Reimburse Maintenance Musi IV 24 - 25 November 2019
Reimburse Maintenance Musi IV 24 - 25 November 2019
PERATURAN :
>
>
0
0
9
10
11
12
13
14
15
16
17
SUB AKUN PETTYCASH
PERATURAN :
NOTA/KUITANSI USAHAKAN ASLI DARI TOKO, APABILA TIDAK ADA, SILAHKAN BUAT NOTA/K
DITANDATANGANI OLEH SM/PM
NOTA/KUITANSI DIATAS 1 JUTA AKAN DIAJUKAN DENGAN PPK TERPISAH
TRANSPORT / BBM
Contoh:
BBM Kendaraan Operasional Mobil (AVANZA)
BBM Kendaraan Operasional Motor (SUPRA X)
Grabcar dari Bandara ke Site a/n BUDI
ENTERTAIN
Contoh:
Rokok & Minum pengawas Adhi Karya ke site
Konsumsi SM Adhi Karya ke site
KONSUMSI
Contoh:
Isi ulang Air Galon 4 @10rb
ALAT/MATERIAL BANTU
Contoh:
Beli Semen 5kg
ATK
Contoh:
Beli Kertas A4 1 rim, nota kosong 1 buah
BARANG CETAKAN
Contoh:
Cetak As Built Drawing untuk ke Mainkon 5 bundle @30rb
Fotocopy dokumen 50 lembar
INTERNET
Contoh:
Isi ulang modem di site nomor 089912345678
Bayar tagihan internet Indihome No 78978967 atas nama BAMBANG bulan MARET 2019
KEAMANAN
Biaya keamanan security proyek bulan MARET 2019
AIR
Biaya Tagihan AIR bulan (………..) No ID PEL (………………………..) a/n (……………………)
LISTRIK
Biaya Tagihan Listrik bulan (………..) No ID PEL (………………………..) a/n (……………………)
KEBERSIHAN
Biaya Kebersihan bulanan RT bulan (…………………)
SEWA KOS
Biaya sewa kamar koss bulan (…………………) a/n (…………………………)
N BUAT NOTA/KUITANSI KOSONG DAN
DEBIT KREDIT
5,000,000
150,000
30,000
30,000
30,000
100,000
40,000
50,000
20,000
150,000
20,000
300,000
500,000
200,000
15,000
500,000
50,000
100,000
150,000
500,000
50,000
100,000
50,000
400,000
PT. Mandala Putera Prima
Proyek : Gelora Bung Tomo Surabaya
Rekapitulasi & Reimburst Petty Cash / Site Expense
Periode : 3 September 2019
PC
No Tanggal Uraian Debit Kredit Balance
Number
DANA CAIR -
-
Material -
1 22-Nov-19 Lasdop 35,000 (35,000)
2 24-Nov-19 Pasir & Semen 15,000 (50,000)
(50,000)
Alat (50,000)
3 24-Nov-19 Tespen + Tang Kombinasi 55,000 (105,000)
(105,000)
JASA (105,000)
Sewa Pickup Untuk Angkut tangga dari Server ke site
4 24-Nov-19
PP ( BG 8349 IV )
200,000 (305,000)
5 25-Nov-19 Sewa Motor 2 Hari BG 8349 IV per hari Rp. 50.000,- 100,000 (405,000)
6 26-Nov-19 Extend Hotel 1 Hari 160,000 (565,000)
(565,000)
Transport (565,000)
7 23-Nov-19 Travel Lampung - Bakauheni ( Nana ) 65,000 (630,000)
8 23-Nov-19 Feri Bakauheni - Merak ( Nana ) 50,000 (680,000)
9 23-Nov-19 Bis Merak - Rambutan ( Nana ) 35,000 (715,000)
10 23-Nov-19 Kereta Manggarai - Bandara Soeta ( Debba ) 50,500 (765,500)
11 23-Nov-19 Grab Bandara Palembang - Hotel ( Debba ) 94,000 (859,500)
12 24-Nov-19 Grab Pondok Indah - Bandara Soeta ( Nana ) 155,000 (1,014,500)
13 24-Nov-19 Tol Grab Ke Bandara Soeta ( Nana ) 20,000 (1,034,500)
14 24-Nov-19 Grab Bandara Palembang - Hotel ( Nana ) 95,000 (1,129,500)
15 25-Nov-19 Grab Dinas Perumahan Rakyat - Hotel 15,000 (1,144,500)
16 26-Nov-19 Grab Hotel - Bandara Palembang 61,000 (1,205,500)
17 26-Nov-19 Damri Bandara Soeta - Merak ( Nana ) 65,000 (1,270,500)
18 26-Nov-19 Feri Merak - Bakauheni ( Nana ) 50,000 (1,320,500)
19 26-Nov-19 Travel Bakauheni - Lampung ( Nana ) 65,000 (1,385,500)
20 26-Nov-19 Kereta Bandara Soeta - Manggarai ( Debba ) 50,500 (1,436,000)
(1,436,000)
(1,436,000)
Lampung Palembang
travel lampung Bakauheni Rp 65,000 ok
ada feri bahauheni merak Rp 50,000 ok
Bis Merak Rambutan Rp 35,000 ok
ada Grab pondok indah soeta Rp 155,000 ok
ada grab bandara hotel Rp 95,000 ok
tol bandara Rp 20,000 ok
Total Rp 420,000
Palembang Lampung
damri soeta merak Rp 65,000 ada
feri merak bahauheni Rp 50,000 ada
Travel Bakauheni lampung Rp 65,000
Total Rp 180,000
185000 Rp 185,000