Daftar Kuantitas
PEKERJAAN : Ciujung Priority Civil Works Package 2 (Left Side), FMSRB
KABUPATEN : Serang
PROVINSI : Banten
I. Pekerjaan Persiapan
A Pekerjaan Tanah
1 Stripping m3 56,017.18 9,644.00 540,229,683.92
2 Galian Tanah (alat) m3 123,237.79 57,800.00 7,123,144,262.00
3 Timbunan Tanah Tanggul m3 1,110,513.48 156,160.00 173,417,785,036.80
4 Finishing Badan Tanggul m2 268,591.54 6,510.00 1,748,530,925.40
5 Gebalan rumput m2 340,003.54 17,150.00 5,831,060,711.00
B Saluran Drainase
1 Galian Tanah (manual) m3 19,644.48 32,650.00 641,392,272.00
2 Pasangan Batu 1 Pc : 4 Psr. m3 9,951.48 719,570.00 7,160,786,463.60
3 Plesteran 1 Pc : 4 Psr. m2 43,424.64 45,590.00 1,979,729,337.60
Total 198,442,658,692.32
III. Bangunan Pintu Air
A.3 Pondasi
1 Urugan Pasir m3 6.48 252,470.00 1,636,005.60
2 Beton Lantai Kerja m3 6.30 1,102,050.00 6,942,915.00
3 Pengaadan Mini Pile uk. (20 x 20 x 600 cm K-500) m' 1,656.00 179,120.00 296,622,720.00
4 Pemancangan Mini Pile uk. (20 x 20 x 600 cm K-500) m' 1,656.00 90,700.00 150,199,200.00
No. Uraian Pekerjaan Harga Satuan Jumlah Harga
Satuan Volume
Rp. Rp.
A.4 Pemasangan Pintu
1 Pengaadan dan Pemasangan Pintu Air uk. 100 x 150 cm 3.00 41,250,000.00 123,750,000.00
2 Pengaadan dan Pemasangan Pintu Klep uk. 120 x 180 cm 3.00 56,250,000.00 168,750,000.00
B.3 Pondasi
1 Urugan Pasir 10.80 252,470.00 2,726,676.00
2 Beton Lantai Kerja 21.00 1,102,050.00 23,143,050.00
3 Pengaadan Mini Pile uk. (20 x 20 x 600 cm K-500) 4,416.00 179,120.00 790,993,920.00
4 Pemancangan Mini Pile uk. (20 x 20 x 600 cm K-500) 4,416.00 90,700.00 400,531,200.00
JUMLAH HARGA
NO JENIS PEKERJAAN
(Rp)
Terbilang : Dua Ratus Tiga Puluh Milyar Tujuh Ratus Empat Puluh Enam Juta Empat Ratus Empat
Puluh Lima Ribu Rupiah
Daftar Kuantitas
I. Pekerjaan Persiapan
A Pekerjaan Tanah
1 Stripping m3 42,868.76
9,644.00 413,426,321.44
2 Timbunan Tanah Tanggul m3 1,011,411.30
156,160.00 157,941,988,608.00
3 Finishing Badan Tanggul m2 253,886.41
6,510.00 1,652,800,529.10
4 Gebalan rumput m2 325,298.41
17,150.00 5,578,867,731.50
B Saluran Drainase
1 Galian Tanah (manual) m3 19,276.26
32,650.00 629,369,889.00
2 Pasangan Batu 1 Pc : 4 Psr. m3 9,764.95
719,570.00 7,026,565,071.50
3 Plesteran 1 Pc : 4 Psr. m2 42,610.68
45,590.00 1,942,620,901.20
TOTAL 175,185,639,051.74
III. Jembatan 1 Unit
1 Stripping m3 494.00
9,644.00 4,764,136.00
2 Galian Tanah (alat) m3 57,800.00 51,788,800.00
896.00
3 Pasangan Batu 1 Pc : 4 Psr. m3 1,518.00
719,570.00 1,092,307,260.00
4 Timbunan Tanah Kembali Dipadatkan m3 16,488.05
29,060.00 479,142,733.00
5 Beton K-350 (readymix) m3 1,325.92
1,242,760.00 1,647,800,339.20
6 Pembesian kg 262,532.01
14,245.00 3,739,768,482.45
7 Bekisting m2 1,260.00
121,317.00 152,859,420.00
8 Plesteran 1 Pc : 4 Psr. m2 1,630.00
45,590.00 74,311,700.00
9 Pengadaan Spun Pile dia. 60, Class A, cm K-500 m' 1,800.00
617,880.00 1,112,184,000.00
10 Pemancangan Spun Pile dia. 60, Class A, cm K-500 m' 172,480.00 310,464,000.00
1,800.00
11 Beton Lantai Kerja (Beton B-100) m3 1,102,050.00 12,287,857.50
11.15
12 Elastomeric Bearing Pad for Bridge+Anchor bars unit 3,650,000.00 43,800,000.00
12.00
13 Expantsion Joint Asphaltic Plug m 4,400,000.00 132,000,000.00
30.00
14 Steel L.60.60.6 for trotoir kg 35,000.00 4,200,000.00
120.00
15 Pipe drain 2" water hole m' 350,000.00 25,200,000.00
72.00
16 Bridge Nomenclatur 40x15 cm unit 7,500,000.00 15,000,000.00
2.00
17 Single Sign unit 2,500,000.00 5,000,000.00
2.00
18 Procurement, Transportaion & Erection of steel TRUSS kg 47,050.00 11,633,710,505.50
247,262.71
19 PDA Test nos 3,000,000.00 24,000,000.00
8.00
TOTAL 20,560,589,233.65
No. Uraian Pekerjaan Satuan Volume Harga Satuan Jumlah Harga
Satuan Volume Rp. Rp.
IV. Bangunan Pintu Air
A.3 Pondasi
1 Urugan Pasir m3 8.64 252,470.00 2,181,340.80
2 Beton Lantai Kerja m3 8.40 1,102,050.00 9,257,220.00
3 Pengaadan Mini Pile uk. (20 x 20 x 600 cm K-500) m' 2,208.00 179,120.00 395,496,960.00
4 Pemancangan Mini Pile uk. (20 x 20 x 600 cm K-500) m' 2,208.00 90,700.00 200,265,600.00
B.3 Pondasi
1 Urugan Pasir m3 5.40 252,470.00 1,363,338.00
2 Beton Lantai Kerja m3 10.50 1,102,050.00 11,571,525.00
3 Pengaadan Mini Pile uk. (20 x 20 x 600 cm K-500) m' 2,208.00 179,120.00 395,496,960.00
4 Pemancangan Mini Pile uk. (20 x 20 x 600 cm K-500) m' 2,208.00 90,700.00 200,265,600.00
A. UPAH
1 Pekerja Jam 10,000.00
2 Tukang Jam 15,000.00
3 Mandor Jam 18,750.00
4 Operator Jam 31,250.00
5 Pembantu Operator Jam 25,000.00
6 Tenaga Ahli Jam 18,750.00
B. BAHAN/MATERIAL
1 Lime Stone m3 120,000.00
2 Tanah Merah m3 30,000.00
3 Gebalan Rumput m2 7,500.00
4 Batu Belah m3 190,000.00
5 Batu Pecah 1/2 m3 250,000.00
6 Batu Pecah 2/3 m3 240,000.00
7 Batu Pecah 3/5 m3 240,000.00
8 Batu Pecah 5/7 m3 225,000.00
9 Sirtu M3 160,000.00
10 Pasir Urug m3 170,000.00
11 Pasir Pasang m3 220,000.00
12 Pasir Beton M3 260,000.00
13 Kawat Bendrat Kg 25,000.00
14 Besi Beton ( Polos ) Kg 9,400.00
15 Besi Beton ( Ulir ) Kg 9,500.00
16 Paku Kg 20,000.00
17 Papan/Kayu Begisting m3 2,500,000.00
18 Playwood 9 mm Lbr 160,000.00
19 Playwood 12 mm Lbr 190,000.00
20 Playwood film / Fenol 18 mm Lbr 280,000.00
21 Semen ( PC ) Kg 1,600.00
22 Pengaadan /pasang Pintu Air uk. 100 x 150 cm unit 41,250,000.00
23 Pengaadan / pasang Pintu Klep uk. 120 x 180 cm unit 56,250,000.00
24 Spun Pile Dia 600 Class A, K500 M 550,000.00
25 Mini Pile Uk. 20 x 20 x 600 cm, K 500 M 152,000.00
30 Kayu Dolken dia. 8-10 cm btg 20,000.00
31 Sand bag 60x40x20 bh 1,000.00
32 Beton Ready mix K 350 m3 950,000.00
33 Beton Ready mix K 225 m3 870,000.00
34 Elastomeric Bearing Pad for Bridge+Anchor bars unit 3,650,000.00
35 Expantson Joint Asphaltic Plug m 4,400,000.00
36 Steel L.60.60.6 for trotoir kg 35,000.00
37 Pipe drain 2" water hole m1 350,000.00
38 Bridge Nomenclatur 40x15 cm unit 7,500,000.00
39 Single Sign unit 2,500,000.00
40 Procerement of Steel TRUSS kg 35,000.00
41 PDA Test nos 3,000,000.00
7 / 79
DAFTAR UPAH HARGA BAHAN DAN HARGA PERALATAN
C PERALATAN
1 Excavator Cap. 0,7 m3 Jam 444,900.00
2 Excavator 80-140 long arm Jam 351,375.00
3 Bulldozer D65 Jam 529,400.00
4 Wheel loader 1.0-1.6 m3 Jam 358,700.00
5 Three wheel roller 6-8 t Jam 290,500.00
6 Tandem roller 10 t. Jam 284,000.00
7 Vibrator roller 10 t. Jam 340,100.00
8 Vibratory roller 1t Jam 56,154.00
9 Baby roller Jam 66,900.00
10 Dump Truck 22 m3 Jam 355,500.00
11 Dump truck 3-4 m3 Jam 193,800.00
12 Dump Truck cap. 7 m3 Jam 265,100.00
13 Flat bed truck Jam 164,375.00
14 Crawler crane 25 ton Jam 175,400.00
15 Crane Pancang 35 ton Jam 399,800.00
16 Crawler crane 35 ton Jam 332,900.00
17 Diesel Hammer K 25 Jam 61,500.00
18 Diesel Hammer K 35 Jam 78,700.00
19 Bar Bender Jam 50,000.00
20 Bar Cutter Jam 50,000.00
21 Concrete mixer 0.3-0.5 m3 Jam 38,500.00
22 Concrete vibrator Jam 29,060.00
23 Water Tanker Jam 192,400.00
24 Water pump 70-100 mm Jam 25,400.00
25 Stamper Jam 26,600.00
26 Chainsaw Jam 25,000.00
8 / 79
ANALISA HARGA SATUAN
HARGA JUMLAH
No. URAIAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
A. MOBILISASI
Jumlah A 94,000,000.00
B. DEMOBILISASI
Jumlah B 94,000,000.00
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.250000 18,750.00 4,687.50
2 Pekerja Jam 1.500000 10,000.00 15,000.00
B. BAHAN
C. PERALATAN
1 Bulldozer D65 Jam 0.062500 529,400.00 33,087.50
2 Dump Truck cap. 7 m3 Jam 0.031250 265,100.00 8,284.38
3 Chainsaw Jam 1.000000 25,000.00 25,000.00
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Pekerja Jam 0.022000 10,000.00 220.00
2 Mandor Jam 0.001600 18,750.00 30.00
B. BAHAN
C. PERALATAN
1 Excavator Cap. 0,7 m3 Jam 0.012600 444,900.00 5,605.74
2 Bulldozer D65 Jam 0.005500 529,400.00 2,911.70
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.034722 18,750.00 651.04
2 Pekerja Jam 0.277778 10,000.00 2,777.78
B. BAHAN
1 Tanah Merah m3 1.150000 30,000.00 34,500.00
C. PERALATAN
1 Bulldozer D65 Jam 0.011765 529,400.00 6,228.39
2 Excavator Cap. 0,7 m3 Jam 0.024802 444,900.00 11,034.23
3 Dump Truck cap. 7 m3 Jam 0.301984 265,100.00 80,055.99
4 Vibrator roller 10 t. Jam 0.011574 340,100.00 3,936.32
5 Water Tanker Jam 0.014493 192,400.00 2,788.45
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.008900 18,750.00 166.88
2 Pekerja Jam 0.178600 10,000.00 1,786.00
B. BAHAN
C. PERALATAN
1 Excavator Cap. 0,7 m3 Jam 0.008929 444,900.00 3,972.32
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.050000 18,750.00 937.50
2 Pekerja Jam 0.200000 10,000.00 2,000.00
B. BAHAN
1 Spun Pile Dia 600 Class A, K500 M 1.000000 550,000.00 550,000.00
C. PERALATAN
1 Crawler crane 25 ton Jam 0.050000 175,400.00 8,770.00
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.046296 18,750.00 868.06
2 Pekerja Jam 0.185185 10,000.00 1,851.85
B. BAHAN
1 Mini Pile Uk. 20 x 20 x 600 cm, K 500 M 1.000000 152,000.00 152,000.00
C. PERALATAN
1 Crawler crane 25 ton Jam 0.046296 175,400.00 8,120.37
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.208333 18,750.00 3,906.25
2 Pekerja Jam 0.416667 10,000.00 4,166.67
B. BAHAN
Joint Pile joint 0.05000 250,000.00 12,500.00
C. PERALATAN
1 Crane Pancang 35 ton Jam 0.208333 399,800.00 83,291.67
2 Diesel Hammer K 35 Jam 0.208333 78,700.00 16,395.83
1 Crawler crane 25 ton Jam 0.208333 175,400.00 36,541.67
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.119048 18,750.00 2,232.14
2 Pekerja Jam 0.238095 10,000.00 2,380.95
B. BAHAN
C. PERALATAN
1 Crane Pancang 35 ton Jam 0.119048 399,800.00 47,595.24
2 Diesel Hammer K 35 Jam 0.119048 78,700.00 9,369.05
3 Crawler crane 25 ton Jam 0.119048 175,400.00 20,880.95
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.666667 18,750.00 12,500.00
2 Tukang Jam 2.666667 15,000.00 40,000.00
3 Pekerja Jam 6.666667 10,000.00 66,666.67
B. BAHAN
1 Beton Ready mix K 225 m3 1.020000 870,000.00 887,400.00
C. PERALATAN
1 Concrete vibrator Jam 0.400000 29,060.00 11,624.00
2 Concrete Pump m3 1.000000 30,000.00 30,000.00
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.666667 18,750.00 12,500.00
2 Tukang Jam 2.666667 15,000.00 40,000.00
3 Pekerja Jam 6.666667 10,000.00 66,666.67
B. BAHAN
1 Beton Ready mix K 350 m3 1.020000 950,000.00 969,000.00
C. PERALATAN
1 Concrete vibrator Jam 0.400000 29,060.00 11,624.00
2 Concrete Pump m3 1.000000 30,000.00 30,000.00
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.020000 18,750.00 375.00
2 Tukang Jam 0.040000 15,000.00 600.00
3 Pekerja Jam 0.100000 10,000.00 1,000.00
B. BAHAN
1 Besi Beton ( Ulir ) Kg 1.050000 9,500.00 9,975.00
2 Kawat Bendrat Kg 0.030000 25,000.00 750.00
C. PERALATAN
1 Bar Bender Jam 0.002500 50,000.00 125.00
2 Bar Cutter Jam 0.002500 50,000.00 125.00
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 1.180556 18,750.00 22,135.42
2 Tukang Jam 4.722222 15,000.00 70,833.33
3 Pekerja Jam 9.444444 10,000.00 94,444.44
B. BAHAN
1 Batu Pecah 1/2 m3 0.800000 250,000.00 200,000.00
2 Pasir Beton M3 0.650000 260,000.00 169,000.00
2 Semen ( PC ) Kg 250.000000 1,600.00 400,000.00
C. PERALATAN
1 Concrete mixer 0.3-0.5 m3 Jam 1.180556 38,500.00 45,451.39
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.7619 18,750.00 14,285.63
2 Tukang Jam 3.0476 15,000.00 45,714.00
3 Pekerja Jam 6.0952 10,000.00 60,952.00
B. BAHAN
1 Batu Belah m3 1.1700 190,000.00 222,300.00
2 Pasir Pasang m3 0.3920 220,000.00 86,240.00
3 Semen ( PC ) Kg 134.0000 1,600.00 214,400.00
C. PERALATAN
1 Concrete mixer 0.3-0.5 m3 Jam 0.2667 38,500.00 10,266.60
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.1213 18,750.00 2,274.38
2 Tukang Jam 0.2427 15,000.00 3,640.50
3 Pekerja Jam 1.2133 10,000.00 12,133.00
B. BAHAN
1 Pasir Pasang m3 0.0263 220,000.00 5,775.00
2 Semen ( PC ) Kg 10.6000 1,600.00 16,960.00
C. PERALATAN
1 Concrete mixer 0.3-0.5 m3 Jam 0.0173 38,500.00 667.36
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.533333 18,750.00 10,000.00
2 Tukang Jam 1.066667 15,000.00 16,000.00
3 Pekerja Jam 3.200000 10,000.00 32,000.00
B. BAHAN
1 Playwood 12 mm Lbr 0.182292 190,000.00 34,635.42
2 Papan/Kayu Begisting m3 0.004565 2,500,000.00 11,413.04
3 Paku Kg 0.312000 20,000.00 6,240.00
C. PERALATAN
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.054600 18,750.00 1,023.75
2 Pekerja Jam 0.272800 10,000.00 2,728.00
B. BAHAN
C. PERALATAN
1 Excavator Cap. 0,7 m3 Jam 0.109127 444,900.00 48,550.60
2 Matting Batang Kelapa ls 1.000000 250.00 250.00
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.0333 18,750.00 625.00
2 Tukang Jam 0.0667 15,000.00 1,000.00
3 Pekerja Jam 0.3333 10,000.00 3,333.33
B. BAHAN
1 Sand bag 60x40x20 bh 1.200000 1,000.00 1,200.00
2 Kayu Dolken dia. 8-10 cm btg 0.500000 20,000.00 10,000.00
C. PERALATAN
1 Water pump 70-100 mm Jam 1.1200 25,400.00 28,448.00
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.0500 18,750.00 937.50
2 Tukang Jam 0.0500 15,000.00 750.00
3 Pekerja Jam 0.2500 10,000.00 2,500.00
B. BAHAN
1 Gebalan Rumput m2 1.200000 7,500.00 9,000.00
C. PERALATAN
1 Water Tanker Jam 0.0125 192,400.00 2,405.00
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.2500 18,750.00 4,687.50
2 Pekerja Jam 2.5000 10,000.00 25,000.00
B. BAHAN
C. PERALATAN
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.2000 18,750.00 3,750.00
2 Pekerja Jam 2.0000 10,000.00 20,000.00
B. BAHAN
C. PERALATAN
1 Baby roller Jam 0.0400 66,900.00 2,676.00
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Mandor Jam 0.2000 18,750.00 3,750.00
2 Pekerja Jam 2.0000 10,000.00 20,000.00
B. BAHAN
2 Pasir Urug m3 1.2000 170,000.00 204,000.00
C. PERALATAN
1 Stamper Jam 0.0667 26,600.00 1,773.33
HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A. UPAH
1 Erection kg 1.0000 4,000.00 4,000.00
B. BAHAN
1 Procerement of Steel TRUSS kg 1.0000 35,000.00 35,000.00
2 Traspport kg 1.0000 450.00 450.00
C. PERALATAN
1 Crawler crane 35 ton Jam 0.0100 332,900.00 3,329.00
NO.
A. UPAH
1 1 Fotografer
4 2 Ass Fotografer
3 Edit DVD
B. BAHAN
1 DVD
2 Album
C. PERALATAN
1 1 Kamera
#REF! 2 Kamera Video
4 3 Alat bantu
D. SUB TOTAL ( A + B + C )
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN PEKERJAAN ( D + E )
Dibulatkan
NO.
A. UPAH
1 1 Pengukuran per km
4 2
3
B. BAHAN
1
2
3
C. PERALATAN
1 1
#REF! 2
4 3
4
D. SUB TOTAL ( A + B + C )
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN PEKERJAAN ( D + E )
Dibulatkan
NO.
A. UPAH
1 1 Pemasangan Patok
4 2
3
B. BAHAN
1 Kayu Dolken dia 10 cm
2 Paku
3
C. PERALATAN
1 1 Transport
#REF! 2
4 3
4
D. SUB TOTAL ( A + B + C )
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN PEKERJAAN ( D + E )
Dibulatkan
NO.
A. UPAH
1 1 Penggambaran
4 2
3
B. BAHAN
1 Kertas A0
2
C. PERALATAN
1 1 Peralatan bantu
#REF! 2
4 3
D. SUB TOTAL ( A + B + C )
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN PEKERJAAN ( D + E )
Dibulatkan
NO.
A. UPAH
1 1 Upah borongan
4 2
3
B. BAHAN
1 Direksi keet
2
C. PERALATAN
1 1 Peralatan bantu
#REF! 2
4 3
D. SUB TOTAL ( A + B + C )
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN PEKERJAAN ( D + E )
Dibulatkan
Nomor Jenis Pekerjaan I.7
Jenis Pekerjaan Pembuatan Papan Nama Pekerjaan
Kuantitas Pekerjaan 6
Satuan Jenis Pekerjaan bh
NO.
A. UPAH
1 1 Pemasangan Papan nama
4 2
3
B. BAHAN
1 Papan nama
2
C. PERALATAN
1 1 Transport
#REF! 2
4 3
D. SUB TOTAL ( A + B + C )
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN PEKERJAAN ( D + E )
Dibulatkan
NO.
50 A. UPAH
1 1 1 Mandor
4 2 2 Tukang
10 3 pekerja
B. BAHAN
0.3 1 Batu Belah
0.1 2 Batu Pecah 2/3
0.15 3 Batu Pecah 5/7
0.2 4 Sirtu
20 C. PERALATAN
1 1 1 Tandem roller 10 t.
#REF! 2
4 3
D. SUB TOTAL ( A + B + C )
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN PEKERJAAN ( D + E )
Dibulatkan
NO.
100 A. UPAH
1 1 1 Mandor
4 2 2 Tukang
10 3 pekerja
B. BAHAN
1.1 1 Batu Pecah 1/2
0.2 2 Sirtu
100 3 Aspal
50 C. PERALATAN
1 1 1 Tandem roller 10 t.
#REF! 2
4 3
D. SUB TOTAL ( A + B + C )
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN PEKERJAAN ( D + E )
Dibulatkan
NO.
A. UPAH
1 1 Soil Investigation
4 2
3
B. BAHAN
1
2
C. PERALATAN
1 1
#REF! 2
4 3
D. SUB TOTAL ( A + B + C )
E. BIAYA UMUM DAN KEUNTUNGAN
F. HARGA SATUAN PEKERJAAN ( D + E )
Dibulatkan
ANALISA HARGA SATUAN
Priority Civil works Pakacge 1 ( Raight Side )
10 MU
HARGA JUMLAH /
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
1,200,000.00
2,012,500.00
2,500,000.00
5,712,500.00
10 % x D 571,250.00
6,283,750.00
6,283,750.00
HARGA JUMLAH /
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
33,000,000.00
-
-
-
-
33,000,000.00
10 % x D 3,300,000.00
36,300,000.00
36,300,000.00
n Pemasangan Patok
HARGA JUMLAH /
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
3,000.00
10,200.00
2,000.00
15,200.00
10 % x D 1,520.00
16,720.00
16,720.00
HARGA JUMLAH /
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
125,000.00
5,000.00
165,000.00
10 % x D 16,500.00
181,500.00
181,500.00
HARGA JUMLAH /
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
450,000.00
1,500,000.00
50,000.00
2,000,000.00
10 % x D 200,000.00
2,200,000.00
2,200,000.00
pan Nama Pekerjaan
HARGA JUMLAH /
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
75,000.00
250,000.00
25,000.00
350,000.00
10 % x D 35,000.00
385,000.00
385,000.00
an Inspeksi
HARGA JUMLAH /
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
23,800.00
146,750.00
14,200.00
184,750.00
10 % x D 18,475.00
203,225.00
203,220.00
Jalan Masuk
HARGA JUMLAH /
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
9,640.00
5,680.00
1,541,640.00
10 % x D 154,164.00
1,695,804.00
1,695,800.00
HARGA JUMLAH /
SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
150,000.00
-
-
-
150,000.00
10 % x D 15,000.00
165,000.00
165,000.00
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
238,095
#REF! #REF!
#REF! #REF! #REF! #REF!
238,095
#REF! #REF!
#REF! #REF!
#REF! #REF!
238,095
#REF! #REF!
1 2 3 4 5 6 7 8 9 10 11 12
kode
400.00 Ton 5.00 2,000.00 840,000,000 84,000,000 0.33438 126,395.53 8,400.00 134,795.53 -
276 1.40 m3 5.00 2,000.00 1,680,000,000 168,000,000 0.33438 252,791.06 16,800.00 269,591.06 310,500.00
5.00 2,000.00 144,000,000 14,400,000 0.33438 21,667.80 1,440.00 23,107.80 -
5.00 2,000.00 180,000,000 18,000,000 0.33438 27,084.76 1,800.00 28,884.76 -
-
150 50.00 T/Jam 10.00 1,500.00 3,840,000,000 384,000,000 0.23852 549,556.43 51,200.00 600,756.43 168,750.00
47 40.00 Ton 6.00 2,000.00 420,000,000 42,000,000 0.30071 56,833.39 4,200.00 61,033.39 52,875.00
15 800.00 Liter 5.00 2,000.00 102,000,000 10,200,000 0.33438 15,348.03 1,020.00 16,368.03 16,875.00
140 15.00 Ton 5.00 2,000.00 1,200,000,000 120,000,000 0.33438 180,565.04 12,000.00 192,565.04 157,500.00
80 - 5.00 2,000.00 126,000,000 12,600,000 0.33438 18,959.33 1,260.00 20,219.33 90,000.00
15 500.00 Liter 2.00 2,000.00 9,240,000 924,000 0.65455 2,721.60 92.40 2,814.00 16,875.00
100 6.00 Ton 5.00 2,000.00 216,000,000 21,600,000 0.33438 32,501.71 2,160.00 34,661.71 112,500.00
175 20.00 Ton 5.00 2,000.00 504,000,000 50,400,000 0.33438 75,837.32 5,040.00 80,877.32 196,875.00
100 3,000.00 ltr 5.00 2,000.00 210,000,000 21,000,000 0.33438 31,598.88 2,100.00 33,698.88 112,500.00
100 4.00 M3 5.00 2,000.00 180,000,000 18,000,000 0.33438 27,084.76 1,800.00 28,884.76 112,500.00
175 125.00 KVA 5.00 2,000.00 420,000,000 42,000,000 0.33438 63,197.76 4,200.00 67,397.76 196,875.00
125 3.70 m' 5.00 2,000.00 558,000,000 55,800,000 0.33438 83,962.74 5,580.00 89,542.74 140,625.00
90 1.50 M3 5.00 2,000.00 1,014,000,000 101,400,000 0.33438 152,577.46 10,140.00 162,717.46 101,250.00
90 1.50 M3 5.00 2,000.00 1,014,000,000 101,400,000 0.33438 152,577.46 10,140.00 162,717.46 101,250.00
55 8.00 Ton 5.00 2,000.00 912,000,000 91,200,000 0.33438 137,229.43 9,120.00 146,349.43 61,875.00
50 8.00 Ton 5.00 2,000.00 912,000,000 91,200,000 0.33438 137,229.43 9,120.00 146,349.43 56,250.00
60 10.00 Ton 5.00 1,800.00 912,000,000 91,200,000 0.33438 152,477.14 10,133.33 162,610.48 67,500.00
75 10.00 Ton 4.00 2,000.00 921,600,000 92,160,000 0.38629 160,201.82 9,216.00 169,417.82 84,375.00
8 3.00 PK 4.00 1,000.00 9,840,000 984,000 0.38629 3,420.98 196.80 3,617.78 9,000.00
220 50.00 T/Jam 5.00 2,000.00 2,160,000,000 216,000,000 0.33438 325,017.07 21,600.00 346,617.07 247,500.00
6 4.00 " 2.00 2,000.00 5,400,000 540,000 0.65455 1,590.55 54.00 1,644.55 6,750.00
100 4,000.00 Liter 5.00 2,000.00 264,000,000 26,400,000 0.33438 39,724.31 2,640.00 42,364.31 112,500.00
11 0.98 Ton 4.00 2,000.00 150,000,000 15,000,000 0.38629 26,074.52 1,500.00 27,574.52 12,375.00
5 0.17 Ton 4.00 1,000.00 9,000,000 900,000 0.38629 3,128.94 180.00 3,308.94 5,625.00
3 - 4.00 1,000.00 15,000,000 1,500,000 0.38629 5,214.90 300.00 5,514.90 3,375.00
75 - 5.00 2,000.00 180,000,000 18,000,000 0.33438 27,084.76 1,800.00 28,884.76 84,375.00
Harga Solar
harga Bensin
Harga Olie
26 27 28 29 30 31 32 33 34 35 36 37 38 39
BIAYA OPERASI PER JAM KERJA TOTAL
BBM + Olie UPAH TOTAL BIAYA DIBULATKAN
Minyak Perbaikan Operator Pembantu BIAYA SEWA ALAT SEWA ALAT
Pelumas / Supir Operator OPERASI PER PER
/ Supir / JAM JAM KERJA JAM KERJA
Ltr/HP/Jam (Rp.) (Rp.) (Rp.) (Rp.) KET.
1 Orang 1 Orang
0.01 12.50% Per Per
9000
4500
17500
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Dilaksanakan dengan tenaga manusia dengan alat bantu chainsaw
2 Di stokpile untuk selanjutnya dibuang sesuai petunjuk direksi
3 Jam kerja efektif per-hari Tk 8.000 Jam
1 BAHAN
Tidak ada bahan yang diperlukan
2 ALAT
- Chainsaw
Kap. Prod. / jam = 1.00 phn/jam
Koefisien Alat = 1 : Q1' 1.000
- Buldozer D65
Kap. Prod. / jam = 16.00 phn/jam
Koefisien Alat = 1 : Q1' 0.063
3 Alat Bantu
Untuk membawa material ke temporary disposal
a Dumptruk untuk transport ke disposal 0.500 unit
4 Tenaga
Produksi menentukan : Q1' 1.000 phn/jam
Produksi per hari 8.000 phn/hari
Kebutuhan tenaga :
- Pekerja P 12.000 orang
- Mandor M 2.000 orang
Koefisien Tenaga
- Pekerja = (Tk x P) : Qt 1.500 Hari
- Mandor = (Tk x M) : Qt 0.250 Hari
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Dikerjakan secara mekanik
2 Jam kerja efektif per-hari Tk 7.000 jam
3 Faktor bahan galian Fk 1.200 -
4 Material stripping sementara di stok di temporary stokpile menggunakan Excavator
2 ALAT
2.a Excavaator Cap. 0,70 m3
Kapasitas Bucket V 0.700 M3
Faktor Bucket Fb 0.800 -
Faktor Efisiensi alat Fa 0.900 -
Waktu siklus Ts1
- menggali T1 0.167 menit
- Lain-lain T3 0.150 menit
Ts1 0.317 menit
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 79.579 M3/Jam
Ts1 x Fk 397.895 M2/jam
Koefisien Alat = 1 : Q1 - 0.0126 Jam
2.b Bulldozer D 65
Panjang hamparan ( Lh ) 30.00 Meter
Lebar efektif kerja blade (b) 2.40 Meter
Faktor efesiensi alat ( Fa ) 0.80
Kecepatan rata-rata (v) 2.00 Km/Jam
Jumlah lintasan (n) 2.00 Lintasan
Tebal pek stripping (t) 0.20 m'
Waktu siklus ( Ts2 )
a. Perataan 1 kali lintasan ( T1 )
Lh x 60 : ( v x 1000 ) 0.90 Menit
b. Lain-lain ( T2 ) 1.00 Menit
( Tsb ) 1.90 Menit
Kap. Prod. / jam = Lh x b x t x Fa x 60 Q3 181.89 M3/Jam
n x Tsb
Koefisien yg menentukan = 1 : Q1 - 0.0055 Jam
3 TENAGA
Produksi menentukan : Q1 181.895 M3/Jam
Produksi Buangan / hari = Tk x Q2 Qt 1,273.263 M3/Hari
Kebutuhan tenaga :
- Pekerja P 4.000 orang
- Mandor M 0.300 orang
Koefisien Tenaga
- Pekerja = (Tk x P) : Qt 0.0220 Jam
- Mandor = (Tk x M) : Qt 0.0016 Jam
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Material timbunan menggunakan material dari lokasi Borrow area
langsung dihampar dilokasi timbunan
2 Pemadatan dengan Vibro compactor
3 Jam kerja efektif per-hari Tk 7.000 Jam
4 Faktor pengembangan bahan Fk 1.200 -
5 Sesuai spesifikasi tebal hamparan padat t 0.200 M
6 jarak lokasi borrow area ( Rata rata ) L 15.000 km
2 ALAT
2.a Excavator cap. 0,70 m3
Kapasitas Bucket V 0.700 M3
Faktor Bucket Fb 0.800 -
Faktor Efisiensi alat Fa 0.600 -
Waktu siklus Ts1 menit
- menggali T1 0.350 menit
- Lain-lain T3 0.250 menit
Ts1 0.600 menit
2.c Bulldoser D 65
Panjang hamparan ( Lh ) 30.00 Meter
Lebar efektif kerja blade (b) 2.40 Meter
Faktor efesiensi alat ( Fa ) 0.60
Kecepatan rata-rata (v) 3.00 Km/Jam
Jumlah lintasan (n) 2.00 Lintasan
Tebal perataan (t) 0.30 M'
Waktu siklus ( Ts2 )
a. Perataan 1 kali lintasan ( T1 )
Lh x 60 : ( v x 1000 ) 0.60 Menit
b. Lain-lain ( T2 ) 4.00 Menit
( Tsb ) 4.60 Menit
3 TENAGA
Produksi menentukan : Vibrator compactor 10 t. Q1 86.400 M3/Jam
Produksi Lapis tanah / hari = Tk x Q1 Qt 604.800 M3/Hari
Kebutuhan tenaga :
- Pekerja P 24.000 orang
- Mandor M 3.000 orang
Koefisien Tenaga
- Pekerja = (Tk x P) : Qt 0.277778 Jam
- Mandor = (Tk x M) : Qt 0.034722 Jam
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Perapian pada sloop tanggul dengan Excavator stanndart
2 untuk persiapan pekerjaan gebalan rumput
3 Jam kerja efektif per-hari Tk 8.000 Jam
4 Faktor pengembangan bahan Fk 1.000 -
1 BAHAN
1.a Tanah merah M3
2 ALAT
2.a Excavator cap. 0,70 m3
Kapasitas Bucket V 0.700 M3
Faktor Bucket Fb 1.000 -
Faktor Efisiensi alat Fa 0.800 -
Waktu siklus Ts1 menit
- slooping T1 0.150 menit
- Lain-lain T3 0.150 menit
Ts1 0.300 menit
3 TENAGA
Produksi menentukan : Excavator Q1 112.000 M2/Jam
Produksi slooping tanah / hari = Tk x Q1 Qt 896.000 M2/Hari
Kebutuhan tenaga : termasuk perapian
- Pekerja P 20.000 orang
- Mandor M 1.000 orang
Koefisien Tenaga
- Pekerja = (Tk x P) : Qt 0.1786 Jam
- Mandor = (Tk x M) : Qt 0.0089 Jam
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Menggunakan peralatan excavator standard
2 ALAT
2.a Excavator
Kapasitas Bucket V 0.700 M3
Faktor Bucket Fb 0.800 -
Faktor Efisiensi alat Fa 0.600 -
Waktu siklus Ts1 menit
- menggali T1 0.400 menit
- Lain-lain T3 0.600 menit
Ts1 1.000 menit
Kap. Prod. / jam = V x Fb x Fa x 60 Q1 18.327 M3/jam
Ts1 x Fk
Koefisien Alat = 2 : Q1 kf 0.109 Jam
( 2 x Double Handling ) 146.618 M3/hari
3 Tenaga
Produksi menentukan Q1' 18.327 M3/Jam
Produksi Galian / hari = Tk x Q1' Qt 146.618 M3/Hari
Kebutuhan tenaga :
- Pekerja P 5.000 orang
- Mandor M 1.000 orang
Koefisien Tenaga
- Pekerja = P / Q1' 0.2728 Jam
- Mandor = M / Q1' 0.0546 Jam
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 jam kerja efektif per-hari Tk 7.000 jam
5 Perbandingan Pasir & Semen : - Volume Semen Sm 20.000 %
: - Volume Pasir Ps 80.000 %
6 Perbandingan Batu & Mortar :
- Batu Bt 65.000 %
- Mortar (campuran semen & pasir) Mr 35.000 %
7 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.400 ton/m3
- Batu D2 1.600 ton/m3
- Adukan (mortar) D3 1.800 ton/m3
- Pasir D4 1.800 ton/m3
- Semen Portland D5 1.440 ton/m3
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 m3) : D2} x 1.20 (M02) 1.170 m3 Lepas
1.b. Semen ----> Sm x {(Mr x D1 x 1 m3} : D3} x 1.0 (M12) 0.093 m3
x {D5 x (1000)} (M12) 134.000 Kg
1.c. Pasir -----> Ps x {(Mr x D1 x 1 m3) : D4} x 1.05 (M01) 0.392 m3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 350.000 Liter
Faktor Efisiensi Alat Fa 0.750 -
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1 5.000 menit
- Mengaduk T2 4.000 menit
- Menuang T3 1.000 menit
- Tunggu, dll. T4 2.000 menit
Ts1 12.000 menit
3. TENAGA
Produksi Pas. Batu yang menentukan ( Prod. C. Mixer ) Q1 1.313 m3/jam
Produksi Pasangan Batu dalam 1 hari = Tk x Q1 Qt 9.188 m3
Koefisien tenaga
- Mandor = (Tk x M) : Qt (L03) 0.762 jam
- Tukang = (Tk x Tb) : Qt (L02) 3.048 jam
- Pekerja = (Tk x P) : Qt (L01) 6.095 jam
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 jam kerja efektif per-hari Tk 7.000 jam
5 Perbandingan Pasir & Semen : - Volume Semen Sm 25.000 %
: - Volume Pasir Ps 75.000 %
6 Perbandingan Batu & Mortar :
- Batu Bt - %
- Mortar (campuran semen & pasir) Mr 100.000 %
7 Berat Jenis Bahan :
- Berat jenis Mortar terpasang D1 2.000 ton/m3
- Adukan (mortar) D3 1.800 ton/m3
- Pasir D4 1.800 ton/m3
- Semen Portland D5 1.440 ton/m3
1. BAHAN
1.b. Semen ----> Sm x {(Mr x D1 x 1 m3} : D3} x 1.0 (M12) 0.292 m3
x {D5 x (1000)} (M12) 420.000 Kg
1 m3 adukan mortar = 1/( ,025x1,2 ) 33.33 m2 12.600 Kg
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.000 Liter
Faktor Efisiensi Alat Fa 0.750 -
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1 5.000 menit
- Mengaduk T2 5.000 menit
- Menuang T3 1.000 menit
- Tunggu, dll. T4 2.000 menit
Ts1 13.000 menit
3. TENAGA
Produksi Pas. Batu yang menentukan ( Prod. C. Mixer ) Q1 1.731 m3/jam
Produhsi Plesteran per jam Qt 57.693 m2
Koefisien tenaga
- Mandor = (Tk x M) : Qt (L03) 0.121 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.243 jam
- Pekerja = (Tk x P) : Qt (L01) 1.213 jam
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Dewatering menggunakan alat Pompa air
2 Kisdam dari Sand bag Lm 30.000 m'/m'
3 Bracing menggunakan Dolken
4 Jam kerja efektif per-hari Tk 8.000 Jam
2. ALAT
2.a. Water pump cap. 4 "
Waktu Pelaksanaan per 50 bh TP 7.000 jam
Waktu Pelaksanaan per bh TP 0.140 jam
1.120 jam
3. TENAGA
Produksi Pemasangan dan Pembongkaran 30.000 bh
Kebutuhan tenaga :
, - Mandor P 1.000 orang
- Tukang 2.000 orang
- Pekerja M 10.000 orang
Koefisien Tenaga
, - Mandor ( Tk x M) xTP 0.033 Jam
- Tukang ( Tk x T ) x TP 0.067 Jam
- Pekerja ( Tk x P ) x TP 0.333 jam
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Jam kerja efektif per-hari Tk 8.000 jam
3 Faktor pengembangan bahan Fk 1.000 -
1 BAHAN
1.a Pengadaan SP Type FPC320 C500 1.000 m1
b Tiang Pancang Beton 350 x 350 mm Type B 1.000 m1
2 ALAT
2.a Crawler crane 25 ton
Kapasitas Angkat V 25.000 Ton
Faktor Efisiensi alat Fa 0.600 -
Panjang Material rata rata L 10.000 m1
Waktu siklus Ts1 menit
- Mengangkat T1 7.500 menit
- menurunkan T1' 7.500 menit
- Lain-lain T2 3.000 menit
Ts1 18.000 menit
3 TENAGA
Produksi menentukan : Crawler crane 25 ton Q1 20.000 M'/Jam
Produksi / hari = Tk x Q1 Qt 160.000 M'/Hari
Kebutuhan tenaga :
- Pekerja P 4.000 orang
- Mandor M 1.000 orang
Koefisien Tenaga
- Pekerja = (Tk x P) : Qt 0.200 Jam
- Mandor = (Tk x M) : Qt 0.050 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Jam kerja efektif per-hari Tk 8.000 jam
3 Faktor pengembangan bahan Fk 1.000 -
1 BAHAN
1.a Pengadaan mini pile beton ? 28 cm, L = 6 m' (termasuk tulangan) 1.000 m1
2 ALAT
2.a Crawler crane 25 ton
Kapasitas Angkat V 25.000 Ton
Faktor Efisiensi alat Fa 0.600 -
Panjang Material rata rata L 6.000 m1
Waktu siklus Ts1 menit
- Mengangkat T1 4.000 menit
- menurunkan T1' 4.000 menit
- Lain-lain T2 2.000 menit
Ts1 10.000 menit
3 TENAGA
Produksi menentukan : Crawler crane 25 ton Q1 21.600 M'/Jam
Produksi / hari = Tk x Q1 Qt 172.800 M'/Hari
Kebutuhan tenaga :
- Pekerja P 4.000 orang
- Mandor M 1.000 orang
Koefisien Tenaga
- Pekerja = (Tk x P) : Qt 0.185 Jam
- Mandor = (Tk x M) : Qt 0.046 Jam
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Jam kerja efektif per-hari Tk 8.000 jam
3 Faktor pengembangan bahan Fk 1.000 -
1 BAHAN
Tidak ada bahan yang diperlukan
2 ALAT
2.a Crawler piling crane dng Diesel hammer cap. 3,50 ton
Kapasitas Pukulan V 3.500 Ton
Faktor efisiensi alat Fa 0.800 -
Panjang Tiangpancang terangkat Rata rata L 10.000 m1
Faktor pemancangan Fp 0.700 Kedalaman terpancang
Waktu siklus : Ts2
- Angkat tiang Pancang T1 10.000 menit
- Setting Tiang Pancang T2 15.000 menit
- Pek Pemancangan T3 30.000 menit
- Lain-lain T4 15.000 menit
Ts2 70.000 menit
3 TENAGA
Produksi menentukan : Crawler piling crane dng Diesel ha Q2 4.800 M'/Jam
Produksi / hari = Tk x Q2 Qt 38.400 M'/Hari
Kebutuhan tenaga :
- Pekerja P 2.000 orang
- Mandor M 1.000 orang
Koefisien Tenaga
- Pekerja = (Tk x P) : Qt 0.417 Jam
- Mandor = (Tk x M) : Qt 0.208 Jam
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Jam kerja efektif per-hari Tk 8.000 jam
3 Faktor Fk 1.000 -
1 BAHAN
Tidak ada bahan yang diperlukan
2 ALAT
2.a Crawler piling crane dng Diesel hammer cap. 3,50 ton
Kapasitas Pukulan V 3.500 Ton
Faktor efisiensi alat Fa 0.800 -
Panjang Tiangpancang terangkat Rata rata L 10.000 m1
Faktor pemancangan Fp 0.700 Kedalaman terpancang
Waktu siklus : Ts2
- Angkat tiang Pancang T1 5.000 menit
- Setting Tiang Pancang T2 5.000 menit
- Pek Pemancangan T3 15.000 menit
- Lain-lain T4 15.000 menit
Ts2 40.000 menit
3 TENAGA
Produksi menentukan : Crawler piling crane dng Diesel ha Q2 8.400 M'/Jam
Produksi / hari = Tk x Q2 Qt 67.200 M'/Hari
Kebutuhan tenaga :
- Pekerja P 2.000 orang
- Mandor M 1.000 orang
Koefisien Tenaga
- Pekerja = (Tk x P) : Qt 0.238 Jam
- Mandor = (Tk x M) : Qt 0.119 Jam
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Mengunakan concrete mixer 350 ltr
3 Jam kerja efektif per-hari Tk 8.000 jam
1 BAHAN
1.a Beton readymix K 225 1.020 m3
2 ALAT
2.a Concrete vibrator
Kebutuhan Alat Penggetar Beton ini disesuaikan dengan
kapasitas produksi Alat Pencampur (Concrete Mixer)
3 TENAGA
Produksi menentukan : Q1 1.500 M'/Jam
Produksi Beton per hari = Tk x Q1 Qt 12.000 M3
Kebutuhan tenaga : - Mandor M 1.000 orang
- Tukang Tb 4.000 orang
- Pekerja P 10.000 orang
Koefisien Tenaga
- Mandor = (Tk x M) : Qt 0.667 Hari
- Tukang = (Tk x Tb) : Qt 2.667 Hari
- Pekerja = (Tk x P) : Qt 6.667 Hari
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Mengunakan concrete mixer 350 ltr
3 Jam kerja efektif per-hari Tk 8.000 jam
1 BAHAN
1.a Beton readymix K 350 1.020 m3
2 ALAT
2.a Concrete vibrator
Kebutuhan Alat Penggetar Beton ini disesuaikan dengan
kapasitas produksi Alat Pencampur (Concrete Mixer)
3 TENAGA
Produksi menentukan : Q1 1.500 M'/Jam
Produksi Beton per hari = Tk x Q1 Qt 12.000 M3
Kebutuhan tenaga : - Mandor M 1.000 orang
- Tukang Tb 4.000 orang
- Pekerja P 10.000 orang
Koefisien Tenaga
- Mandor = (Tk x M) : Qt 0.667 Hari
- Tukang = (Tk x Tb) : Qt 2.667 Hari
- Pekerja = (Tk x P) : Qt 6.667 Hari
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Jam kerja efektif per-hari Tk 8.000 jam
3 Faktor Kehilangan Besi Tulangan Fh 1.100 -
1 BAHAN
1.a Besi Beton 1.050 Kg
1.b Kawat Bendrat 0.030 Kg
2 ALAT
2.a Cutter machine
Diperlukan :
- Gunting Potong Baja 2 unit bc 0.003 jam
3 TENAGA
Produksi kerja satu hari Qt 400.000 Kg/Hari
dibutuhkan tenaga : - Mandor M 1.000 orang
- Tukang Tb 2.000 orang
- Pekerja P 5.000 orang
Koefisien Tenaga
- Mandor = (Tk x M) : Qt 0.020 Hari
- Tukang = (Tk x Tb) : Qt 0.040 Hari
- Pekerja = (Tk x P) : Qt 0.100 Hari
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Mengunakan concrete mixer 350 ltr
3 Jam kerja efektif per-hari Tk 8.000 jam
1 BAHAN
1.a Semen 250.000 kg
Pasir cor 0.650 m3
Batu split 1/2 0.800 m3
2 ALAT
2.a Concrete mixer 300 ltr
Equipment Capacity V 300.00 litre
Equipment Efficiency Factor Fa 0.80 -
Cycle Time : Ts
- Load T1 5.00 minute
- Mixing T2 5.00 minute
- Unloading T3 2.00 minute
- Waiting, etc T4 5.00 minute
Ts 17.00 minute
Cap. Prod. / hours = V x Fa x 60 Q1 0.85 m3/jam
1000 x Ts
Koefisien Alat = 1 : Q1 - 1.181 jam
3 TENAGA
Produksi menentukan : Concrete mixer 300 ltr Q1 0.847 M'/Jam
Produksi Beton per hari = Tk x Q1 Qt 6.776 M3
Kebutuhan tenaga : - Mandor M 1.000 orang
- Tukang Tb 4.000 orang
- Pekerja P 8.000 orang
Koefisien Tenaga
- Mandor = (Tk x M) : Qt 1.181 Hari
- Tukang = (Tk x Tb) : Qt 4.722 Hari
- Pekerja = (Tk x P) : Qt 9.444 Hari
ANALISA TEKNIK
Ciujung Priority Civil Works Package 1 ( Right Side ) Kab. Serang
I. ASUMSI
1 Pekerjaan dilakukan secara tenaga manual
2 Lokasi pekerjaan pada bangunan dan saluran
3 Jam kerja efektif per-hari Tk 8.000 Jam
4 Faktor bahan Fk 1.050 -
3 TENAGA
Produksi kerja satu hari Qt 15.000 m2/Hari
1.875 m2/jam
dibutuhkan tenaga : - Mandor M 1.000 orang
- Tukang Tb 2.000 orang
- Pekerja P 6.000 orang
Koefisien Tenaga
- Mandor = (Tk x M) : Qt 0.533 jam
- Tukang = (Tk x Tb) : Qt 1.067 jam
- Pekerja = (Tk x P) : Qt 3.200 jam
ANALISA HARGA PERALATAN
Ciujung Priority Civil works Pakacge 1 ( Raight Side )
A. URAIAN PERALATAN
1. Daya (KW) Pw 155.0 HP
2. Kapasitas Cp 0.70 m3
3. Umur Rencana A 8.0 Tahun
4. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
5. Harga Alat B 1,200,000,000.0 Rupiah
Rupiah
B. BIAYA KEPEMILIKAN (OWNING COST)
1. Nilai Sisa Alat = (10% X B) C 120,000,000.00 Rupiah
A. URAIAN PERALATAN
1. Daya (KW) Pw 185.0 HP
2. Kapasitas Cp 15.0 Ton
3. Umur Rencana A 8.0 Tahun
4. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
5. Harga Alat B 1,440,000,000.0 Rupiah
Rupiah
B. BIAYA KEPEMILIKAN (OWNING COST)
1. Nilai Sisa Alat = (10% X B) C 144,000,000.00 Rupiah
A. URAIAN PERALATAN
1. Daya (KW) Pw 125.0 HP
2. Kapasitas Cp 3.7 m'
3. Umur Rencana A 5.0 Tahun
4. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
5. Harga Alat B 558,000,000.0 Rupiah
Rupiah
B. BIAYA KEPEMILIKAN (OWNING COST)
1. Nilai Sisa Alat = (10% X B) C 55,800,000.00 Rupiah
A. URAIAN PERALATAN
1. Daya (KW) Pw 75.0 HP
2. Kapasitas Cp 10.00 Ton
3. Umur Rencana A 4.0 Tahun
4. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
5. Harga Alat B 921,600,000.0 Rupiah
Rupiah
B. BIAYA KEPEMILIKAN (OWNING COST)
1. Nilai Sisa Alat = (10% X B) C 92,160,000.00 Rupiah
A. URAIAN PERALATAN
1. Daya (KW) Pw 125.0 HP
2. Kapasitas Cp 11.00 Ton
3. Umur Rencana A 5.0 Tahun
4. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
5. Harga Alat B 390,000,000.0 Rupiah
Rupiah
B. BIAYA KEPEMILIKAN (OWNING COST)
1. Nilai Sisa Alat = (10% X B) C 39,000,000.00 Rupiah
A. URAIAN PERALATAN
1. Daya (KW) Pw 125.0 HP
2. Kapasitas Cp 25.00 Ton
3. Umur Rencana A 5.0 Tahun
4. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
5. Harga Alat B 840,000,000 Rupiah
Rupiah
B. BIAYA KEPEMILIKAN (OWNING COST)
1. Nilai Sisa Alat = (10% X B) C 84,000,000 Rupiah
A. URAIAN PERALATAN
1. Daya (KW) Pw 100.0 HP
2. Kapasitas Cp 7.00 Ton
3. Umur Rencana A 5.0 Tahun
4. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
5. Harga Alat B 600,000,000.0 Rupiah
Rupiah
B. BIAYA KEPEMILIKAN (OWNING COST)
1. Nilai Sisa Alat = (10% X B) C 60,000,000.00 Rupiah
A. URAIAN PERALATAN
1. Daya (KW) Pw 100.0 HP
2. Kapasitas Cp 35.00 Ton
3. Umur Rencana A 5.0 Tahun
4. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
5. Harga Alat B 1,140,000,000.0 Rupiah
Rupiah
B. BIAYA KEPEMILIKAN (OWNING COST)
1. Nilai Sisa Alat = (10% X B) C 114,000,000.00 Rupiah
A. URAIAN PERALATAN
1. Daya (KW) Pw HP
2. Kapasitas Cp 8.00 Ton
3. Umur Rencana A 5.0 Tahun
4. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
5. Harga Alat B 912,000,000.0 Rupiah
Rupiah
B. BIAYA KEPEMILIKAN (OWNING COST)
1. Nilai Sisa Alat = (10% X B) C 91,200,000.00 Rupiah
A. URAIAN PERALATAN
1. Daya (KW) Pw 276.0 HP
2. Kapasitas Cp 1.40 m3
3. Umur Rencana A 5.0 Tahun
4. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
5. Harga Alat B 1,680,000,000.0 Rupiah
Rupiah
B. BIAYA KEPEMILIKAN (OWNING COST)
1. Nilai Sisa Alat = (10% X B) C 168,000,000.00 Rupiah
Note :
Harga belum termasuk PPN
MU 1 1.300 Upah
MU 2 1.200 Material
MU 2a 1.200 Material utama
MU 3 1.200 alat bantu
MU 4 1.200 sub con
MU 5 1.000 BQ
MU 6 1.200 An. Alat
MU 7 10.000 Harga satuan ( Biaya umum dan Keuntungan )
MU Mob 1.200
MU Jembt 1.000
OE Rp 315,000,000,000.00
Target penawaran Rp 312,136,000,000.00
99.091
Realisasi Penawaran Rp #REF!
Rp #REF!
% #REF!
Hrg sewa Fuel hrg Fuel Biaya fuel
per jam per jam
Rp. ltr Rp. Rp.
Excavator PC 200 150,000.00 20 9,000.00 180,000.00
Buldozer D65 175,000.00 25 9,000.00 225,000.00
Vibro roller 10 ton 150,000.00 12 9,000.00 108,000.00
Dumptruck 8 m3 90,000.00 10 9,000.00 90,000.00
Floating Excavator 1.40 m3 350,000.00 25 9,000.00 225,000.00
Operator Total
Rp.
20,000.00 350,000.00 444,900.00 78.66936
20,000.00 420,000.00 529,400.00 79.3351
20,000.00 278,000.00 340,100.00 81.74066
17,500.00 197,500.00 265,100.00 74.50019
17,500.00 592,500.00 Err:509 Err:509