman 1dari 1

PERENCANAAN ANGGARAN LOMBA AGUSTUSAN 2016

ALAT LOMBA
KERUPUK 4 KALENG = 75,000
TALI RAPIA 1 GULUNG X 15,000 = 15,000
JARUM 2 BUNGKUS X 2,500 = 5,000
BAKYAK 3 PASANG X = 120,000

HADIAH LOMBA
BUKU ISI 38 17 LUSIN X 18,000 = 306,000

ATK
AMPLOP 1 PACK X 10,000 = 10,000
SOLASI 2 GULUNG X 2,500 = 5,000
SAMPUL KOPI 5 LEMBAR X 1,000 = 5,000

SETOR YAYASAN 624 SISWA X 3,000 = 1,872,000

TRANSPORT GURU
KEPSEK 1 X 125,000 = 125,000
KESISWAAN 1 X 125,000 = 125,000
WALAS 18 X 60,000 = 1,080,000
NON WALAS 6 X 50,000 = 300,000
KEBERSIHAN 100,000 = 100,000
BIAYA TAK TERDUGA 225,000
4,368,000

Mengetahui,
Kepala Madrasah Waka Kesiswaan

Abdul Munif, S.Pd.I Annisah, S.Pd

Anda mungkin juga menyukai