TABLE OF CONTENTS
1. GENERAL ........................................................................................................................................................ 4
4. APPENDIX ....................................................................................................................................................... 8
³7KLVGRFXPHQWLVWKHSURSHUW\RI7(31*,WPXVWQRWEHUHSURGXFHGRUWUDQVPLWWHGWRRWKHUVZLWKRXWZULWWHQDXWKRUL]DWLRQIURm the
&RPSDQ\´
Document Identification Number
1. GENERAL
1.1 DEFINITION
COMPANY: means TEPNG ± Total E&P Nigeria Ltd and, on behalf, OFON
PHASE 2 PROJECT.
CONTRACTOR: means PNL ± Ponticelli Nigeria Ltd and Ponticelli Upstream that
have been awarded the CONTRACT by COMPANY.
CONTRACT: means the document linking COMPANY and CONTRACTOR within the
framework of OFON 2 Project.
WORKSITE: Means the site where the construction part of the work will be held
1.3 PURPOSE
The purpose of this procedure is to define the system to be used to ensure the control of non
conform items.
This procedure applies to PONTICELLI Limited designated areas and personnel involved in
OFON 2 project.
- to welding repairs,
³7KLVGRFXPHQWLVWKHSURSHUW\RI7(31*,WPXVWQRWEHUHSURGXFHGRUWUDQVPLWWHGWRRWKHUVZLWKRXWZULWWHQDXWKRUL]DWLRQIURm the
&RPSDQ\´
Document Identification Number
- to the free issued material (COMPANY material) for which reports are established.
2. RESPONSIBILITIES
Any member of the team when discovering that a non conformance has taken place will be
responsible for reporting the non conformance to the appropriate Hierarchical Manager:
Hook up Manager, Onshore Manager or Technical Manager and Quality Manager.
- take the necessary and sufficient steps to isolate the non conforming item,
- shall propose a solution to solve the nonconforming item (repair, acceptance with non
conformance, declassification, reject) and get COMPANY to approve them,
- shall implement remedial action in accordance with the remedial action, validated by
Company, described in the non conformance report.
1RUHSDLUVKDOOEHFDUULHGRXWZLWKRXW&203$1<¶VDSSURYDO5HSDLUVVKDOOEHZLWQHVVHGE\
COMPANY.
In each location, the Local QA/QC Manager is responsible for following up all local non
conformances and to inform the Project QA/QC Manager.
For each non conformance, the Local QA/QC Manager is responsible for:
- Establishing, numbering and recording the required non conformance report (see
Appendices 1).
The non conformance reports are numbered chronologically from 001 to 999.
³7KLVGRFXPHQWLVWKHSURSHUW\RI7(31*,WPXVWQRWEHUHSURGXFHGRUWUDQVPLWWHGWRRWKHUVZLWKRXWZULWWHQDXWKRUL]DWLRQIURm the
&RPSDQ\´
Document Identification Number
- Issuing if necessary (see a and b) to the Customer Quality Manager for review decision, the
non conformance report.
a) Internal treatment
Costuction shall implement the corrective action specified by appropriate Hierarchical Manager
Any non conformance of products that leads to scrap, or compliance of products with
relation to procedure requirements is handled internally.
b) External treatment
Vendors / Subcontractors is in charge of the treatment and the following of the NCR related to
this activities.
When COMPANY identify a Non Conforming situation they will instruct the contractor to
issue an NCR.
Any Non Conformances Raised giving rise to the acceptance condition or repair of an external
manufactured product, will require a special procedure which will incorporate (The Supplier
documentation and a specific procedure). This will be submitted to COMPANY prior to any
agreements/decisions being made. See Deviation procedure NG-018-XX-PNL-024014
³7KLVGRFXPHQWLVWKHSURSHUW\RI7(31*,WPXVWQRWEHUHSURGXFHGRUWUDQVPLWWHGWRRWKHUVZLWKRXWZULWWHQDXWKRUL]DWLRQIURm the
&RPSDQ\´
Document Identification Number
The Hierarchical Manager concerned confirms that the required actions have been put into
effect (div. 5).
The local QA/QC confirms that these action have been put into effect (div. 6), and request
COMPANY signature on closed NCR.
The concerned Hierarchical Manager confirms the effectiveness of the required actions
(div. 5).
2.5 The COMPANY representative signs off this action (div. 6).Clarifications concerning
stage 4 "Final decision"
It is necessary to favour a solution that has the approval of the interveners. However:
- In the case of persistent disagreement the final decision belongs to the Hierarchical
Manager concerned;
- in the case of proceeding with derogation the final decision obligatory rests with the Project
QA/QC Manager or the local QA/QC and agreement by COMPANY. (Par 2.3b)
3. RECORDS
All non conformance reports will be included in the final as built construction documentation.
A non conformance register shall be prepared and updated each time a non conformance report is
issued.
- The purpose,
³7KLVGRFXPHQWLVWKHSURSHUW\RI7(31*,WPXVWQRWEHUHSURGXFHGRUWUDQVPLWWHGWRRWKHUVZLWKRXWZULWWHQDXWKRUL]DWLRQIURm the
&RPSDQ\´
Document Identification Number
4. APPENDIX
APPENDIX 1 :
³7KLVGRFXPHQWLVWKHSURSHUW\RI7(31*,WPXVWQRWEHUHSURGXFHGRUWUDQVPLWWHGWRRWKHUVZLWKRXWZULWWHQDXWKRUL]DWLRQIURm the
&RPSDQ\´
NON-CONFORMANCE REPORT
N°: .................................................
REPORT Sender
Visa :
Addressee: .....................................
SOLUTION PROPOSAL
Solution proposed by :
Name : «««««««««««
Date : ««««««««««««
Visa :.
Addressee: .....................................
Addressee: .....................................
Decision taken by :
4- DECISION (by the supervisor of the activities concerned by N.C.R.) Name : ................................
Solution proposed under-taken
Date : ......... / ......... / .........
Another proposal attached to NCR
Visa :
Addressee: .....................................
Visa :
Addressee: .....................................
Noted by :
6- &/,(17¶6(;(&87,215(3257
Name : ................................
The solution has been carried out YES NO
Date : ......... / ......... / .........